Professional Documents
Culture Documents
Atlas Honda is the market leader in the motorcycle industry and its efficient
working shows this position can be maintained and improved even further in the years to
come. Its nearest competitors have still a long way to reach Atlas. The reasons behind
this are the quality standards at Atlas, its committed workforce and ample chances of
growth at all levels in the organization.
Atlas Honda has this exemplary tradition of orientation which gives its new
recruits a clear picture of the industry and production employed at the industry. I would
like to appreciate Atlas Honda on their efforts and wish them future success (Amen).
This report contains the workings of the departments that I visited during the
orientation program at Atlas Honda. This report also has suggestions for further
improvements to the current working and processes in the organization.
1
ATLAS HONDA – COMPANY PROFILE
Atlas Honda Limited is a joint venture between the Atlas Group and Honda Motor Co.
Japan.
The company was created by the merger of Panjdarya Limited, Sheikhupura successor to
Atlas Epak Ltd., Dhaka since taken over by the Government of Bangladesh and Atlas
Autos Ltd. in 1991. Both these motorcycle manufacturing concerns were established by
the Atlas Group. Atlas Honda Limited manufactures and markets Honda motorcycles in
collaboration with Honda Motor Company. The Company also manufactures shock
absorbers under a Technical Assistance Agreement with Showa of Japan, world leaders
in shock absorber technology.
Honda motorcycles are by far the best selling motorcycles in the country with an
unmatched reputation for high quality, reliability and after-sales-service.
2
strongly encouraged to allow constructive self-expression and teamwork. The Company
training and development programme encourages each member to develop himself and
contribute to his full potential.
Atlas Honda is playing a pioneering role in creating conditions for easy and confident use
of motorcycles all over the country.
A vast and growing network of over 1500 motorcycles sales service and spare parts
dealers has been established. To back up this system, Atlas has set up Technical Training
Centers in Karachi, Lahore and Faisalabad, which provide several courses of varying
duration and complexity for motorcycle mechanics and users each year. Mobile training
facilities take the latest know-how, technology and maintenance of motorcycles to major
rural and urban centers around the country.
During the current year, the company produced 117,209 units, which is a 30%
increase over the previous year’s production of 90,064 units.
Sales revenue increased to Rs.6.98 billion from Rs.5.52 billion last year
showing a growth of 26.44%
Profit before tax increased to Rs.650.92 million as against Rs.394.57 million
for the previous year.
The operating expenses went up to Rs.360.04 million as compared to
Rs.322.37 million last year.
Price for CD-70 has decreased to Rs. 58500 from Rs.68500 while the price of
CG-125 has gone down to Rs.73000 from Rs.83000.
This clearly shows that the company is on the progress ladder and will overhaul its
competitors by a large percentage. Currently, it holds around more than 60% of the
market share in the motorcycle industry. Coordination and extensive efforts of all the
departments put together has resulted in improved performance for the company.
3
VISION
To remain the market leader in the motorcycle industry and emerge as a globally
competitive center of production and exports.
PROPOSED VISION
Strengthen our dominance as the market leader in the motorcycle industry, emerging as a
globally competitive center of production and exports.
MISSION STATEMENT
4
COMPANY POLICY
CUSTOMER
Our customers are the reasons and sources of our business. It is our joint aim with our
dealers to ensure that the customers enjoy the highest value of satisfaction from use of
Honda.
QUALITY
To ensure that our products and services meet the set standards of excellence.
LOCAL MANUFACTURING
To be the industry leader in indigenization of motorcycle parts.
EMPLOYEES
Enhance and continuously update each member’s capabilities and education to provide an
environment which encourages practical expression of individual potential in goal
directed team efforts and compensate them attractively according to their abilities and
performance.
TECHNOLOGY
Maintain and develop advantage by use of distinct business technology.
SHAREHOLDERS
Safeguarding shareholder by maximizing profit, payment of regular satisfactory dividend
and adding value to shares.
CORPORATE CITIZEN
To comply with all Government laws and regulations to maintain a high standard of
ethics in all operations, and to act as a responsible member of the community.
5
QUALITY POLICY
6
SWOT ANALYSIS
STRENGTHS
A cordial, friendly and frank environment free of any communication gaps.
