Professional Documents
Culture Documents
Perhitungan Biaya :
Harga Pokok Produk Selesai dan ditransfer ke
-Tahap berikutnya 359,5 m3 x Rp 931.676,69 = 334,937,769.67 352,0m3 x Rp1.019.047,41 = 358,704,687.55
- Gudang 350 m3 x Rp1.124.788,50 = 393,675,974.61
Produk hilang di akhir proses 15,5 m3 x Rp 931.676,69 = 14,440,988.68 7,5 m3 x Rp 1.019.047,41 = 7,642,855.56 2,0 m3 x Rp1.124.788,50 = 2,249,577.00
349,378,758.35 366,347,543.11 395,925,551.61