Level 1
Level 2
Level 3
1.1.1
Preliminary Site
Preparation Work
Level 4
1.1.2.1.1
1.1.2.1.2
1.1.2.1.3
1.1.2.1.4
Work up to plinth
1.1.2.2.1
1.1.2.2.2
1.1.2.2.3
1.1.2.3.1
1.1.2.3.2
1.1.2.3.3
1.1.2.4.1
1.1.2.4.2
1.1.2.5.1
1.1.2.5.2
1.2.1.1.1
1.2.1.1.2
1.2.1.1.3
1.2.1.2.1
1.2.1.2.2
1.2.1.2.3
1.2.1.3.1
1.2.2.1.1
1.2.2.1.2
1.2.2.1.3
1.2.2.2.1
1.2.2.2.2
1.2.2.2.3
Surface preparation
Removal of Old Plaster
Surface Levelling
New Plasterring
Removal of Old Tiles
Floor Leveling
Fixing New Tiles
1.2.2.3.1
1.2.3.1.1
1.2.3.1.2
1.2.3.1.3
1.2.3.2.1
1.2.3.2.2
1.2.3.2.3
Surface preparation
Removal of Old Plaster
Surface Levelling
New Plasterring
Removal of Old Tiles
Floor Leveling
Fixing New Tiles
1.2.3.3.1
1.2.4.1.1
1.2.4.1.2
1.2.4.1.3
1.2.4.1.4
1.2.5.1.1
1.2.5.1.2
1.2.5.1.3
Surface preparation
Removal of Old Plaster
Surface Levelling
New Plasterring
Surface preparation
Removal of Old Plaster
Surface Levelling
New Plasterring
1.1
New Construction
1.1.2.5
1.3.1.1
1.3.1.2
1.3.1.3
Finishing Work
Concealed Wiring
Fitting Electrical Fixtures
Testing
Construction
1.0 and Renovation
of House
Renovation Work
1.2.5
Level 5
1.2.4.1
1.2.5
1.3 Termite treatment
1.4 Site Cleaning
1.2.5.2.1
Surface preparation
OUSE
ng
Level 6
1.1.2.1.3.1
1.1.2.1.3.2
1.1.2.1.3.3
1.1.2.1.4.1
1.1.2.1.4.2
1.1.2.1.4.3
Steel Forming
Concrete Pouring
Curing Cement
Brick Work
Sand filling & Consolidation
Layer Bitumen/Water Proofing
1.1.2.2.3.1
Curing Cement
1.1.2.3.2.1
1.1.2.3.2.2
1.1.2.3.2.3
Steel Forming
Concrete Pouring
Curing Cement
1.1.2.5.1.1
1.1.2.5.2.1
Painting Work
Painting Door & Frame
1.2.1.3.1.1
1.2.1.3.1.2
Wall Painting
Door & Frame Painting
1.2.2.3.1.1
1.2.2.3.1.2
Wall Painting
Door & Frame Painting
1.2.3.3.1.1
1.2.3.3.1.2
Wall Painting
Door & Frame Painting
1.2.4.1.4.1
White Wash
1.2.5.2.1.1
Wall Painting
Activity
Role
Qty
Effort
Hours/da Hourly
Total
Estimate
y
Cost
Manpower Cost
in Days
Equipment
Equipment Cost
Praveen Jaiman
No
Effort
Total
Hours/ Hourly
Estimate in Equipment
day Cost
Days
Cost
125
1000.00
Activity
Role
Qty
1.1 New Construction \ 1.1.2 Civil Works \ 1.1.2.2 Work up to Lintel \ 1.1.2.2.3 RCC Work at Lintel \
1.1.2.2.3.1 Curing Cement
1
2
25.00
2
Laborer
1.1 New Construction \ 1.1.2 Civil Works \ 1.1.2.3 Work up to Roof \
1.1.2.3.1
Brick Work Up to Roof
Work Supervisor
1
8
50.00
4
1.1.2.3.1
Brick Work Up to Roof
5
8
25.00
4
Laborer
1.1.2.3.1
Brick Work Up to Roof
Mason
2
8
37.50
4
1.1 New Construction \ 1.1.2 Civil Works \ 1.1.2.3 Work up to Roof \ 1.1.2.3.2 RCC Work at Roof
1.1.2.3.2.1 Steel Forming
Work Supervisor
1
8
50.00
2
1.1.2.3.2.1 Steel Forming
5
8
25.00
2
Laborer
1.1.2.3.2.1 Steel Forming
Mason
1
8
37.50
2
1.1.2.3.2.2 Concrete Pouring
8
50.00
1
Work Supervisor
1
1.1.2.3.2.2 Concrete Pouring
6
8
25.00
1
Laborer
1.1.2.3.2.2 Concrete Pouring
Mason
2
8
37.50
1
1.1.2.3.2.3 Curing Cement
1
2
25.00
6
Laborer
1.1 New Construction \ 1.1.2 Civil Works \ 1.1.2.3 Work up to Roof \
1.1.2.3.3
Roof & Inside Wall Plastering
Work Supervisor
1
8
50.00
2
1.1.2.3.3
Roof & Inside Wall Plastering
5
8
25.00
2
Laborer
1.1.2.3.3
Roof & Inside Wall Plastering
Mason
2
8
37.50
2
1.1 New Construction \ 1.1.2 Civil Works \ 1.1.2.4 Flooring Work \
1.1.2.4.1
Floor Finishing
Work Supervisor
1
8
50.00
1
1.1.2.4.1
Floor Finishing
4
8
25.00
1
Laborer
1.1.2.4.1
Floor Finishing
Mason
2
8
37.50
1
1.1.2.4.2
Tiles Fixing
1
Work Supervisor
1
8
50.00
1.1.2.4.2
Tiles Fixing
4
8
25.00
1
Laborer
1.1.2.4.2
Tiles Fixing
Mason
2
8
37.50
1
1.1 New Construction \ 1.1.2 Civil Works \ 1.1.2.5 Finishing Work \
1.1.2.5.1
Wall Surface Preparation
Work Supervisor
1
8
50.00
3
1.1.2.5.1
Wall Surface Preparation
4
8
25.00
3
Laborer
1.1.2.5.1
Wall Surface Preparation
Mason
