You are on page 1of 6

NO

16

URAIAN PEKERJAAN

KOFESIEN

BEKISTING KOLOM BETON 1 M2


Bahan :
Kayu/ Papan Kls. III
Paku
Minyak Bekisting
Kayu Kls. II ( Papan )
Dolken Kayu Galam/ Bambu
Polywood 9 mm
Upah :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

17

COR KOLOM K1 (40/40) BETON K-250/ M3


( A ) Beton K-250
( B ) Pembesian 100 Kg
( C ) Bekisting/ Cetakan/ M3

18

COR KOLOM K2 (40/40) BETON K-250/ M3


( A ) Beton K-250
( B ) Pembesian 100 Kg
( C ) Bekisting/ Cetakan/ M3

19

COR KOLOM PRAKTIS 12 x 12 BETON K-225/ M3


( A ) Beton K-225
( B ) Pembesian 100 Kg
( C ) Bekisting/ Cetakan/ M3

20

COR BALOK PRAKTIS 12 x 15 BETON K-225/ M3


( A ) Beton K-225
( B ) Pembesian 100 Kg
( C ) Bekisting/ Cetakan/ M3

21

22

23

24

0.040
0.400
0.200
0.015
2.000
0.350
0.660
0.330
0.033
0.033

Jumlah
Harga Satuan

HARGA
SATUAN
(Rp)

BAHAN
(Rp)

M3
Kg
Ltr
M3
Btg
Lbr

Org
Org
Org
Org

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,000,000.00
15,000.00
2,000.00
2,500,000.00
7,500.00
90,000.00
45,000.00
50,000.00
55,000.00
55,000.00

0.50

JUMLAH

Rp
Rp
Rp
Rp
Rp
Rp

80,000.00
6,000.00
400.00
37,500.00
15,000.00
31,500.00

Rp

170,400.00

Rp
Rp
Rp
Rp
Rp

29,700.00
16,500.00
1,815.00
1,815.00
49,830.00

1.000
M3
3.000 100Kg
10.000
M2
Jumlah
Harga Satuan

Rp
Rp
Rp

1,355,425.00
1,254,000.00
110,115.00

Rp
Rp
Rp
Rp

1,355,425.00
3,762,000.00
1,101,150.00
4,863,150.00

1.000
M3
3.000 100Kg
10.000
M2
Jumlah
Harga Satuan

Rp
Rp
Rp

1,355,425.00
1,254,000.00
110,115.00

Rp
Rp
Rp
Rp

1,355,425.00
3,762,000.00
1,101,150.00
4,863,150.00

1.000
M3
2.570 100Kg
16.667
M2
Jumlah
Harga Satuan

Rp
Rp
Rp

693,125.53
1,254,000.00
110,115.00

Rp
Rp
Rp
Rp

693,125.53
3,222,780.00
1,835,286.71
5,058,066.71

1.000
M3
2.264 100Kg
16.667
M2
Jumlah
Harga Satuan
COR BALOK LISTPLANK (15 x 40) BETON K-250/ M3
( A ) Beton K-250
1.000
M3
( B ) Pembesian 100 Kg
1.445 100Kg
( C ) Bekisting/ Cetakan/ M3
13.333
M2
Jumlah
Harga Satuan
PASANG KACA 5 mm/ M2
Bahan :
Kaca Polos
1.100
M2
Upah :
Pekerja
0.015
Org
Tukang Kayu
0.150
Org
Kepala Tukang
0.015
Org
Mandor
0.001
Org
Jumlah
Harga Satuan
PASANG KUSEN ALUMUNIUM/ M
Bahan :
Kusen Alumunium
1.050
M1
Perlengkapan ( 15% x Kusen )
0.100
Upah :
Pekerja
0.015
Org
Tukang Kayu
0.150
Org
Kepala Tukang
0.015
Org
Mandor
0.0075
Org
Jumlah
Harga Satuan
VERTICAL BLINDS/ M2
Bahan :
Ventilation Blinds dan Vertical Blinds
1.000
M2
Upah :
Pekerja
0.350
Org
Tukang Kayu
0.350
Org
Kepala Tukang
0.035
Org
Mandor
0.0180
Org
Jumlah
Harga Satuan

