Section A:
1.0 General Description
2.0 Reference Standards
3.0 Environmental conditions
4.0 Scope of work
5.0 Technical specifications
6.0 Inspection
7.0 Packaging and transport
8.0 Installation, testing and commissioning
9.0 Commercial terms and conditions
10.0 Documentation
11.0 Delivery period
12.0 Performance Bank guarantee
13.0 List of Preferred makes

Section B: (Schedule of Prices)


• Schedule of Prices
• Schedule of Spares
• Delivery schedule
• Schedule of deviations

List of Enclosures and Drawings:


1. Annexure-1: Guaranteed Technical Particulars

2. Tender Drawing No. (RRCAT/E/0421/R-0)


Specifications for Sandwich Bus duct for Power Conditioning System

1.0 General Description:

1.1 Introduction:
The specification covers the Design / Engineering, Fabrication, Assembly, Testing at works,
Supply at site, Installation, Testing and commissioning of a continuous duty, 50 Hz, 415
V±10%, 3200A, three phase four-wire, EC grade Aluminium Conductor Sandwich Bus Duct
having class F insulation and GI/Aluminium enclosure with degree of Ingress Protection IP65.

The Proposed outdoor sandwich Bus duct is required for electrical power transfer in between
Indus substation and Power Conditioning system (PCS) building. The Bus duct shall be routed
from Indus substation transformers (04 numbers) to existing Input electrical panel at PCS
building for feeding unconditioned power to PCS. The conditioned power will be fed back again
to existing Low Tension Power Control Centres (LT PCCs - 04 numbers) at Indus substation
from Output electrical panel of PCS through Bus duct. The total eight (08) lengths of the
sandwich bus duct shall be erected in between Indus substation and PCS building with their end
terminations. The end terminations on either sides ends shall be from top and through flexible
tinned copper links. The existing equipment layout along with tentative layout of proposed Bus
duct is shown in Tender drawing (RRCAT/E/0421/R-0). The bidder shall submit the requisite
design details, schematic drawings including end terminations etc. for the same in his techno-
commercial offer (Part-1).

1.2 Eligibility Criteria:

The bidder shall comply with the following conditions

1.2.1 The Bidder should be Original Equipment Manufacturer (OEM) / authorised system
integrator of OEM and engaged in supply, installation, testing and commissioning of Sandwich
Bus duct. The bidder shall have reasonable number of installed base of similar capacity and
submit a valid documentary proof for the same in part–I (Technical Bid). In case bidder is
authorised system integrator, he should submit the agreement with OEM, showing that he is
authorised to quote on their behalf for this tender and they shall support the bidder for all
warranty etc.

1.2.2 Bidder / OEM shall have experience of having successfully completed following works
during last five years ending 31.03.2009. Bidder / OEM must submit reference reports /
completion certificate from existing customers.

Three similar works costing not less than Rs. 64.00 Lakhs each or equivalent OR
Two similar works costing not less than Rs. 80.00 Lakhs each or equivalent OR
One similar work costing not less than Rs. 128.00 Lakhs or equivalent

The similar work would mean supply, installation, testing and commissioning of sandwich bus
duct /bus trunking system. In this regard, a list of clientele (with address and contact number)
having such installation shall also be provided for verification.

2.0 Reference Standards:


The Sandwich bus duct and all associated equipment and components shall be manufactured in
accordance with following publications of International Electrotechnical Commission (IEC) /
Bureau of Indian (BIS) Standards or equivalent standards.
Specifications for Sandwich Bus duct for Power Conditioning System

1. Specification for low voltage switchgears and control gears - IEC 60529/IS
General rules 13947Part1: 1993
2. Specification for Low-voltage switchgear and control gear IEC/EN 60439 (part 1) /
assemblies - Type tested and partially type-tested assemblies IS 8623 (part 1)
3. Specification for Low-voltage switchgear and control gear IEC/EN 60439 (part 2) /
assemblies - Particular requirements for busbar Trunking IS 8623 (part 2)
systems (bus ways)
4. Steel for general Structural purposes - specifications IS - 2062
5. Cold rolled low carbon steel sheet & strips. IS - 513
6. Code of practice for phosphate coating of iron and steel. IS - 6005
7. Guide for marking of insulated conductors & Guide for uniform IS-5578 & IS- 11353
system of marking and identification of conductors and
apparatus terminals
8. Specifications for Copper strips for electrical purposes. IS - 1897
9. Wrought aluminium and aluminium alloy bars, rods, tubes IS - 5082
and sections, plates and sheets for electrical applications.
10. Danger notice plates. IS - 2551

Note: Type test reports for the offered system issued by any IEC/CPRI/Government
accredited Lab shall be submitted with the offer.