MBO (Management by Objectives) – Targets for the future are set well in advance by
the management at Atlas Honda, which provides the employees with goals to work
upon and improve any shortcomings.
Punch Card system, which creates a sense of accuracy and responsibility in the
employees to reach on time and helps to maintain discipline.
A standardized uniform for all, which removes any possibility of discrimination and
promotes cordiality.
Job Rotation is practiced on a regular basis aiding the employee to add to his skills.
Kaizen (Japanese principle of continuous improvement) and Ala Mayar (quality
standards) strictly followed. This makes sure that the organization and the team at
Atlas Honda, keep improving themselves and their surroundings.
Well-established brand name in the market.
Maximum employee satisfaction – Turnover less than 1%
Adequate exposure to the surroundings to newly recruited employees before
assignment of work responsibilities.
Continuously growing demand for Honda motorcycles all over Pakistan.
Expanding network of dealers and service facilities.
Committed management and a dedicated workforce.
Transparent and merit-based selection program for new employees.
WEAKNESSES
Inadequate backup strategies and planning for unforeseen and unpredicted
competition.
Lack of an established Marketing Research department, therefore lacking in proper
forecasting of future activities.
7
No major changes to existing models or introduction of a new model since past few
years.
Lack of advertising campaigns for promotion of the product and entering newer
markets.
Lack of extracurricular activities and sponsorship for sports etc.
OPPORTUNITIES
Huge market size covering all of Pakistan, with lots of unventured markets needing
focus and attention, for development into future profitable territories.
Population growing and youth need to be focused on, as future prospects of
motorcycle customers.
Poor quality and performance of Chinese motorcycles can be encashed by Atlas
Honda, to project their ever improving quality and sustainability to the customers.
Various successful ERP implementations in organizations, supporting need for
implementation at Atlas Honda, aiding smooth and efficient flow of business
processes.
Low prices by competitors induced Honda to decrease its prices resulting in excess
demand for the market leader, expected to grow at a larger scale.
Ever increasing media for advertising provides Honda with opportunities to project
itself in the best-suited way to its prospect customers.
Growing second hand exchange of Honda motorcycles due to the cost factor. Honda
dealers now practice this process, which gives Honda great deal of control over its
circulation of motorcycles in the market.
THREATS
New Entrants such as the growing brands of Chinese motorcycles in the market pose
a serious threat for Honda but due to the fact, that Honda has reduced its prices, they
have increased their market share.
Political Instability and Unhealthy Law & Order Situation are also a major threat for
Honda. Honda customers are reported to have said that they were robbed of their
motorcycles after just having taken the motorcycle out of the factory. Honda is
8
reported to have lost quite a great deal of market, especially in Karachi, due to these
snatchings.
MARKETING MIX
PRODUCT
Honda currently offers two brands in the market: CD-70 and CG-125 (CD and CG
are manufacturing model codes for the motorcycle and 70 and 125 are the
displacement volumes of the engines).
In the past, Honda has offered more than 40 brands for its customers, which were
taken out of the production process due to their declining sales and contracting
markets.
The main features of Atlas Honda motorcycles that have given it the edge over its
customers are: High resale value, fuel economy, durability and reliability.
The product parts installed in the motorcycle are produced in-house, purchased from
vendors or imported from Japan as CKD (Complete Knock Down) units.
PLACE
Atlas Honda has two production plants at Karachi and Sheikhupura. At the Karachi
plant, only CD 70 is produced while at the Sheikhupura plant, CD 70 and CG 125
both are produced. The Karachi plant is on 5 acres while the Sheikhupura plant is on
25 acres.
The distribution network of Honda comprises of 64 Antenna Dealers and 925 Service
Dealers all over the country (Antenna Dealers are responsible for the warranty claim
by the customer and its relevant processing while Service Dealers are responsible for
sales and parts replacement and service to customers).
4-Stroke Mechanics are independent mechanics who are trained by Honda to provide
service to customers. Honda trains them in 4-stroke technology and later if they
provide excellent service and satisfaction to customers, Honda can make them
Service Dealers after quality assurance check.
9
PROMOTION
Atlas Honda practices advertising but only to a limited degree. The reason being that
it already has a well-established market and excess demand.