Rp
Rp
Rp

693,125.53
1,254,000.00
51,980.00

Rp
Rp
Rp
Rp

693,125.53
2,839,056.00
866,350.66
3,705,406.66

Rp
Rp
Rp

1,355,425.00
1,254,000.00
51,980.00

Rp
Rp
Rp
Rp

1,355,425.00
1,812,030.00
693,049.34
2,505,079.34

Rp

110,000.00

Rp
Rp
Rp
Rp
Rp

675.00
7,500.00
825.00
55.00
9,055.00

Rp
Rp
Rp
Rp
Rp

675.00
7,500.00
825.00
412.50
9,412.50

Rp
Rp
Rp
Rp
Rp

15,750.00
17,500.00
1,925.00
990.00
36,165.00

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp

Rp

121,000.00

Rp

121,000.00

45,000.00
6,750.00

Rp
Rp

47,250.00
675.00

Rp

47,925.00

Rp

180,000.00

Rp

180,000.00

45,000.00
50,000.00
55,000.00
55,000.00

45,000.00
50,000.00
55,000.00
55,000.00

180,000.00
45,000.00
50,000.00
55,000.00
55,000.00

JUMLAH
HARGA
(Rp)

UPAH
(Rp)

Rp

110,115.00

Rp

4,863,150.00

Rp

4,863,150.00

Rp

5,058,066.71

Rp

3,705,406.66

Rp

2,505,079.34

Rp

130,055.00

Rp

57,337.50

Rp

216,165.00

NO
1

25

26

27

28

URAIAN PEKERJAAN

KOFESIEN

PASANG RANGKA JENDELA/ PINTU ALUMUNIUM/ M


Bahan :
Kusen Alumunium
1.050
Perlengkapan ( 15% x Kusen )
0.150
Upah :
Pekerja
0.015
Tukang Kayu
0.150
Kepala Tukang
0.015
Mandor
0.0008
Jumlah
Harga Satuan
JENDELA J1
/ UNIT
Bahan :
Frame Alumunium
27.900
Frame Daun Jendela
18.960
Kaca Polos 5 mm
10.200
Karet Kaca/ Sealent
39.200
Pintu Teak Wood 6 mm L/D (Jati)
0.000
Kunci Pintu 2 x Slagh
0.000
Grendel Pintu
0.000
Engsel Pintu
0.000
Tarikan Jendela/ Ventilasi Alumunium
4.000
Grendel Jendela Alumunium
8.000
Engsel Jendela Alumunium
8.000
Hak Angin Alumunium
8.000
Vertical Blinds
0.000
Upah :
Pemasangan
0.000
Jumlah
Harga Satuan
JENDELA J2
/ UNIT
Bahan :
Frame Alumunium
39.200
Frame Daun Jendela
18.960
Kaca Polos 5 mm
16.320
Karet Kaca/ Sealent
60.000
Pintu Teak Wood 6 mm L/D (Jati)
0.000
Kunci Pintu 2 x Slagh
0.000
Grendel Pintu
0.000
Engsel Pintu
0.000
Tarikan Jendela/ Ventilasi Alumunium
4.000
Grendel Jendela Alumunium
8.000
Engsel Jendela Alumunium
8.000
Hak Angin Alumunium
8.000
Vertical Blinds
0.000
Upah :
Pemasangan
0.000
Jumlah
Harga Satuan
JENDELA J3
/ UNIT
Bahan :
Frame Alumunium
23.550
Frame Daun Jendela
19.770
Kaca Polos 5 mm
9.180
Karet Kaca/ Sealent
34.800
Pintu Teak Wood 6 mm L/D (Jati)
0.000
Kunci Pintu 2 x Slagh
0.000
Grendel Pintu
0.000
Engsel Pintu
0.000
Tarikan Jendela/ Ventilasi Alumunium
4.000
Grendel Jendela Alumunium
8.000
Engsel Jendela Alumunium
8.000
Hak Angin Alumunium
8.000
Vertical Blinds
0.000
Upah :
Pemasangan
0.000
Jumlah
Harga Satuan

HARGA
SATUAN
(Rp)

BAHAN
(Rp)

M1
Org
Org
Org
Org

M'
M'
M2
M'
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2

Bhn

M'
M'
M2
M'
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2

Bhn

M'
M'
M2
M'
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2

Bhn

Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

JUMLAH

45,000.00
6,750.00

Rp
Rp

47,250.00
1,012.50

Rp

48,262.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,599,716.25
1,086,531.24
1,326,561.00
98,000.00
40,000.00
80,000.00
80,000.00
80,000.00
-

Rp

4,390,808.49

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,247,630.00
1,086,531.24
2,122,497.60
150,000.00
40,000.00
80,000.00
80,000.00
80,000.00
-

