Professional Documents
Culture Documents
Chapter 2 Propagation-1
Chapter 3 Propagation-2
Objectives:
The aims of this section are to enable the student to:
• Describe basic GSM RF Planning and optimization
• List the important characteristics of a good RF plan
• List the basic steps involved in Cell/RF planning
• Prepare a single Power Budget for both uplink and downlink
A well planned network not only gives reliable operation, it also provides a cost-effective network coupled
with a high quality of service. There are certain issues that need to be examined to produce an effective
network plan.
These include:
Sufficient capacity support
Efficient use of the available frequency spectrum
The minimum number of sites to provide the required service
Flexibility for future expansion
Adequate coverage in a given area with the minimum of interference.
The first step in any plan will be to assess the requirements of the customer. This information will include:
Business plan
The number of subscribers and their distribution
Grade of service
Local constraints
Available frequency spectrum
Once the planned system is implemented, all assumptions need to be validated by following an
optimisation process.
The planning process can be simplified into 4 main headings:
Capacity planning
Coverage planning
Parameter planning
Optimisation
Figure 1-1 illustrates a simplified diagram which itemises the planning process.
Figure 1-2 illustrates a basic outline of the optimisation process.
NOTE The information given in Figure 1-2 under ’Recommendations’ is not in any particular order of
application.
Once the planning and optimisation processes have been carried out, the following aims should have been
met:
Coverage as per expectations and customer request.
Co-channel and Adjacent channel interference levels as predicted and within limits.
Minimum adjustments required to antennas during the optimisation process.
Planning process should be well structured and optimisation restricted to the final stages of
implementation and the commissioning of new sites.
Expansion of the system should be easy and require minimum disruption and changes to the network.
In order to provide the basic elements of a well planned network (good coverage and adequate capacity),
the planner needs to know the customer’ s expectations.
These may be specified as number of subscribers for a given coverage area or a set number of sites in an
area for example.
Armed with either of these, the planner can then begin to assess the number sites required (for a given
number of subscribers), or the capacity capabilities (if given a number of sites).
Certain assumptions are made for the planning process:
25 mE average traffic per subscriber
Grade of Service (air interface) 2%
Mobile to Mobile traffic 10% (Mobile originated & Mobile terminated)
Mobile to PSTN traffic 70% (Mobile originated)
Land to Mobile traffic 20% (Mobile terminated)
Average Call duration 90 secs
Traffic Capacity of 1 carrier with 7 TCHs:
2.94E (approximately 118 subscribers). A 1/1/1 site will have capacity of approximately 350 subscribers.
Traffic capacity of 2 carriers with 14 TCHs: 8.2E (approximately 330 subscribers).
A 2/2/2 site will have a capacity of about 990 subscribers.
As an example, if the customer has given the maximum number of sites for a city as 20, then the capacity
of those sites would be as follows:
For a 1/1/1 site:
350 subscribers per site - 350 x 20 = 7000 subscribers
For a 2/2/2 site:
990 subscribers per site - 990 x 20 = 19800 subscribers
If the customer specified capacity required was for 10000 subscribers, then to support these subscribers
using 1/1/1 sites, the planner would calculate 29 sites would easily support the subscribers.
For a network utilising 2/2/2 sites, 11 sites would support the 10000 subscribers. The actual deployment of
the sites and their configuration would depend on the subscriber distribution within the coverage area.
Table 1-1 illustrates how subscribers/erlangs may be distributed over a given area.
Subscriber Distribution
Urban 30 75 3000 9 3
If it is decided that the sites whose traffic is _ 20% will be 2/2/2 configuration and the rest will be 1/1/1,
then the total sites would be:
8 @ 2/2/2 + 9 @ 1/1/1 = 17 sites
It is possible to calculate an approximate area covered for a given number of sites. For instance, a cell with
a 1km radius can give coverage for about 3sq.km. Therefore, if we needed to provide coverage for a city
with an area of 250sq. km, then we would require approximately 84 sites.
The number of sites could be reduced if the less busy areas of the city were covered utilising larger cells
with the more dense capacity areas using smaller cells.
Any area can be divided into one or more of the following areas:
Urban
Suburban
Quasi-Open
Open
Water
Once sample site areas (areas selected which take into account all types of clutter) have been chosen
several basic steps then need to be carried out:
Site surveys - assessing building heights and construction obstructions, foliage, orientation of sectors,
local legal requirements.
Preparation of power budgets.
Propagation tests - using drive tests to obtain data for the site to calculate coverage probabilities.
Propagation model adjustment - using drive test results to modify propagation model for more accurate
prediction.
One of the first steps in the planning process is the production of a power budget for both uplink and
downlink. Table 1-2 shows a power budget spreadsheet using typical values.
The following however should be noted:
BTS receiver sensitivity is quoted at -107dBm, but it could be as good as 110dBm
MS receiver sensitivity is quoted at -102dBm, but could be as good as 105dBm
The actual peak power of a MS is typically 31-32dBm even though the peak power is stated at 33dBm,
this means that the uplink power budget is normally 1-2dB worse than in Table 1-2.
