You are on page 1of 60

OBRA: CONSTRUCCION DE POLIDEPORTIVO

OBRA:

MONTO

Descripcin

Parte Seccin

Parcial

Total
#NAME?

OBRAS CIVILES

619.93
6,187.98
4,831.78
#NAME?
783.17
2,704.58
417.62
80.70
775.84
1,927.87
2,291.13

1.00 TRABAJOS PRELIMINARES


2.00 MOVIMIENTO DE TIERRAS
3.00 CONCRETO SIMPLE
4.00 CONCRETO ARMADO
5.00 ALBAILERIA
6.00 REVOQUES ENLUCIDOS Y MOLDADURAS
7.00 PISOS
8.00 ZOCALOS Y CONTRAZOCALOS
9.00 PINTURA
10.00 CARPINTERIA METALICA, MADERA Y OTROS
11.00 INSTALACIONES ELECTRICAS

TOTAL

#NAME?

#NAME?

#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?

#NAME?

#NAME?

TOTAL COSTO DIRECTO


GASTOS GENERALES DIRECTOS
GASTOS GENERALES INDIRECTOS
UTILIDADES

TOTAL DE OBRAS CIVILES

###
###
7.00%

OBRA: CONSTRUCCION DE POLIDEPORTIVO


OBRAS CIVILES
TEM

DESCRIPCIN

UNIDAD

METRADO

PRESUPUESTO
COSTO (Nuevos Soles)
UNITARIO

TOTAL

OBRAS CIVILES
1.00 TRABAJOS PRELIMINARES
1.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS

Glb

1.00

150.00

1.02 CAMPAMENTO PROVISIONAL DE LA OBRA

Glb

1.00

300.00

300.00

1.03 LIMPIEZA DE TERRENO

m2

21.00

5.83

122.46

1.04 TRAZO, NIVELACION Y REPLANTEO

m2

28.00

1.70

47.47

SUB TOTAL 1.00

150.00

619.93

2.00 MOVIMIENTO DE TIERRAS


2.01 EXCAVACION DE ZAPATAS HASTA UNA PROF. DE 2.00 MTS.

M3

154.45

2.44

377.06

2.02 EXCAVACION PARA CIMIENTOS CORRIDOS

M3

73.16

10.27

751.07

2.03 EXCAVACION DE VIGAS DE CIMENTACION Y CONEXIN

m3

2.94

32.50

95.56

2.04 RELLENO COMPACATDO CON MATERIAL PROPIO

m3

99.72

27.86

2,778.27

2.05 ELIMINACION DE MATERIAL EXCEDENTE

m3

156.98

13.93

2,186.02

SUB TOTAL 2.00

6,187.98

3.00 CONCRETO SIMPLE


3.01 SOLADO PARA ZAPATAS Y VIGAS DE CIMENTACION E = 0.10 M.

m2

77.22

30.32

2,341.14

3.02 CIMIENTO CORRIDO MEZCLA 1:10 CEMENTO - HORMIGON + 30% PG

m3

3.03 SOBRECIMIENTO MEZCLA 1:8 CEMENTO - HORMIGON + 25% PG

m3

6.79

141.29

959.37

0.70

196.06

3.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

136.75

m2

9.90

34.47

341.25

3.05 FALSO PISO DE CONCRETO DE 4", MEZCLA 1:10 CEMENTO - HORMIGON

m2

13.21

25.15

332.17

3.06 VEREDA DE 4"

m2

11.80

50.81

599.58

3.07 ENCOFRADO Y DESENCOFRADO PARA VEREDA

m2

4.14

29.35

121.52

3.00 CONCRETO CICLOPEO

SUB TOTAL 3.00

4,831.78

4.00 CONCRETO ARMADO


ZAPATAS
4.01 CONCRETO f'c = 210 KG/CM2 PARA ZAPATAS

m3

42.47

261.38

11,101.43

4.02 ACERO DE REFUERZO fy= 4200 KG/CM2, PARA CANASTILLA DE ZAPATA

Kg

677.86

3.88

2,630.12
567.76

VIGAS DE CIMENTACION
4.03 CONCRETO f'c = 210 Kg/cm2 PARA VIGAS DE CIMENTACION

m3

1.78

318.61

4.04 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION

m2

3.56

41.67

148.51

4.05 ACERO DE REFUERZO PARA VIGAS DE CIMENTACION

Kg

129.60

4.76

616.46

4.03 CONCRETO f'c = 210 Kg/cm2 PARA VIGAS DE CONEXIN

m3

3.56

0.00

0.00

4.04 ENCOFRADO Y DESENCOFRADO DE CONEXIN

m2

0.00

0.00

0.00

4.05 ACERO DE REFUERZO PARA CONEXIN

Kg

0.00

0.00

0.00

VIGAS DE CONEXIN

COLUMNAS
4.06 CONCRETO f'c = 210 Kg/cm2 PARA COLUMNAS

m3

1.61

290.24

468.01

4.07 ENCOFRADO Y DESENCOFRADO DE COLUMNAS

m2

17.20

52.81

908.33

4.08 ACERO DE REFUERZO PARA COLUMNAS

Kg

23.52

5.01

117.87

PLACAS
4.06 CONCRETO f'c = 210 Kg/cm2 PARA PLACAS

m3

0.00

0.00

0.00

4.07 ENCOFRADO Y DESENCOFRADO DE PLACAS

m2

#NAME?

0.00

#NAME?

4.08 ACERO DE REFUERZO PARA PLACAS

Kg

0.00

0.00

0.00

4.06 CONCRETO f'c = 210 Kg/cm2 PARA VIGAS

m3

#NAME?

0.00

#NAME?

4.07 ENCOFRADO Y DESENCOFRADO DE VIGAS

m2

#NAME?

0.00

#NAME?

4.08 ACERO DE REFUERZO PARA VIGAS

Kg

0.00

0.00

0.00

VIGAS

LOSA ALIGERADA
4.09 CONCRETO f'c = 210 Kg/cm2 PARA LOSA ALIGERADA

m3

1.15

279.06

320.92

4.10 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA

m2

24.93

63.66

1,587.04

4.11 ACERO DE REFUERZO PARA LOSA ALIGERADA

Kg

269.93

5.01

1,352.79

4.12 LADRILLO HUECO DE ARCILLA DE 30X30X9CM.

PZA

58.00

2.06

119.23

4.09 CONCRETO f'c = 210 Kg/cm2 PARA LOSA MACIZA

m3

#NAME?

40,990.00

#NAME?

4.10 ENCOFRADO Y DESENCOFRADO DE LOSA MACIZA

m2

0.00

40,990.00

0.00

4.11 ACERO DE REFUERZO PARA LOSA MACIZA

Kg

0.00

40,990.00

0.00

4.09 CONCRETO f'c = 210 Kg/cm2 PARA ESCALERAS

m3

0.00

12.00

0.00

4.10 ENCOFRADO Y DESENCOFRADO DE ESCALERAS

m2

0.00

220.00

0.00

4.11 ACERO DE REFUERZO PARA ESCALERAS

Kg

0.00

2,000.00

0.00

LOSA MACISA

ESCALERAS

OBRA: CONSTRUCCION DE POLIDEPORTIVO


OBRAS CIVILES
TEM

DESCRIPCIN

UNIDAD

METRADO

PRESUPUESTO
COSTO (Nuevos Soles)
UNITARIO

SUB TOTAL 4.00

TOTAL
#NAME?

5.00 ALBAILERIA
5.01 MURO DE LADRILLO K.K. MAQUINADO DE ARCILLA, ASENTADO DE SOGA

m2

16.89

46.38

783.17

5.02 MURO DE LADRILLO K.K. MAQUINADO DE ARCILLA, ASENTADO DE CABEZA

m2

0.00

0.00

0.00

SUB TOTAL 5.00

783.17

6.00 REVOQUES ENLUCIDOS Y MOLDADURAS


6.01 TARRAJEO FROTACHADO EN INT. Y EXT. , E=1.5 CM, C/MORTERO 1:5

m2

70.28

18.69

1,313.78

6.02 TARRAJEO FROTACHADO DE VIGAS COLUMNAS CIELO RASO Y ALEROS, E=1.5 CM, C/MORTERO 1:5

m2

37.62

17.43

655.63

6.03 LADRILLO PASTELERO DE 24X24X3mm, ASENTADO CON MEZCLA

m2

24.75

29.70

735.17

SUB TOTAL 6.00

2,704.58

7.00 PISOS
7.01 PISO DE CONCRETO DE 2" COLOREADO

m2

13.21

31.62

SUB TOTAL 7.00

417.62
417.62

8.00 ZOCALOS Y CONTRAZOCALOS


8.01 CONTRAZOCALO DE CEMENTO DE 0.20 m. DE ALTO SIN COLOREAR.
SUB TOTAL 8.00

ML

10.10

7.99

80.70
80.70

OBRA: CONSTRUCCION DE POLIDEPORTIVO


OBRAS CIVILES
TEM

DESCRIPCIN

UNIDAD

METRADO

PRESUPUESTO
COSTO (Nuevos Soles)
UNITARIO

TOTAL

9.00 PINTURA
9.01 PINTURA LATEX EN INTERIORES Y EXTERIORES, 2 MANOS

m2

107.91

7.19

SUB TOTAL 9.00

775.84
775.84

10.00 CARPINTERIA METALICA, MADERA Y OTROS


10.01 PUERTA DE MADERA CEDRO C/MARCO INC. BISAGRAS Y CERRADURA PESADA DE 0.90 X 2.20 M.

2.00

529.89

10.02 VENTANA V-1 DE 0.95 X 1.20M. SISTEMA DIRECTO

p2

12.27

16.71

205.05

10.03 VENTANA V-2 DE 01.63 X 1.20M. SISTEMA DIRECTO

p2

21.93

16.71

366.50

p2

10.53

16.71

175.92

1.00

120.63

120.63

10.04 VENTANA V-3 DE 01.63 X 0.60M. SISTEMA DIRECTO


10.05 VENTANA V-4 DE 0.80 X 0.40M. (ATENCION A LA CALLE)-INC. PROTECTOR DE FIERRO

und

und

SUB TOTAL 10.00

1,059.78

1,927.87

11.00 INSTALACIONES ELECTRICAS


11.01 SUB TABLERO DE CONTROL PVC CON RIEL DIN-INCLUIDO INSTALACION

1.00

350.45

350.45

11.02 INSTALACIN DE TUBERAS PVC SAP (ELCTRICAS) 5/8"

UND
ML

39.01

8.55

333.63

11.03 SALIDA PARA CENTRO DE LUZ

PTO

5.00

108.61

543.05

11.04 SALIDA PARA INTERRUPTOR CON CAJA DE PVC

PTO

3.00

41.49

124.47

11.05 SALIDA PARA TOMACORRIENTE CON CAJA DE PVC

PTO

4.00

42.69

170.76

11.06 INSTALACIN DE FLUORESCENTE RECTO ISPE 2 X 40 W INC LUMINARIA

UND

2.00

108.32

216.65

11.07 INSTALACIN DE SOQUETE, INCLUIDO LUMINARIA

UND

3.00

33.32

99.97

11.08 INSTALACION DE INTERRUPTOR DOBLE C/DADOS 15A

UND

1.00

71.29

71.29

11.09 INSTALACION DE INTERRUPTOR SIMPLE C/DADOS 15A

UND

2.00

47.85

95.70

11.10 INSTALACION DE TOMACORRIENTE DOBLE C/DADO 15A

UND

4.00

71.29

285.16

SUB TOTAL 11.00

2,291.13

TOTAL DE OBRAS CIVILES

#NAME?

RESUMEN GENERAL
7.0 Obras Civiles
11.0 Gastos Generales Directos
Gastos Generales Indirectos
Utilidades

TOTAL GENERAL

#NAME?
37%

#NAME?

12%

#NAME?

7%

#NAME?

#NAME?

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

1.01
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS

GLB

LUGAR

ESPECIFICACION

CANTID.

REN.CUADRILLA

1.0

0.0

FACTOR REND.

1.0

0.0

1.0

0.0

HORAS REND. EQUIPOS

PERSONAL BASE :
CAPATAZ
0.00

METRADO
D E S C R I P C I O N

UNID.

Principal
0.0

0.0

0.0

0.0

OFICIAL

0.0 =

0.0

0.0

0.0

PEON

0.0

PARCIAL

GLB

1.00

150.00

150.00

0.00

0.00

0.00

150.00

MANO DE OBRA :
CAPATAZ

H.H.

