You are on page 1of 1

TR.1 & TR.

2 CASE
HV. PANEL CASE
(TR.1 NEUTRAL)
(TR.2 FUTURE)

GEN. NEUTRAL
REINFORCING

MDP NEUTRAL
MDP NEUTRAL
GEN. CASE
3PH 3W 11KV.

MDP CASE
F-A
12KV XLPE/PVC 50-3C(BY KENYAN SIDE)
FEP(100)x2(BY JAPANESE SIDE)
BY KENYAN SIDE

BAR
H.V. PANEL BOARD

LBS
BY JAPANESE SIDE

35

95
95

95

95
35

95
35
DS 3P 12KV 100A

INTERLOCK
27
LAx3
F PT F TT VS
V 15KV
LBS
12KV 20KA/15KV
630AF/100A

95

95
120

120
LBS PANEL DIESEL ENGINE GENERATOR
AS STAND-BY 500KVA
TT
INCOMING 51 55 PF W WH A 30A 3φ4W 415/240V 50Hz
CTx3 EC EP E3 E2-2 E2-1 E1
E2-1
TT
51G ET-01

G E
1,100 1,800 CONTROL
PANEL

BATTERY
E1
LEGEND

INTERLOCK
Fx3 VS
V NO. SYMBOL DESCRIPTION
600V
VTx3
AS
A 1 LDS LOAD DISCONNECTING SWITCH
CTx3 1000A

CHARGER
2,250

HZ 2 LA LIGHTNING ARRESTER
45∼65HZ

TO EARTH MCCB 3P + N 3
GAS CIRCUIT BREAKER 12KV 630A
TERMINAL BOX 800AT/800AT GCB
F-B SF6 MANUAL OPERATION
ET-01 12KV XLPE/SWA/PVC 70-3C E
OIL-EMMERSED 4 GROUNDING
F CLASS E3 F-F
E1 (XLPE/PVC 240-1Cx2)x4 + E
TRANSFORMER
3φ 4W 5 CT CURRENT TRANSFORMER
FRONT SIDE 11KV/380V-220V
1500KVA 6 PT POTENTIAL TRANSFORMER
ELEVATION ELEVATION E2-1 27 x3
DIAL TYPE
THERMOMETER F
49 ATS 4P 7 FUSE
HV PANEL 800A
TT
F-C 8 TEST TERMINAL
(XLPE/PVC 300-1Cx4)x4 + E
MAIN DISTRIBUTION PANEL (MDP) AUTOMATIC
9 MOLDED CASE CIRCUIT BREAKER, 3P
TRANSFER
UNIT FOR KPLC *A
SWITCH
10
AUTOMAIC TRANSFER SWITCH
F
KWH. F-D F-E
(XLPE/PVC 240-1Cx2)x4 + E (XLPE/PVC 240-1Cx2)x4 + E
BY POWER CAMPANY 11 SC STATIC CAPACITOR

*B 12 SR SERIES REACTOR
MDP
B Y R
13 WH WATT-HOUR METER
F 5Ax3
ON ON V
VS 14 W WATT METER
OFF MCCB 3P+N OFF MCCB 3P+N
FAULT 2500AF/2500AT FAULT 800AF/800AT
15 PF POWER FACTOR METER
W A
AS
R Y B 16 A AMPARE METER

17 V VOLT METER
Fx3 TT
AS
18 AMPARE METER CHANGE OVER SWITCH
TT MULTI
55 VS
CTx3 METER 19 VOLT METER CHANGE OVER SWITCH
PVC/PVC 1.5-3C
20 51 OVER CURRENT RELAY
1,420