Diversity gain, although nominally quoted at 3dB, could be anything from 0-4dBm depending upon
environment, MS location, diversity type, etc.
The maximum permitted path loss (MPL) in the downlink is 2dB more than the uplink allowable loss. This
may mean reduction of BTS output by 2dB to maintain system balance.
If the difference was only 1dBm, then the BTS cannot be adjusted down to obtain system balance because
it can only be adjusted in 2dB steps. In this case, the lower value of MPL would be taken as the design
parameter.
The majority of the system losses/gains are the same because they are equipment related.
Fade margin is a function of the area coverage probability. If it is 4dB for 90% coverage, then the minimum
isotropic receive Power that is required for 90% coverage probability outdoors is -92dBm. Fade Margin is
discussed in a later section.
The allowable path loss calculated in the power budget is the absolute maximum permissable and includes:
Free Space Loss
Clutter Factors
Coverage Confidence Level (Probability of coverage of the area)
If the actual loss value is better than that calculated, then the cell size is adequate to give the performance
predicted.
With the cell commissioned, drive test readings can be taken to give actual signal strengths. With these
values, statistical tools can then be employed to produce coverage probabilities and the required Fade
Margin.
By using these values in the Power Budget, the processes can be repeated until the system is ’ fine tuned’ to
produce the radius and performance required.
Summary
RF planning can be broken down into several basic steps and requires understanding of the following:
Propagation Models
Coverage requirements
Link (Power) Budgets
Antenna factors
Frequency Planning and re-use
Objectives:
The aims of this section are to enable the student to show basic knowledge of, and calculate:
• Radio propagation in fre space
• Fresnel zones and their effect
• Effects of the environment on radio propagation
• Building losses and In-Building coverage
• Path loss in different propagation environments and the use of relevant
propagation models in prediction
• Macro and Micro cellular principles
In a mobile environment, there is seldom a direct line of sight between the mobile and the BTS. Hence the
pure free space path loss calculated as per the formula given in the previous page is not directly applicable.
The signal almost always arrives via multiple paths at the receiver end, be it a mobile or the BTS as shown
in Figure 2-2.
The multi path is due to reflection, diffraction and scattering of radio waves. The extent of these effects
depends on the type and the total area of the obstruction. For instance, a
plain surface will cause maximum reflection whilst a sharp edge like the corner of a
building will cause scattering of signals known as ’ Knife-Edge Diffraction’ .
Knife-Edge Diffraction
Propagation over rough terrain is dependant on the size of objects encountered over that terrain with respect
to the frequency used.
Cell Definition
A cell is a geographical area, which is covered by radio signals. Conventionally, a practical cell is
considered to have an irregular shape, with uniform Receive Signal Strength (RSS) all around. This is
shown in Figure 2-4 (a).
However, it is convenient to assume a regular shape for analytical and planning purposes. Ideally a cell
should be circular in shape Figure 2-4 (b) with varying signal strengths all around. From a geometrical
point of view this can be approximated by a hexagon, with different RSS values on the sides. As illustrated
in Figure 2-4 (c).
Of all the types of propagation environment considered in a mobile communications network, the most
common, and also most unpredictable is the Urban environment. The Urban environment consists of many
types of ’ obstruction’ . The predominant features are the buildings within the area. As well as the effects of
the environment (buildings, foliage etc.) on external propagation levels, account must be taken of the effect
the construction of the buildings has on signal levels inside the buildings themselves.
Building Penetration
The attenuation given by a building is simply the difference between signal level outside the building and
the level inside.
The attenuation afforded by a building will depend on several factors:
Construction materials
Thickness of walls
Size of the building
Angle of arrival of the signals
Typically, signal values can vary by as much as -40dB to 80dB depending on the various factors.
Generally speaking, a building with a wall facing the signal origin will offer less penetration loss than one
which is at an angle to the signal source.
Also, Doors and windows will offer less resistance to RF signals than walls and will thus provide a better
penetration of RF signals.
Another factor which can contribute to the degradation of signals within a building is the amount of
furnishing within it. A fully furnished building can give 2-3dB more attenuation than one which is empty.
Figure 2-5 gives some typical values for varying building types and uses.
NOTE The values given are for illustration purposes only and are not definitive.
Building Attenuation
Figure 2-5
Propagation Models
Propagation models are effectively a set way of applying an environment’ s characteristics to calculations to
produce a prediction of signal levels within that environment.
Models are created for different environments by carrying out tests at selected frequencies, over varying
distances and times and with varying antenna heights.
The data retrieved from these tests is then analyzed using mathematical tools and a curve is produced.
Imperical formulae to match these curves are then generated and used as propagation models.
Common propagation models are
Log-Distance model
Longley-Rice Model (Irregular terrain)
Okumura
Hata
Cost 231 - Hata (Similar to Hata; used for 1500-2000MHz frequencies)
Walfish-Ikegami Cost 231
Walfisch-Xia JTC
XLOS (Motorola Proprietary)
Deterministic Microcell Model (DMM)
Bullington
Du Path loss model
Diffracting screens model
Of all the models listed, the Hata and Walfisch-Ikegami models are agreed to be the most important.