0.00

0.00

OPERARIO

H.H.

0.00

0.00

OFICIAL

H.H.

0.00

0.00

PEON

H.H.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

0.00

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS

C. # B

0.0 =

C O S T O S

CANTID. UNITARIO

0.0

0.0 OPERARIO

HECHO POR :

COD

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

0.00

0.00

0.00

0.00

0.00

0.00

0.00

COSTO DIRECTO

S/.

150.00

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

Nro

%
0

0.00%

0.00%

0.00%
0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

1.02
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

CAMPAMENTO PROVISIONAL DE LA OBRA

GLB

LUGAR

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

ESPECIFICACION

CANTID.

REN.CUADRILLA

1.0

0.0

FACTOR REND.

1.0

0.0

1.0

0.0

HORAS REND. EQUIPOS

0.0

0.0
0.0 PERSONAL BASE :
0.0 CAPATAZ

0.0

0.00

0.0 OPERARIO

0.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

0.0

HECHO POR :
METRADO
COD

D E S C R I P C I O N

UNID.

Principal

0.00

C O S T O S

CANTID. UNITARIO

PARCIAL

INDICE CREPCO
SUB-TOTAL

MATERIALES :
ALQUILER DE LOCAL PARA ALMACEN DE OBRA

GLB

2.0000

150.00

300.00

0.00

300.00
MANO DE OBRA :
CAPATAZ

H.H.

0.00

15.97

0.00

OPERARIO

H.H.

0.00

12.42

0.00

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.00

10.01

0.00
0.00
0.00

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

0.00

0.00

0.00

0.00

COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.0

0.00
300.00

Nro

%
0

0.00%

0.00%

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

1.03
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

LIMPIEZA DE TERRENO

M2

LUGAR

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en


REN.CUADRILLA
FACTOR REND.

ESPECIFICACION

CANTID.

HORAS REND. EQUIPOS

60.0

0.0

1.0

0.0

60.0

0.0

0.0

0.0
0

1.00

8.0 PERSONAL BASE :

0.00

0.0 CAPATAZ

0.1 =

0.8

0.00

0.0 OPERARIO

0.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

4.0 =

32.0

HECHO POR :
METRADO
COD

D E S C R I P C I O N

UNID.

Principal

C O S T O S

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :
0.00

Nro

%
0

0.00%

0.00%

0.00
0.00

0.00%

0.00

0.00

0.00

0.00

0.00

MANO DE OBRA :
CAPATAZ

H.H.

0.01

15.97

0.21

OPERARIO

H.H.

0.00

12.42

0.00

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.53

10.01

5.34
0.00
0.00

5.55

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

0.28

0.00
0.00

0.28

COSTO DIRECTO

S/.

5.83

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.00%
0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

1.04
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

TRAZO, NIVELACION Y REPLANTEO

M2

LUGAR

REN.CUADRILLA
FACTOR REND.
ESPECIFICACION

CANTID.

NIVEL TOPOGRAFICO

HORAS REND. EQUIPOS

1.00

500.0

0.0

1.0

0.0

500.0

0.0

0.0 CAPATAZ

1.0 =

8.0

0.00

0.0 OPERARIO

0.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

3.0

1.0 =

TOPOGRAFO
METRADO
UNID.

Principal

0.00

HECHO POR :

D E S C R I P C I O N

C O S T O S

CANTID. UNITARIO

PARCIAL

SUB-TOTAL

CLAVOS PARA MADERA C/C 3"

KG

0.020

3.40

0.07

CORDEL

0.300

0.50

0.15

YESO DE 28 KG

Bol

0.025

6.50

0.16

MADERA TORNILLO INC. CORTE P/ENCOFRADO

P2

0.020

4.50

0.09

0.00

0.00

0.47

MANO DE OBRA :
H.H.

0.02

15.97

0.26

OPERARIO

H.H.

0.00

12.42

0.00

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.05

10.01

0.48

H.H.

0.02

12.42

0.20
0.00

0.93

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

NIVEL TOPOGRAFICO

H.M.

0.02

0.05
15.00

24.0
8.0

Nro

%
0

0.00%

0.00%

0.00%

0.00

CAPATAZ

0.0

INDICE CREPCO

MATERIALES :

TOPOGRAFO

0.0

8.0
0.0 PERSONAL BASE :

COD

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

0.24

0.00
0.00

0.29

COSTO DIRECTO

S/.

1.70

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.00%
0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

0.00
OBRA:

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

PARTIDA

22/03/12

COSTO POR
0.00

GLB

LUGAR

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

ESPECIFICACION

CANTID.

REN.CUADRILLA

1.0

0.0

FACTOR REND.

1.0

0.0

1.0

0.0

HORAS REND. EQUIPOS

0.0

0.0
0.0 PERSONAL BASE :
0.0 CAPATAZ

0.0

0.00

0.0 OPERARIO

0.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

0.0

HECHO POR :
METRADO
COD

D E S C R I P C I O N

UNID.

Principal

0.00

C O S T O S

CANTID. UNITARIO

PARCIAL

INDICE CREPCO
SUB-TOTAL

MATERIALES :
DEMOLICION DE ESTRUCTURAS EXISTENTES(INC. ELIMIN. DESMONTE)

GLB

1.000

650.00

0.0

250.00

Nro

%
0

0.00%

0.00%

0.00
0.00

0.00%

0.00

0.00

0.00

0.00

250.00

MANO DE OBRA :
CAPATAZ

H.H.

0.00

15.97

0.00

OPERARIO

H.H.

0.00

12.42

0.00

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.00

10.01

0.00
0.00
0.00

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

0.00

0.00

0.00

0.00
0.00

0.00

COSTO DIRECTO

S/.

250.00

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.00%
0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

0.00
OBRA:

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

COSTO POR
0.00

PARTIDA

22/03/12
:

GLB

LUGAR

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

ESPECIFICACION

CANTID.

REN.CUADRILLA

1.0

0.0

FACTOR REND.

1.0

0.0

1.0

0.0

HORAS REND. EQUIPOS

0.0

0.0
0.0 PERSONAL BASE :
:

0.0

0.00

0.0 OPERARIO

0.0 =

0.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

0.0

METRADO
D E S C R I P C I O N

UNID.

C O S T O S

CANTID. UNITARIO

PARCIAL

200.00

0.00

0.00

0.00

200.00

MANO DE OBRA :
CAPATAZ

H.H.

0.00

15.97

0.00

OPERARIO

H.H.

0.00

12.42

0.00

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.00

10.01

0.00

0.00
0.00

0.00

HERRAMIENTAS Y EQUIPOS :

EST

5.000

HM

0.00

Nro

%
0

0.00%

0.00%

0.00%

200.00

0.00

HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :
DESMONTAJE DE COBERTURA DE CASETA (INCL. ELEIMINACION DE DESMONTE) GLB

C. # B

0.0 CAPATAZ

HECHO POR :

COD

Principal

0.00

0.00

0.00

12.00

0.00

0.00

0.00

0.00

0.00

COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.00
200.00

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

2.01
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

EXCAVACION DE ZAPATAS HASTA UNA PROF. DE 2.00 MTS.

M2

LUGAR

REN.CUADRILLA
FACTOR REND.
ESPECIFICACION

CANTID.

HORAS REND. EQUIPOS

1.00

40.0

0.0

1.0

0.0

40.0

0.0

0.1 =

0.8

0.00

0.0 OPERARIO

0.0 =

0.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

1.0 =

8.0

C O S T O S

CANTID. UNITARIO

PARCIAL

0.00
0.00

0.00

0.00

0.00

MANO DE OBRA :
CAPATAZ

H.H.

0.02

15.97

0.32

OPERARIO

H.H.

0.00

12.42

0.00

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.20

10.01

2.00

0.00
0.00

2.32

HERRAMIENTAS Y EQUIPOS :
EST

5.000

2.32

0.12

0.00

0.00

0.00

0.00

COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :

HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

C. # B

0.0 CAPATAZ

METRADO
UNID.

Principal

0.00

HECHO POR :

D E S C R I P C I O N

0.0

8.0
0.0 PERSONAL BASE :

COD

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

0.12
2.44

Nro

%
0

0.00%

0.00%

0.00%
0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

2.02
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

EXCAVACION PARA CIMIENTOS CORRIDOS

M2

LUGAR

REN.CUADRILLA
FACTOR REND.
ESPECIFICACION

CANTID.

PLANCHA COMPACTADORA

HORAS REND. EQUIPOS

1.00

200.0

0.0

1.0

0.0

200.0

0.0

0.1 =

0.8

0.00

0.0 OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

1.0 =

8.0

0.0

0.0

PEON

8.0 =

64.0

C O S T O S

CANTID. UNITARIO

PARCIAL

M3

0.15

35

0.00

0.00

0.00

5.25

MANO DE OBRA :
CAPATAZ

H.H.

0.00

15.97

0.06

OPERARIO

H.H.

0.04

12.42

0.50

OFICIAL

H.H.

0.04

11.07

0.44

PEON

H.H.

0.32

10.01

3.20

0.00
0.00

4.21

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

H.M.

0.04

Nro

%
0

0.00%

0.00%

0.00%

5.25

0.00

PLANCHA COMPACTADORA

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :
AFIRMADO

C. # B

0.0 CAPATAZ

METRADO
UNID.

Principal

0.00

HECHO POR :

D E S C R I P C I O N

0.0

8.0
0.0 PERSONAL BASE :

COD

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

4.21

0.21

15.00

0.60

0.00

0.00

0.00

0.00

COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.81
10.27

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

2.03
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

EXCAVACION DE VIGAS DE CIMENTACION Y CONEXIN

M3

LUGAR

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

ESPECIFICACION

CANTID.

REN.CUADRILLA

3.0

0.0

FACTOR REND.

1.0

0.0

3.0

0.0

HORAS REND. EQUIPOS

0.0

0.0
0.0 PERSONAL BASE :
:

0.1 =

0.8

0.00

0.0 OPERARIO

0.0

0.0

0.0

OFICIAL

0.0 =

0.0

0.0

0.0

PEON

1.0 =

8.0

METRADO
D E S C R I P C I O N

UNID.

C. # B

0.0 CAPATAZ

HECHO POR :

COD

Principal

0.00

C O S T O S

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :
0.00

Nro

%
0

0.00%

0.00%

0.00%

0.00

0.00

0.00

0.00

0.00

MANO DE OBRA :
CAPATAZ

H.H.

0.27

15.97

4.26

OPERARIO

H.H.

0.00

12.42

0.00

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

2.67

10.01

26.69

30.95
HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

30.95

1.55

0.00

0.00

0.00

0.00

0.00

0.00

COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

1.55
32.50

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

2.04
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

RELLENO COMPACATDO CON MATERIAL PROPIO

M3

LUGAR

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

ESPECIFICACION

CANTID.

REN.CUADRILLA

3.5

0.0

FACTOR REND.

1.0

0.0

3.5

0.0

HORAS REND. EQUIPOS

0.0

0.0
0.0 PERSONAL BASE :

0.00

0.1 =

0.8

0.0 OPERARIO

0.0 =

0.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

1.00 =

8.0

METRADO
D E S C R I P C I O N

UNID.

C O S T O S

CANTID. UNITARIO

PARCIAL

0.00
0.00

0.00

0.00

0.00

MANO DE OBRA :
CAPATAZ

H.H.

0.23

15.97

3.65

OPERARIO

H.H.

0.00

12.42

0.00

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

2.29

10.01

22.88
0.00
0.00

26.53

HERRAMIENTAS Y EQUIPOS :
EST

5.000

26.53

0.000

1.33
0.00

0.00
0.00
0.00
COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :

HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

C. # B

HECHO POR :

COD

Principal

0.0 CAPATAZ

1.33
27.86

Nro

%
0

0.00%

0.00%

0.00%
0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

2.05

FECHA :

OBRA:

OBRA: CONSTRUCCION DE POLIDEPORTIVO

PARTIDA

ELIMINACION DE MATERIAL EXCEDENTE

22/03/12

COSTO POR

M3

0.00
LUGAR

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

ESPECIFICACION

CANTID.

REN.CUADRILLA

7.0

0.0

FACTOR REND.

1.0

0.0

7.0

0.0

HORAS REND. EQUIPOS

0.0

0.00
0.00 PERSONAL BASE :

HECHO POR :
METRADO
COD

D E S C R I P C I O N

UNID.

Principal
:

0.1 =

0.8

OPERARIO

0.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

1.0 =

8.0

C O S T O S

CANTID. UNITARIO

PARCIAL

0.00
0.00

0.00

0.00

0.00

0.00

MANO DE OBRA :
CAPATAZ

H.H.

0.11

15.97

1.83

OPERARIO

H.H.

0.00

12.42

0.00

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

1.14

10.01

11.44

13.27
HERRAMIENTAS Y EQUIPOS :
EST

5.000

0.66

0.000

0.00
0.00

0.00
0.00
0.00
COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :

HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

C. # B

CAPATAZ

0.66
13.93

Nro

%
0

0.00%

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

#NAME?
OBRA:

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

PARTIDA

22/03/12

COSTO POR
#NAME?

M3

LUGAR

REN.CUADRILLA

50.0

FACTOR REND.
ESPECIFICACION

CANTID.

CAMION VOLQUETE 6 X 4 330 HP 10 m3

1.0

HORAS REND. EQUIPOS

2.00

50.0

16.0
PERSONAL BASE :

HECHO POR :
METRADO
COD

D E S C R I P C I O N

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

UNID.

Principal

CAPATAZ

0.1 =

0.8

OPERARIO

0.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

3.0 =

24.0

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00

0.00%

5.06

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.02

15.97

0.26

OPERARIO

H.H.

0.00

12.42

0.00

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.48

10.01

4.80

0.00
HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

CAMION VOLQUETE 6 X 4 330 HP 10 m3

H.M

0.320

0.25
60.00

19.20

0.000

0.00

0.00

19.45

0.00%

S/.

24.51

0.00%

COSTO DIRECTO

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

3.01
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

SOLADO PARA ZAPATAS Y VIGAS DE CIMENTACION E = 0.10 M.

M2

LUGAR

REN.CUADRILLA

40.0

FACTOR REND.
ESPECIFICACION

CANTID.

1.0

HORAS REND. EQUIPOS

0.50

MEZCLADORA 11 HP, 11 p3

40.0

4.0
PERSONAL BASE :

HECHO POR :
METRADO
COD

D E S C R I P C I O N

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

UNID.

Principal

CAPATAZ

0.1 =

0.8

OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

1.0 =

8.0

0.0

0.0

PEON

6.0 =

48.0

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :

0.00%

CEMENTO PORTLAND TIPO I (42.5KG)

BLS

0.35

17.65

6.18

0.00%

HORMIGON (PUESTO EN OBRA)

M3

0.130

33.61

4.37

0.00%

AGUA

M3

0.020

5.00

0.10

0.00%

0.00

0.00

10.65

0.00%

17.02

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.02

15.97

0.32

OPERARIO

H.H.

0.20

12.42

2.48

OFICIAL

H.H.

0.20

11.07

2.21

PEON

H.H.

1.20

10.01

12.01

0.00
HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

MEZCLADORA 11 HP, 11 p3

H.M

0.100

COSTO DIRECTO

0.85
18.00

1.80

0.00

2.65

0.00%

S/.

30.32

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

3.02
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

CIMIENTO CORRIDO MEZCLA 1:10 CEMENTO - HORMIGON + 30% PG

REN.CUADRILLA

LUGAR

TRUJILLO

25.0

FACTOR REND.
ESPECIFICACION

CANTID.
1.00

8.0

VIBRADORA DE CONCRETO, 4HP, 18 PL(1,50*)

0.50

4.0 PERSONAL BASE :

HECHO POR :
METRADO
D E S C R I P C I O N

UNID.

1.0

HORAS REND. EQUIPOS

MEZCLADORA 11 HP, 11 p3

COD

M3

TABLA DE RENDIMIENTOS (En 8 horas) en

25.0

Principal

CAPATAZ

0.1 =

0.8

OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

2.0 =

16.0

0.0

0.0

PEON

8.0 =

64.0

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :

0.00%

CEMENTO PORTLAND TIPO I (42.5KG)

BLS

2.90

17.65

51.19

0.00%

AGUA

M3

0.16

5.00

0.80

0.00%

PIEDRA DE 8"

M3

0.50

30.00

15.00

HORMIGON (PUESTO EN OBRA)

M3

0.83

33.61

27.90

0.00

0.00%

94.88

0.00%

37.19

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.03

15.97

0.51

OPERARIO

H.H.

0.32

12.42

3.97

OFICIAL

H.H.

0.64

11.07

7.08

PEON

H.H.

2.56

10.01

25.63

0.00
HERRAMIENTAS Y EQUIPOS :
EST

5.000

MEZCLADORA 11 HP, 11 p3

HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

H.M

0.32

18.00

5.76

VIBRADORA DE CONCRETO, 4HP, 18 PL(1,50*)

H.M

0.16

10.00

1.60

1.86

0.00

COSTO DIRECTO

0.00

9.22

0.00%

S/.

141.29

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

3.03
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

SOBRECIMIENTO MEZCLA 1:8 CEMENTO - HORMIGON + 25% PG

REN.CUADRILLA

ESPECIFICACION

CANTID.

TRUJILLO

1.00

8.0

VIBRADORA DE CONCRETO, 4HP, 18 PL(1,50*)

0.50

4.0 PERSONAL BASE :

13.0

Principal

C. # B

0.0 CAPATAZ

0.1 =

0.8

0.0 OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

2.0 =

16.0

0.0

0.0

PEON

8.0 =

64.0

HECHO POR :
METRADO
UNID.

1.0

HORAS REND. EQUIPOS

MEZCLADORA 11 HP, 11 p3

D E S C R I P C I O N

LUGAR

13.0

FACTOR REND.

COD

M3

TABLA DE RENDIMIENTOS (En 8 horas) en

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :

CEMENTO PORTLAND TIPO I (42.5KG)

BLS

3.70

17.65

65.31

0.00%

AGUA

M3

0.16

2.00

0.32

0.00%

PIEDRA MEDIANA DE 6"

M3

0.42

30.00

12.60

0.00%

HORMIGON (PUESTO EN OBRA)

M3

0.85

33.61

28.57

0.00%

0.00

106.80

0.00%

71.52

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.06

15.97

0.98

OPERARIO

H.H.

0.62

12.42

7.64

OFICIAL

H.H.

1.23

11.07

13.62

PEON

H.H.

4.92

10.01

49.28

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

MEZCLADORA 11 HP, 11 p3

H.M

0.615

18.00

11.08

3.58

VIBRADORA DE CONCRETO, 4HP, 18 PL(1,50*)

H.M

0.308

10.00

3.08

0.00

0.00

17.74

0.00%

S/.

196.06

0.00%

COSTO DIRECTO

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

3.04

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

PARTIDA

22/03/12

COSTO POR

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

M2

LUGAR

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en


REN.CUADRILLA

14.0

FACTOR REND.
ESPECIFICACION

CANTID.

1.0

HORAS REND. EQUIPOS

14.0

0.0
0.0 PERSONAL BASE :

0.1 =

0.8

0.0 OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

0.5 =

4.0

METRADO
D E S C R I P C I O N

UNID.

C. # B

HECHO POR :

COD

Principal

0.0 CAPATAZ

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :
ALAMBRE NEGRO N 8

KG

0.26

3.40

CLAVOS PARA MADERA C/C 3"

KG

0.13

3.40

0.88
0.44

0.00%

MADERA TORNILLO INC. CORTE P/ENCOFRADO

P2

4.83

4.50

21.74

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00

23.06

0.00%

10.87

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.06

15.97

0.91

OPERARIO

H.H.

0.57

12.42

7.10

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.29

10.01

2.86

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

0.54

0.00

0.00
0.00

0.00

0.00

0.54

0.00%

S/.

34.47

0.00%

COSTO DIRECTO

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

3.05
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

FALSO PISO DE CONCRETO DE 4", MEZCLA 1:10 CEMENTO - HORMIGON

M2

LUGAR

REN.CUADRILLA

100.0

FACTOR REND.
ESPECIFICACION

CANTID.

MEZCLADORA 11 HP, 11 p3

1.0

HORAS REND. EQUIPOS

1.00

100.0

8.0
0.0 PERSONAL BASE :

UNID.

C. # B

0.3 =

2.4

0.0 OPERARIO

3.0 =

24.0

0.0

0.0

OFICIAL

1.0 =

8.0

0.0

0.0

PEON

8.0 =

64.0

METRADO
D E S C R I P C I O N

Principal

0.0 CAPATAZ

HECHO POR :

COD

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :
CEMENTO PORTLAND TIPO I (42.5KG)

BLS

0.44

17.65

AGUA

M3

0.015

2.00

7.77
0.03

0.00%

HORMIGON (PUESTO EN OBRA)

M3

0.130

33.61

4.37

0.00%

REGLA DE MADERA

P2

0.10

3.50

0.35

0.00%

0.00

0.00%

0.00
0.00

0.00

12.52

0.00%

10.66

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.02

15.97

0.38

OPERARIO

H.H.

0.24

12.42

2.98

OFICIAL

H.H.

0.08

11.07

0.89

PEON

H.H.

0.64

10.01

6.41

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

MEZCLADORA 11 HP, 11 p3

H.M.

0.08

0.53
18.00

1.44
0.00

0.00

0.00

1.97

0.00%

S/.

25.15

0.00%

COSTO DIRECTO

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

3.06
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

VEREDA DE 4"

M2

LUGAR

REN.CUADRILLA

45.0

FACTOR REND.
ESPECIFICACION

CANTID.

MEZCLADORA DE 9-11p3

1.0

HORAS REND. EQUIPOS

1.00

45.0

8.0
PERSONAL BASE :

HECHO POR :
METRADO
COD

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

D E S C R I P C I O N

UNID.

Principal

CAPATAZ

0.5 =

4.0

OPERARIO

4.0 =

32.0

0.0

0.0

OFICIAL

1.0 =

8.0

0.0

0.0

PEON

8.0 =

64.0

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :

0.00%

ARENA GRUESA

M3

0.0460

40.00

1.84

0.00%

PIEDRA CHANCADA 1/2"

M3

0.0570

40.00

2.28

0.00%

CEMENTO PORTLAND TIPO I (42.5KG)

BOL

0.8680

17.65

15.32

0.00%

AGUA

M3

0.0060

2.00

0.01

0.00%

ARENA FINA

M3

0.0140

40.00

0.56

REGLA DE MADERA

P2

0.10

3.50

0.35

0.00

20.36

0.00%

26.46

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.09

15.97

1.42

OPERARIO

H.H.

0.71

12.42

8.83

OFICIAL

H.H.

0.18

11.07

1.97

PEON

H.H.

1.42

10.01

14.24

0.00
HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

MEZCLADORA DE 9-11p3

H.M

0.178

1.32
15.00

2.67

0.000

0.00

0.00

3.99

0.00%

S/.

50.81

0.00%

COSTO DIRECTO

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

3.07
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

ENCOFRADO Y DESENCOFRADO PARA VEREDA

M2

CANTID.
0

REN.CUADRILLA

7.2

0.0

FACTOR REND.

1.0

0.0

7.2

0.0

HORAS REND. EQUIPOS


8.0

0.00

0.0 CAPATAZ

0.1 =

0.8

0.00

0.0 OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

1.00 =

8.0

HECHO POR :
METRADO
UNID.

Principal

C O S T O S

CANTID. UNITARIO

PARCIAL

Alambre N 16

KG

0.2000

3.40

0.68

CLAVOS PARA MADERA C/C 3"

KG

0.1500

3.40

0.51

MADERA TORNILLO INC. CORTE P/ENCOFRADO

P2

0.0300

4.50

0.14

0.00

0.00

0.00

1.33

MANO DE OBRA :
CAPATAZ

H.H.

0.11

15.97

1.77

OPERARIO

H.H.

1.11

12.42

13.80

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

1.11

10.01

11.12

0.00
0.00

26.70

HERRAMIENTAS Y EQUIPOS :
EST

5.000

1.33
0.00

0.00
0

0.00

0.00

COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

C. # B
0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :

HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

0.0

1.00

PERSONAL BASE :

D E S C R I P C I O N

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

ESPECIFICACION

COD

0.00
LUGAR

1.33
29.35

Nro

%
0

0.00%

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

4.01
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

CONCRETO f'c = 210 KG/CM2 PARA ZAPATAS

REN.CUADRILLA

ESPECIFICACION

CANTID.

TRUJILLO

1.00

8.0

VIBRADOR DE CONCRETO, 4HP, 18 PL(1,50*)

0.50

4.0 PERSONAL BASE :

25.0

Principal

C. # B

0.0 CAPATAZ

0.2 =

1.6

0.0 OPERARIO

2.0 =

16.0

0.0

0.0

OFICIAL

2.0 =

16.0

0.0

0.0

PEON

8.0 =

64.0

HECHO POR :
METRADO
UNID.

1.0

HORAS REND. EQUIPOS

MEZCLADORA DE 9-11p3

D E S C R I P C I O N

LUGAR

25.0

FACTOR REND.

COD

M3

TABLA DE RENDIMIENTOS (En 8 horas) en

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :

CEMENTO PORTLAND TIPO I (42.5KG)

BLS

9.00

17.65

158.85

0.00%

AGUA

M3

0.184

2.00

0.37

0.00%

PIEDRA CHANCADA 1/2"

M3

0.750

40.00

30.00

0.00%

ARENA GRUESA

M3

0.55

40.00

22.00

0.00%

0.00

211.22

0.00%

41.68

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.06

15.97

1.02

OPERARIO

H.H.

0.64

12.42

7.95

OFICIAL

H.H.

0.64

11.07

7.08

PEON

H.H.

2.56

10.01

25.63

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

MEZCLADORA DE 9-11p3

H.M

0.320

15.00

2.08
4.80

VIBRADOR DE CONCRETO, 4HP, 18 PL(1,50*)

H.M

0.160

10.00

1.60

0.00

0.00

8.48

0.00%

S/.

261.38

0.00%

COSTO DIRECTO

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

4.02
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

ACERO DE REFUERZO fy= 4200 KG/CM2, PARA CANASTILLA DE ZAPATA

KG

LUGAR

REN.CUADRILLA

250.0

FACTOR REND.
ESPECIFICACION

CANTID.

CIZALLA PARA CORTE DE FIERRO

1.0

HORAS REND. EQUIPOS

1.00

250.0

8.0
0.0 PERSONAL BASE :

UNID.

C. # B

0.1 =

0.8

0.0 OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

1.0 =

8.0

METRADO
D E S C R I P C I O N

Principal

0.0 CAPATAZ

HECHO POR :

COD

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :

ALAMBRE N 16

KG

0.060

3.40

0.20

0.00%

ACERO CORRUGADO fy = 4200 KG/CM2, GRADO 60

Kg

1.070

2.50

2.68

0.00%

0.00

0.00%

0.00

0.00%

0.00

2.88

0.00%

0.77

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.00

15.97

0.05

OPERARIO

H.H.

0.03

12.42

0.40

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.03

10.01

0.32

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

CIZALLA PARA CORTE DE FIERRO

H.M

0.032

0.04
6.00

0.19
0.00

0.00

0.00

0.23

0.00%

S/.

3.88

0.00%

COSTO DIRECTO

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

4.03
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

CONCRETO f'c = 210 Kg/cm2 PARA VIGAS DE CIMENTACION

REN.CUADRILLA

ESPECIFICACION

CANTID.

TRUJILLO

1.00

8.0

VIBRADOR DE CONCRETO, 4HP, 18 PL(1,50*)

0.50

4.0 PERSONAL BASE :

12.0

Principal

C. # B

0.0 CAPATAZ

0.2 =

1.6

0.0 OPERARIO

2.0 =

16.0

0.0

0.0

OFICIAL

2.0 =

16.0

0.0

0.0

PEON

8.0 =

64.0

HECHO POR :
METRADO
UNID.

1.0

HORAS REND. EQUIPOS

MEZCLADORA DE 9-11p3

D E S C R I P C I O N

LUGAR

12.0

FACTOR REND.

COD

M3

TABLA DE RENDIMIENTOS (En 8 horas) en

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :

CEMENTO PORTLAND TIPO I (42.5KG)

BLS

9.73

17.65

171.73

0.00%

AGUA

M3

0.184

2.00

0.37

0.00%

PIEDRA CHANCADA 1/2"

M3

0.530

40.00

21.20

0.00%

ARENA GRUESA

M3

0.52

40.00

20.80

0.00%

0.00

214.10

0.00%

86.84

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.13

15.97

2.13

OPERARIO

H.H.

1.33

12.42

16.56

OFICIAL

H.H.

1.33

11.07

14.76

PEON

H.H.

5.33

10.01

53.39

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

MEZCLADORA DE 9-11p3

H.M

0.667

15.00

10.00

4.34

VIBRADOR DE CONCRETO, 4HP, 18 PL(1,50*)

H.M

0.333

10.00

3.33

0.00

0.00

17.67

0.00%

S/.

318.61

0.00%

COSTO DIRECTO

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

4.04
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION

M2

LUGAR

REN.CUADRILLA

12.0

FACTOR REND.
ESPECIFICACION

CANTID.

1.0

HORAS REND. EQUIPOS

12.0

0.0 PERSONAL BASE :

UNID.

C. # B

0.1 =

0.8

0.0 OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

1.0 =

8.0

0.0

0.0

PEON

0.5 =

4.0

METRADO
D E S C R I P C I O N

Principal

0.0 CAPATAZ

HECHO POR :

COD

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :
CLAVOS PARA MADERA C/C 3"

KG

0.15

3.40

ALAMBRE NEGRO N 8

KG

0.30

3.40

0.51
1.02

0.00%

MADERA TORNILLO INC. CORTE P/ENCOFRADO

P2

4.24

4.50

19.08

0.00%

0.00
0.00
0.00

0.00

0.00%

20.61

0.00%

20.06

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.07

15.97

1.06

OPERARIO

H.H.

0.67

12.42

8.28

OFICIAL

H.H.

0.67

11.07

7.38

PEON

H.H.

0.33

10.01

3.34

0.00

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

1.00

0.00

0.00

0.00

0.00

1.00

0.00%

S/.

41.67

0.00%

COSTO DIRECTO

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

4.05
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

ACERO DE REFUERZO PARA VIGAS DE CIMENTACION

KG

FACTOR REND.
ESPECIFICACION

CANTID.

CIZALLA PARA CORTE DE FIERRO

HORAS REND. EQUIPOS

250.0

0.0

1.0

0.0

250.0

0.0

8.0

0.00

0.0 CAPATAZ

0.2 =

1.6

0.00

0.0 OPERARIO

2.0 =

16.0

0.0

0.0

OFICIAL

2.0 =

16.0

0.0

0.0

PEON

0.0

HECHO POR :
METRADO
UNID.

0.0

1.00

PERSONAL BASE :

D E S C R I P C I O N

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en


REN.CUADRILLA

COD

0.00
LUGAR

Principal

C O S T O S

CANTID. UNITARIO

PARCIAL

INDICE CREPCO
SUB-TOTAL

MATERIALES :
ALAMBRE N 16

KG

0.060

3.40

0.20

ACERO CORRUGADO fy = 4200 KG/CM2, GRADO 60

Kg

1.070

2.50

2.68

0.00

0.00

0.00

2.88

MANO DE OBRA :
CAPATAZ

H.H.

0.01

15.97

0.10

OPERARIO

H.H.

0.06

12.42

0.79

OFICIAL

H.H.

0.06

11.07

0.71

PEON

H.H.

0.00

10.01

0.00

0.00
0.00

1.61

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

CIZALLA PARA CORTE DE FIERRO

H.M

0.032

0.08
6.00

0.19

0.00
0

0.00

0.00

COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.0

0.27
4.76

Nro

%
0

0.00%

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

4.06
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

CONCRETO f'c = 210 Kg/cm2 PARA COLUMNAS

REN.CUADRILLA

ESPECIFICACION

CANTID.

TRUJILLO

1.00

8.0

VIBRADOR DE CONCRETO, 4HP, 18 PL(1,50*)

0.50

4.0 PERSONAL BASE :

18.0

Principal

C. # B

0.0 CAPATAZ

0.2 =

1.6

0.0 OPERARIO

2.0 =

16.0

0.0

0.0

OFICIAL

2.0 =

16.0

0.0

0.0

PEON

10.0 =

80.0

HECHO POR :
METRADO
UNID.

1.0

HORAS REND. EQUIPOS

MEZCLADORA DE 9-11p3

D E S C R I P C I O N

LUGAR

18.0

FACTOR REND.

COD

M3

TABLA DE RENDIMIENTOS (En 8 horas) en

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :

CEMENTO PORTLAND TIPO I (42.5KG)

BLS

9.00

17.65

158.85

0.00%

AGUA

M3

0.184

2.00

0.37

0.00%

PIEDRA CHANCADA 1/2"

M3

0.750

40.00

30.00

0.00%

ARENA GRUESA

M3

0.55

40.00

22.00

0.00%

0.00

211.22

0.00%

66.79

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.09

15.97

1.42

OPERARIO

H.H.

0.89

12.42

11.04

OFICIAL

H.H.

0.89

11.07

9.84

PEON

H.H.

4.44

10.01

44.49

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

MEZCLADORA DE 9-11p3

H.M

0.44

15.00

6.67

3.34

VIBRADOR DE CONCRETO, 4HP, 18 PL(1,50*)

H.M

0.22

10.00

2.22

0.00

0.00

12.23

0.00%

S/.

290.24

0.00%

COSTO DIRECTO

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

4.07
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

M2

LUGAR

REN.CUADRILLA

10.0

FACTOR REND.
ESPECIFICACION

CANTID.

1.0

HORAS REND. EQUIPOS

10.0

0.0 PERSONAL BASE :

UNID.

C. # B

0.1 =

0.8

0.0 OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

1.0 =

8.0

0.0

0.0

PEON

0.0

METRADO
D E S C R I P C I O N

Principal

0.0 CAPATAZ

HECHO POR :

COD

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :
CLAVOS PARA MADERA C/C 3"

KG

0.24

3.40

ALAMBRE NEGRO N 8

KG

0.21

3.40

0.82
0.71

0.00%

MADERA TORNILLO INC. CORTE P/ENCOFRADO

P2

6.71

4.50

30.20

0.00%

0.00

0.00
0.00

0.00

0.00%

31.73

0.00%

20.08

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.08

15.97

1.28

OPERARIO

H.H.

0.80

12.42

9.94

OFICIAL

H.H.

0.80

11.07

8.86

PEON

H.H.

0.00

10.01

0.00

0.00

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

1.00

0.00

0.00

0.00

0.00

1.00

0.00%

S/.

52.81

0.00%

COSTO DIRECTO

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

4.08

FECHA :

OBRA:

OBRA: CONSTRUCCION DE POLIDEPORTIVO

PARTIDA

ACERO DE REFUERZO PARA COLUMNAS

22/03/12

COSTO POR

KG

FACTOR REND.
ESPECIFICACION

CANTID.

CIZALLA PARA CORTE DE FIERRO

HORAS REND. EQUIPOS

220.0

0.0

1.0

0.0

220.0

0.0

8.0

0.00

0.0 CAPATAZ

0.2 =

1.6

0.00

0.0 OPERARIO

2.0 =

16.0

0.0

0.0

OFICIAL

2.0 =

16.0

0.0

0.0

PEON

0.0

HECHO POR :
METRADO
UNID.

0.0

1.00

PERSONAL BASE :

D E S C R I P C I O N

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en


REN.CUADRILLA

COD

0.00
LUGAR

Principal

C O S T O S

CANTID. UNITARIO

PARCIAL

MATERIALES :
KG

0.060

3.40

0.20

ACERO CORRUGADO fy = 4200 KG/CM2, GRADO 60

Kg

1.070

2.50

2.68

0.00

0.00

0.00

2.88

MANO DE OBRA :
CAPATAZ

H.H.

0.01

15.97

0.12

OPERARIO

H.H.

0.07

12.42

0.90

OFICIAL

H.H.

0.07

11.07

0.81

PEON

H.H.

0.00

10.01

0.00

0.00
0.00

1.82

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

CIZALLA PARA CORTE DE FIERRO

H.M

0.036

0.09
6.00

0.22

0.00
0

0.00

0.00

COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.0

INDICE CREPCO
SUB-TOTAL

ALAMBRE N 16

C. # B

0.31
5.01

Nro

%
0

0.00%

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

4.09
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

CONCRETO f'c = 210 Kg/cm2 PARA LOSA ALIGERADA

REN.CUADRILLA

ESPECIFICACION

CANTID.

1.00

8.0

VIBRADOR DE CONCRETO, 4HP, 18 PL(1,50*)

0.50

4.0 PERSONAL BASE :

25.0

Principal

C. # B

0.0 CAPATAZ

0.3 =

2.4

0.0 OPERARIO

3.0 =

24.0

0.0

0.0

OFICIAL

2.0 =

16.0

0.0

0.0

PEON

11.0 =

88.0

HECHO POR :
METRADO
UNID.

1.0

HORAS REND. EQUIPOS

MEZCLADORA DE 9-11p3

D E S C R I P C I O N

LUGAR

25.0

FACTOR REND.

COD

M3

TABLA DE RENDIMIENTOS (En 8 horas) en

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :

CEMENTO PORTLAND TIPO I (42.5KG)

BLS

9.73

17.65

171.73

0.00%

AGUA

M3

0.184

2.00

0.37

0.00%

PIEDRA CHANCADA 1/2"

M3

0.530

40.00

21.20

0.00%

ARENA GRUESA

M3

0.52

40.00

20.80

0.00%

0.00

214.10

0.00%

55.77

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.10

15.97

1.53

OPERARIO

H.H.

0.96

12.42

11.92

OFICIAL

H.H.

0.64

11.07

7.08

PEON

H.H.

3.52

10.01

35.24

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

MEZCLADORA DE 9-11p3

H.M

0.32

15.00

2.79
4.80

VIBRADOR DE CONCRETO, 4HP, 18 PL(1,50*)

H.M

0.16

10.00

1.60

0.00

0.00

9.19

0.00%

S/.

279.06

0.00%

COSTO DIRECTO

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

4.10
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA

M2

LUGAR

REN.CUADRILLA

12.0

FACTOR REND.
ESPECIFICACION

CANTID.

1.0

HORAS REND. EQUIPOS

12.0

0.0 PERSONAL BASE :

UNID.

C. # B

0.1 =

0.8

0.0 OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

2.0 =

16.0

0.0

0.0

PEON

2.0 =

16.0

METRADO
D E S C R I P C I O N

Principal

0.0 CAPATAZ

HECHO POR :

COD

TABLA DE RENDIMIENTOS (En 8 horas) en

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :
CLAVOS PARA MADERA C/C 3"

KG

0.11

3.40

ALAMBRE NEGRO N 8

KG

0.10

3.40

0.37
0.34

0.00%

MADERA TORNILLO INC. CORTE P/ENCOFRADO

P2

5.25

4.50

23.63

0.00%

0.00

0.00
0.00

0.00

0.00%

24.34

0.00%

37.45

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.07

15.97

1.06

OPERARIO

H.H.

0.67

12.42

8.28

OFICIAL

H.H.

1.33

11.07

14.76

PEON

H.H.

1.33

10.01

13.35

0.00

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

1.87

0.00

0.00

0.00

0.00

1.87

0.00%

S/.

63.66

0.00%

COSTO DIRECTO

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

4.11
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

ACERO DE REFUERZO PARA LOSA ALIGERADA

KG

FACTOR REND.
ESPECIFICACION

CANTID.

CIZALLA PARA CORTE DE FIERRO

HORAS REND. EQUIPOS

220.0

0.0

1.0

0.0

220.0

0.0

8.0

0.00

0.0 CAPATAZ

0.2 =

1.6

0.00

0.0 OPERARIO

2.0 =

16.0

0.0

0.0

OFICIAL

2.0 =

16.0

0.0

0.0

PEON

0.0

HECHO POR :
METRADO
UNID.

0.0

1.00

PERSONAL BASE :

D E S C R I P C I O N

TABLA DE RENDIMIENTOS (En 8 horas) en


REN.CUADRILLA

COD

0.00
LUGAR

Principal

C O S T O S

CANTID. UNITARIO

PARCIAL

MATERIALES :
KG

0.060

3.40

0.20

ACERO CORRUGADO fy = 4200 KG/CM2, GRADO 60

Kg

1.070

2.50

2.68

0.00

0.00

0.00

2.88

MANO DE OBRA :
CAPATAZ

H.H.

0.01

15.97

0.12

OPERARIO

H.H.

0.07

12.42

0.90

OFICIAL

H.H.

0.07

11.07

0.81

PEON

H.H.

0.00

10.01

0.00

0.00
0.00

1.82

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

CIZALLA PARA CORTE DE FIERRO

H.M

0.036

0.09
6.00

0.22

0.00
0

0.00

0.00

COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.0

INDICE CREPCO
SUB-TOTAL

ALAMBRE N 16

C. # B

0.31
5.01

Nro

%
0

0.00%

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

4.12
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

LADRILLO HUECO DE ARCILLA DE 30X30X9CM.

PZA

0.00
LUGAR

TABLA DE RENDIMIENTOS (En 8 horas) en


REN.CUADRILLA
FACTOR REND.

ESPECIFICACION

CANTID.

HORAS REND. EQUIPOS

2000.0

0.0

1.0

0.0

2000.0

0.0

0.0

0.0
PERSONAL BASE :
:

0.1 =

0.8

0.00

0.0 OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

1.0 =

8.0

0.0

0.0

PEON

9.00 =

72.0

METRADO
D E S C R I P C I O N

UNID.

C O S T O S

CANTID. UNITARIO

PARCIAL

PZA

1.050

1.50

1.58
0.00

0.00

0.00

0.00

1.58

MANO DE OBRA :
CAPATAZ

H.H.

0.00

15.97

0.01

OPERARIO

H.H.

0.00

12.42

0.05

OFICIAL

H.H.

0.00

11.07

0.04

PEON

H.H.

0.04

10.01

0.36

0.00
0.00

0.46

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

0.02
0.00

0.00
0

0.00

0.00

COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :
LADRILLO HUECO DE ARCILLA DE 30X30X9CM.

C. # B

0.0 CAPATAZ

HECHO POR :

COD

Principal

0.00

0.02
2.06

Nro

%
0

0.00%

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

5.01
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

MURO DE LADRILLO K.K. MAQUINADO DE ARCILLA, ASENTADO DE SOGA

M2

0.00
LUGAR

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en


REN.CUADRILLA
FACTOR REND.

ESPECIFICACION

CANTID.

HORAS REND. EQUIPOS

10.0

0.0

1.0

0.0

10.0

0.0

0.0

0.0
PERSONAL BASE :
:

0.1 =

0.8

0.00

0.0 OPERARIO

1.00 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

0.50 =

4.0

METRADO
D E S C R I P C I O N

UNID.

C O S T O S

CANTID. UNITARIO

PARCIAL

39.000

0.60

23.40

ARENA GRUESA

UND
M3

0.031

40.00

1.24

CEMENTO PORTLAND TIPO I (42.5KG)

BLS

0.218

17.65

3.85

AGUA

M3

0.015

2.00

0.03

MADERA TORNILLO ANDAMIO

P2

0.403

4.50

1.81

CLAVOS PARA MADERA C/C 3"

KG

0.020

3.40

0.07

0.00

0.00

0.00

30.40

MANO DE OBRA :
CAPATAZ

H.H.

0.08

15.97

1.28

OPERARIO

H.H.

0.80

12.42

9.94

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.40

10.01

4.00

0.00
0.00

15.22

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

0.76
0.00

0.00
0

0.00

0.00

COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :
LADRILLO KK ARCILLA MAQUINADO

C. # B

0.0 CAPATAZ

HECHO POR :

COD

Principal

0.00

0.76
46.38

Nro

%
0

0.00%

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

6.01
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

TARRAJEO FROTACHADO EN INT. Y EXT. , E=1.5 CM, C/MORTERO 1:5

M2

0.00
LUGAR

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en


REN.CUADRILLA
FACTOR REND.

ESPECIFICACION

CANTID.

HORAS REND. EQUIPOS

20.0

0.0

1.0

0.0

20.0

0.0

0.0

0.0
PERSONAL BASE :
:

0.2 =

1.6

0.00

0.0 OPERARIO

2.00 =

16.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

1.00 =

8.0

METRADO
D E S C R I P C I O N

UNID.

C O S T O S

CANTID. UNITARIO

PARCIAL

CEMENTO PORTLAND TIPO I (42.5KG)

BLS

0.12

17.65

2.07

ARENA FINA

M3

0.016

40.00

0.64

AGUA

M3

0.005

2.00

0.01

0.00

0.00

0.00

2.72

MANO DE OBRA :
CAPATAZ

H.H.

0.08

15.97

1.28

OPERARIO

H.H.

0.80

12.42

9.94

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.40

10.01

4.00

0.00
0.00

15.22

HERRAMIENTAS Y EQUIPOS :
EST

5.000

0.76
0.00

0.00
0

0.00

0.00

COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :

HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

C. # B

0.0 CAPATAZ

HECHO POR :

COD

Principal

0.00

0.76
18.69

Nro

%
0

0.00%

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

6.02
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

TARRAJEO FROTACHADO DE VIGAS COLUMNAS CIELO RASO Y ALEROS, E=1.5 CM, C/MORTERO 1:5

FACTOR REND.
CANTID.

HORAS REND. EQUIPOS

METRADO
COD

D E S C R I P C I O N

UNID.

0.0

1.0

0.0

12.0

0.0

Principal
0.1 =

0.8

OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

0.5 =

4.0

PARCIAL

BLS

0.19

17.65

3.27

ARENA FINA

M3

0.021

40.00

0.84

AGUA

M3

0.005

2.00

0.01

0.00

0.00

4.12

MANO DE OBRA :
CAPATAZ

H.H.

0.07

15.97

1.06

OPERARIO

H.H.

0.67

12.42

8.28

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.33

10.01

3.34

12.68
HERRAMIENTAS Y EQUIPOS :
5.000

0.63
0.00

0.00
0.00
0.00
0.00
COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.0

INDICE CREPCO
SUB-TOTAL

CEMENTO PORTLAND TIPO I (42.5KG)

EST

C. # B

MATERIALES :

HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

0.0

CAPATAZ

C O S T O S

CANTID. UNITARIO

TRUJILLO

12.0

PERSONAL BASE :

HECHO POR :

0.00
LUGAR

TABLA DE RENDIMIENTOS (En 8 horas) en


REN.CUADRILLA

ESPECIFICACION

M2

0.63
17.43

Nro

%
0

0.00%

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

6.03
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

LADRILLO PASTELERO DE 24X24X3mm, ASENTADO CON MEZCLA

M2

FACTOR REND.
ESPECIFICACION

CANTID.

HORAS REND. EQUIPOS

30.0

0.0

1.0

0.0

30.0

0.0

PERSONAL BASE :

HECHO POR :
METRADO
D E S C R I P C I O N

UNID.

Principal
0.2 =

1.6

OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

1.0 =

8.0

0.0

0.0

PEON

0.0

PARCIAL

BLS

0.22

17.65

3.88

ARENA FINA

M3

0.031

40.00

1.24

LADRILLO PASTELERO 24X24

PZA

17.000

1.00

17.00

P2

0.0300

3.50

0.11

0.00

0.00

22.23

MANO DE OBRA :
CAPATAZ

H.H.

0.05

15.97

OPERARIO

H.H.

0.27

12.42

3.31

OFICIAL

H.H.

0.27

11.07

2.95

PEON

H.H.

0.00

10.01

0.00

0.85

7.12
HERRAMIENTAS Y EQUIPOS :
EST

5.000

0.36
0.00

0.00
0.00
0.00
0.00
COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.0

INDICE CREPCO
SUB-TOTAL

CEMENTO PORTLAND TIPO I (42.5KG)

HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

C. # B

C O S T O S

CANTID. UNITARIO

0.0

CAPATAZ

MATERIALES :

REGLA DE MADERA

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en


REN.CUADRILLA

COD

0.00
LUGAR

0.36
29.70

Nro

%
0

0.00%

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

7.01
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

PISO DE CONCRETO DE 2" COLOREADO

M2

LUGAR

REN.CUADRILLA

100.0

FACTOR REND.
ESPECIFICACION

CANTID.

MEZCLADORA DE 9-11p3

1.0

HORAS REND. EQUIPOS

1.00

100.0

8.0
0.0 PERSONAL BASE :

HECHO POR :
METRADO
COD

D E S C R I P C I O N

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

UNID.

Principal

CAPATAZ

0.5 =

4.0

OPERARIO

4.0 =

32.0

0.0

0.0

OFICIAL

1.0 =

8.0

0.0

0.0

PEON

8.0 =

64.0

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :

0.00%

CEMENTO PORTLAND TIPO I (42.5KG)

BLS

0.455

17.65

8.03

0.00%

AGUA

M3

0.042

2.00

0.08

0.00%

ARENA GRUESA

M3

0.050

40.00

2.00

0.00%

PIEDRA CHANCADA 1/2"

M3

0.050

40.00

2.00

0.00%

ARENA FINA

M3

0.009

40.00

0.36

OCRE

KG

0.339

15.00

5.09

REGLA DE MADERA

P2

0.100

3.50

0.35

0.00

17.91

0.00%

11.91

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.04

15.97

0.64

OPERARIO

H.H.

0.32

12.42

3.97

OFICIAL

H.H.

0.08

11.07

0.89

PEON

H.H.

0.64

10.01

6.41

0.00
HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

MEZCLADORA DE 9-11p3

H.M

0.08

0.60
15.00

1.20
0.00

COSTO DIRECTO

0.00

1.80

0.00%

S/.

31.62

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

8.01
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

CONTRAZOCALO DE CEMENTO DE 0.20 m. DE ALTO SIN COLOREAR.

ML

LUGAR

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en


REN.CUADRILLA

20.0

FACTOR REND.
ESPECIFICACION

CANTID.

1.0

HORAS REND. EQUIPOS

20.0

0.00
PERSONAL BASE :

0.1 =

0.8

0.0 OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

0.3 =

2.6

METRADO
D E S C R I P C I O N

UNID.

C. # B

HECHO POR :

COD

Principal

0.0 CAPATAZ

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :

0.00%

CEMENTO PORTLAND TIPO I (42.5KG)

BLS

0.031

17.65

0.55

0.00%

AGUA

M3

0.002

2.00

0.00

0.00%

ARENA FINA

M3

0.004

40.00

0.16

0.00%

0.00

0.00

0.00

0.00%

0.00

0.71

0.00%

6.93

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.04

15.97

0.64

OPERARIO

H.H.

0.40

12.42

4.97

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.13

10.01

1.32

0.00

0.00

0.00

0.00

5.000

0.35

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

0.00

COSTO DIRECTO

S/.

0.35

0.00%

7.99

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

9.01
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

PINTURA LATEX EN INTERIORES Y EXTERIORES, 2 MANOS

M2

LUGAR

REN.CUADRILLA

33.0

FACTOR REND.
ESPECIFICACION

CANTID.

1.0

HORAS REND. EQUIPOS

0.00

33.0

0.0
0.0 PERSONAL BASE :
:

0.1 =

0.8

0.0 OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

0.0

METRADO
D E S C R I P C I O N

UNID.

Principal

0.0 CAPATAZ

HECHO POR :

COD

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :
IMPRIMANTE

GLN

0.1300

14.00

PINTURA LATEX SUPERMATE

GLN

0.0400

45.00

1.82
1.80

0.00%

0.00

0.00%

0.00

0.00%

0.00
0.00

0.00%

3.62

0.00%

3.40

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.02

15.97

OPERARIO

H.H.

0.24

12.42

3.01

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.00

10.01

0.00

0.00

0.39

0.00

0.00
HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

0.17

0.00

0.00

0.17

0.00%

S/.

7.19

0.00%

COSTO DIRECTO

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

10.01
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

PUERTA DE MADERA CEDRO C/MARCO INC. BISAGRAS Y CERRADURA PESADA DE 0.90 X 2.20 M.

REN.CUADRILLA

CANTID.

2.0

0.0
0.0 PERSONAL BASE :

UNID.

C. # B

0.1 =

0.8

0.0 OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

0.5 =

4.0

METRADO
D E S C R I P C I O N

Principal

0.0 CAPATAZ

HECHO POR :

COD

TRUJILLO

1.0

HORAS REND. EQUIPOS

0.00

LUGAR

2.0

FACTOR REND.
ESPECIFICACION

UND

TABLA DE RENDIMIENTOS (En 8 horas) en

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :
PUERTA DE MADERA CEDRO DE 0.90 X 2.20 M. C/MARCO INC. BISAGRAS Y
CERRADURA PESADA MARCA FORTE DE 3 GOLPES
UND

1.0000

450.00

450.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

450.00

0.00%

76.09

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.40

15.97

6.39

OPERARIO

H.H.

4.00

12.42

49.68

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

2.00

10.01

20.02

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

3.80
0.00
0.00

0.00

0.00

3.80

0.00%

S/.

529.89

0.00%

COSTO DIRECTO

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

10.02
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

VENTANA V-1 DE 0.95 X 1.20M. SISTEMA DIRECTO

P2

LUGAR

REN.CUADRILLA

61.0

FACTOR REND.
ESPECIFICACION

CANTID.

1.0

HORAS REND. EQUIPOS

61.0

0.0 PERSONAL BASE :

UNID.

C. # B

0.1 =

0.8

0.0 OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

1.0 =

8.0

METRADO
D E S C R I P C I O N

Principal

0.0 CAPATAZ

HECHO POR :

COD

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

C O S T O S (S/.)

CANTID. UNITARIO

PARCIAL

0.0

INDICE CREPCO
SUB-TOTAL

Nro

MATERIALES :
VIDRIO IMPORTADO POLARIZADO SKI BLUE DE 8MM. INSTALADO EN SISTEMA
DIRECTO (INC./ACCESORIOS)
SILICONA

P2

1.0500

12.00

12.60

PZA

0.0800

10.00

0.80

0.00%

0.00

0.00%

0.00
0.00
0.00
0.00
0.00

13.40

0.00%

3.15

0.00%

MANO DE OBRA :
CAPATAZ

H.H.

0.01

15.97

OPERARIO

H.H.

0.13

12.42

1.63

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.13

10.01

1.31

0.00

0.21

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

0.16

0.00

0.00

0.00

0.00

0.16

0.00%

S/.

16.71

0.00%

COSTO DIRECTO

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

10.03
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

VENTANA V-2 DE 01.63 X 1.20M. SISTEMA DIRECTO

P2

Dlar/Sol
LUGAR

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en


REN.CUADRILLA
FACTOR REND.

ESPECIFICACION

CANTID.

HORAS REND. EQUIPOS

61.0

0.0

1.0

0.0

61.0

0.0

0.0

0.0
PERSONAL BASE :
:

0.1 =

0.8

0.00

0.0 OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

1.00 =

8.0

METRADO
D E S C R I P C I O N

UNID.

C O S T O S

CANTID. UNITARIO

PARCIAL

SILICONA

P2

1.0500

12.00

12.60

PZA

0.0800

10.00

0.80

0.00

0.00

0.00

13.40

MANO DE OBRA :
CAPATAZ

H.H.

0.01

15.97

OPERARIO

H.H.

0.13

12.42

1.63

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.13

10.01

1.31

0.21

0.00
0.00

3.15

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

0.16
0.00

0.00
0

0.00

0.00

COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :
VIDRIO IMPORTADO POLARIZADO SKI BLUE DE 8MM. INSTALADO EN SISTEMA
DIRECTO (INC./ACCESORIOS)

C. # B

0.0 CAPATAZ

HECHO POR :

COD

Principal

0.00

0.16
16.71

Nro

%
0

0.00%

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

10.04
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

VENTANA V-3 DE 01.63 X 0.60M. SISTEMA DIRECTO

P2

Dlar/Sol
LUGAR

TABLA DE RENDIMIENTOS (En 8 horas) en


REN.CUADRILLA
FACTOR REND.

ESPECIFICACION

CANTID.

HORAS REND. EQUIPOS

61.0

0.0

1.0

0.0

61.0

0.0

0.0

0.0
PERSONAL BASE :
:

0.1 =

0.8

0.00

0.0 OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

1.00 =

8.0

METRADO
D E S C R I P C I O N

UNID.

C O S T O S

CANTID. UNITARIO

PARCIAL

SILICONA

P2

1.0500

12.00

12.60

PZA

0.0800

10.00

0.80

0.00

0.00

0.00

13.40

MANO DE OBRA :
CAPATAZ

H.H.

0.01

15.97

OPERARIO

H.H.

0.13

12.42

1.63

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.13

10.01

1.31

0.21

0.00
0.00

3.15

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

0.16
0.00

0.00
0

0.00

0.00

COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :
VIDRIO IMPORTADO POLARIZADO SKI BLUE DE 8MM. INSTALADO EN SISTEMA
DIRECTO (INC./ACCESORIOS)

C. # B

0.0 CAPATAZ

HECHO POR :

COD

Principal

0.00

0.16
16.71

Nro

%
0

0.00%

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

10.05
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

VENTANA V-4 DE 0.80 X 0.40M. (ATENCION A LA CALLE)-INC. PROTECTOR DE FIERRO

ESPECIFICACION

UND

Dlar/Sol
LUGAR

TABLA DE RENDIMIENTOS (En 8 horas) en

CANTID.

REN.CUADRILLA

5.0

0.0

FACTOR REND.

1.0

0.0

5.0

0.0

HORAS REND. EQUIPOS

0.0

0.0
PERSONAL BASE :
:

0.1 =

0.8

0.00

0.0 OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

0.0

METRADO
D E S C R I P C I O N

UNID.

C O S T O S

CANTID. UNITARIO

PARCIAL

SILICONA
PROTECTOR DE FIERRO-INC. INSTALACION

P2

3.4400

12.00

41.28

PZA

0.0800

10.00

0.80

1.000

55.00

55.00

UNID.

0.00

0.00

0.00

97.08

MANO DE OBRA :
CAPATAZ

H.H.

0.16

15.97

2.56

OPERARIO

H.H.

1.60

12.42

19.87

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.00

10.01

0.00

0.00
0.00

22.43

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

1.12
0.00

0.00
0

0.00

0.00

COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :
VIDRIO IMPORTADO POLARIZADO SKI BLUE DE 8MM. INSTALADO EN SISTEMA
DIRECTO (INC./ACCESORIOS)

C. # B

0.0 CAPATAZ

HECHO POR :

COD

Principal

0.00

1.12
120.63

Nro

%
0

0.00%

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

11.01
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

SUB TABLERO DE CONTROL PVC CON RIEL DIN-INCLUIDO INSTALACION

UND

0.00
LUGAR

TABLA DE RENDIMIENTOS (En 8 horas) en

ESPECIFICACION

CANTID.

REN.CUADRILLA

4.0

0.0

FACTOR REND.

1.0

0.0

4.0

0.0

HORAS REND. EQUIPOS

0.0

0.0
PERSONAL BASE :
:

0.1 =

0.8

0.00

0.0 OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

1.00 =

8.0

METRADO
D E S C R I P C I O N

UNID.

C O S T O S

CANTID. UNITARIO

PARCIAL

UNID.

1.00

120.00

120.00

LLAVE TERMOMAGNETICA DE 2X16A

PZA

1.00

55.00

55.00

LLAVE TERMOMAGNETICA DE 2X20A

PZA

1.000

55.00

55.00

LLAVE TERMOMAGNETICA DE 3X32A

PZA

1.000

70.00

70.00

0.00

0.00

0.00

300.00

MANO DE OBRA :
CAPATAZ

H.H.

0.20

15.97

3.19

OPERARIO

H.H.

2.00

12.42

24.84

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

2.00

10.01

20.02

0.00
0.00

48.05

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

2.40
0.00

0.00
0

0.00

0.00

COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :
SUB TABLERO METALICO DE 12 POLOS NORMALIZADO

C. # B

0.0 CAPATAZ

HECHO POR :

COD

Principal

0.00

2.40
350.45

Nro

%
0

0.00%

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

11.02
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

INSTALACIN DE TUBERAS PVC SAP (ELCTRICAS) 5/8"

ML

0.00
LUGAR

TABLA DE RENDIMIENTOS (En 8 horas) en


REN.CUADRILLA
FACTOR REND.

ESPECIFICACION

CANTID.

HORAS REND. EQUIPOS

50.0

0.0

1.0

0.0

50.0

0.0

0.0

0.0
PERSONAL BASE :
:

0.1 =

0.8

0.00

0.0 OPERARIO

1.0 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

0.0

METRADO
D E S C R I P C I O N

UNID.

C O S T O S

CANTID. UNITARIO

PARCIAL

TUBO PVC SEL 5/8" X 3 MTS.

UND

0.33

6.00

2.00

CURVA PVC DEL 5/8"

PZA

0.25

4.00

1.00

PEGAMENTO PARA TUBERIA PVC (ELECT)

GLN

0.030

90.00

2.70

UNION SIMPLE PRESION PVC SEL(LUZ) 5/8"

PZA

0.333

1.50

0.50

0.00

0.00

0.00

6.20

MANO DE OBRA :
CAPATAZ

H.H.