2
8
37.50
3
1.1 New Construction \ 1.1.2 Civil Works \ 1.1.2.5 Finishing Work \
1.1.2.5.2
Door Fixing
Work Supervisor
1
2
50.00
1
1.1.2.5.2
Door Fixing
2
2
25.00
1
Laborer
1.1.2.5.2
Door Fixing
Mason
1
2
37.50
1
1.1 New Construction \ 1.1.2 Civil Works \ 1.1.2.5 Finishing Work \ 1.1.2.5.1 Wall Surface Preparation
1.1.2.5.1.1 Painting Work
Work Supervisor
1
8
50.00
2
1.1.2.5.1.1 Painting Work
4
8
30.00
2
Astt. Painter
1.1.2.5.1.1 Painting Work
Painter
2
8
40.00
2
1.1 New Construction \ 1.1.2 Civil Works \ 1.1.2.5 Finishing Work \ 1.1.2.5.2 Door Fixing
1.1.2.5.2.1 Painting Door & Frame
Work Supervisor
1
4
50.00
1
1.1.2.5.2.1 Painting Door & Frame
2
4
40.00
1
Painter
Praveen Jaiman
Equipment
Effort
Hours/da Hourly
Total
Estimate
y
Cost
Manpower Cost
in Days
Equipment Cost
No
Effort
Total
Hours/ Hourly
Estimate in Equipment
day Cost
Days
Cost
100.00
1600.00
4000.00
2400.00
800.00
2000.00
600.00
400.00
1200.00
600.00 Concrete Mixture
300.00
125
1000.00
800.00
2000.00
1200.00
400.00
800.00
600.00
400.00
800.00
600.00
1200.00
2400.00
1800.00
100.00
100.00
75.00
800.00
1920.00
1280.00
200.00
320.00
Activity
Praveen Jaiman
Role
Work Supervisor
Electrician
Helper
Laborer
Work Supervisor
Electrician
Helper
Work Supervisor
Electrician
Helper
attached bathroom
Work Supervisor
Laborer
Mason
Work Supervisor
Laborer
Mason
Work Supervisor
Laborer
Mason
attached bathroom
Work Supervisor
Laborer
Mason
Work Supervisor
Laborer
Mason
Work Supervisor
Laborer
Mason
attached bathroom
Work Supervisor
Laborer
Mason
attached bathroom
Work Supervisor
Painter
Astt. Painter
Work Supervisor
Painter
Astt. Painter
Qty
Effort
Hours/da Hourly
Total
Estimate
y
Cost
Manpower Cost
in Days
1
1
2
1
1
1
2
1
1
1
cum toilet
1
4
1
1
4
2
1
4
2
cum toilet
1
4
1
1
2
1
1
2
2
cum toilet
1
4
1
cum toilet
1
1
2
1
1
1
4
8
8
8
4
8
8
2
4
4
1.2.1.1
8
8
8
8
8
8
8
8
8
1.2.1.2
8
8
8
8
4
4
8
8
8
1.2.1.3
8
8
8
1.2.1.3
8
8
8
8
8
8
Equipment
Equipment Cost
No
Effort
Total
Hours/ Hourly
Estimate in Equipment
day Cost
Days
Cost
50.00
1
200.00
40.00
1
320.00
30.00
1
480.00
25.00
1
200.00
50.00
1
200.00
40.00
1
320.00
30.00
1
480.00
50.00
1
100.00
40.00
1
160.00
30.00
1
120.00
Plaster Changing
50.00
1
400.00
25.00
1
800.00
37.50
1
300.00
1
50.00
400.00
25.00
1
800.00
37.50
1
600.00
50.00
2
800.00
25.00
2
1600.00
37.50
2
1200.00
Tiles Changing
50.00
1
400.00
25.00
1
800.00
37.50
1
300.00
50.00
1
400.00
25.00
1
200.00
37.50
1
150.00
50.00
2
800.00
25.00
2
800.00
37.50
2
1200.00
Finishing Work
50.00
4
1600.00
25.00
4
3200.00
37.50
4
1200.00
Finishing Work \ 1.2.1.3.1 Surface preparation
50.00
2
800.00
40.00
2
640.00
30.00
2
960.00
50.00
1
400.00
40.00
1
320.00
30.00
1
240.00
Activity
Role
Qty
1.2 Renovation Work \ 1.2.2 Bed Room No. 2 & attached bathroom cum toilet \ 1.2.2.1
1.2.2.1.1
Removal of Old Plaster
Work Supervisor
1
8
1.2.2.1.1
Removal of Old Plaster
4
8
Laborer
1.2.2.1.1
Removal of Old Plaster
Mason
1
8
1.2.2.1.2
Surface Levelling
Work Supervisor
1
8
1.2.2.1.2
Surface Levelling
4
8
Laborer
1.2.2.1.2
Surface Levelling
Mason
2
8
1.2.2.1.3
New Plasterring
Work Supervisor
1
8
1.2.2.1.3
New Plasterring
4
8
Laborer
1.2.2.1.3
New Plasterring
Mason
2
8
1.2 Renovation Work \ 1.2.2 Bed Room No. 2 & attached bathroom cum toilet \ 1.2.2.2
1.2.2.2.1
Removal of Old Tiles
Work Supervisor
1
8
1.2.2.2.1
Removal of Old Tiles
4
8
Laborer
1.2.2.2.1
Removal of Old Tiles
Mason
1
8
1.2.2.2.2
Floor Leveling
Work Supervisor
1
8
1.2.2.2.2
Floor Leveling
2
4
Laborer
1.2.2.2.2
Floor Leveling
Mason
1
4
1.2.2.2.3
Fixing New Tiles
Work Supervisor
1
8
1.2.2.2.3
Fixing New Tiles
2
8
Laborer
1.2.2.2.3
Fixing New Tiles
Mason
2
8
1.2 Renovation Work \ 1.2.2 Bed Room No. 2 & attached bathroom cum toilet \ 1.2.2.3