Motorola’ s NetPlan uses the proprietary XLOS model as well as the Deterministic Microcell Model
(DMM).
Any given model is only as accurate as the information provided to it and assuming it is used in the correct
environment for which it is intended.
For example, the Hata model is suitable for use in Urban/Suburban areas. While the Walfisch-Ikegami is
more suited to the dense urban Microcell type areas.
In the following pages, the common models will be examined in more detail.
Okumura-Hata Model
In the early 1960’ s a Japanese engineer named Okumura carried out a series of detailed propagation tests
for land-mobile radio services at various different frequencies. The frequencies were 200 MHz in the VHF
band and 453, 922, 1310, 1430 and 1920 MHz in the UHF band. The results were statistically analyzed and
described for distance and frequency dependencies of median field strength, location variabilities and
antenna height gain factors for the base and mobile stations in urban, suburban and open areas over quasi-
smooth terrain.
The correction factors corresponding to various terrain parameters for irregular terrain, such as rolling hills,
isolated mountain areas, general sloped terrain and mixed land-sea path were defined by Okumura.
As a result of these tests carried out primarily in the Tokyo area, a method for predicting field strength and
service area for a given terrain of a land mobile radio system was defined.
The Okumura method is valid for:
frequency range of 150 to 2000 MHz
distances between the base station and the mobile stations of 1 to 100 km
base station effective antenna heights of 30 to 100 m.
MS antenna height assumed as 1.5m
The results of the median field strength at the stated frequencies were displayed graphically. Different
graphs were drawn for each of the test frequencies in each of the terrain environments (eg. urban, suburban,
hilly terrain etc.) Also shown on these graphs were the various antenna heights used at the test transmitter
base stations. The graphs show the median field strength in relation to the distance in km from the site.
Figure 2-6 illustrates some of the resultant curves that were produced. As this is a graphical representation
of results it does not transfer easily into a computer environment. However, the results provided by
Okumura are the basis on which path loss prediction equations have been formulated. The most important
work has been carried out by another Japanese engineer named Hata. Hata has taken Okumura’ s graphical
results and derived an equation to calculate the path loss in various environments. These equations have
been modified to take into account the differences between the Japanese terrain and the type of terrain
experienced in Western Europe.
Hata used the information contained in Okumura’ s propagation loss report of the early 1960’ s, which
presented its results graphically, to define a series of empirical formulas to allow propagation prediction to
be done on computers. The propagation loss in an urban area can be presented as a simple formula of:
A + B log 10 R
where: is:
A frequency function
B antenna height function
R the distance from the transmitter.
Here, we assume that the BTS antenna is above roof level for any building within the cell and that there is
no line of sight between the BTS and the mobile. We define the following parameters with reference to
Figure 2-9: w the distance between street mobile and building hm mobile antenna height hB BTS antenna
heights hr height of roof.
hB difference between BTS height and roof top.
hm difference between mobile height and rooftop.
Under non line of sight propagation conditions, for the sake of simplicity, we assume that the environment
has buildings of uniform height. For a mobile on the street, the signal undergoes diffraction from rooftops
and also multiple diffraction due to the surrounding buildings.
The total path loss is given by:
We know that radio signals get diffracted when they encounter an obstacle. We can imagine the signal to
travel with spherical wave fronts. Looking at the cross section, Fresnel Zones are a set of concentric circles,
which are loci of all points having the same signal strength. The Fresnel zones are apart from each other.
Figure 2-12‘ illustrates the nature of Fresnel Zones.
The radius of the Fresnel Zone is dependent on frequency and antenna height. For a given antenna height
the signal will propagate further before the FIRST Fresnel Zone touches the ground.
Also, the diffraction is maximum when the difference between the direct ray and the diffracted ray is /2.
The propagation of radio waves could be studied by using either Statistical Prediction algorithms or
Deterministic models. The latter are more accurate than the former, but require large computation time.
Deterministic models relate the propagation parameters to the physical structure of the buildings, such as
the wall orientation, materials used, their refraction and diffraction coefficients etc. The statistical models
on the other hand only look at the path losses based on measurements made between buildings.
The Ray tracing model of the NetPlan is one such Deterministic model. It treats the walls, roofs and floors
as black mirrors. Losses in the path between transmitters and receivers are calculated using the mechanisms
of direct transmission, reflection and diffraction.
In small areas with “soft” walls (few metallic frames, unglazed surfaces), direct transmission and reflection
are the most predominant mechanisms. Larger micro cell environments where buildings provide a canyon
for propagation, diffraction is the major mechanism of propagation.
When the beam strikes a wall, part of it gets reflected and the rest goes ‘through’ the wall. There are
multiple reflections within the wall as shown in Figure 2-14. The ray tracing is performed by studying the
wave’ s arrival time, intensity, phase and direction of impact. The intensity of each beam is a function of
wall material, thickness and incident angle.
