Contract : BS22 A&B CSB Section : Installation Activity Check List

Date: 15/09/2010

S.No TASK CS KM JLNS JGPA LJPN MLCD KHCY NP KJMD GDPI OK JLAA STVR METE TKBD BAPU

1 Cable Layout
Power Cable Y Y Y Y Y N N Y Y Y Y Y Y Y Y N
Data Cable Y Y Y Y Y N N Y Y Y Y Y Y Y Y N
2 EC / Rack Installation
Electrical Cabinet and Isolator Y Y Y Y Y N N Y Y Y N N N N N N
Switch & Router Rack Y Y Y Y Y N N Y Y Y N N N N N N
3 Cable Termination
Main UPS Power Termination Y Y Y Y N N N Y Y P N N N N N N
4 Gate Installation Work
Gate Shifting Y Y Y Y Y N N Y Y Y Y Y Y Y Y Y
1 array is installed
Gate Erection / Fixing Y Y Y Y Y N N Y Y Y P Y Y Y P N completely.Due to pow
Software Installation Y Y Y Y N N N N N N N N N N N N problem at station anot
Internal Gate Operational Test N N N N N N N N N N N N N N N N array was not installed.
5 TOM Installation Work
TOM Configuration Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
TOM Shifting N N N N N N N Y Y Y Y N N N N N 1 array is installed.On
side due to Tap off box
Internal Operational Test N N N N N N N N N N N N N N N N cutting problem gates
6 SC Installation Work not installed
SC Configuration Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
SC Shifting N N N N N N N Y Y Y Y N N N N N
Internal Operational Test N N N N N N N N N N N N N N N N
7 Network Equipment Installation
Equipment Configuration Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
8 TR Installation
TR Configuration N N N N N N N N N N N N N N N N
9 Earth Strip Installation
Earth Strip Laying & Connectivity N P Y Y Y N N N N N N Y Y N N N
10 Room Handover
TOM Room N N N N Y N N Y Y Y Y Y N Y N N
EFO Room N N N N N N N Y N N Y Y Y Y N N

Y - indicates activity completed


P - indicates activity in progress
N - indicates activity not started yet