Para 1
Para 1 m3
Saco
en kg
(42.5kg)
Cantidades
Totales
2,987
Cantidades
Totales x
Unidad de
Medida
Pedestales
Columnas
Muro de
contencin
Cimientos
Edificio
Muros y Losa
Edificio
138.99
91.41
139.06
6.35
36.07
251.53
185.07
286.46
1,655.38
706.00
64.13
42.18
64.17
2.93
16.64
116.07
85.40
132.18
763.85
550.68
508.32
55.87
51.57
36.74
33.92
55.90
51.60
2.55
2.36
14.50
13.38
101.10
93.33
74.39
68.67
115.14
106.29
665.39
614.20
Solado
MATERIALES
CEMENTO
1.00
42.50
335.00
1,000,691.90
23,545.69 Sacos
ARENA CONCRETO
2.68
59.00
706.00
2,108,920.84
1,378 M3
TRITURADO
2.41
90.00
1,059.00
3,163,381.26
2,309 M3
0.43
3.35
10,006.92
Para 1
Para 1 m3
Saco
en kg
(42.5kg)
Cantidades
Totales
ADITIVO:POLYHEED GL
Zapatas
Vigas
Losa
48 Caneca 208 kg
1586.73
Peso
unitrio
Cantidades
Totales x
Unidad de
Medida
MATERIALES
1510
CEMENTO
1.00
42.50
365.00
579,156.45
13,627 Sacos
ARENA CONCRETO
57.00
741.00
1,175,766.93
768 M3
741.00
731.31
TRITURADO
84.00
982.00
1,558,168.86
1,137 M3
510.64
471.36
562.82
519.53
0.43
3.65
ADITIVO:POLYHEED GL
TOTAL DE MATERIALES DE PLAYA PARA NEGOCIAR:
5,791.56
2,146.85
TRITURADO
3,446.39
28 Caneca 208 kg