Professional Documents
Culture Documents
B MATERIAL
1 Batu Gunung M3 1.2000 290,000.00 348,000
Total B 348,000
C PERALATAN
1 Alat Bantu Ls 1.0000 5,000.00 5,000
Total C 5,000
C PERALATAN
Total C
B MATERIAL
1 Pipa PVC + Ijuk Ls 1.0000 7500 7,500
Total B 7,500
C PERALATAN
Total C
JENIS PEKERJAAN
: Pasangan Wire Mesh Ø 6 mm
SATUAN PEMBAYARAN : M²
B MATERIAL
1 Wire Mesh Ø 6 mm M² 1.1000 34,000.00 37,400
Total B 37,400
C PERALATAN
1 Alat Bantu Ls 1.0000 $ 1,000 1,000
Total C 1,000
B MATERIAL
1 Kayu Ulin M³ 0.03000 3,750,000.00 112,500
Total B 112,500
C PERALATAN
Total C
B MATERIAL
Total B
C PERALATAN
1 Excavator Jam 0.0150 350,000.00 5,250
2 Weel Loader Jam 0.0150 250,000.00 3,750
3 Dump Truck Jam 0.0600 150,000.00 9,000
4 Alat Bantu Set 0.2000 20,000.00 4,000
Total C 22,000
B MATERIAL
1 Batu Pecah 1/2 2/3 cm M³ 0.7200 280,000.00 201,600
2 Pasir Pasangan M³ 0.5510 200,000.00 110,200
3 Semen Kg 220.0000 1,060.00 233,200
4 Kayu Bekisting M³ 0.0150 1,800,000.00 27,000
Total B 572,000
C PERALATAN
Total C
B MATERIAL
1 Batu Pecah 1/2 2/3 cm M³ 1.00500 280,000.00 281,400
2 Pasir Pasangan M³ 0.50500 200,000.00 101,000
3 Semen Kg 350.27030 1,060.00 371,287
4 Kayu Bekisting M³ 0.01500 1,800,000.00 27,000
Total B 780,687
C PERALATAN
1 Concrete Mixer Jam 0.73000 300,000.00 219,000
2 Concrete Vibrator Jam 0.73000 25,000.00 18,250
3 Water Jet Pump Jam 0.06330 20,000.00 1,266
4 Alat Bantu LS 1.00000 20,000.00 20,000
Total C 258,516
B MATERIAL
1 Batu Pecah 1/2 2/3 cm M³ 0.03100 280,000.00 8,680
2 Pasir Pasangan M³ 0.03200 200,000.00 6,400
3 Semen Kg 28.00000 1,060.00 29,680
Total B 44,760
C PERALATAN
1 Concrete Mixer Jam 0.00500 300,000.00 1,500
2 Concrete Vibrator Jam 0.00500 25,000.00 125
3 Water Pump Jam 0.00570 20,000.00 114
5 Dump Truck Jam 0.00450 150,000.00 675
6 Alat Bantu LS 1.00000 20,000.00 20,000
Total C 22,414
B MATERIAL
1 Semen PC Kg 12.50000 1,060.00 13,250
2 Pasir Pasangan M3 0.04000 200,000.00 8,000
3 Batako Bh 12.50000 5,000.00 62,500
Total B 83,750
C PERALATAN
Total C
B MATERIAL
Total B
C PERALATAN
1 Excavator Jam 0.01500 350,000.00 5,250
2 Dump Truck Jam 0.03000 150,000.00 4,500
Total C 9,750
B MATERIAL
1 Buis Beton 1/2 Ø 30 Cm Bh 2.00000 60,000.00 120,000
Total B 120,000
C PERALATAN
1 Alat Bantu LS 1.00000 1,000 1,000
Total C 1,000
B MATERIAL
1 Pasir Urug M³ 1.20000 100,000.00 120,000
Total B 120,000
C PERALATAN
Total C
B MATERIAL
1 Wire Mesh Ø 10 mm M² 1.10000 95,000.00 104,500
Total B 104,500
C PERALATAN
1 Alat Bantu Ls 1.00000 1,000 1,000
Total C 1,000
B MATERIAL
1 Buis Beton Ø 50 Cm Bh 2.00000 125,000.00 250,000
Total B 250,000
C PERALATAN
1 Alat Bantu LS 1.00000 $ 1,000 1,000
Total C 1,000
B MATERIAL
1 Kayu Ulin M³ 0.04000 3,750,000.00 150,000
Total B 150,000
C PERALATAN
Total C
JENIS PEKERJAAN
: Pancang Galam Ø 15 Cm
SATUAN PEMBAYARAN : Titik
B MATERIAL
1 Kayu Galam Ø 15 Cm Btg 1.00000 25,000.00 25,000
Total B 25,000
C PERALATAN
Alat bantu Ls 1.00000 2,000 2,000
Total C 2,000
B MATERIAL
Total B
C PERALATAN
Total C
B MATERIAL
1 Paving block Bh 38.00000 2,000.00 76,000
2 Pasir M³ 0.10000 200,000.00 20,000
Total B 96,000
C PERALATAN
1 Alat Bantu Set 0.20000 1,000 200
Total C 200
B MATERIAL
1 Paving block Bh 28.0000 2,500.00 70,000
2 Pasir M³ 0.1000 200,000.00 20,000
Total B 90,000
C PERALATAN
1 Alat Bantu Set 0.2000 1,000 200
Total C 200
B MATERIAL
1 Bata Merah 10 x 10 x 20 cm Bh 80.0000 600.00 48,000
2 Semen portland Kg 11.5000 1,060.00 12,190
3 Pasir Pasang M3 0.0430 200,000.00 8,600
Total B 68,790
C PERALATAN
1 Alat Bantu Set 0.2000 1,000 200
Total C 200