NetPlan provides conductivity constants for various types of materials used in buildings. Diffraction is the
predominant mode of propagation when the beam strikes the corner of a building. Further discussions on
the ray-tracing model are beyond the scope of our
Dense Urban
Urban
Suburban
Rural
Propagation – 2
Objectives
Radio Link Design
Calculation of Mobile Receiver Sensivity
Example 5
Signal Variations
Probability Density Functions (PDFs) of Signals
Variation of Gaussian Curve for Varying values of s
Calculation of Standard Deviation
Example 6
Example 6
Confidence Intervals
The Concept of Normalized Standard Deviation
Example 7
Calculation of Edge Probability and Fade Margin
Example 8
Example 9
Example 10
In-Building Margins
Example 11
Example 12
Fussy Logic Vs Fuzzy Logic
Coverage Plots
Cell Planning and C/I
Example 13
Co-Channel interference C/I – Omni Cells
Co-Channel interference C/I-Sectored Cells
Adjacent Channel Interference
Objectives:
The aims of this section are to enable the student to show basic knowledge of, and calculate:
Explain the need for radio link design and calculate acceptable path loss for a given
power budget
Explain and calculate Fade Margin and signal variation
Explain and calculate Probability Density Functions (PDF) of signals
Calculate Standard Deviation
Explain and calculate Normal Distribution and confidence intervals
Explain and calculate Edge Probability
Calculate In-Building coverage
Explain coverage plots
Explain and calculate C/I ratio for both Co-channel and Adjacent channel
Interference
The primary objective of Radio Link Design is to provide RF coverage over a desired area with a good deal
of certainty. In practical terms it involves preparation of a Power budget, which takes into account the
receiver’ s sensitivity, BTS transmit power, path losses etc.
The link budget we studied in Chapter 1 could be described by a Level diagram shown in Figure 3-1.
From the diagram we can write an expression for the maximum allowable path loss as:
Where, LFT and LFR are feeder and connector losses at the transmitter and receiver respectively. FM is the
fade margin.
In RF design, the key factors are the relationship between Path Loss and Coverage area as well as how to
arrive at the Fade Margin.
The mobile should get a minimum signal which is above the thermal noise, with a specified Carrier to
Noise ratio. It should also have adequate cushion to take care of any degradation in the performance of the
RF circuitry due to aging, temperature variations etc.
The noise level at the receiver is calculated as follows:
NR = kTB
The normal or the Gaussian distribution depends upon the value of Standard Deviation. We get a different
curve for each value of ó. The total area under the normal curve is unity.This is illustrated in Figure 3-5.
Propagation Index:
This is the attenuation constant .
This can be theoretically computed by using the formulae applicable for the specific propagation model
chosen for the cell site.
Or we can obtain RSS at various points at a desired distance from the BTS using drive tests and plot RSS
vs distance. From the plot we can obtain the propagation constant.
Area Probability:
This is the fraction of the total area within which the RSS will be above a specified threshold.
For the RSS calculated in Example 8, prepare a power budget for the uplink and down links. RSS required
is – 92.425 dBm. This is taken as the sensitivity limit of the mobile.
Example 9
For the RSS calculated in Example 8, prepare a power budget for the uplink and down links. RSS required
is – 92.425 dBm.
Central business 20 dB 15 dB
area
Residential area 15 dB 12 dB
Industrial Area 12 dB 10 dB
In Car 6 to 8 dB
Up to now, all the models that we have studied are purely empirical. The formulae we used do not at all
take care of all possible environments. Hence only an iterative process could achieve the accuracy of
planning based on these models. We also have computer tools to do the job of performing the elaborate and
complex
calculations, given the parameters and assumptions. Fuzzy Logic could be useful for experienced planners
in making right guesses!
Certain assumptions can be made:
Divide the environment into 5 categories;
Free Space
Rural
Suburban
Urban
Dense Urban.
We assign specific attenuation constant values to each category, say, 0, 1 4.Fuzzy Logic helps us to
guess the right value for , the attenuation constant for an environment which is neither rural nor suburban
nor urban but a mixture, with a strong resemblance to one of the major categories.
The following simple rules could be used:
Figure 3-9
Figure 3-10
3 3 8.917dB
4 3.46 11.08dB
7 4.58 15.35dB
9 5.19 17.25dB
12 6 19.45dB
Objectives:
State the reasons for good frequency planning
Explain the concept of manual frequency planning
Explain the concept of automatic frequency planning
Describe the concept of frequency reuse patterns
Explain directional frequency reuse
The ultimate goal of frequency planning in a GSM network is attaining and maintaining the highest
possible C/I ratio everywhere within the network coverage area. A general requirement is at least 12 dB C/I,
allowing tolerance in signal fading above the 9dB specification of GSM.
The actual plan of a real network is a function of its operating environment (geography, RF, etc.) and there
is no universal textbook plan that suits every network. Nevertheless, some practical guidelines gathered
from experience can help to reduce the planning cycle time.
As the BCCH carrier is not hopping, it is strongly recommended to separate bands for
BCCH and TCH, as shown below
BCCH re-use plan: 4x3 or 5x3, depending on the bandwidth available and operating environment.