3.0 Environmental conditions:

3.1 Service Conditions: The Sandwich Bus Duct and all its associated components shall be
capable of withstanding any combination of the following environment conditions, and
it must operate, without mechanical and electrical damage or degradation of operating
characteristics:

1. Ambient air temperature - 40º C


2. Maximum ambient air temperature - 48º C
3. Relative humidity not exceeding - 95 % non-condensing
4. Maximum altitude without de-rating - 1000 M
5. Seismic withstand level - As per Zone–III requirements
6. Ingress protection degree (acc. IEC 60529) - at least IP65

3.2 Heat dissipation: To remove heat from the Sandwich Bus Duct, its metallic enclosure
shall have sufficient heat dissipation capability throughout the year without any
additional cooling arrangement.

3.3 Adequate clearance between bus ducts shall be ensured. The proposed clearance shall
be sufficient from maintenance point of view. This shall not cause any mutual
interference also.

4.0 Scope of Work:


4.1 The scope includes the Design / Engineering, Fabrication, Assembly, Testing at
works, Supply at site, Installation, Testing and commissioning of a continuous duty, 50
Hz, 415 V±10%, 3200A, three phase four-wire, EC grade Aluminium Conductor
Sandwich Bus Duct having class F insulation and GI/Aluminium enclosure with degree
Specifications for Sandwich Bus duct for Power Conditioning System

of Ingress Protection IP65. The external Aluminium earthing conductor of minimum size
2 runs 50X8mm running along the bus duct shall be provided and the same shall be
connected to the existing earthing network by equivalent capacity GI/Aluminium strip.
Required measures shall be taken during jointing and connection for ensuring the
earthing conductor resistance as low as possible. The outdoor bus duct shall be provided
with canopy made out of CRCA sheet. These canopies shall be duly painted with
polyurethane paint of approved shade.

4.2 Supply, installation, testing and commissioning of all required accessories for this
Sandwich bus Duct like bends, end termination flanges with flexible tinned copper
links on either sides, MS fabrication for mounting/support, adopter boxes and earthing
of the bus duct from substation earthing grid are in the scope of Supplier. All required
minor civil works like wall cutting, bricks masonry and plaster on wall crossings etc.
shall also be under the present scope.
4.3 The scope also includes supply of spares and accessories required for five years trouble
free operation. Item wise unpriced list of spares shall be submitted along with part–I of
the offer. The prices shall be indicated for individual spare component alongwith part-
2 (Price bid) of the offer.

5.0 Technical Specification:

5.1 General: The Sandwiched Bus duct shall be of compact design, maintenance free and
suitable for outdoor application confirming to IP 65 as per IEC 60529/IS 13947Part1:
1993. A type tested low voltage switchgear and control gear assembly (TTA) as
per IEC 60439 (1 & 2) and IS 8623 (1 & 2) shall only be acceptable. The complete
assembly shall include rising mains, straight length, bends, joints, expansion joints,
offset, flanges, flexible lengths, overlapped jointing arrangement with indication of
proper pressure during tightening, thrust pads, spring hangers, flexible tinned copper
links at terminations, flexible rubber bellow and adopter box on flange terminations at
transformer side, universal fixing brackets, supports etc. in line with the site
requirements. Bolted joints shall be provided with suitable bolts, spring washers, lock
nuts etc. in line with the type tested design. The bus duct shall be reusable and can be
dismantled without any loss and breakdown of material.

5.2 Technical Parameters: The offered system should be suitable to take continuous 100%
loading in all positions. The temperature rise of Busbars shall not exceed 55°C over the
40°C ambient. Calculations shall be submitted, demonstrating rating and temperature rise.
The minimum rated RMS short circuit withstand current for the Busbars shall be 50 kA
for 1 sec. Bare Aluminium earth bus of minimum size 2 runs 50X8mm shall be provided
along the length of the bus duct. The Impedance balance shall be ensured among the
phases for achieving equal current sharing and voltage balance. The transposition details
may please be submitted with the part-I. Supplier shall furnish the values for mutual
inductance and voltage drop during the submission of detailed engineering drawings.

