You are on page 1of 13

ID means identify

Automate the module which is stable.

N = number of fields

Minimum 1 and maximum+1 is considered in robust test case along with normalized test case. Thus formula is 6n+1. Maintenance is most expensive part of software development. Use Hungarian methodology.CM = Configuration management. Backup the code. Modularize them. Coverage can be availed using data driven technology.

CS = Client server application.

Demos

Written in ruby. Web page exposes html or Silverlight, then test studio supports. We dont mind how systems are written in the back. We can login.

This is a windows application. Testing tables.

Avoid tab key Dont use auto fill too.

You might also like