You are on page 1of 1

Inspection Record for Site Welding

Client: Project No.: Project Name:

Record No.:

Subcontractor: Subcontract P.O. No.: Item welded.: Welding process:

Reference Document:

Items to inspect

Subcontractor inspected initials/date Hold Point

Company inspected* initials/date

Remarks

1.0

Qualified weld procedure available (e.g. PQR)

2.0

Qualification of welders

3.0

Welding preparation visual inspection (fit-up)

4.0

Type of filler wire/electrode (make, AWS no.)

5.0

Electrode quiver on site

6.0

Preheat: temp

7.0

Interpass inspection (temperature, removal of slag)

8.0

Post weld heat treatment: temp.


o

9.0

NDT; radiography/dyepen/other ................. *

Report No. Report No.

10.0 Repair 11.0 Final visual inspection

h
Attachments, No. of pages:

H - Companys presence is mandatory for all activities in section. h - Companys presence is mandatory.

Accepted for Subcontractor


Name: Signature: Date:

Accepted for Company


Name: Signature:

Accepted for Client


Name: Signature:


*Company only initials for holdpoint

Date:

Date:

C:\RB_Forms\RB26C30.DOT\

www.red-bag.com

You might also like