Current density : In line with Type tested design


Colour coding : Red, Yellow, Blue, & black etc.
Support :Compatible to withstand the stipulated short-circuit/earth
fault Current.

The insulating material shall be non-toxic, chemically inert, fire-retardant and stable
material.
Specifications for Sandwich Bus duct for Power Conditioning System

5.3 Material description and construction features:

5.3.1 Busbars and Joint: The busbars shall be of fully round edge and made of reputed
make EC grade Aluminium. Each busbar shall be individually insulated by means of
class F or better insulation. If required, the busbars shall be suitably treated at
termination ends and bimetallic strips can be used. Neutral conductor shall have the
same size as phase conductor. The Sandwich Bus duct system shall be manufactured in
convenient lengths to facilitate easy transportation and installation. Each section shall be
provided with suitable brackets at convenient intervals for fixing to the wall/roof
support. Expansion joints may be provided as per manufacturer’s design and
recommendation. Cross-section of the busbar and current density shall be in accordance
with the Type tested assembly for the rated capacity. Flexible tinned copper links shall
be used for terminations to the transformer/Panel.

5.3.2 Enclosure:
5.3.2.1 Material: The enclosure shall be made up of hot dip GI, however bidder may
offer aluminium.

5.3.2.2 Process: After proper metal pre-treatment (7-tank process) the enclosure shall be
hot dip galvanised. The same shall be duly coated with epoxy powder paint of approved
shade. The minimum thickness of coating shall not be less than 50 micron.

5.3.3 Supports and Canopy

The supplier shall use the purpose made fixing brackets/mountings. The supporting
structure shall have adequate space and strength for laying additional one run of similar
bus duct and stresses under short circuit (50kA for 1 sec.). The supplier is requested to
submit the drawings and design details of required supporting structure. The outdoor
bus duct shall be provided with canopy made out of CRCA sheet. This CRCA sheet shall
be processed under 7-tank metal pre-treatment process before painting. The canopies and
supports shall be duly painted with polyurethane paint of approved shade.

6.0 Inspection & Testing:


A comprehensive pre-despatch inspection including following Acceptance tests in line
with IEC 60439 (1 & 2) and IS 8623 (1 & 2) shall be conducted prior to despatch at
manufacturer's works / approved testing laboratory in presence of authorised
representative(s) from RRCAT. Typical section-samples with each of the items of
complete sandwich busduct system including coupling, straight sections, interconnecting
sections, bends etc shall be offered for these tests.

(a) Visual Inspection and Physical measurements for conformity to the specifications.

(b) Measurement of Insulation Resistance between Busbars and Busbar & earth with
1KV Megger.

(c) mV (milli-volt) drop test of one joint.

(d) High Voltage withstand test at 5kV; 50 Hz for one minute


Specifications for Sandwich Bus duct for Power Conditioning System

(e) Measurement of Average Resistance per conductor, impedance measurement at 50Hz


and few kHz etc.

(f) Degree of Protection (IP65) testing.

(g) Test for Short circuit withstand capacity for one section of Bus duct System.

(h) Heat run test for the assembled sample section with each of the items of complete
Sandwich bus duct.

7.0 Packing and Transport:


7.1 The Packing and transport is the responsibility of the supplier. The Company shall
furnish the list of packing materials containing items within it along with its weight
inside. The company shall do packing in prefabricated wooden crates and on arrival at
site material shall be opened and inspected by both supplier and RRCAT.

7.2 Equipments shall be packed and protected so as not to suffer deterioration, damage or
breakage during shipment, transhipment or storage in a tropical climate. All
lifting/handling points shall be clearly marked.

7.3 Each package shall be properly labelled to indicate the type and quantity of material it
contains along with the Purchase Order number, dimensions and any other necessary
data to identify the equipment and relate it to the Purchase Order. The supplier shall not
ship the equipment without prior approval of the purchaser’s representative and
subsequent written instructions to do so.