1.2.2.3.1
Surface preparation
Work Supervisor
1
8
1.2.2.3.1
Surface preparation
4
8
Laborer
1.2.2.3.1
Surface preparation
Mason
1
8
1.2 Renovation Work \ 1.2.2 Bed Room No. 2 & attached bathroom cum toilet \ 1.2.2.3
1.2.2.3.1.1 Wall Painting
Work Supervisor
1
8
1.2.2.3.1.1 Wall Painting
Painter
1
8
1.2.2.3.1.1 Wall Painting
2
8
Astt. Painter
1.2.2.3.1.2 Door & Frame Painting
Work Supervisor
1
8
1.2.2.3.1.2 Door & Frame Painting
Painter
1
8
1.2.2.3.1.2 Door & Frame Painting
1
8
Astt. Painter
1.2 Renovation Work \ 1.2.3 Drawing cum dining room \ 1.2.3.1 Plaster Changing
1.2.3.1.1
Removal of Old Plaster
Work Supervisor
1
8
1.2.3.1.1
Removal of Old Plaster
4
8
Laborer
1.2.3.1.1
Removal of Old Plaster
Mason
1
8
1.2.3.1.2
Surface Levelling
Work Supervisor
1
8
1.2.3.1.2
Surface Levelling
4
8
Laborer
1.2.3.1.2
Surface Levelling
Mason
2
8
1.2.3.1.3
New Plasterring
Work Supervisor
1
8
1.2.3.1.3
New Plasterring
4
8
Laborer
1.2.3.1.3
New Plasterring
Mason
2
8
Praveen Jaiman
Equipment
Effort
Hours/da Hourly
Total
Estimate
y
Cost
Manpower Cost
in Days
Equipment Cost
No
Effort
Total
Hours/ Hourly
Estimate in Equipment
day Cost
Days
Cost
Plaster Changing
50.00
1
400.00
25.00
1
800.00
37.50
1
300.00
1
50.00
400.00
25.00
1
800.00
37.50
1
600.00
2
50.00
800.00
25.00
2
1600.00
37.50
2
1200.00
Tiles Changing
50.00
1
400.00
25.00
1
800.00
37.50
1
300.00
50.00
1
400.00
25.00
1
200.00
37.50
1
150.00
50.00
2
800.00
25.00
2
800.00
37.50
2
1200.00
Finishing Work
50.00
4
1600.00
25.00
4
3200.00
37.50
4
1200.00
Finishing Work \ 1.2.2.3.1 Surface preparation
50.00
2
800.00
40.00
2
640.00
30.00
2
960.00
50.00
1
400.00
40.00
1
320.00
30.00
1
240.00
50.00
25.00
37.50
50.00
25.00
37.50
50.00
25.00
37.50
2
2
2
1
1
1
3
3
3
800.00
1600.00
600.00
400.00
800.00
600.00
1200.00
2400.00
1800.00
Activity
Role
Qty
Effort
Hours/da Hourly
Total
Estimate
y
Cost
Manpower Cost
in Days
Equipment
Equipment Cost
No
Effort
Total
Hours/ Hourly
Estimate in Equipment
day Cost
Days
Cost
1.2 Renovation Work \ 1.2.3 Drawing cum dining room \ 1.2.3.2 Tiles Changing
1.2.3.2.1
Removal of Old Tiles
Work Supervisor
1
8
50.00
2
800.00
1.2.3.2.1
Removal of Old Tiles
4
8
25.00
2
Laborer
1600.00
1.2.3.2.1
Removal of Old Tiles
Mason
1
8
37.50
2
600.00
1.2.3.2.2
Floor Leveling
Work Supervisor
1
8
50.00
1
400.00
1.2.3.2.2
Floor Leveling
2
4
25.00
1
Laborer
200.00
1.2.3.2.2
Floor Leveling
Mason
1
4
37.50
1
150.00
1.2.3.2.3
Fixing New Tiles
Work Supervisor
1
8
50.00
3
1200.00
1.2.3.2.3
Fixing New Tiles
2
8
25.00
3
Laborer
1200.00
1.2.3.2.3
Fixing New Tiles
Mason
2
8
37.50
3
1800.00
1.2 Renovation Work \ 1.2.3 Drawing cum dining room \ 1.2.3.3 Finishing Work
1.2.3.3.1
Surface preparation
Work Supervisor
1
8
50.00
4
1600.00
1.2.3.3.1
Surface preparation
4
8
25.00
4
3200.00
Laborer
1.2.3.3.1
Surface preparation
Mason
1
8
37.50
4
1200.00
1.2 Renovation Work \ 1.2.3 Drawing cum dining room \ 1.2.1.3 Finishing Work \ 1.2.1.3.1 Surface preparation
1.2.3.3.1.1 Wall Painting
Work Supervisor
1
8
50.00
3
1200.00
1.2.3.3.1.1 Wall Painting
Painter
1
8
40.00
3
960.00
1.2.3.3.1.1 Wall Painting
2
8
30.00
3
Astt. Painter
1440.00
1.2.3.3.1.2 Door & Frame Painting
Work Supervisor
1
8
50.00
1
400.00
1.2.3.3.1.2 Door & Frame Painting
Painter
1
8
40.00
1
320.00
1.2.3.3.1.2 Door & Frame Painting
1
8
30.00
1
Astt. Painter
240.00
1.2 Renovation Work \ 1.2.4 Boundary Wall \ 1.2.4.1 Plaster Changing & White Wash \
1.2.4.1.1
Removal of Old Plaster
Work Supervisor
1
8
50.00
2
800.00
1.2.4.1.1
Removal of Old Plaster
4
8
25.00
Laborer
2
1600.00
1.2.4.1.1
Removal of Old Plaster
Mason
1
8
37.50
2
600.00
1.2.4.1.2
Surface Levelling
1
Work Supervisor
1
8
50.00
400.00
1.2.4.1.2
