STEP I: AND PUT TWO SECTIONSOF SUPPORTPIPESCONNECTED TOGETHER AS SHOWN IN FIGURE I.

ATTACH A CAP AI THE END OF THE PIPES.

-E-= ( F I G U R E1

ts
FIGURE 2

F
F FtcuRE3

STEP2: USING THE STEELJIG(SEEAI A\D A]). THE SUPPORTPOLESSHOULDREACH THE BASE OF THE
TRAMPOLINE LEGS. ONCE THE ASSEMBLY TIAS BEEN COMPLETED PROPERLY.THE SUPPORTPOLES
SHOULD LOOK LIKE FIGURE 4.

FIGURE4

A1 A2
A1: Fixing supportpipes onto trampoline legs A2z Hooking the topperjig use a plastic
with two specialjigs, two spacerand firm hook sewn on safety net to firm the
them use screw set (2 jigs for a standpipe). safefy equipment.

The Screw Set must be on the inside, underneaththe trarnpoline. IMPORIANT - Do not attach the Upper Steel Jig
to the "T" piece on the Frame. The Steel Jig must be located on the leg only.