Divide the dedicated band for TCH into 3 groups with an equal number of frequencies (N). These
frequencies will be the ARFCN equipped in the MA list of a hoUse an equal number of frequencies in all
cells within the hopping area. The allocation of frequencies to each sector is recommended to be in a
regular or continuous sequence (see planning example).pping system (FHI).
The number of frequencies (N) in each group is determined by the design loading factor (or carrier-to-
frequency ratio). A theoretical maximum of 50% is permitted in 1x3 SFH. Any value higher than 50%
would practically result unacceptable quality.
No more than 48 frequencies in a cell with multiple carriers with GPRS timeslots
Use the same HSN for sectors within the same site. Use different HSNs for different sites. This will help
to randomize the co-channel interference level between the sites.
Use different MAIOs to control adjacent channel interference between the sectors within a site
Bandwidth: 10 MHz
S Site configuration: Mix of 2-2-2, 3-3-3 and 4-4-4
S Loading factor: 33%
S Environment: Multi layer (micro and macro co-exist)
The spectrum is split as shown below
A total of 49 channels are available and the first and last one are reserved as guard bands. Thus, there are
47 usable channels. 12 channels are used in the BCCH layer with a 4x3 re-use pattern.Based on 33%
loading and a 4-4-4 configuration, N is calculated as N = 3 / 0.33 = 9 hopping frequencies per cell. Thus, a
total of 27 channels are required for the hopping TCH layer. The remaining 8 channels are used in the
micro layer as BCCH. One of the possible frequency and parameter setting plans is outlined in the table
Table 4-1.
Table 4-1
The above MAIO setting will avoid all possible adjacent channel interference among sectors within the
same site. The interference (co or adjacent channel) between sites will still exist but it is reduced by the
randomization effect of the different HSNs
1x1 is usually practical in rural area of low traffic density, where the average occupancy of the hopping
frequencies is low. With careful planning, it can be used in high traffic areas as well.
BCCH re-use plan: 4X3 or 5X3, depending on the bandwidth available and operating environment.
The allocation of TCH frequencies to each sector is recommended to be in a regular or continuous
sequence.
Use different HSNs to reduce interference (co and adjacent channel) between the sites.
Use the same HSNs for all carriers within a site and use MAIOs to avoid adjacent and co--channel
interference between the carriers. Repeated or adjacent MAIOs are not to be used within the same site to
avoid co-channel and adjacent channel interference respectively.
A maximum loading factor of 1/6 or 16.7% is inherent in a continuous sequence of frequency allocation.
Since adjacent MAIOs are restricted, the maximum number of MAIOs permitted is:
All the rules outlined for SFH are generally applicable to BBH. As the BCCH is in the hopping frequency
list, a dedicated band separated from TCH may not be essential. An example of frequency spectrum
allocation is shown below
Directional Re-use
In a sectored site, a group of channels (ARFCNs) is transmitted in the direction of antenna orientation. This
is based on a tricellular platform consisting of 3 identical cells as shown in Figure 4-1.Every cell is
considered as an OMNI logically. The cells are excited from the corners, separated by 1200. The axes of
the diagram represent the 3 directions of reuse. These are designated as {f(00) }, { f(1200) } and
{ f(2400) }
Because we use directional antennae, the worst co channel interference will be from only one interfering
station in the same direction.
We form a generic combination of the tri-cell pattern using 7 such patterns, as shown in Figure 4-2.
From this, we can see that each of the three axes has three parallel layers. This results in a total of six or
multiples of six frequency groups. While assigning frequencies to individual cells we have to take the
directions of reuse in
to account.
Objectives :
The objectives of this section are to enable the student to:
Explain the factors to be considered regarding antenna selection
Describe the advantages and disadvantages of certain antenna locations
Explain antenna diversity
Describe different antenna configurations
Explain the various specifications given for antennas
Explain downtilt
Antenna Considerations
The primary objective for a proper antenna location and choice of an appropriate diversity scheme is to
provide a uniform coverage within the cell area and minimum interference to and from other BTS antennae.
Choice of antenna location ( cell site ) is based on proper containment of coverage and alignment of the
sites in to a specific hexagonal pattern. The choice may be limited due to availability of space, links to BSC
etc.
Containment of Coverage in Urban/Suburban areas:
In Urban areas, the following conditions usually exist:
Several Sites may be needed
Frequency re use is unavoidable
In-building penetration is a must
Large coverage obtained by keeping an antenna at a height may not satisfy in-building coverage
requirements.
In fact, one can rely on the buildings to serve as radio path shields, limiting the coverage area. Also the
reflections from the buildings provide coverage to areas which would not have been possible in the normal
LOS mode. (Street Canyons). These additional paths consequently increase in-building penetration also.
Antenna Considerations
Antenna Location
The location of an antenna needs to be chosen not only for coverage needs, but also to ensure that the
minimum interference to and from other sites is acheived.
Choice of location is driven by proper containment of coverage and site alignment within the confines of
the specified pattern.
In urban areas, there are certain conditions which prevail:
Several sites will be required
The re-use of frequencies is common
In-building penetration needs to be provided
Merely placing an antenna at the highest point is not the answer to providing best coverage.