The need for advertising arises when the product is to be ventured out into newer
arenas or newer markets. Due to this factor, Atlas Honda has started advertisements
some time back.
The most common advertisement seen on the media is on GEO TV with a catchy
theme and tune.
Other than this advertisement, Honda uses sign boards, pana flex boards and
billboards to display its products.
Print media is also employed for advertisements due to the fact that newspaper is a
widely read medium of information.
Atlas Honda has sponsored Independence Day rallies in the past.
In the last Champions Trophy, Atlas Honda sponsored hockey matches but this needs
to be practiced on a more regular basis.
PRICE
For the CD 70, Atlas Honda has set the price at Rs.58500 and for CG-125, the price is
Rs. 73000. These prices have been revised after a Rs.10000 decrement in the price of
Atlas Honda some time back.
Chinese competitors’ motorcycles lie in the range of Rs.30000-50000, due to which
people are going for Chinese motorcycles (cost factor but poor quality) but still
cannot reach the market leader spot that Honda has occupied since many years.
Yamaha and Suzuki have also followed in Honda’s footsteps and decreased their
prices accordingly.
10
ORIENTATION PLAN
The orientation program at Atlas Honda lasted for a week. It was a nice and knowledge
acquiring experience of the company, its environment and workings. There was a visit of
each department listed below, for 3 hours where the related employees briefed about their
respective departments. It is a courtesy on behalf of the personnel in the various
departments to take out time for the newly recruited employee and show him around and
they deserve full regard for it.
The departments visited were:
HR and Administration
Information Technology
Logistics
Finance
Quality Assurance
Maintenance
CAD / CAM
Production
PPC
Marketing / Parts
The orientation helps the newly recruited employee feel at home and easy around his
new working new environment. He gets to know the people in the organization who
are always willing to lend him a helping hand.
The orientation program explains the business proceedings, the production processes
and various related activities going on at the company and respective departments
playing their parts.
All the departments are covered and the personnel brief about their respective
departments. The employee now knows whom to approach for any particular
problem, which requires solutions and explanations.
11
Suggestions for Improvement in the Orientation Program
The time duration for orientation in each department should be set keeping in mind
the set-up of the respective departments and number of business processes it carries
out. In our orientation, the production department orientation time was 3 hours, which
was the same as other departments’ orientation time although production requires
more time to be understood well.
The personnel should be informed in advance about the new recruit’s visit to his
particular department. Otherwise, it happens that the personnel in that department
have scheduled activities for the day and are unable to give ample amount of time to
the newly recruited employee for orientation.
Before the orientation actually starts, each department representative should give a
brief presentation to the recruit about his respective department’s processes and then
show him the actual working. The recruit can also be given a short pamphlet
explaining each department and the personnel working in them.
The orientation should start with the assembly line and production after HR /
Administration visit. This would help the trainee to grasp how actually things are
carried out and prior knowledge of motorcycle parts and manufacturing.
12
DEPARTMENT VISITS
HR / ADMINISTRATION
13
Hay’s Job Evaluation System is used for compensation of employees and their
performance measurement. Job grades are assigned to positions instead to persons and
each position is analyzed individually and compensated accordingly.
14
INFORMATION TECHNOLOGY (IT) DEPARTMENT
15
The IT Structure at Atlas is about to undergo revision at a massive scale. The reason for
this is the new proposal under consideration. Atlas is planning to shift from:
LAN to WAN (Wide Area Network)
Oracle to ERP (Enterprise Resource Planning) : The ERP is to be
installed at Karachi and connected to the other regional offices in
different cities. In Karachi, connection of the company’s Server with
the ISP will be via Radio Link while the ISP – ISP Link is to be of
Fiber Optic.
The ERP to be installed is currently under consideration. It is to be
selected from the packages available in the market or it is going to be a
customized one: People Soft, JD Edwards, SAP are market leaders in
ERP packages. ERP covers all the departments of an organization and
their related accounting etc.
The ERP installation process under consideration is a great effort on behalf of Atlas
Honda to venture into new IT arenas to produce maximum efficiency. This proposal
should be brought forward at the earliest and implemented.