Surface Levelling
4
8
25.00
1
Laborer
800.00
1.2.4.1.2
Surface Levelling
Mason
2
8
37.50
1
600.00
1.2.4.1.3
New Plasterring
3
Work Supervisor
1
8
50.00
1200.00
1.2.4.1.3
New Plasterring
4
8
25.00
3
Laborer
2400.00
1.2.4.1.3
New Plasterring
Mason
2
8
37.50
3
1800.00
1.2.4.1.4
Surface preparation
Work Supervisor
1
8
50.00
1
400.00
1.2.4.1.4
Surface preparation
4
8
25.00
1
Laborer
800.00
1.2.4.1.4
Surface preparation
Mason
1
8
37.50
1
300.00
1.2 Renovation Work \ 1.2.4 Boundary Wall \ 1.2.4.1 Plaster Changing & White Wash \ 1.2.4.1.4 Surface preparation
1.2.4.1.4.1 White Wash
Work Supervisor
1
8
50.00
2
800.00
1.2.4.1.4.1 White Wash
4
8
25.00
2
1600.00
Laborer
1.2.4.1.4.1 White Wash
Mason
1
8
37.50
2
600.00
Praveen Jaiman
Activity
Role
Qty
Equipment
Effort
Hours/da Hourly
Total
Estimate
y
Cost
Manpower Cost
in Days
1.2 Renovation Work \ 1.2.5 Work on Outside Surface of House \ 1.2.5.1 Plaster Changing \
1.2.5.1.1
Removal of Old Plaster
Work Supervisor
1
8
50.00
1.2.5.1.1
Removal of Old Plaster
4
8
25.00
Laborer
1.2.5.1.1
Removal of Old Plaster
Mason
1
8
37.50
1.2.5.1.2
Surface Leveling
Work Supervisor
1
8
50.00
1.2.5.1.2
Surface Leveling
2
4
25.00
Laborer
1.2.5.1.2
Surface Leveling
Mason
1
4
37.50
1.2.5.1.3
New Plasterring
Work Supervisor
1
8
50.00
1.2.5.1.3
New Plasterring
2
8
25.00
Laborer
1.2.5.1.3
New Plasterring
Mason
2
8
37.50
1.2 Renovation Work \ 1.2.5 Work on Outside Surface of House \ 1.2.5.2 Finishing Work \
1.2.5.2.1
Surface Preparation
Work Supervisor
1
8
50.00
1.2.5.2.1
Surface Preparation
6
8
25.00
Laborer
1.2.5.2.1
Surface Preparation
Mason
2
8
37.50
1.2 Renovation Work \ 1.2.5 Work on Outside Surface of House \ 1.2.5.2 Finishing Work \ 1.2.5.2.1
1.2.5.2.1.1 Wall Painting
Work Supervisor
1
8
50.00
1.2.5.2.1.1 Wall Painting
Painter
1
8
40.00
1.2.5.2.1.1 Wall Painting
2
8
30.00
Astt. Painter
1.3 Termite treatment \
1.3.1
Termite treatment
Lump-sum
1.4 Site Cleaning \
1.4.1
Disposal of Waste and Debris
Lump-sum
2
2
2
2
2
2
4
4
4
Equipment Cost
No
Effort
Total
Hours/ Hourly
Estimate in Equipment
day Cost
Days
Cost
800.00
1600.00
600.00
800.00
400.00
300.00
1600.00
1600.00
2400.00
5
2000.00
5
6000.00
5
3000.00
Surface Preparation
10
4000.00
10
3200.00
10
4800.00
1
10000.00
9500.00
Sub-total 202880.00
Sub-total
2000.00
Praveen Jaiman
10
Material
Material
Overhead
Total Cost
Fixed Cost
500.00
Building
Material
1000.00
500.00
Building
Material
3500.00
500.00
Building
Material
4500.00
500.00
Building
Material
5400.00
500.00
Praveen Jaiman
11
Material
Material
Overhead
Total Cost
Fixed Cost
500.00
Building
Material
3500.00
500.00
Building
Material
15000.00
500.00
Building
Material
1500.00
500.00
Building
Material
10000.00
500.00
500.00
500.00
Building
Material
9000.00
500.00
Building
Material
750.00
500.00
Praveen Jaiman
12
Material
Material
Overhead
Total Cost
Fixed Cost
Building
Material
4500.00
500.00
Building
Material
2000.00
500.00
Building
Material
10000.00
500.00
500.00
Building
Material
Praveen Jaiman
9500.00
500.00
13
Material
Material
Overhead
Total Cost
Fixed Cost
Building
Material
2000.00
500.00
Building
Material
10000.00
500.00
500.00
Building
Material
9500.00
500.00
Building
Material
2500.00
500.00
Praveen Jaiman
14
Material
Material
Building
Material
Overhead
Total Cost
11500.00
Fixed Cost
500.00
500.00
Building
Material
11000.00
500.00
Building
Material
4500.00
500.00
Building
Material
1200.00
500.00
Praveen Jaiman
15
Material
Material
Building
Material
Total Cost
6000.00
Overhead
Fixed Cost
500.00
500.00
Building
Material
20000.00
500.00
500.00
500.00
Sub-total 158350.0
Praveen Jaiman
17000.00
380230.00
16
Activity
Start Date
Finish Date
Resources / Day
Effort Days
(Estimate)
Effort Hrs.