As well as giving a source of interference ot other sites in the coverage area, in-building coverage will not
be fully acheived as succesfully as more specific solutions.
Figure 5-1 illustrates the possibilities of antenna location within a built-up area. In the first case, whilst a
large area is covered by the high mounted antenna, interference control is difficult and in-building coverage
is limited.
In the second instance, the buildings act as a natural containment for the propagation, and can also give
coverage in areas that would otherwise be considered ’ dead spots’ . In-building coverage is also improved
in this scenario. In Figure 5-2, location of the antenna at a high point within a suburban environment will
be more beneficial than in a city environment and cause less of an interference problem.
Antenna Location
Location of antennae at high points needs careful examination of site coverage, type of area etc.
We have the following techniques by which the effects of Multi path fading can be minimized:
In the Time Domain: Interleaving
In the Frequency Domain: Frequency Hopping
In the Spatial Domain: Space Diversity
In the Polarisation Domain: Polarisation Diversity.
Of the 4 different schemes listed above, the last two techniques are related to antenna systems.
In general, a diversity antenna system provides a number of receive paths ( normally 2). The diverse output
from each path is combined by the receiver to give a signal of sufficient S/N.
Thus a Diversity antenna System essentially has:
Two or More antennae
A combiner circuitry.
Another major requirement of Diversity antenna systems is that the signals arriving at the different receive
paths/ports should have very low correlation. This is because if a signal is fading at one port, the chances of
it happening in the other port should be LOW. This is the basis of Diversity.
Antenna Diversity
Space Diversity
The separation between antenna is a function of the correlation coefficient. To achieve a desired correlation
coefficient, say <0.7, different configurations need different spacings. Figures given in Table 5-1 are for
minimum required separation. If space is not a constraint, larger separation is always recommended.
Horizontal separation is preferred because it provides low correlation values.
However, horizontal separation suffers from angular dependence (as in Figure 5-4). Vertical separation
does not suffer much from angular dependence. It also requires minimum supporting fixtures and does not
occupy a lot of space. But, as the distance increases, the correlation between the RF signals at the antenna
points increases rapidly, thereby negating the very advantage of space diversity.
Figure 5-5
Polarisation Diversity
A plane polarised wave has two components namely Vertical and Horizontal components. The two fields
exhibit a good degree of de correlation. This means that dual polarization can be used as a diversity system.
A Dual- Polarisation antenna consists of 2 sets of radiating elements which radiate, or in reciprocal, receive,
2 orthogonal fields. The antenna has 2 input connectors which separately connect to each set of the
elements. The antenna has therefore the capability to transmit and receive two orthogonally polarised fields
simultaneously.
Figure 5-9 shows the two types of Dual-Polarisation antennas.
Antenna Configurations
Figure 5-10 shows both the single and double antenna systems.
One Antenna System:
Needs a Duplexer for the port Transmitting and Receiving.
Needs a Duplexer or an External Filter for the receive only arm.
The filter can be avoided if the isolation between the two ports Is better than 30 dB.
Two Antenna System:
Receiving antenna is the Dual Polarised antenna.
The use of the duplexer increases the risk of high inter-modulation products. It is essential to choose low
inter-mod product duplexers for this configuration. Figure 5-11 shows the configuration using the Air
Combining system.
Downtilt
When the main radiation lobe of the antenna is intentionally adjusted above or below its plane of
propagation, the result is known as a “beam tilt”. When tiled downward, we get the “Down Tilt”.
Down tilt can be done in 2 ways:
Electrical Down tilt
Mechanical Down tilt.
Mechanical Downtilt
Mechanical down tilt is done by physically changing the antenna position. A common method is by the use
of scissor-type mounting brackets.
Figure 5-14 illustrates the effect of Mechanical downtilt on the pattern. As can be seen from the diagram,
mechanical downtilt not only causes the main lobe of the antenna to be lowered, but it also causes the back
Electrical Downtilt
Electrical down tilt is achieved by changing the phase value of the RF signal at the inputs of a phased array.
It is normally factory set and can be field-adjusted by changing externally the phasing cables supplied by
the manufacturer. Figure 5-15 shows an example of the effect of using different length phasing cables.
Figure 5-16 shows an the resultant coverage changes for differing values of electrical downtilt.
Keeping the interference objective in mind, it is preferable to limit the outer edge of the main lobe to the
cell radius. In general down tilt angles greater than 7-10 degrees are not recommended. Also not more than
2 degrees difference in down tilt angles between any two adjacent sectors in a given site is desirable.
The down tilt angle for a cell may be calculated from geometry. It is given by the equation:
Example 16
Downtilt Notch
When the antenna is physically down tilted, a notch at the centre of the horizontal beam pattern is produced.
This notch becomes larger as the down tilt angle increases.This notch can be effectively used to control
interference as shown in Figure 5-19
Objectives:
The aims of this section are to enable the student to:
List the various steps involved in the RF Planning process
Explain each of the steps of the planning process
State other factors to be considered in the planning process
State customer requirements
Explain the use of Drive Tests
Explain the use of Planning tools
Describe the customisation of planning models
Perform an RF Planning exercise
Introduction
Chapter 1 introduced the planning and optimisation process in general terms. This chapter looks at each
step of the process in detail. The planning processes will be referenced to an imaginary city known
as ’ Utopia’ .