ERP experienced and ERP trainees to be hired when ERP implemented at Atlas
Honda, adding to the currently available skill set of employees. Current employees
need to be given extensive training to get the ERP know-how.
Creating a company website localized according to the cities and having online query
forms so visitors queries are handled effectively and the latest information is
uploaded on the website. Suggestion forms should be present so employees can
contribute as to how to improve the workings of the company and visitors can suggest
ideas too.
16
FINANCE
SALES TAX
The Sales Tax applied is VAT (Value Added Tax), which is at the rate of 15% on
final product after the cost and profit are calculated for registered goods and 18% for
unregistered goods.
IMPORT ACCOUNTING
Import Accounting deals with the complexities involved in the Import process of
parts to the company. The first step is the opening of L / C by importer in favor of
supplier and the insurance coverage etc. After L / C is opened by importer, supplier is
informed by the L / C Advising Bank in the supplier’s country who proceeds with the
documentation needed (Supplier must submit sales invoice with the description of goods
and their cost, Certificate of Origin identifying the country where the goods were
manufactured and other relevant documents) The supplier sends his documents (e.g.: Bill
of Exchange (Short term financial instrument addressed by seller requiring buyer to pay a
certain amount of money at a future date), Sales Invoice etc.) to the L / C Advising Bank.
The bank examines the documents for compliance with credit terms. These documents
are sent to Issuing Bank who confirms the deal. Bill of Lading is issued by carrier
17
describing the goods accepted by the carrier and under certain conditions, and serves as a
receipt for goods to be delivered to a designated person.
Bill of Entry is taken to Customs House where importer tells them that goods are
coming at port and duties etc. are cleared (HS Code helps to identify the goods being
imported).
Insurance coverage is also accounted for and is divided in: FOB (Supplier’s
responsibility for cost of goods until they are loaded on ship), CIF (Supplier’s
responsibility for goods only until loading of goods from supplier’s port, but he has to
insure the goods and must pay the cost and freight necessary for delivery of goods to
buyer and C & F (Supplier must pay the costs and freight till delivery of goods to port of
destination).
DEALER ACCOUNTING
The dealers after accepting payment from the buyer deposit the money in the respective
branch of the bank designated by Atlas Honda for this purpose. From there on, the
payment is transferred to the Central Branch of the designated bank. Order form copy is
received by department and booking is okayed.
This department is concerned with salaries structure preparation, which is done through a
computerized system. Attendance of employees is recorded and at the end of the month,
salary of all employees are paid after deductions of tax, absenteeism etc. Additions for
medical, overtime etc. are also made accordingly.
18
PAYABLES
For inventory purposes, FIFO (First In-First Out) accounting method is followed. Stock is
maintained up to 10 days average.
Fixed Assets accounting is also done by this department. Depreciation on fixed
assets is done using Straight-Line and Reducing Balance Method. Computers and
Accessories and Dies and Jigs are charged to income on a straight-line basis. Other assets
are depreciated on reducing balance method. The depreciation method and useful lives of
items of fixed assets are reviewed periodically and altered when needed.
Costs associated with developing and maintaining computer software are
recognized as expense as incurred. Costs associated with unique software products and
generating economic benefits exceeding costs beyond one year, are recognized as
Intangible Assets.
19
QUALITY ASSURANCE DEPARTMENT
When the parts come in from vendors, a Tender note is prepared for all the
incoming parts in the day. A receiving report is prepared for the goods when
they are received.
The incoming parts are divided into:
Critical parts: Concerned with safety of bike rider
Control items: Which can cause functional failure
Others: Concerned with appearance of motorcycle
A shortage list is prepared at day’s end for items short supplied by vendor.
An inspector checks the items and takes random samples from them. After
checking, an Inspection Report prepared which discusses the equipment
checked and the specific measures that were used. Those who have failed the
test are returned back to vendor if purchased from vendor.
80% of items are checked at Vendor’s location and the remaining 20% are
checked at Atlas Honda by their own inspector. In case of doubt on a
particular lot, the whole lot is checked. At the vendor’s, this inspector from
Atlas Honda attends the quality check carried out and suggests improvements
for the processes.
Meetings are held from time to time discussing the various equipment, quality
assurance checks and suggestions for improvement are put forward.