8.0 Installation, testing and commissioning:

8.1 Installation at site:


8.1.1 Sandwich Bus duct system shall be installed as per the recommendation of the
manufacturer. The busbar chamber should not have any access left open to prevent
entry of insects inside it. The supplier shall depute their specialist at site during the
installation, testing and commissioning period for attending the related issues etc.

8.1.2 Starting from activities of transport of the material within the site at RRCAT, supplier
shall arrange all the required material, handling equipments and requisite manpower
to carry out the installation work at site.

8.1.3 The installation of the Busducts has to be carried out with necessary rising mains,
straight length, bends, joints, expansion joints, offset, flanges, flexible lengths,
overlapped jointing arrangement with indication of proper pressure during
tightening, thrust pads, spring hangers, flexible tinned copper links at terminations,
flexible rubber bellow and adopter box on flange terminations at transformer side,
universal fixing brackets, supporting system, which are generated from ground/
External wall of the Indus Substation Building considering the factors of ease of
maintenance & replacement of particular section etc. The Supporting and either side
termination system drawings shall be submitted for the approval of RRCAT before
execution.

8.1.4 The building is ready for the subject system. The bidders are advised to visit the site
Specifications for Sandwich Bus duct for Power Conditioning System

with prior intimation for appropriate planning. The Storage at site may be
appropriately planned.

8.2 Testing and Commissioning:


All the routine tests shall be repeated at site after the completion of Installation of
Sandwich Busduct System including HV test, Insulation resistance and mill volt – drop as
per relevant IEC/IS and a report shall be submitted for approval of RRCAT. The
endurance test for 96 hours with available load/rated load shall be considered as part of
commissioning.

The supplier shall arrange all the required manpower, equipments etc. to carry out the
testing and commissioning work at site.

9.0 Commercial Terms & conditions:


The supplier shall strictly adhere to the completion schedule for supply, installation &
commissioning. The Bus duct shall be guaranteed for a period of minimum 2 (Two) years
from the date of acceptance after commissioning.
10.0 Documentation:
10.1 With Bid:
(a) Copies of experience certificate for the similar work executed.
(b) Copy of OEM authorisation certificate in case bidder is authorised system
integrator.
(c) Detailed catalogues and drawings for regular and expansion joints.
(d) Original Catalogues and literature for offered items.
(e) List of installations completed in last five years along with their completion
certificate.
(f) Type Test reports for offered items, including following tests:
(i) Heat run test.
(ii) Ingress Protection (IP).
(iii) Impulse voltage withstand test.
(iv) Short-circuit withstand test.
(g) Detailed supporting calculations for offered items for the followings:
(i) Heat loss & Temperature rise.
(ii) Sizing of busbars and insulation system rated for continuous current and
fault current (50kA) for one second.

10.2 Before manufacturing for approval of RRCAT:


Detailed bus duct drawings along with end terminations, supporting structure and
bill of material.

10.3 On supply of material:


Three (03) sets of proposed layout-drawings, test reports, technical catalogues,
installation instructions, O&M instructions, guarantee certificate & compliance
report etc.

10.4 After completion:


(a) 6 sets of instruction bound manuals to be submitted by the supplier containing as-
built drawings, inspection & test reports, technical catalogues & test certificates, O&M
instructions, installation instructions, guarantee certificate & compliance report etc.
Specifications for Sandwich Bus duct for Power Conditioning System

(b) One softcopy of the above mentioned (refer (a)) documents.

11.0 Completion Period:


The bidder shall quote for minimum completion period. In this regard, a detailed bar chart
shall be submitted by the bidder for manufacturing, testing at works, transportation,
delivery at site, and installation, testing & commissioning at site. Expected completion
schedule for the total work is around 04 (Four) months.

12.0 Performance Bank Guarantee:


The supplier shall furnish a bank guarantee towards performance of the equipment valid
till the offered guarantee period of 2 years.