850

21 51G GROUND FAULT RELAY


MCCB 3P MCCB 3P MCCB 3P
250AT 250AT 250AT
*D 22 27 UNDER VOLTAGE RELAY
250AF 250AF 250AF

225

225

225
225
800

1250

800

100

100

100

100
100

100

100

100
100
100

100
100

100

100
100

100

100

100

100
AF

23 55 POWER FACTOR CONTROLLER


MC MC MC
250A 250A 250A
24 49
MCCB

AND TRIP CONTACTOR

800

200
200

200

200
800

100

100

100

100

100
75

50

100

100

100

100
100

100

100

100

100

100

100

100
1250
850 1,470 1,470
AT

25 T TRANSFORMER TEMPERATURE RELAY


SR1 SR1 SR1
6.38kvar 6.38kvar 6.38kvar
3P+N

3P+N

3P+N

3P+N

3P+N

3P+N

3P+N
3P+N

3P+N

3P+N

3P+N
3P+N
3P+N

3P+N

3P+N
3P+N

3P+N
3P+N

3P+N
3P+N

3P+N
3P+N

3P+N
3P+N

3P+N

3P+N
POLE

GENERATOR POWER SUPPLY


- WHEN 27(UNDER VOLTAGE RELAY) WILL FUNCTION,
CAP2 CAP2 CAP2 GENERATOR SHALL BE STARTED AUTOMATICALLY.
3φ380V 3φ380V 3φ380V
SIZE OF CABLE

AND ATS SHALL BE MOVED TO DIESEL GENERATOR SUPPLY.


200kvar 200kvar 200kvar
- WHEN COMMERCIAL POWER WILL BE SUPPLIED AGAIN,
OIL-EMMERSED TRANSFORMER 500KVA ATS SHALL BE MOVED TO COMMERCIAL POWER
3φ4W 11KV/380-220V, CLASS F DIESEL GENERATOR SHALL BE STOPPED AUTOMATICALLY .
DIAL TYPE THERMOMETER WITH ALARM
AND TRIP CONTACTOR
TRANSFORMER MULTIMETER MEASUREMENT
-VOLT METER
-AMPARE METER
-FREQUENCY METER
-WATT METER
-WATTHOUR METER
600 800 900 800 800 900
PANEL
NAME

SCOPE OF WORK
*A *B *C *D *E
KENYA SIDE
HV. ELECTRICAL POLE H=12M W/HV. CUT-OUT SWITCH
& HV. LIGHTNING ARRESTER
11KV CABLE FROM INCOMING POLE TO HV.PANEL
DEMAND

(KVA)
2,250

LOAD

INSTALLATION OF KWH. METER (BY KPLC)


INSPECTION (BY KPLC) OF POWER RECEIVING SYSTEM
OBTAIN APPROVAL OF POWER RECEIVING (FROM KPLC)
KPLC MCCB MCCB CAP MCCB JAPANESE SIDE
DEMAND

FACTOR

0.70

0.70

0.70

0.70

0.70

0.70
0.70

1.00

0.70

0.70

0.70
0.70
0.70

0.70

0.70
0.70

0.70
0.70

0.70
0.70

0.70
0.70

0.70
0.70

0.70

0.70
UNDER GROUND PIPE
MAN HOLE
INITIAL

UNDERGROUND PIPING FOR 11KV INCOMING CABLING


450
260

260

37

33

33

10

10
20

11

78

10

10

10
85

48

10
78
10

10

10

10

10

10

40

40
(KVA)
LOAD

& TRANSFORMER
FRONT SIDE HV. PANEL BOARD
ELEVATION ELEVATION LIGHTNING ARRESTOR 12KV (HV. PANEL)
F-01

F-02

F-03

F-04

F-05

FE-01

FE-12
F-06

F-07

FE-02

FE-13
F-08

F-09

FE-03
F-10

F-11

FE-04
F-12

F-13

FE-05

FE-07

FE-08

FE-10

FE-11
FE-06

FE-09
FEEDER
NUMBER

TRANSFOMER (11KV/415-240V 750KVA)


MDP
MAIN DISTRIBUTION PANEL (MDP)

NOTE : THE INDECATED DEMENTION FOR REFERENCE ONLY E3

ELECTRICAL

You might also like