There is a Standard room for quality check where the items are checked on Calibration
Equipment. For example, Roundness Testing Machine checks for roundness of various
motorcycle parts and is sensitive up to 0.1 micron. Other equipments are micrometer and
verniers, ageing machine, owen etc which have separate functions.
An endurance test is carried out and the motorcycle is checked for several
kilometers on several obstacles and routes for durability and efficient performance.
20
MAINTENANCE DEPARTMENT
The Maintenance Department is responsible for working on the machines and equipment
that shows faults and breakdowns during the day and to get them into running position as
the earliest so there is minimum production loss. It is responsible for supervision and
managing spares and staff. It is also involved in forecasting and planning for machine and
equipment replacement. Currently, there are 282 machines with 197 of them in
production.
Types of Measures:
Corrective Maintenance: This is carried out for daily breakdowns and
inefficiencies in machines.
Preventive Maintenance: This is carried out as advance planning of faults that
can occur in the machines. Forecasting and planning for machine and parts
replacement is prepared at the start of each year to see which equipment needs
work.
Spare Parts (Machine wise): Spare parts are reordered on basis of minimum
stock level and historical usage in the past. A spare part report is prepared for
finding utilization of spare parts machine wise.
The management staff for the department should consist of more than one skilled
manager. The reason being, that the machines can breakdown any time and if one
manager is employed in repairing that particular machine, the other can work on the
next machine that breaks down.
The maintenance manual should contain record of the most common breakdowns and
scenarios where the recent breakdowns were tackled efficiently so other people in the
team can anytime study and learn from them.
21
PRODUCTION PLANNING AND CONTROL DEPARTMENT
Production Plan is prepared for the whole month deciding color, number of units to
be produced – depending on market demand (usually information is got from
dealers).
Copy of the production plan is given to procurement and stores.
Plan is submitted at start of the month for units required to be produced as decided by
Marketing Department.
Daily Activity Report prepared for planned and actual monthly produced units. It also
shows record for local parts and those In-Transit.
A list indicating the shortage of parts is sent from Sheikhupura at day’s end to
Karachi. Those units are checked in store and if present, are sent with next day’s
scheduled supply to SKP.
Raw Material Import File maintained which tells about shipment, order, arrival,
production and stock maintained for 2-3 months.
Work Order given to shops which gives an outline of production for the month at
hand.
Issuance of frame number and engine assembly number also done by PPC.
The department personnel have a daily check on the units produced and go for the
information to the various shops producing the units. They check the files and
records. The simple way should be that for each department, their display board
should display the units actually produced and planned production and reasons for the
shortcomings so that they can be improved on and discussed for later improvement.
22
LOGISTICS DEPARTMENT
LOGISTICS
Vendor Procurement deals with parts which are: In-house produced, CKD (Complete
Knock down Units) (these are units imported from Japan) and Vendor procured
(Those procured from Vendors). 80 Vendors currently are in Karachi and 65 Vendors
are in Sheikhupura.
In house production is of the various motorcycle parts mainly press parts and fenders,
patches, hub, switch assembly line, frame body etc.
Commercial Section deals with Imports of parts and their record keeping & Local
purchases (parts other than used directly in motorcycle like thinner etc.)
Vendors are selected if they follow the QCRC principles (Quality, Cost, Reliability
and Capacity). They are upgraded and their processes updated through Vendor
Production Systems Upgrade and Vendor Improvement Programs.
The Logistics Section also decides the delivery method for the materials delivery and
presents a truck route which covers maximum dealers.
BMR (Balancing Modernization and Replacement) principles are followed which
helps to keep the processes and work methods according to the current industry
standards.
OSP (Outside Processing) is also practiced which includes changes made to parts sent
to Vendors like chrome plating of parts etc.
23
PRODUCTION DEPARTMENT
There are some processes like the melting aluminum which are to be handled
cautiously preventing any mishaps. For this a worker needs to have safety equipment
always on and protecting him.
Rotation on the assembly line as regards different duties should be regularly practiced
as to remove redundancy and boredom in the work and improve performance.
24
CAD / CAM DEPARTMENT
25
MARKETING DEPARTMENT
26