13.0 List of Preferred Makes:

Item Make
Aluminium Sandwich Bus Duct System Henikwon/ Schneider

Note:
1. Alternate makes shall also be acceptable subject to compliance with tender
specifications.
2. The offered system shall be strictly complying with the tender specifications.
3. Item not covered above, but required for the work shall be of reputed makes
subject to approval of RRCAT.
Specifications for Sandwich Bus duct for Power Conditioning System

TECHNICAL DATA SHEET

1. DESIGN PARTICULARS

1.1 Type of Bus Duct COMPACT BUSDUCT WITH


SANDWICH BUSBARS
1.2 Type of construction Sandwich epoxy resin / mica polyester
insulated type busduct.
1.3 Ingress protection IP 65
1.4 Supply frequency 50 Hz
1.5 Type of Cooling Natural Air Cooled
1.6 Installation Outdoor
1.7 Nominal Service Voltage - in Volts 415±10%
1.8 Continuous Current Rating of Bus Ducts 3200A
under Site Conditions - Amps
1.9 One minute Power Frequency Withstand 5 kV (rms)
Voltage
1.10 Short Time Current Rating for one second 50
- kA (RMS)
1.11 Maximum Temperature rise of Busbars at 55 oC
Rated Current over and above an ambient
of 40°C
1.12 Busbar Material EC grade Aluminium

1.13 Busduct Enclosure Material GI/Aluminium


1.14 Thickness of epoxy powder coating over Minimum 50 micron
enclosure
2.0 BUS DUCTS TENTATIVE LENGTH
2.1 Bus Duct - length in mtrs. Refer Tender drawing No.
RRCAT/E/0421/R-0
2.2 90° Bend
2.3 No. of Terminations
3.0 GENERAL
3.1 External Earthing Conductor 2runs of 50X8mm Aluminium
3.2 Canopy material and thickness CRCA and 2mm thick
3.3 Canopy and supports protection against Polyurethane painted
corrosion
Specifications for Sandwich Bus duct for Power Conditioning System

Section-B

1.0 Schedule of Prices:


Note:
1. The bidders may visit the site for final estimation of required length, bends, joints and
supports etc. for the bus duct. The prior permission of Chief Engineer, RRCAT (Fax No. 0731-
2488866 or email ID kekre@rrcat.gov.in.) is mandatory for the site visit.

2. Bidders are requested to quote the prices in foreign currency/Indian Rupees (as applicable)
with complete details of taxes and duties as applicable.

S.No. Description Qty. Supply Taxes Erection, Taxes Amount


Rate & Testing & &
Duties Commissioning Duties
Rate
1.0 Design/ Engineering, fabrication,
Assembly, Testing at works,
supply, erection, testing and
commissioning at site of
continuous duty, three phase, four
wire, 3200A, 415V; 50Hz;
Outdoor type Aluminium
Conductor sandwich bus duct
having GI/Aluminium enclosure
(IP65) and class F insulation PRICES
along with required MS
fabrication/mountings supports NOT
and other accessories as per
specifications. TO
1.1 From transformer No. 01 to PCS 01 set
Incoming Panel BE
1.2 From transformer No. 04 to PCS 01 set FILLED
Incoming Panel
1.3 From transformer No. 05 to PCS 01 set IN
Incoming Panel
1.4 From transformer No. 07 to PCS 01 set PART-1
Incoming Panel
1.5 From PCS output Panel to PCC-3 01 set
in Indus substation
1.6 From PCS output Panel to PCC-2 01 set
in Indus substation
1.7 From PCS output Panel to PCC-1 01 set
in Indus substation
1.8 From PCS output Panel to PCC-4 01 set
in Indus substation
1.9 Spares price as per the spares list

Signature & Seal of the Bidder


Specifications for Sandwich Bus duct for Power Conditioning System

2.0 Schedule of Spares: The bidder shall submit the spares list as mentioned in scope of
work (4.3).

S.No. Description Qty. Supply Rate Amount

PRICES PRICES
NOT NOT
TO TO
BE BE
FILLED FILLED
IN IN
PART-1 PART-1

The final spares list/quantity shall be on the purchaser discretion.

Signature & Seal of the Bidder

3.0 Completion Schedule:

The bidder shall submit the completion schedule along with the offer. After placement of
order, duration required for each activity should be mentioned separately as per the format
given below.

S.No. Activity Duration


1.0 Design and Engineering
2.0 Fabrication
3.0 Assembly and Testing at Works
4.0 Supply at site
5.0 Installation at site
6.0 Testing and Commissioning

Signature & Seal of the Bidder


Specifications for Sandwich Bus duct for Power Conditioning System

4.0 Schedule of deviations:

There are no deviations in the specification of the offered item(s) except for the following.

