Professional Documents
Culture Documents
Section
Quantity
[mm]
[nos]
Weight
Working Drawing
Assembly Details
kg / pc total kg
6 holes 14
Angle
40/40/5
1430
2625
185
715
4.21
925
175
Section A
8.42B
3
4
1430
19
1 hole 19
Flat
100/6
-156
4 holes 14
23 30
23
80
0.50
21
54
21
54
4
5
1a
1.00B
4 holes 15
4
4
Flat
75/6
-100
2
23
Hex Nut
M 12
54
Plain Rod
8 -1430
0.37
0.74B
0.015
0.18C
23
to be welded
to part 1a
4.2
before welding
Ri
IS 1363
Plain
Washer
13
Ri=25
0.56
1.12B
Ri=21
55
0.19
B
nuts to be welded
centered to holes
welding
this side
Section B
4
225
0.07C
16.8
0.005
0.09C
33
1c
1d
1e
threads to be cleaned after
145
obtain alignment
of holes
min. 40*
0.08
12.6
1.01C
B = 13.46 kg
C = 1.35 kg
Transportation Weight
B + C + 0.35 kg
For Delivery:
- The suspenders shall be folded together with the
crossbeam and to be bound with a binding wire
- Fit one hex nut and one washer to each J - hook.
All steelparts must be hot dip galvanized according to IS 2629 & 2633, min thickness = 80 m
*Required Nos of
Crossbeams
per bridge:
= Span in [m]
Span:
Steel Drawing:
Nepal
225
A = 15.16 kg
Produced by
105
65
thread M12
0.015
70
before welding
0.80B
4.2
IS 1363
1f
1a
Hex Bolt
M 12x70
rod to be inserted
1b
50
120
Hex Nut
M 12
1d
180
1150
Rod
(J - Hook)
12 - 209
21
14
19
2 holes 17
12
70
Walkway cables
insert to part 1b
485
Flat
75/6
-150
IS 1363
100
1d
1.38B
150
0.69
Swiss Association for International Cooperation, in partnership with His Majestys Government of Nepal, funded and supported by the Swiss Government (SDC Nepal).