This document outlines the tasks and timeline for a student project to develop a side window wiper. It instructs the student to list the tasks to be completed under project stage 3, indicate the number of days needed for each task by shading boxes in the "DAYS" column, and submit a softcopy of the project planner for grading. The student has listed 4 tasks including creating a product prototype, powerpoint slides using Microsoft Powerpoint, sketching the product, and updating a blog on progress.
This document outlines the tasks and timeline for a student project to develop a side window wiper. It instructs the student to list the tasks to be completed under project stage 3, indicate the number of days needed for each task by shading boxes in the "DAYS" column, and submit a softcopy of the project planner for grading. The student has listed 4 tasks including creating a product prototype, powerpoint slides using Microsoft Powerpoint, sketching the product, and updating a blog on progress.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
This document outlines the tasks and timeline for a student project to develop a side window wiper. It instructs the student to list the tasks to be completed under project stage 3, indicate the number of days needed for each task by shading boxes in the "DAYS" column, and submit a softcopy of the project planner for grading. The student has listed 4 tasks including creating a product prototype, powerpoint slides using Microsoft Powerpoint, sketching the product, and updating a blog on progress.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
Class: _1R7_ Project Title: _______Side window wiper_______ Group Name: ______CARE______
Project Stage 3: Completing the Product
(1) Write down the tasks allocated and to be completed by you. (2) Shade the appropriate boxes in the “DAYS” column to show how much time you need to complete the tasks. (3) Submit a *softcopy of your project planner to your Project Work Facilitators for grading. Note: Please make use of the table on Page 2 if you require more than 10 days to complete your tasks.