Professional Documents
Culture Documents
1. All the final year MBA students (fourth semester) are asked to
present- project report ( first three chapter) at power point
presentation.
4. Batch one : roll no. from 01 to 20 : Time: 9.00 a.m to 12.30 p.m
Co-ordinator H.O.D
PREPARATION OF THE PROJECT REPORT
CHAPTER – I
1.1. Introduction and Background of the study:
1.2. Need for the study
1.3. Objective of the study ( primary and secondary)
1.4. Scope of the study
1.5. Limitations of the study
1.6. Chapterisation
CHAPTER – II
CHAPTER – III
CHAPTER – IV
CHAPTER – V
5.1. SUMMARY
5.2. FINDINGS
5.3. SUGGESTIONS & RECOMMENDATIONS
5.4. CONCLUSION
Questionnaire
Bibliography
Any other( including company balance sheet, income statement,
company product details, other relevant documents)
Note:
Table of contents
List of figures
Certification
Bonafide certificate
Acknowledgement
For these details: kindly see the notice board after first review.
------------------
(Note: Submit these details and attach with your report as First page.)
Roll Number:
Register Number:
Area of Specialization: