Project Organization Alarm Monitoring System - PT. PAL

July 2011

s
Project Organization Alarm Monitoring System - PT. PAL

July 2011

s
Project Organization Alarm Monitoring System - PT. PAL

Project Manager Budi Ardiansyah

Project Leader Rocky Tampubolon

Automation Engineering
Sugiharto Prayudha Prihatmoko
Engineering Site Activities

Hardware Engineer
Lita Prihatini

Commissioning Team Siemens

Installation Team Siemens

July 2011

s
AMS Project Requirements VS Siemens Competency
High reliability system Redundant CPU Siemens projects using Redundant CPU
Sadhana Jawa Timur (2009) 1 pair redundant PLC for tobacco processing plant PGN Jawa Barat, Banten, Lampung, Sumsel (2008-2011) 8 pairs redundant PLC for gas transportation management and emergency shutdown valve system ORICA Kalimantan Timur (2010-2011) 3 pairs redundant PLC for process explosives manufacturing + 1 pair redundant PLC for safety system

s
AMS Project Requirements VS Siemens Competency
Large Archiving System WinCC Archive System Siemens projects with large scale WinCC tag logging and alarm archive
PGN Jawa Barat, Banten, Lampung, Sumsel (2008-2011) 3000s analog tags, collected to 2 servers (pagardewa & cilegon), and transferring each other backup daily. Semen Baturaja Palembang (2011) 500s analog tags, monthly archived from 2 computers to 1 database server.

s
AMS Project Requirements VS Siemens Competency
Communication with VDR Communication with Non-Siemens partner Siemens projects with communication with non-Siemens partner
FPSO Brotojoyo Jawa Timur (2009) Communication with easyGen diesel engine control with ModBus Lontar Papyrus Jambi (2010) Communication with ABB drives controller with serial RK512 ASCII