Planning Steps
Planning Steps
Coverage requirements
In-building coverage expectations
Initial Roll out plans
Pre determined number of sites ?
2. Survey:
4. Draft Plan:
Other Considerations
The planning exercise depends on the type of site under consideration- is it a macro site ( large area ) or a
mini site? Is it a micro cell or a pico cell? This is to a large extent defined by the traffic growth projections,
amount of spectrum available, coverage required at the time of launch and capacity planned for the first 3-5
years of operation. To start with Macro cells may be designed to give maximum coverage with limited
number of sites. As the traffic and capacity increase, cells may be split, or new cells may be added to get
more focussed coverage. Tall sites are modified by reducing antenna
heights to get better coverage and minimize interferences.
Other Considerations
Customer Requirements
The success of the planning process depends on how well we understand what the customer wants.It would
be a good idea to have a questionnair answered by the customer.
Some of the important questions should include precise boundary limits for the network (does the Govt.
have any special conditions?), areas in which medium in-building coverage is considered adequate, areas
where excellent coverage is needed, what are the potential growth areas, what are the implementation
strategies and specific requirements if any.
Is there any limit on the initial investment for the customer?
What is the minimum the customer is willing to support with reference to the competition?
It is important to understand these customer requirements so that the draft plan will be in tune with what the
customer wants and fine tuning becomes easier.
Customer Requirements
This is basically a scouting exercise. It is better to spend at least a week in each city/locality. It helps in
identifying the network requirements for the city/location. Keep an open eye for the major traffic routes,
main roads, the general city layout, types of buildings, location of major hotels, shopping centres, airport,
railway station, typical consumer behaviour, telephone density, number of restaurants, bars and clubs, parks
and open areas, any historical buildings, old buildings, congested localities with narrow streets, any lakes,
‘ nullahs’ ( narrow canals/waterways ) and so on.
In-Building Coverage
Identify different types of buildings in the city, such as hotels, restaurants, commercial buildings, shopping
malls residential and so on. Select a few buildings in each type and conduct propagation tests. Receive
signal strength is noted at the entrance ( on the road) of the buildings and inside- more importantly in the
basement and ground floor.
This is because the in building coverage is usually less only in these areas. As we go higher up in the
building, the coverage usually improves.
With reference to the signal strength in the road, the building penetration loss can then be computed.
Repeat the process for all buildings and for all categories of buildings. This will give an estimate of
building loss for the locality under consideration.
In-Building Coverage
_ Classify Buildings –
Hotels/Restaurants
Commercial
Industrial
Residential
Shopping malls/markets
Propagation tests in a number of buildings in each variety.
RF signal on the road Vs. inside building gives building
penetration loss.
Repeat tests in as many buildings as possible to get an
estimate of building loss for the area.
In-building coverage affected mostly in ground
floor/basements.
Typical Values: ( examples only )
Hotels/Restaurants 15 dB
Commercial bldgs 20 dB
Shopping malls 15 dB
Industrial Estates 12-15 dB
Residential buildings 15-20 dB
Old/Historical buildings 25-30 dB.
RF Propagation Tests
RF survey is done by performing drive tests within the proposed cell site area. For a new network, we set
up a test transmitter at a chosen point and measure RF signal strengths at various points. In an existing
network, the drive test is used to collect data from the network itself.
A typical RF propagation kit is listed in Table 6-1.
Table 6-1
Power meter
VSWR meter
The concepts of RF planning were covered in Section 3. It is possible to do this planning for a number of
sites by manually handling the propagation test results.
However, to do iterative operations and get a coverage map it is essential to use planning tools to automate
the process.
There are many planning tools available to day:
NetPlan ( Motorola)
PlaNet (MSI)
CellCad (LCC)
Odyssey (Aethos)
Asset (Aircon)
Planning tool Requirements:
The planning tool must be easy to use, should be compatible with tools like the TEMs, should be
economical and require minimum hardware.
Obtain Maps:
It is important to have the map of the city/area under consideration. Such map information could be
obtained as paper copies from authorized sources or from a satellite image. The latter option is very
expensive. The maps could be obtained from the local authorities. Where contour maps are required they
could be obtained from the Survey of India department. The maps should be preferably on 1:50000 or
1:25000 scale. Normally the data would be in 50m resolution. Less than this is not suitable for macro cell
designs as it calls for large memory requirements for the planning tool.For micro cells, less than 30 m
resolutions can be considered, where a “ Ray Tracing Tool” is used.The geographical data of the area is
digitized under 3 different categories:
Typically RF propagation tests are conducted for 5-8 proposed BTS sites covering as much of the area as
possible. Efforts should be made to include all types of clutters during the propagation test. Almost all the
planning tools have provision for changing the clutter values to match the propagation test results. They all
have different directory structures and means of handling the geographical data. As an example, the PlaNet
has a procedure for tuning the Macro Cell models. NetPlan has a Custom Path Loss Model which enables
the planer to play with the values of various types of clutter and fine tune the model. For the sake of
illustration, an excerpt from the “ User Reference Guide” of PlaNet is placed as an Annexure.
