You are on page 1of 7

CADANGAN PINDAAN & TAMBAHAN MASJID ABDUL RAHMAN PUTRA AL-HAJ YAN KECIL SEDIAADA DI YAN KECIL,

KEDAH DARUL AMAN.


BIL
1

DESCRIPTION
DEMOLITION WORK
Demolition work

UNIT

QTY

RATE

L/S

25,000.00

TOTAL TO SUMMARY
2
a.
b.

c.

d.

e.
f.
g.

h.

PILING WORKS
150mm x 150mm R.C pile
Mobilization and site organisation
Supply, deliver and unload
- Initial piles in 6.00m length.
- Extention piles in 6.00m length.
Handle, transport and pitch
- Initial piles in 6.00m length.
- Extention piles in 6.00m length.
Driving
- Initial piles in 6.00m length.
- Extention piles in 6.00m length.
Insitu extension joint
Cut off and strip head
Testing of piles
- First load test
- Subsequent load test
PDA test

25,000.00

L/S

7,000.00

M
M

774.00
3,096.00

27.00
27.00

20,898.00
83,592.00

M
M

774.00
3,096.00

0.80
0.80

619.20
2,476.80

M
M
NO
NO

774.00
3,096.00
516.00
129.00

5.00
5.00
10.00
35.00

3,870.00
15,480.00
5,160.00
4,515.00

NO
NO
NO

2.00
2.00
2.00

4,000.00
3,000.00
800.00

8,000.00
6,000.00
1,600.00

TOTAL TO SUMMARY
3

WORK BELOW LOWEST FLOOR FINISH

a.

Excavation to reduce level


Average 450mm deep at apron
Pad Footing
Exc. not exceeding 1.50m
50mm thk. Lean concrete
Concrete
Formwork
Rebar
Column Stump
Concrete
Formwork
Rebar
Ground Beam
Excavate trench
50mm thk. Lean concrete
Concrete
Formwork
Rebar
Ground Floor Slab ;
150mm thk Concrete slab
50mm thk. Lean conc
150mm thk. Hardcore
DPM
BRC
- A8
- B6
Apron Slab
150mm thk Concrete slab
50mm thk. Lean conc
150mm thk. Hardcore
DPM
BRC
Formwork ; 150mm high
Antitermite treatment
Perimeter drain.
225mm dia. Half round P.C. Drain

b.

c.

d.

e.

f.

g.
h.

TOTAL TO SUMMARY

AMOUNT

159,211.00

M2

115.00

3.00

345.00

M3
M2
M3
M2
KG

39.00
30.00
17.00
76.00
1,513.00

12.00
10.00
280.00
30.00
3.20

468.00
300.00
4,760.00
2,280.00
4,841.60

M3
M2
KG

6.00
49.00
1,248.00

280.00
30.00
3.20

1,680.00
1,470.00
3,993.60

M3
M2
M3
M2
KG

52.00
81.00
48.00
484.00
9,984.00

12.00
10.00
280.00
30.00
3.20

624.00
810.00
13,440.00
14,520.00
31,948.80

M2
M2
M2
M2

760.00
760.00
760.00
760.00

42.00
10.00
12.00
6.00

31,920.00
7,600.00
9,120.00
4,560.00

M2
M2

760.00
304.00

19.00
17.00

14,440.00
5,168.00

M2
M2
M2
M2
M2
M
M2

115.00
115.00
115.00
115.00
115.00
114.00
875.00

42.00
10.00
12.00
6.00
19.00
4.50
5.00

4,830.00
1,150.00
1,380.00
690.00
2,185.00
513.00
4,375.00

200.00

25.00

5,000.00

174,412.00

CADANGAN PINDAAN & TAMBAHAN MASJID ABDUL RAHMAN PUTRA AL-HAJ YAN KECIL SEDIAADA DI YAN KECIL,
KEDAH DARUL AMAN.
BIL

DESCRIPTION

FRAME

a.

Column
Concrete - Grade 30
Formwork
Rebar
Roof Beam
Concrete - Grade 30
Formwork
Rebar
Upper roof beam
Concrete - Grade 30
Formwork
Rebar
Roof Beam - Dome
Concrete - Grade 30
Formwork
Rebar
Ring beam
Concrete - Grade 30
Formwork
Rebar

b.

c.

5
a.

b.

c.