0.02

15.97

OPERARIO

H.H.

0.16

12.42

1.99

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.00

10.01

0.00

0.26

0.00
0.00

2.24

HERRAMIENTAS Y EQUIPOS :
EST

5.000

0.11
0.00

0.00
0

0.00

0.00

COSTO DIRECTO

S/.

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :

HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

C. # B

0.0 CAPATAZ

HECHO POR :

COD

Principal

0.00

0.11
8.55

Nro

%
0

0.00%

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

11.03
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

SALIDA PARA CENTRO DE LUZ

PTO

LUGAR

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

ESPECIFICACION

CANTID.

REN.CUADRILLA

4.0

0.0

FACTOR REND.

1.0

0.0

4.0

0.0

HORAS REND. EQUIPOS

0.0

0.0
PERSONAL BASE :
CAPATAZ
0.00

METRADO
COD

D E S C R I P C I O N

UNID.

0.8

1.0 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

0.0

C O S T O S

CANTID. UNITARIO

PARCIAL

TUBO PVC SEL 5/8" X 3 MTS.

UND

6.25

6.00

37.50

CINTA AISLANTE

ROLL

0.25

3.50

0.88

CAJA OCTOGONAL LIVIANA 4"

UNID.

1.000

5.00

5.00

CABLE TWG N 14

ML

12.500

1.20

15.00

CURVA PVC DEL 5/8"

PZA

4.00

4.00

16.00

CONEXION A CAJA PVC SEL 5/8"

PZA

4.00

1.20

4.80

0.00

0.00

0.00

79.18

MANO DE OBRA :
CAPATAZ

H.H.

0.20

15.97

3.19

OPERARIO

H.H.

2.00

12.42

24.84

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.00

10.01

0.00

0.00

0.00

0.00

0.00

5.000

1.40

0.00

0.00

0.00

0.00

0.00

1.40

COSTO DIRECTO

S/.

108.61

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

28.03

HERRAMIENTAS Y EQUIPOS :
EST

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :

HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

C. # B

0.1 =

0.0 OPERARIO

HECHO POR :

Principal
:

Nro

%
0

0.00%

0.00%

0.00%
0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

11.04
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

SALIDA PARA INTERRUPTOR CON CAJA DE PVC

PTO

LUGAR

TABLA DE RENDIMIENTOS (En 8 horas) en


REN.CUADRILLA
FACTOR REND.

ESPECIFICACION

CANTID.

HORAS REND. EQUIPOS

10.0

0.0

1.0

0.0

10.0

0.0

0.0

0.0
PERSONAL BASE :
CAPATAZ
0.00

METRADO
COD

D E S C R I P C I O N

UNID.

0.8

1.0 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

0.8 =

6.0

C O S T O S

CANTID. UNITARIO

PARCIAL

CAJA RECTANGULAR DE PLASTICO 4"X2"

UNID.

1.0000

5.00

5.00

CINTA AISLANTE

ROLL

0.1000

3.50

0.35

CONEXION A CAJA PVC SEL 5/8"

PZA

1.00

1.20

1.20

TUBO PVC SEL 5/8" X 3 MTS.

UND

1.60

6.00

9.60

UNION SIMPLE PRESION PVC SEL(LUZ) 5/8"

UND

1.00

1.50

1.50

4.800

1.20

5.76

ML

0.00

0.00

0.00

23.41

MANO DE OBRA :
CAPATAZ

H.H.

0.08

15.97

1.28

OPERARIO

H.H.

0.80

12.42

9.94

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.60

10.01

6.01

0.00

0.00

0.00

0.00

5.000

0.86

0.00

0.00

0.00

0.00

0.00

0.86

COSTO DIRECTO

S/.

41.49

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

17.22

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :

CABLE TWG N 14

C. # B

0.1 =

0.0 OPERARIO

HECHO POR :

Principal
:

Nro

%
0

0.00%

0.00%

0.00%
0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

11.05
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

SALIDA PARA TOMACORRIENTE CON CAJA DE PVC

PTO

LUGAR

TABLA DE RENDIMIENTOS (En 8 horas) en


REN.CUADRILLA
FACTOR REND.

ESPECIFICACION

CANTID.

HORAS REND. EQUIPOS

10.0

0.0

1.0

0.0

10.0

0.0

0.0

0.0
PERSONAL BASE :
CAPATAZ
0.00

METRADO
COD

D E S C R I P C I O N

UNID.

0.8

1.0 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

0.8 =

6.0

C O S T O S

CANTID. UNITARIO

PARCIAL

CAJA RECTANGULAR DE PLASTICO 4"X2"

UNID.

1.0000

5.00

5.00

CINTA AISLANTE

ROLL

0.1000

3.50

0.35

CONEXION A CAJA PVC SEL 5/8"

PZA

1.00

1.20

1.20

TUBO PVC SEL 5/8" X 3 MTS.

UND

1.60

6.00

9.60

UNION SIMPLE PRESION PVC SEL(LUZ) 5/8"

UND

1.00

1.50

1.50

5.800

1.20

6.96

ML

0.00

0.00

0.00

24.61

MANO DE OBRA :
CAPATAZ

H.H.

0.08

15.97

1.28

OPERARIO

H.H.

0.80

12.42

9.94

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.60

10.01

6.01

0.00

0.00

0.00

0.00

5.000

0.86

0.00

0.00

0.00

0.00

0.00

0.86

COSTO DIRECTO

S/.

42.69

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

17.22

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :

CABLE TWG N 14

C. # B

0.1 =

0.0 OPERARIO

HECHO POR :

Principal
:

Nro

%
0

0.00%

0.00%

0.00%
0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

11.06
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

INSTALACIN DE FLUORESCENTE RECTO ISPE 2 X 40 W INC LUMINARIA

UND

LUGAR

TABLA DE RENDIMIENTOS (En 8 horas) en


REN.CUADRILLA
FACTOR REND.

ESPECIFICACION

CANTID.

HORAS REND. EQUIPOS

10.0

0.0

1.0

0.0

10.0

0.0

0.0

0.0
PERSONAL BASE :
CAPATAZ
0.00

METRADO
COD

D E S C R I P C I O N

UNID.

0.8

1.0 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

0.0

C O S T O S

CANTID. UNITARIO

PARCIAL

CABLE TWG N 14
CINTA AISLANTE

UND
ML
ROLL

1.0000

95.00

95.00

1.000

1.20

1.20

0.1000

3.50

0.35

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :
FLUORECENTE RECTO ISPE 2X40W. C/EQUIPO+PANTALLA

C. # B

0.1 =

0.0 OPERARIO

HECHO POR :

Principal
:

Nro

%
0

0.00%

0.00%

0.00%

0.00
0.00
0.00
0.00

0.00

0.00

0.00

96.55

MANO DE OBRA :
CAPATAZ

H.H.

0.08

15.97

1.28

OPERARIO

H.H.

0.80

12.42

9.94

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.00

10.01

0.00

0.00

0.00

0.00

0.00

5.000

0.56

0.00

0.00

0.00

0.00

0.00

0.56

COSTO DIRECTO

S/.

108.32

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

11.21

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

11.07
OBRA:
PARTIDA

FECHA :
OBRA: CONSTRUCCION DE POLIDEPORTIVO

22/03/12

COSTO POR

INSTALACIN DE SOQUETE, INCLUIDO LUMINARIA

UND

LUGAR

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en


REN.CUADRILLA
FACTOR REND.

ESPECIFICACION

CANTID.

HORAS REND. EQUIPOS

10.0

0.0

1.0

0.0

10.0

0.0

0.0

0.0
PERSONAL BASE :
CAPATAZ
0.00

METRADO
COD

D E S C R I P C I O N

UNID.

0.8

1.0 =

8.0

0.0

0.0

OFICIAL

0.0

0.0

0.0

PEON

0.0

C O S T O S

CANTID. UNITARIO

PARCIAL

CABLE TWG N 14

UND
ML

1.0000

15.00

15.00

1.000

1.20

1.20

CINTA AISLANTE

ROLL

0.1000

3.50

0.35

SOQUETE DE BAKELITA

UND

1.0000

5.00

5.00

0.00

0.00

0.00

21.55

MANO DE OBRA :
CAPATAZ

H.H.

0.08

15.97

1.28

OPERARIO

H.H.

0.80

12.42

9.94

OFICIAL

H.H.

0.00

11.07

0.00

PEON

H.H.

0.00

10.01

0.00

0.00

0.00

0.00

0.00

5.000

0.56

0.00

0.00

0.00

0.00

0.00

0.56

COSTO DIRECTO

S/.

33.32

G.G., D.T. Y UTILIDADES

S/.

TOTAL

S/.

11.21

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :
LAMPARA AHORRADOR

C. # B

0.1 =

0.0 OPERARIO

HECHO POR :

Principal
:

Nro

%
0

0.00%

0.00%

0.00%
0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

11.08

FECHA :

OBRA:

OBRA: CONSTRUCCION DE POLIDEPORTIVO

PARTIDA

22/03/12

COSTO POR

0.00

UND

LUGAR:

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

INSTALACION DE INTERRUPTOR DOBLE C/DADOS 15A

REND. CUADRILLA

15.0

FACTOR REND.
ESPECIFICACION

CANTID.

0.0

1.0

HORAS REND. EQUIPOS

0.0

15.0

0.0

0.0

0.0

0.0
0.0 PERSONAL BASE :

Principal

0.0 CAPATAZ

0.10 =

0.8

0.0 OPERARIO

1.00 =

8.0

0.0 OFICIAL

0.0

0.0 PEON

0.0

0.0

0.00 :

0.0

0.0

0.00 :

0.0

0.0

0.00 :

0.0

0.00 :

0.0

HECHO POR :
METRADO
COD

D E S C R I P C I O N

UNID.

C O S T O S

CANTID. UNITARIO

PARCIAL

C. # B
0.0

0.0

0.0

0.0

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :
0.00

Nro

%
0

0.00%

0.00%

INTERRUPTOR DOBLE BIPOLAR BAKELITA

UND

1.0000

15.44

15.44

0.00%

DADO CONMUTADOR 15A TIPO BTICINO O SIMILAR

UND

2.0000

20.00

40.00

0.00%

PLACA ALUMINIO 2 CAVIDAD HORIZONTAL

UND

1.0000

8.00

8.00

0.00%

0.00

0.00%

0.00%

0.00

0.00%

0.00

0.00

0.00%

0.00

63.44

0.00%

7.48

0.00%

0.00%

MANO DE OBRA :
CAPATAZ

H-H

0.0533

15.97

0.85

OPERARIO

H-H

0.5333

12.42

6.62

OFICIAL

H-H

0.0000

11.07

0.00

PEON

H-H

0.0000

10.01

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

0.37

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00
0.00

0.37

COSTO DIRECTO

S/.

71.29

G.G., D.T. Y UTILIDADES

S/.

0.00%

TOTAL

S/.

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

11.09

FECHA :

OBRA:

OBRA: CONSTRUCCION DE POLIDEPORTIVO

PARTIDA

22/03/12

COSTO POR

0.00

UND

LUGAR:

TRUJILLO

TABLA DE RENDIMIENTOS (En 8 horas) en

INSTALACION DE INTERRUPTOR SIMPLE C/DADOS 15A

REND. CUADRILLA

15.0

FACTOR REND.
ESPECIFICACION

CANTID.

0.0

1.0

HORAS REND. EQUIPOS

0.0

15.0

0.0

0.0

0.0 PERSONAL BASE :

0.0 CAPATAZ

0.10 =

0.8

0.0 OPERARIO

1.00 =

8.0

0.0 OFICIAL

0.0

0.0 PEON

0.0

0.0

0.00 :

0.0

0.0

0.00 :

0.0

0.0

0.00 :

0.0

0.00 :

0.0

HECHO POR :
METRADO
COD

D E S C R I P C I O N

UNID.

Principal

C O S T O S

CANTID. UNITARIO

PARCIAL

0.0

C. # B
0.0

0.0

0.0

0.0

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :
0.00

Nro

%
0

0.00%

0.00%

INTERRUPTOR SIMPLE BIPOLAR BAKELITA

UND

1.0000

12.00

12.00

0.00%

DADO CONMUTADOR 15A TIPO BTICINO O SIMILAR

UND

1.0000

20.00

20.00

0.00%

PLACA ALUMINIO 2 CAVIDAD HORIZONTAL

UND

1.0000

8.00

8.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

0.00

40.00

0.00%

7.48

0.00%

0.00%

MANO DE OBRA :
CAPATAZ

H-H

0.0533

15.97

0.85

OPERARIO

H-H

0.5333

12.42

6.62

OFICIAL

H-H

0.0000

11.07

0.00

PEON

H-H

0.0000

10.01

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

0.37

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0

0.00

0.37

COSTO DIRECTO

S/.