One day = 8 hrs. (Estimate)
WS L
Praveen Jaiman
El.
17
Activity
Start Date
Finish Date
13.05.2009
14.05.2009
Resources / Day
Effort Days
(Estimate)
Effort Hrs.
One day = 8 hrs. (Estimate)
WS L
1.1.2.5.1.1
16
El.
P
2
Painting Work
Praveen Jaiman
18
Activity
Start Date
Finish Date
Resources / Day
Effort Days
(Estimate)
Effort Hrs.
One day = 8 hrs. (Estimate)
WS L
El.
1.1 New Construction \ 1.1.2 Civil Works \ 1.1.2.5 Finishing Work \ 1.1.2.5.2 Door Fixing
1.1.2.5.2.1 Painting Door & Frame
15.05.2009 15.05.2009
1
8
1
1.1.2.5.2.1 Painting Door & Frame
1.1 New Construction \ 1.1.3 Electrical Works \
1.3.1.1
Concealed Wiring
1.3.1.1
Concealed Wiring
16.05.2009 16.05.2009
1
8
1
1
1
2
1.3.1.1
Concealed Wiring
1.3.1.1
Concealed Wiring
1.3.1.2
Fitting Electrical Fixtures
1.3.1.2
Fitting Electrical Fixtures
18.05.2009 18.05.2009
1
8
1
1
2
1.3.1.2
Fitting Electrical Fixtures
1.3.1.3
Testing
1.3.1.3
Testing
19.05.2009 19.05.2009
1
8
1
1
1
1.3.1.3
Testing
1.2 Renovation Work \ 1.2.1 Bed Room No. 1 & attached bathroom cum toilet \ 1.2.1.1 Plaster Changing
1.2.1.1.1
Removal of Old Plaster
1.2.1.1.1
Removal of Old Plaster
20.05.2009 20.05.2009
1
8
1
4
1
1.2.1.1.1
Removal of Old Plaster
1.2.1.1.2
Surface Levelling
1.2.1.1.2
Surface Levelling
21.05.2009 21.05.2009
1
8
1
4
2
1.2.1.1.2
Surface Levelling
1.2.1.1.3
New Plasterring
1.2.1.1.3
New Plasterring
22.05.2009 23.05.2009
2
16
1
4
2
1.2.1.1.3
New Plasterring
1.2 Renovation Work \ 1.2.1 Bed Room No. 1 & attached bathroom cum toilet \ 1.2.1.2 Tiles Changing
1.2.1.2.1
Removal of Old Tiles
1.2.1.2.1
Removal of Old Tiles
25.05.2009 25.05.2009
1
8
1
4
1
1.2.1.2.1
Removal of Old Tiles
1.2.1.2.2
Floor Leveling
1.2.1.2.2
Floor Leveling
26.05.2009 26.05.2009
1
8
1
2
1
1.2.1.2.2
Floor Leveling
1.2.1.2.3
Fixing New Tiles
1.2.1.2.3
Fixing New Tiles
27.05.2009 28.05.2009
2
16
1
2
2
1.2.1.2.3
Fixing New Tiles
1.2 Renovation Work \ 1.2.1 Bed Room No. 1 & attached bathroom cum toilet \ 1.2.1.3 Finishing Work
1.2.1.3.1
Surface preparation
1.2.1.3.1
Surface preparation
29.05.2009 03.06.2009
5
32
1
4
1
1.2.1.3.1
Surface preparation
1.2 Renovation Work \ 1.2.1 Bed Room No. 1 & attached bathroom cum toilet \ 1.2.1.3 Finishing Work \ 1.2.1.3.1 Surface preparation
1.2.1.3.1.1 Wall Painting
1.2.1.3.1.1 Wall Painting
04.06.2009 05.06.2009
2
16
1
1.2.1.3.1.1 Wall Painting
1.2.1.3.1.2 Door & Frame Painting
1.2.1.3.1.2 Door & Frame Painting
06.06.2009 06.06.2009
1
8
1
1.2.1.3.1.2 Door & Frame Painting
1.2 Renovation Work \ 1.2.2 Bed Room No. 2 & attached bathroom cum toilet \ 1.2.2.1 Plaster Changing
1.2.2.1.1
Removal of Old Plaster
1.2.2.1.1
Removal of Old Plaster
08.06.2009 08.06.2009
1
8
1
4
1
1.2.2.1.1
Removal of Old Plaster
1.2.2.1.2
Surface Levelling
1.2.2.1.2
Surface Levelling
09.06.2009 09.06.2009
1
8
1
4
2
1.2.2.1.2
Surface Levelling
1.2.2.1.3
New Plasterring
1.2.2.1.3
New Plasterring
10.06.2009 11.06.2009
2
16
1
4
2
1.2.2.1.3
New Plasterring
1.2 Renovation Work \ 1.2.2 Bed Room No. 2 & attached bathroom cum toilet \ 1.2.2.2 Tiles Changing
1.2.2.2.1
Removal of Old Tiles
1.2.2.2.1
Removal of Old Tiles
12.06.2009 12.06.2009
1
8
1
4
1
1.2.2.2.1
Removal of Old Tiles
1.2.2.2.2
Floor Leveling
1.2.2.2.2
Floor Leveling
13.06.2009 13.06.2009
1
8
1
2
1
1.2.2.2.2
Floor Leveling
1.2.2.2.3
Fixing New Tiles
1.2.2.2.3
Fixing New Tiles
15.06.2009 16.06.2009
2
16
1
2
2
1.2.2.2.3
Fixing New Tiles
1.2 Renovation Work \ 1.2.2 Bed Room No. 2 & attached bathroom cum toilet \ 1.2.2.3 Finishing Work
1.2.2.3.1
Surface preparation
1.2.2.3.1
Surface preparation
17.06.2009 20.06.2009
4
32
1
4
1
1.2.2.3.1
Surface preparation
1.2 Renovation Work \ 1.2.2 Bed Room No. 2 & attached bathroom cum toilet \ 1.2.2.3 Finishing Work \ 1.2.2.3.1 Surface preparation
1.2.2.3.1.1 Wall Painting
1.2.2.3.1.1 Wall Painting
22.06.2009 23.06.2009
2
16
1
1.2.2.3.1.1 Wall Painting
1.2.2.3.1.2 Door & Frame Painting
1.2.2.3.1.2 Door & Frame Painting
24.06.2009 24.06.2009
1
8
1
Praveen Jaiman
19
Activity
Start Date
Finish Date
Resources / Day
Effort Days
(Estimate)
Effort Hrs.