UNIT

QTY

RATE

M3
M2
KG

53.00
401.00
11,024.00

280.00
30.00
3.20

14,840.00
12,030.00
35,276.80

M3
M2
KG

31.00
359.00
6,820.00

280.00
30.00
3.20

8,680.00
10,770.00
21,824.00

M3
M2
KG

15.00
116.00
3,300.00

280.00
30.00
3.20

4,200.00
3,480.00
10,560.00

M3
M2
KG

5.00
38.00
1,100.00

280.00
30.00
3.20

1,400.00
1,140.00
3,520.00

M3
M2
KG

2.00
25.00
440.00

280.00
30.00
3.20

560.00
750.00
1,408.00

TOTAL TO SUMMARY
ROOF CONSTRUCTION
Roof Structure & Finishes
M.S. Structure
Metal deck Roof tile with polyuthrene ( PU )
Chicken wire netting
450mm girth G.I flashing.
Ditto painting general surfaces G.I flashing
250mm wide x 25mm thk. Fascia board
Ditto painting
Ridge & hip Capping

AMOUNT

130,438.80

M2
M2
M2
M
M
M
M
M

800.00
800.00
800.00
83.00
38.00
112.00
112.00
46.00

95.00
80.00
8.00
37.00
8.00
18.00
5.00
45.00

76,000.00
64,000.00
6,400.00
3,071.00
304.00
2,016.00
560.00
2,070.00

M2
M2
M2
M2
M2
M
M

174.00
174.00
174.00
73.00
174.00
16.00
0.40

250.00
25.00
19.00
17.00
30.00
7.00
12.00

43,500.00
4,350.00
3,306.00
1,241.00
5,220.00
112.00
4.80

R.C Flat roof


150mm thk concrete slab - Grade 25
Water proofing
BRC A8
BRC B6
Formwork
Scupper drain - 75mm wide
Scour pipe - 50mm dia. Upvc pipe
Parapet wall
Concrete - Grade 25
Formwork
Rebar
RWDP
110mm dia. UPVC RWDP
Dome cover
Shoes

M3
M2
KG

3.00
18.00
447.00

250.00
30.00
3.20

750.00
540.00
1,430.40

M
NO
NO

34.00
6.00
6.00

30.00
9.00
9.00

1,020.00
54.00
54.00

Dome
M.S. Structure
Alum. Dome cover
Painting
450mm girth G.I flashing.
Moon

M2
M2
M2
M
NO

109.00
109.00
109.00
23.00
1.00

95.00
90.00
20.00
37.00
500.00

10,355.00
9,810.00
2,180.00
851.00
500.00

TOTAL TO SUMMARY
6

WALL

a.

External wall
Decorative brick railing - 900mm high
Painting
Brickwall 115mm thk

TOTAL TO SUMMARY

239,699.20

M
M
M2

80.00
80.00
7.00

250.00
10.80
35.00

20,000.00
864.00
245.00

21,109.00

CADANGAN PINDAAN & TAMBAHAN MASJID ABDUL RAHMAN PUTRA AL-HAJ YAN KECIL SEDIAADA DI YAN KECIL,
KEDAH DARUL AMAN.
BIL

7
a.

DESCRIPTION

WINDOW
Alumn. Frame
Fixed window - 6864mm x 741mm high
Lintol window 125mm x 200mm

UNIT

NO
M

QTY

4.00
29.00

RATE

1,300.00
30.00

TOTAL TO SUMMARY

AMOUNT

5,200.00
870.00
6,070.00

WALL FINISHES

a.

External Finishes
Painting
Wall tile
Plastering

M2
M2
M2

154.00
5.00
7.00

12.00
70.00
15.00

1,848.00
350.00
105.00

Internal Finishes
Painting
Plastering column

M2
M2

583.00
400.00

12.00
15.00

6,996.00
6,000.00

b.

9
a.

b.

TOTAL TO SUMMARY
FLOOR FINISHES

15,299.00

External Finishes
Cement Rendered ; apron slab

M2

115.00

15.00

1,725.00

Internal Finishes
Homogenous tile - 450mm x 450mm

M2

760.00

80.00

60,800.00

TOTAL TO SUMMARY
10

CEILING FINISHES

a.

External Finishes
UAC asbestos free ceiling
Skim coat
Internal Finishes
- UAC asbestos free ceiling

b.