47.85

G.G., D.T. Y UTILIDADES

S/.

0.00%

TOTAL

S/.

0.00%

FORMULARIO

REF

No. 10

ANALISIS

DE

COSTOS

UNITARIOS
Dlar/Sol

11.10

FECHA :

OBRA:

OBRA: CONSTRUCCION DE POLIDEPORTIVO

PARTIDA

22/03/12

COSTO POR

0.00

UND

LUGAR:

TABLA DE RENDIMIENTOS (En 8 horas) en

INSTALACION DE TOMACORRIENTE DOBLE C/DADO 15A

REND. CUADRILLA

15.0

FACTOR REND.
ESPECIFICACION

CANTID.

0.0

1.0

HORAS REND. EQUIPOS

0.0

15.0

0.0

0.0

0.0 PERSONAL BASE :

0.0 CAPATAZ

0.10 =

0.8

0.0 OPERARIO

1.00 =

8.0

0.0 OFICIAL

0.0

0.0 PEON

0.0

0.0

0.00 :

0.0

0.0

0.00 :

0.0

0.0

0.00 :

0.0

0.00 :

0.0

HECHO POR :
METRADO
COD

D E S C R I P C I O N

UNID.

Principal

C O S T O S

CANTID. UNITARIO

PARCIAL

0.0

C. # B
0.0

0.0

0.0

0.0

0.0

INDICE CREPCO
SUB-TOTAL

MATERIALES :
0.00

Nro

%
0

0.00%

0.00%

TOMACORRIENTE BIPOLAR DOBLE BAKELITA

UND

1.0000

15.44

15.44

0.00%

DADO CONMUTADOR 15A TIPO BTICINO O SIMILAR

UND

2.0000

20.00

40.00

0.00%

PLACA ALUMINIO 2 CAVIDAD HORIZONTAL

UND

1.0000

8.00

8.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

0.00

63.44

0.00%

7.48

0.00%

0.00%

MANO DE OBRA :
CAPATAZ

H-H

0.0533

15.97

0.85

OPERARIO

H-H

0.5333

12.42

6.62

OFICIAL

H-H

0.0000

11.07

0.00

PEON

H-H

0.0000

10.01

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

HERRAMIENTAS Y EQUIPOS :
HERRAMIENTAS MANUALES Y EQUIPOS DE SEGURIDAD

EST

5.000

0.37

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0000

0.00

0.0

0.00

0.37

COSTO DIRECTO

S/.

71.29

G.G., D.T. Y UTILIDADES

S/.

0.00%

TOTAL

S/.

0.00%

PLANILLA DE METRADO
OBRA:

OBRA: CONSTRUCCION DE POLIDEPORTIVO

TEM

DESCRIPCIN

UND

glb

1.00

N Veces CoeficienteCant. Elem. Parcial

TOTAL

1.00 TRABAJOS PRELIMINARES


1.01

MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS

1.02

CAMPAMENTO PROVISIONAL DE LA OBRA

glb

1.03

LIMPIEZA DE TERRENO

m2

1.04

TRAZO, NIVELACION Y REPLANTEO

1.00

1.00

1.00

1.00

1.00

1.00

3.00

7.00

1.00

21.00

21.00

8.00

m2

3.50

1.00

28.00

28.00

0.00

0.00

glb

1.00

1.00

1.00

1.00

0.00

0.00

glb

1.00

1.00

1.00

1.00

2.00 MOVIMIENTO DE TIERRAS


2.01

EXCAVACION DE ZAPATAS HASTA UNA PROF. DE 2.00 MTS.

M3
Z-1

2.02

154.45
1.50

2.00

1.50

31.00

139.50

Z-2

2.10

2.00

2.10

1.00

8.82

Z-3

1.75

2.00

1.75

1.00

6.13

EXCAVACION PARA CIMIENTOS CORRIDOS

M3
0.60

1.20

14.44

10.40

0.60

1.20

4.05

2.91

EJE X-2

0.60

1.20

3.37

2.43

EJE X-7

0.60

1.20

17.12

12.32

ENTRE EJE X-7 Y X-8

0.60

1.20

0.84

0.60

EJE X-8

0.60

1.20

9.60

6.91

EJE Y-1

0.60

1.20

18.43

13.27

EJE Y-1 -2

0.60

1.20

3.43

2.47

EJE Y-2

0.60

1.20

2.80

2.02

EJE Y-2-3

0.60

1.20

3.78

2.72

EJE Y-3

0.60

1.20

5.60

4.03

EJE Y-3-4

0.60

1.20

1.20

0.86

EJE Y-4

0.60

1.20

0.60

0.43

EJE Y-5-6

0.60

1.20

5.61

4.04

EJE Y-5

0.60

1.20

0.60

EJE Y-6-7

0.60

1.20

0.60

0.43

EJE Y-6-9

0.60

1.20

6.45

4.64

0.60

1.20

3.10

0.60

0.70

7.00

EJE Y-7-10
2.03

EXCAVACION DE VIGAS DE CIMENTACION Y CONEXIN

2.04

RELLENO COMPACATDO CON MATERIAL PROPIO

73.16

EJE X-1
ENTRE EJE X-1 Y X-2

m3

0.43

2.23
6.00

2.94

154.45

1.00

154.45

73.16

1.00

73.16

m3

EXCAVACION DE ZAPATAS HASTA UNA PROF. DE 2.00 MTS.


EXCAVACION PARA CIMIENTOS CORRIDOS
EXCAVACION DE VIGAS DE CIMENTACION Y CONEXIN

99.72

2.94

SOLADO PARA ZAPATAS Y VIGAS DE CIMENTACION E = 0.10 M.

77.22

CIMIENTO CORRIDO MEZCLA 1:10 CEMENTO - HORMIGON + 30% PG

6.79

SOBRECIMIENTO MEZCLA 1:8 CEMENTO - HORMIGON + 25% PG

9.30

CONCRETO f'c = 210 KG/CM2 PARA ZAPATAS

1.00
0.10
0.15

42.47

CONCRETO f'c = 210 KG/CM2 PARA VIGAS DE CIMENTACION

2.94

1.00

77.22

1.00

6.79

1.00

1.40

1.00

42.47

1.78

CONCRETO f'c = 210 KG/CM2 PARA VIGAS DE CONEXIN

2.05

CONCRETO f'c = 210 Kg/cm2 PARA VIGAS DE CIMENTACION

0.00

CONCRETO f'c = 210 Kg/cm2 PARA COLUMNAS

0.00

ELIMINACION DE MATERIAL EXCEDENTE

M3

VOLUMNE DE EXCAVACION

156.98
230.54

VOLUMENE DE RELLENO

99.72

ESPONJAMIENTO 20%

1.20

3.00 CONCRETO SIMPLE


3.01

SOLADO PARA ZAPATAS Y VIGAS DE CIMENTACION E = 0.10 M.

m2
1.50

1.50

31.00

69.75

Z-2

2.10

2.10

1.00

4.41

Z-3

1.75

1.75

1.00

3.06

0.60

20.00

1.00

12.00

2.00

5.08

VIGAS DE CIMENTACION
3.02

CIMIENTO CORRIDO MEZCLA 1:10 CEMENTO - HORMIGON + 30% PG

m3

(-)SECCION DE COLUMNA
3.03

SOBRECIMIENTO MEZCLA 1:8 CEMENTO - HORMIGON + 25% PG

6.79
0.50

0.80

6.35

0.50

0.80

1.68

3.00

2.01

0.25

0.80

0.25

6.00

0.30

0.15

0.50

9.30

1.00

0.70

0.50

9.30

m3

3.04

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

3.05

FALSO PISO DE CONCRETO DE 4", MEZCLA 1:10 CEMENTO - HORMIGON

m2

3.06

VEREDA DE 4"

m2

0.70

m2
TAPAS LATERALES

3.07

77.22

Z-1

ENCOFRADO Y DESENCOFRADO PARA VEREDA

0.15

0.50

2.00

9.30
0.60

1.00

13.21

13.21
11.80

1.00

2.30

1.00

2.30

1.00

6.00

1.00

6.00

1.00

3.50

1.00

3.50

13.80

1.00

4.14

m2

0.30

9.90

8.00

4.14

4.00 CONCRETO ARMADO


ZAPATAS
4.01

4.02

CONCRETO f'c = 210 KG/CM2 PARA ZAPATAS

m3

42.47

Z-1

1.50

0.55

1.50

31.00

Z-2

2.10

0.55

2.10

1.00

2.43

Z-3

1.75

0.55

1.75

1.00

1.68

ACERO DE REFUERZO fy= 4200 KG/CM2, PARA CANASTILLA DE ZAPATA

38.36

Kg

677.86

Z-1

1.36

14.00

0.99

31.00

584.34

Z-2
Z-3

1.96
1.61

20.00
16.00

0.99
0.99

1.00
1.00

38.81
25.50

Alambre de amarre N 16

29.22

VIGAS DE CIMENTACION
4.03

CONCRETO f'c = 210 Kg/cm2 PARA VIGAS DE CIMENTACION

m3
V1

1.78
0.13

0.33

5.40

1.00

1.78

PLANILLA DE METRADO
OBRA:

OBRA: CONSTRUCCION DE POLIDEPORTIVO

TEM

DESCRIPCIN

UND

N Veces CoeficienteCant. Elem. Parcial

TOTAL

0.00
4.04

Encofrado y Desencofrado de VIGAS DE CIMENTACION

m2

3.56

V1
4.05

ACERO DE REFUERZO PARA VIGAS DE CIMENTACION

0.33

5.40

2.00

6.95

6.00

1.00

3.56

1.00

93.41

3/4"

Kg

2.24

129.60

3/8"
estibos

6.95

4.00

0.56

1.00

15.57

0.89

29.00

0.56

1.00

14.45

Alambre de amarre N 16

6.17

COLUMNAS
4.06

CONCRETO f'c = 210 Kg/cm2 PARA COLUMNAS

m3
C-1

4.07

4.08

ENCOFRADO Y DESENCOFRADO DE COLUMNAS

1.61
0.50

10.75

0.30

1.00

1.61

10.75

1.60

1.00

17.20

11.99

12.00

0.00

m2

ACERO DE REFUERZO PARA COLUMNAS

17.20

Kg

23.52

C1

0.00
ESTRIBOS

1.60

25.00

0.56

1.00

22.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Alambre de amarre N 16

1.12

VIGAS
4.09

CONCRETO f'c = 210 Kg/cm2 PARA VIGAS

m3
X-8

4.10

ENCOFRADO Y DESENCOFRADO DE VIGAS

0.30

13.85

1.00

1.00

1.15

0.30

13.85

1.00

2.00

8.31

0.30

13.85

2.00

2.00

16.62

16.65

4.00

2.23

1.00

148.52

8.50

1.00

2.23

1.00

18.96

1.60

100.00

0.56

1.00

89.60

m2
X-8

4.11

1.15
0.50

ACERO DE REFUERZO PARA VIGAS

24.93

Kg

269.93

X-8
ESTRIBOS
Alambre de amarre N 16

12.85

LOSA ALIGERADA
0.00

CONCRETO f'c = 210 Kg/cm2 PARA LOSA ALIGERADA

m3

DESCONTAR VOLUMEN DE VIGAS Y COLUMNAS (-)

0.00

6.00

ENCOFRADO Y DESENCOFRADO DE VIGAS

m2

ACERO DE REFUERZO PARA VIGAS

AREA

122.23

615.76

0.20

0.30

0.20

1.00

1.00

123.15

15.35

1.00

1.00

0.92

80.45

0.00

1.00

2.00

0.00

0.30

0.00

2.00

2.00

0.00

41.33

1.00

0.56

1.00

23.14

34.59

1.00

0.99

1.00

34.24

1105.00

1.00

0.25

1.00

276.25

AREA

0.00

Kg

336.51
3/8"
1/2"

ALAMBRE DE TEMPERATURA
Alambre de amarre N 16

2.87

PLANILLA DE METRADO
OBRA:
TEM

OBRA: CONSTRUCCION DE POLIDEPORTIVO


DESCRIPCIN

UND

N Veces CoeficienteCant. Elem. Parcial

TOTAL

You might also like