One day = 8 hrs. (Estimate)
WS L
24.06.2009
1.2.2.3.1.2
24.06.2009
El.
P
1
Praveen Jaiman
20
Activity
Start Date
Finish Date
Resources / Day
Effort Days
(Estimate)
Effort Hrs.
One day = 8 hrs. (Estimate)
WS L
1.2 Renovation Work \ 1.2.3 Drawing cum dining room \ 1.2.3.1 Plaster Changing
1.2.3.1.1
Removal of Old Plaster
1.2.3.1.1
Removal of Old Plaster
25.06.2009 26.06.2009
2
8
1
1.2.3.1.1
Removal of Old Plaster
1.2.3.1.2
Surface Levelling
1.2.3.1.2
Surface Levelling
27.06.2009 27.06.2009
1
8
1
1.2.3.1.2
Surface Levelling
1.2.3.1.3
New Plasterring
1.2.3.1.3
New Plasterring
29.06.2009 01.07.2009
3
24
1
1.2.3.1.3
New Plasterring
1.2 Renovation Work \ 1.2.3 Drawing cum dining room \ 1.2.3.2 Tiles Changing
1.2.3.2.1
Removal of Old Tiles
1.2.3.2.1
Removal of Old Tiles
02.07.2009 03.07.2009
2
16
1
1.2.3.2.1
Removal of Old Tiles
1.2.3.2.2
Floor Leveling
1.2.3.2.2
Floor Leveling
04.07.2009 04.07.2009
1
8
1
1.2.3.2.2
Floor Leveling
1.2.3.2.3
Fixing New Tiles
1.2.3.2.3
Fixing New Tiles
06.07.2009 08.07.2009
3
24
1
1.2.3.2.3
Fixing New Tiles
1.2 Renovation Work \ 1.2.3 Drawing cum dining room \ 1.2.3.3 Finishing Work
1.2.3.3.1
Surface preparation
1.2.3.3.1
Surface preparation
09.07.2009 13.07.2009
4
32
1
1.2.3.3.1
Surface preparation
1.2 Renovation Work \ 1.2.3 Drawing cum dining room \ 1.2.1.3 Finishing Work \ 1.2.1.3.1 Surface preparation
1.2.3.3.1.1 Wall Painting
1.2.3.3.1.1 Wall Painting
14.07.2009 16.07.2009
3
24
1
1.2.3.3.1.1 Wall Painting
1.2.3.3.1.2 Door & Frame Painting
1.2.3.3.1.2 Door & Frame Painting
17.07.2009 17.07.2009
1
8
1
1.2.3.3.1.2 Door & Frame Painting
1.2 Renovation Work \ 1.2.4 Boundary Wall \ 1.2.4.1 Plaster Changing & White Wash \
1.2.4.1.1
Removal of Old Plaster
1.2.4.1.1
Removal of Old Plaster
20.04.2009 21.04.2009
2
16
1.2.4.1.1
Removal of Old Plaster
1.2.4.1.2
Surface Levelling
1.2.4.1.2
Surface Levelling
22.04.2009 22.04.2009
1
8
1.2.4.1.2
Surface Levelling
1.2.4.1.3
New Plasterring
1.2.4.1.3
New Plasterring
23.04.2009 25.04.2009
3
24
1.2.4.1.3
New Plasterring
1.2.4.1.4
Surface preparation
1.2.4.1.4
Surface preparation
27.04.2009 27.04.2009
1
8
1.2.4.1.4
Surface preparation
1.2 Renovation Work \ 1.2.4 Boundary Wall \ 1.2.4.1 Plaster Changing & White Wash \ 1.2.4.1.4 Surface preparation
1.2.4.1.4.1 White Wash
1.2.4.1.4.1 White Wash
28.04.2009 29.04.2009
2
16
1.2.4.1.4.1 White Wash
1.2 Renovation Work \ 1.2.5 Work on Outside Surface of House \ 1.2.5.1 Plaster Changing \
1.2.5.1.1
Removal of Old Plaster
1.2.5.1.1
Removal of Old Plaster
30.04.2009 01.05.2009
2
16
1.2.5.1.1
Removal of Old Plaster
1.2.5.1.2
Surface Leveling
1.2.5.1.2
Surface Leveling
02.05.2009 04.05.2009
2
16
1.2.5.1.2
Surface Leveling
1.2.5.1.3
New Plasterring
1.2.5.1.3
New Plasterring
05.05.2009 08.05.2009
4
32
1.2.5.1.3
New Plasterring
1.2 Renovation Work \ 1.2.5 Work on Outside Surface of House \ 1.2.5.2 Finishing Work \
1.2.5.2.1
Surface Preparation
1.2.5.2.1
Surface Preparation
09.05.2009 14.05.2009
5
40
1.2.5.2.1
Surface Preparation
1.2 Renovation Work \ 1.2.5 Work on Outside Surface of House \ 1.2.5.2 Finishing Work \ 1.2.5.2.1 Surface Preparation
1.2.5.2.1.1 Wall Painting
1.2.5.2.1.1 Wall Painting
15.05.2009 26.05.2009
10
80
1.2.5.2.1.1 Wall Painting
1.3 Termite treatment \
1.3.1
Termite treatment (Lump-Sump)
18.04.2009 18.04.2009
1
1.4 Site Cleaning \
1.4.1
Disposal of Waste and Debris
20.07.2009 21.07.2009
2
(LUMP-Sump)
Praveen Jaiman
El.