All tools have provision for manipulating clutter values.
Different tools have different Directory structures and means of handling geographical data. Macro Cell
Tuning procedure described in “ User Reference Guide” of PlaNet kept in Annexure for illustration
purposes.
The procedure mainly talks about ensuring correct data header files to include:
BTS location
EIRP of BTS
Antenna Type
BTS antenna height
Description of surrounding area.
Procedure uses a general core model equation:
The equation has constants k1 to k6 and a constant for clutter, kclutter.
Initial values for the constants are set as per the model chosen (say Okumara-Hata).
PlaNet programme is run repeatedly to make RMS error values for all data files ZERO or a minimum.
For each run of the programme, the values of k1 to k6 are manipulated.
This completes Model calibration.
Once the geographical data is entered in to the planning tool, a coverage map is required to be generated for
each site.
The most important step is then to prepare a Link Budget for the site under consideration. Some of the key
points to be considered are:
What is the desired probability of the receive signal strength at the mobile, within the entire coverage
area? ( usually 90 or 95% and is decided in consultation with the customer).
What is the expected in-building coverage?
What is the probability on the “ EDGE” of the coverage area that the receive signal strength is sufficient
for the mobile to make and hold a call?
What is the fade margin available?
What is the maximum permissible path loss ( from the Link Budget)
What is the radius of the cell?
What are the areas of different types of coverage planned for? For example Main business area could be
100 sq. Km and the suburban area could be 200 sq. Km and so on.
How many sites are required for each type of area? ( from coverage point of view)
Is the number of sites calculated as above adequate for capacity?
Decide on more sites for capacity.
Coverage Estimation
Having calculated the Maximum permissible path loss, the cell radius can be determined as explained in
Section 2.
For a given cell radius, we can calculate the estimated coverage area based on the formula:
The site separation distance D = (3N) R. ( R is the radius of the cell, same as d)
For a given area, we can then calculate the number of sites required.
Number of Sites = Total Area / Cell area.
Capacity Considerations
Having determined the number of sites, it is then required to check if the capacity requirements are also met.
This depends on the spectrum available, which will decide the site configurations. The availability of other
features like frequency hopping etc is also to be taken into account. If capacity requirements are not met,
then more sites may have to be added. If the number of sites as calculated above is not acceptable to the
customer, then a second round of calculations may be required, assuming 50% in building coverage in
place of 75%.
Fine Tuning
Site Selection
The choice of a site location depends on factors like the antenna heights above ground as well as above
clutter. A generic rule of thumb could be used depending upon the type of area under consideration.
Here the search area size is very critical, usually within 100m
the antenna should be at or slightly above the average surrounding clutter height
All near field obstructions should be avoided
Antenna orientation may be along major roads
Try and mount antennas close to solid structures like a lift motor room, this minimizes back lobe
radiation effects
As far as possible avoid towers on building tops as this might cause interference to
neighboring cells.
Residential/Suburban areas:
Here the site separations may be larger than the first case and to that extent the location of the site is also
less critical. Search areas are typically 200 m
Antenna height should be 3 to 5 metres above the average clutter height
Try and locate sites close to major routes or at large junctions
Back lobe radiation is less critical, though it is desirable to avoid it.
Industrial areas:
A suitable location as much at the centre of the area as possible should be selected.
High ways:
Objectives :
Explain the reason for extending the range of cells
Explain the various methods used for range extension
Discuss the results of the various methods
Most operators are nowadays looking for achieving maximum coverage with a minimum or optimum
number of sites. This requirement becomes significant especially in the 1800 MHz band. For in these
frequencies, the path loss in more and cell sizes are much smaller than GSM 900 frequencies. Hence to get
more coverage, the number of sites increases.
Extending the range of each cell helps in reducing the number of sites required. The range of a cell depends
upon the BTS transmit power, BTS receive sensitivity and the mobile’ s receive sensitivity. If we can
improve these parameters, the cell can be ‘extended’ .
To maximize BTS o/p power, single carrier cells can be used, this will avoid the combination losses of
multiple carrier cells.
The output power at the top of the cabinet could be set to 40Watts, giving an increase in signal strength of 3
dB.
Another way to maximize Tx and Rx signals is to implement low loss feeder cables. A typical 7/8”
Andrews coaxial cable has an attenuation of 3.92 dB/100mt. If a 1-5/8” Andrews cable with an attenuation
of 2.16 dB/100mt is used, then an increase of 1.6 dB can be obtained per 100m.
For sites with 2 or more carriers we can enhance the EIRP of the BTS by using air combining techniques.
By using duplexers, this can be achieved with 2 or 3 antennae as shown in Figure 7-1. For sites with 2
carriers we can enhance the EIRP of the BTS by using air combining techniques. When applied to
Polarization antennae, we can get air combining using a single antenna or with 2 antennae as shown in
Figure 7-2.
Figure 7-2
Improving BTS Sensitivity