62,525.00

M2
M2

115.00
13.50

45.00
4.00

5,175.00
54.00

M2

962.00

45.00

43,290.00

TOTAL TO SUMMARY
11

SANITARY FITTING
Floor Trap
Water Tap

48,519.00

NO
NO

1.00
6.00

20.00
40.00

TOTAL TO SUMMARY
12

BUILDING WORK IN CONNECTION


450mm x 200mm high Concrete ablution including
formwork, reinforcement and finishes.
TOTAL TO SUMMARY

20.00
240.00
260.00

5.00

100.00

500.00
500.00

CADANGAN PINDAAN & TAMBAHAN MASJID ABDUL RAHMAN PUTRA AL-HAJ YAN KECIL SEDIAADA
DI YAN KECIL, KEDAH DARUL AMAN.
SUMMARY OF BUILDING COST
MASJID

AREA OF BUILDING :DESCRIPTION

BIL

AMOUNT ( RM )

DEMOLITION WORKS

25,000.00

PILING WORKS

159,211.00

WORK BELOW LOWEST FLOOR FINISH

174,412.00

FRAME

130,438.80

ROOF CONSTRUCTION

239,699.20

WALL

DOOR & WINDOW

WALL FINISHES

15,299.00

FLOOR FINISHES

62,525.00

10

CEILING FINISHES

48,519.00

11

SANITARY FITTING

260.00

12

BUILDING WORK IN CONNECTION

500.00

21,109.00

TOTAL AMOUNT

6,070.00

883,043.00

CADANGAN PINDAAN & TAMBAHAN MASJID ABDUL RAHMAN PUTRA AL-HAJ YAN KECIL SEDIAADA DI YAN KECIL,
KEDAH DARUL AMAN.
WALKWAY
BIL

DESCRIPTION

WORK BELOW LOWEST FLOOR FINISH

a.

Excavation to reduce level


Average 450mm deep at walkway
Pad Footing
Exc. not exceeding 1.50m
50mm thk. Lean concrete
Concrete
Formwork
Rebar
Ground Beam
Excavate trench
50mm thk. Lean concrete
Concrete
Formwork
Rebar
Ground Floor Slab ;
150mm thk Concrete slab
50mm thk. Lean conc
150mm thk. Hardcore
DPM
BRC
Antitermite treatment
Perimeter drain.
225mm dia. Half round P.C. Drain

b.

c.

d.

e.
f.

UNIT

QTY

RATE

M2

35.00

3.00

105.00

M3
M2
M3
M2
KG

1.00
1.00
1.00
5.00
89.00

12.00
10.00
280.00
30.00
3.20

12.00
10.00
280.00
150.00
284.80

M3
M2
M3
M2
KG

1.00
5.00
1.00
14.00
208.00

12.00
10.00
280.00
30.00
3.20

12.00
50.00
280.00
420.00
665.60

M2
M2
M2
M2
M2
M2

35.00
35.00
35.00
35.00
35.00
35.00

42.00
10.00
12.00
6.00
19.00
5.00

1,470.00
350.00
420.00
210.00
665.00
175.00

23.00

25.00

575.00

TOTAL TO SUMMARY
2

FRAME

a.

Column
150mm dia. m.s column
Painting

3
a.

4
a.

6,134.40

M
M2

24.00
12.00

90.00
15.00

TOTAL TO SUMMARY
ROOF CONSTRUCTION
Roof Structure & Finishes
M.S. Structure
Poly-carbonate roofing sheet

TOTAL TO SUMMARY

2,160.00
180.00

2,340.00

M2
M2

41.00
41.00

95.00
130.00

TOTAL TO SUMMARY
FLOOR FINISHES
External Finishes
Cement Rendering

AMOUNT

3,895.00
5,330.00

9,225.00

M2

35.00

15.00

525.00

525.00

CADANGAN PINDAAN & TAMBAHAN MASJID ABDUL RAHMAN PUTRA AL-HAJ YAN KECIL SEDIAADA
DI YAN KECIL, KEDAH DARUL AMAN.
SUMMARY OF BUILDING COST
WALKWAY

AREA OF BUILDING :DESCRIPTION

BIL

AMOUNT ( RM )

WORK BELOW LOWEST FLOOR FINISH

6,134.40

FRAME

2,340.00

ROOF CONSTRUCTION

9,225.00

FLOOR FINISHES

TOTAL AMOUNT

525.00

18,224.40

CADANGAN PINDAAN & TAMBAHAN MASJID ABDUL RAHMAN PUTRA AL-HAJ YAN KECIL
SEDIAADA DI YAN KECIL, KEDAH DARUL AMAN.
SUMMARY OF COST ESTIMATE
MASJID
BIL

DESCRIPTION

UNIT QTY

RATE

AMOUNT

PRELIMINARIES - Say 5%

BUILDING WORKS ( Refer to summary of building )

WALKWAY ( Refer to summary of building )

18,224.40

EXTERNAL WORKS
a) Resurfaces Premix
b ) Fencing & gate

4,000.00
10,000.00

55,313.37
883,043.00

MECHANICAL & ELECTRICAL WORK ( say )

191,000.00

TOTAL CONSTRUCTION COST

1,161,580.77