21
Activity
Start Date
Finish Date
Resources / Day
Effort Days
(Estimate)
Effort Hrs.
One day = 8 hrs. (Estimate)
WS L
Praveen Jaiman
El.
22
urces / Day
Ass Con. Mix for
t. P one Day
01
(For single
day on
04.04.2009)
05.04.2009 : Sunday
but no holiday for 1
laborer due to curing
job.
12.04.2009 Sunday
19.04.2009 Sunday
19.04.2009 : Sunday
but no holiday for 1
laborer due to curing
job.
26.04.2009 Sunday
01
(One day on
27.04.2009)
03.05.2009 Sunday
10.05.2009 Sunday
Praveen Jaiman
23
urces / Day
Ass Con. Mix for
t. P one Day
4
Praveen Jaiman
24
urces / Day
Ass Con. Mix for
t. P one Day
17.05.2009 Sunday
24.05.2009 Sunday
01.06.2009 Sunday
07.06.2009 Sunday
14.06.2009 Sunday
21.06.2009 Sunday
Praveen Jaiman
25
urces / Day
Ass Con. Mix for
t. P one Day
1
Praveen Jaiman
26
urces / Day
Ass Con. Mix for
t. P one Day
28.06.2009 Sunday
05.07.2009 Sunday
12.07.2009 Sunday
1
19.04.2009 Sunday
18.04.2009 Termite
Treatment
26.04.2009 Sunday
03.05.2009 Sunday
10.05.2009 Sunday
17.05.2009 Sunday
6
24.05.2009 Sunday
19.04.2008 Sunday
19.07.2009 Sunday
Praveen Jaiman
27
urces / Day
Ass Con. Mix for
t. P one Day
Praveen Jaiman
28
Activity
1.1
1.1.1
New Construction
Preliminary Site
Preparation Work
1.1.2
1.1.3
Civil Works
Electrical Work
1.2
Renovation Work
1.2.1
1.2.2
Praveen Jaiman
Resource
Type
Unit of
Measure Working
ment
Hrs /Day
Work Supervisor
Mason
Laborer
Electrician
Helper
Painter
Astt. Painter
Project Material/
Concrete Mixture
Building Material
Fixed Cost
Labor
Labor
Labor
Labor
Labor
Labor
Labor
No.
No.
No.
No.
No.
No.
No.
08
08
08
08
08
08
08
Material
Material
No.
No.
08 Hrs./Day
Work Supervisor
Mason
Laborer
Electrician
Helper
Painter
Astt. Painter
Project Material/
Concrete Mixture
Building Material
Fixed Cost
Labor
Labor
Labor
Labor
Labor
Labor
Labor
No.
No.
No.
No.
No.
No.
No.
08
08
08
08
08
08
08
Material
Material
No.
No.
08 Hrs./Day
Work Supervisor
Mason
Laborer
Electrician
Helper
Painter
Astt. Painter
Project Material/
Concrete Mixture
Building Material
Fixed Cost
Labor
Labor
Labor
Labor
Labor
Labor
Labor
No.
No.
No.
No.
No.
No.
No.
08
08
08
08
08
08
08
Material
Material
No.
No.
08 Hrs./Day
Work Supervisor
Mason
Laborer
Electrician
Helper
Painter
Astt. Painter
Project Material/
Concrete Mixture
Building Material
Fixed Cost
Labor
Labor
Labor
Labor
Labor
Labor
Labor
No.
No.
No.
No.
No.
No.
No.
08
08
08
08
08
08
08
Material
Material
No.
No.
08 Hrs./Day
Work Supervisor
Mason
Laborer
Electrician
Helper
Painter
Astt. Painter
Project Material/
Concrete Mixture
Building Material
Fixed Cost
Labor
Labor
Labor
Labor
Labor
Labor
Labor
No.
No.
No.
No.
No.
No.
No.
08
08
08
08
08
08
08
Material
Material
No.
No.
