You are on page 1of 1
aes f[s|Ly Q-Stage Components [i 851 Bridging Ledger BSL bridging edger ismadeof scaffold ube to gv lear accessor avoid 825M 02035 fbstructions to bays, with standards at 16.0° (4.877m) centres. 'V pressings in centre takes transom for steelstage or timberbattens. S71 Ii Erection Procedure > Check the ground condition and pride sole plates or slippers as necessary. Stat setting out fram the highest point and Blance four adjustable Base lacksin the proximate position forthe ist bay » Place the standard into each of the two adjustable Bas Jacks ensuring that adustment is approximately even. While one ‘operator olds the two standards up-nigh, the other inserts the lower transom untinthe'V" Pressing > Make sure the sedges ofthe head fitings are outside on the outside onthe outside standard, This is so that it does not bse Bord shoe latlrm bal rate On rene starch wedge con ere Bore ie he Captive wedgesyet » The standards being held upright, two ledgers can now be fitted inte the 'Vlocation at right angle to transom, The next twostandards fitted with the bas jack ae then connected tthe ledgers with a ansom in between > Forma towerby placng anothe level of ledgers and transom atthe requred position. > after checking the evel and positon of tower, wedges can now be tapped fil. > Second and subsequent bays can now be added with aditonal ledger, standard and transom ina similar manner and ensure that scaffolassquare and evel before fang the wedges > Thesecondift can be erected by placing batten between the ransom to frm a safe working platform, Acces to this level mmustbeby ladders > oce the standardoverspigotof the previous standard and continue to fxledger an tansoms ¥ Diagonal race sb te seat progresses Braces shold beed atom fever fou by agonal cross the scaffold > Asthe scaffold extends upwards buling tes must be ited inthe appropriate positions > When the level of working platform i reached, the bay mut be fy decked out with battens and toe boards Fred tothe tuter standard and end ba. The toe board is fed by mteansof toe boardbracket, >» Te querdralsshould be formedin the frst and second" locating is above the platform on the outside standard and at the endof each run by using ledgers > additional platform wath i required Access Brackets can be connected tothe standards, Make sure thatthe Access Brackets are connected with tie bar to prevent baten from moving Hh Dismantiing Procedure Before dismanting check the scaffold structure, for any modification or movement occured during use that will affect the ‘overall stability. All loose materials, sheeting ete. must be removed before the main scaffolds dismantied ensuring that it remains adequately braced and tied. A temporary wozking platform must be positioned below the level tobe dismantled and be at least 3 batien wide. The scaffold must be dismantled in layers, The diagonal bracing and building ties must only be removed when that partof the scaffoldis tobe dismantled ll Safety steps > Ensure thatthe scaffoldersare trained and groperty supervised during erection and dismantling of scaffolding Check the foundation for maximum leg lad, before starting the scaffold erection > Initial and periodiclevelling of scaffolding must be-checked using spirit level > Scaffold structure must be strengthened using bracing andtiesas the scafold progresses >All working platforms are tobe closely boarded, Toe boards and guardrails must be provided for any platform from which a persons Hable to fall > Wherever aladderis used to reach working platforms, itshould not stand on loose materials and bricks and should always standoon firmandalevel base. > Scaffolds should not be overloaded and material placed on any scaffold should be for use within a reasonable time. Office : P.O. Box : 65525, Dubai, UAE Tel: 4971.4 3388677, Fax: +971 4 3388676 BSL Gulf L.L.C E-mail; bslgulf@emirates.net.ae, Website : www. britishscaffolding.com n nitro? ® brofessional download the free tal online at nitropat.com/professional

You might also like