Professional Documents
Culture Documents
Product Presentation
Insert Nozzle Here Matrix Reader Gets Part Number
Product Evaluation
(Engineering Targets)
Residue size under 1 m: None Expected Footprint under 1 foot2: Within Range # of Operators Needed 1 or less: 1 # of Operator Miscues <=1 / 100: None with minimal training. Less than 2 hours of maintenance per month: Met Steps required to use <=2: Within Range Time added to process <=10 sec.: Under
Purdue School of Engineering and Technology 5
Product Evaluation
(Engineering Targets)
Minimize cost added: $0.012 per nozzle over the first year. Number of injuries per year, zero: None expected. % of nozzles damaged during process, zero: None expected. % of incorrect identification or pass/fail, zero: None Expected. % of models capable of being tested, 100: Inconclusive but positive indications.
Purdue School of Engineering and Technology 6
Recommendations
Automate by incorporating into assembly line Develop case to house electrical control components Reinforce test unit housing with stiffening agents
Purdue School of Engineering and Technology 7
Questions/Comments