08 Hrs./Day
Category
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Total
Man
Days
Resource
Code
Roles
Work
Work
Work
Work
Work
Work
Work
Team
Team
Team
Team
Team
Team
Team
Head
member
member
member
member
member
member
Material
Material
Work
Work
Work
Work
Work
Work
Work
Team
Team
Team
Team
Team
Team
Team
Head
member
member
member
member
member
member
Material
Material
Work
Work
Work
Work
Work
Work
Work
Team
Team
Team
Team
Team
Team
Team
Head
member
member
member
member
member
member
Material
Material
3
0
1
3
5
0
0
0
Team
Team
Team
Team
Team
Team
Team
Head
member
member
member
member
member
member
Material
Material
Work
Work
Work
Work
Work
Work
Work
30
39
122
0
0
6
8
2
Material
Material
Work
Work
Work
Work
Work
Work
Work
1
0
2
0
0
0
0
15
17
42
0
0
3
5
0
Team
Team
Team
Team
Team
Team
Team
Head
member
member
member
member
member
member
15
17
42
0
0
3
5
0
29
1.2.4
1.2.5
1.3
Resource
Type
Labor
Labor
Labor
Labor
Labor
Labor
Labor
Unit of
Measure
ment
No.
No.
No.
No.
No.
No.
No.
Material
Material
Work Supervisor
Mason
Laborer
Electrician
Helper
Painter
Astt. Painter
Project Material/
Concrete Mixture
Building Material
Fixed Cost
Work Supervisor
Mason
Laborer
Electrician
Helper
Painter
Astt. Painter
Project Material/
Concrete Mixture
Building Material
Fixed Cost
Activity
Category
Drawing cum dining room
Work Supervisor
Mason
Laborer
Electrician
Helper
Painter
Astt. Painter
Project Material/
Concrete Mixture
Building Material
Fixed Cost
Boundary Wall
Work on outside
surface of the house
Termite treatment
Working
Hrs /Day
08 Hrs./Day
08 Hrs./Day
08 Hrs./Day
08 Hrs./Day
08 Hrs./Day
08 Hrs./Day
08 Hrs./Day
Resource
Code
Work
Work
Work
Work
Work
Work
Work
No.
No.
08 Hrs./Day
Material
Material
Labor
Labor
Labor
Labor
Labor
Labor
Labor
No.
No.
No.
No.
No.
No.
No.
08
08
08
08
08
08
08
Material
Material
No.
No.
08 Hrs./Day
Labor
Labor
Labor
Labor
Labor
Labor
Labor
No.
No.
No.
No.
No.
No.
No.
08
08
08
08
08
08
08
Material
Material
No.
No.
08 Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Hrs./Day
Work
Work
Work
Work
Work
Work
Work
Roles
Team Head
Team member
Team member
Team member
Team member
Team member
Team member
Team
Team
Team
Team
Team
Team
Team
Head
member
member
member
member
member
member
Material
Material
Work
Work
Work
Work
Work
Work
Work
Material
Material
Total
Man
Days
20
23
56
0
0
4
7
0
13
36
0
0
0
0
0
Team
Team
Team
Team
Team
Team
Team
Head
member
member
member
member
member
member
0
24
78
0
0
20
60
0
Lump-sump
Fixed Cost
1.4
Lump-sump
Total Project C
Praveen Jaiman
30
Total
Hrs.
Hourly
Cost
8
0
16
0
0
0
0
50.00
37.50
25.00
40.00
30.00
40.00
30.00
400.00
0.00
400.00
0.00
0.00
0.00
0.00
125.00
0.00
0.00
500.00
Total Cost
Sub-total
1,300.00
240
312
976
0
0
48
64
50.00
37.50
25.00
40.00
30.00
40.00
30.00
12,000.00
11,700.00
24,400.00
0.00
0.00
1,920.00
1,920.00
16
125.00
2,000.00
54,150.00
6,500.00
Sub-total
114,590.00
24
0
8
24
40
0
0
50.00
37.50
25.00
40.00
30.00
40.00
30.00
1,200.00
0.00
200.00
960.00
1,200.00
0.00
0.00
125.00
0.00
4,500.00
500.00
Sub-total
8,560.00
120
136
336
0
0
24
40
50.00
37.50
25.00
40.00
30.00
40.00
30.00
6,000.00
5,100.00
8,400.00
0.00
0.00
960.00
1,200.00
125.00
Sub-total
120
136
336
0
0
24
40
50.00
37.50
25.00
40.00
30.00
40.00
30.00
125.00
Sub-total
Praveen Jaiman
0.00
21,500.00
2,000.00
45,160.00
6,000.00
5,100.00
8,400.00
0.00
0.00
960.00
1,200.00
0.00
21,500.00
2,000.00
45,160.00
31
Total
Hrs.
160
184
448
0
0
32
56
Hourly
Cost
50.00
37.50
25.00
40.00
30.00
40.00
30.00
125.00
Total Cost
8,000.00
6,900.00
11,200.00
0.00
0.00
1,280.00
1,680.00
0.00
25,000.00
2,000.00
Sub-total
56,060.00
0
104
288
0
0
0
0
50.00
37.50
25.00
40.00
30.00
40.00
30.00
0.00
3,900.00
7,200.00
0.00
0.00
0.00
0.00
125.00
0.00
5,700.00
1,000.00
Sub-total
17,800.00
0
192
624
0
0
160
480
50.00
37.50
25.00
40.00
30.00
40.00
30.00
0.00
7,200.00
15,600.00
0.00
0.00
6,400.00
14,400.00
125.00
0.00
26,000.00
1,500.00
Sub-total
71,100.00
10,000.00
500.00
Sub-total
10,500.00
9,500.00
500.00
Sub-total
10,000.00
380,230.00
Praveen Jaiman
32
Monthly Salary
Work Supervisor
Mason
Laborer
Electrician
Helper
Painter
Astt. Painter
12000.00
Cost/Hr.
50.00
Amount in Rs.
Cost/Hr.
300.00
200.00
37.50
25.00
320.00
240.00
40.00
30.00
320.00
240.00
40.00
30.00