You are on page 1of 1

PROJECT ACTION PLAN

Date Planning
23/8/2010 Get task briefing from lecturer
24/8/2010 Search the information about Green Science
25/8/2010 Find an examples of science model for LISTA
27/8/2010 Discussion with partner about the model wants to build for LISTA.

The model that we choose first is Turbine Model. After reflect back,

the decision was made to change decision to build a Pyramid

Number Model.
9/9/2010 Show the draft to lecturer
15/9/2010 Search the materials to build a model-Pyramid Number Model
17/9/2010 Refer to the Curriculum specification to see the suitable topic that

suitable for using LISTA


20/9/2010 Construct a LISTA
30/9/2010 Make power point of LISTA and its user manual
13/10/2010 Reflection of LISTA
14/10/2010 Present to class the LISTA models
15/10/2010 Submit the assignment

You might also like