S.No. Tender Deviation detail Remarks/Justification


Specification
Para/Point No.

Signature & Seal of the Bidder


Specifications for Sandwich Bus duct for Power Conditioning System

Annexure-1
GUARANTEED TECHNICAL PARTICULARS (GTP)

The Bidder should compulsorily fill the Guaranteed Technical particulars.


(To be furnished with the Part-I Technical offer)
Sandwich Bus duct System:
S. No. Description Details
1.0 (Generals):
1.1 Make & Model
1.2 Experience of OEM in the model offered ( ) years
1.3 Whether the bidder is Authorised System Integrator Yes/No
1.4 In case of Authorised System Integrator Authorisation certificate Yes/No
from OEM is enclosed
1.5 Experience of the bidder ( ) years
1.6 Manufacturing certification (ISO9001etc.)
1.7 Service Conditions:
Average ambient air temperature ( )°C
Maximum ambient air temperature ( )°C
Relative humidity not exceeding ( )% Non-
Maximum altitude without derating Condensing
Ingress Protection class ( )mtrs.
IP( )
1.8 Compliance to Standards IEC( )
IS( )
1.9 Mounting position Vertical/Flat
1.10 Rated current ( )A
1.11 Momentary Current Rating - kA (Peak)
1.12 Rated Insulation voltage(Ui) ( )V
1.13 Rated Operating voltage(Ue) ( )V
1.14 Standard Impulse (1.2/50µsec.) voltage(Uimp) withstand capacity ( )kV
1.15 Rated frequency ( )Hz
1.16 Weight of the assembly per metre ( )kg.
1.17 Short circuit withstand capacity ( )kA/ for 1sec.
1.18 Perm. suspension distances of Trunking units ( )mtr.
1.19 Approximate expansion from no load to full load at maximum ( )mm/m/°C
ambient temperature.
1.20 Minimum recommended clearance between bus ducts, wall, floor ( )mm
and others
2.0 Conductor:
2.1 No. of active conductors and cross-section area …….Numbers,
For each phase and neutral. …….mm2
2.2 Name of Conductor Material ………………,
Purity grade ..…………..,and
Conductivity …………mho/m

2.3 Bare earth conductor material and size ………….., and


………..mm x mm
2.4 Any special coating on conductor / at joints
Specifications for Sandwich Bus duct for Power Conditioning System

S. No. Description Details


2.5 Average resistance and reactance per conductor at rated ………Ohm/m,
current (Amb. Temp. 40° C) ………Ohm/m.
2.6 Maximum hot spot temperature rise above Maximum ( )°C
ambient temperature of 48oC
2.7 Maximum Voltage drop per mtr. (At 0.8 p.f.) at rated ( )mV and ( )mV
current.
2.8 Maximum Voltage drop per joint at rated current.
3.0 Insulation:
3.1 Class of insulation
3.2 Name of Insulating material and its thickness , ……....mm.
3.3 Dielectric Strength ( )kV/mm
3.4 Compressive Strength
4.0 Enclosure:
4.1 Material thickness .........,mm
4.2 Surface treatment process
4.3 Painting process
5.0 Joints:
5.1 Number of bolts per joint
5.2 Insulating material over bolt and its Insulation strength
5.3 Lock nut provided for tightening Yes/No
6.0 Expansion joint:
6.1 Recommended interval length for Expansion joint ( )mtr.
7.0 End Flange:
7.1 Conductors clearance ( )mm
7.2 Terminals Length ( )mm
8.0 Supports for bus duct:
8.1 Supporting interval for horizontal run ( ) mtr.
8.2 Spring, hangers etc. included for vertical risers Yes/No
8.3 MS angle/brackets included Yes/No
8.4 Polyurethane coated Yes/No
9.0 MS sheet work:
9.1 Material for canopy and thickness , ……..mm
9.2 Material for adopter boxes and thickness , ……..mm
9.3 Polyurethane coated Yes/No
10.0 Flexible Tinned copper links:
10.1 Cross-section of link ( )mm2
10.2 Current Carrying Capacity ( )A
10.3 Resistivity of material ( ) Ohm-m

Signature & Seal of the Bidder