Rp

5,886,658.84

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,350,298.13
1,132,949.51
1,193,904.90
87,000.00
40,000.00
80,000.00
80,000.00
80,000.00
-

Rp

4,044,152.53

45,000.00
50,000.00
55,000.00
55,000.00

57,337.50
57,306.50
130,055.00
2,500.00
180,000.00
10,000.00
15,000.00
10,000.00
10,000.00
10,000.00
10,000.00
216,165.00
1

57,337.50
57,306.50
130,055.00
2,500.00
180,000.00
10,000.00
15,000.00
10,000.00
10,000.00
10,000.00
10,000.00
216,165.00
1

57,337.50
57,306.50
130,055.00
2,500.00
180,000.00
10,000.00
15,000.00
10,000.00
10,000.00
10,000.00
10,000.00
216,165.00
1

JUMLAH
HARGA
(Rp)

UPAH
(Rp)
6

Rp
Rp
Rp
Rp
Rp

675.00
7,500.00
825.00
44.00
9,044.00

Rp
Rp

Rp
Rp

Rp
Rp

Rp

57,306.50

Rp

4,390,808.49

Rp

5,886,658.84

Rp

4,044,152.53

NO
1

29

30

31

32

URAIAN PEKERJAAN

KOFESIEN

JENDELA J4
/ UNIT
Bahan :
Frame Alumunium
Frame Daun Jendela
Kaca Polos 5 mm
Karet Kaca/ Sealent
Pintu Teak Wood 6 mm L/D (Jati)
Kunci Pintu 2 x Slagh
Grendel Pintu
Engsel Pintu
Tarikan Jendela/ Ventilasi Alumunium
Grendel Jendela Alumunium
Engsel Jendela Alumunium
Hak Angin Alumunium
Upah :
Pemasangan
JENDELA J7
/ UNIT
Bahan :
Frame Alumunium
Frame Daun Jendela
Kaca Polos 5 mm
Karet Kaca/ Sealent
Pintu Teak Wood 6 mm L/D (Jati)
Kunci Pintu 2 x Slagh
Grendel Pintu
Engsel Pintu
Tarikan Jendela/ Ventilasi Alumunium
Grendel Jendela Alumunium
Engsel Jendela Alumunium
Hak Angin Alumunium
Upah :
Pemasangan
PINTU P1
/ UNIT
Bahan :
Frame Alumunium
Frame Daun Jendela
Kaca Polos 5 mm
Karet Kaca/ Sealent
Pintu Teak Wood 6 mm L/D (Jati)
Kunci Pintu 2 x Slagh
Grendel Pintu
Engsel Pintu
Tarikan Jendela/ Ventilasi Alumunium
Grendel Jendela Alumunium
Engsel Jendela Alumunium
Hak Angin Alumunium
Upah :
Pemasangan
PINTU P2
/ UNIT
Bahan :
Frame Alumunium
Frame Daun Jendela
Kaca Polos 5 mm
Karet Kaca/ Sealent
Gipsum Board 9 mm
Kunci Pintu 2 x Slagh
Grendel Pintu
Engsel Pintu
Tarikan Jendela/ Ventilasi Alumunium
Grendel Jendela Alumunium
Engsel Jendela Alumunium
Hak Angin Alumunium
Upah :
Pemasangan

15.000
0.000
5.440
20.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

M'
M'
M2
M'
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

M'
M'
M2
M'
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

0.000 Bhn
Jumlah
Harga Satuan
11.900
20.240
5.680
13.500
0.000
1.000
4.000
6.000
0.000
0.000
4.000
4.000

M'
M'
M2
M'
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

0.000 Bhn
Jumlah
Harga Satuan
39.700
5.800
8.648
45.550
7.682
1.000
2.000
3.000
0.000
0.000
0.000
0.000

BAHAN
(Rp)

0.000 Bhn
Jumlah
Harga Satuan
14.520
0.000
3.128
14.520
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

HARGA
SATUAN
(Rp)

M'
M'
M2
M'
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Bh

0.000 Bhn
Jumlah
Harga Satuan

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

57,337.50
57,306.50
130,055.00
2,500.00
180,000.00
10,000.00
15,000.00
10,000.00
10,000.00
10,000.00
10,000.00
1

57,337.50
57,306.50
130,055.00
2,500.00
180,000.00
10,000.00
15,000.00
10,000.00
10,000.00
10,000.00
10,000.00
1

57,337.50
57,306.50
130,055.00
2,500.00
180,000.00
10,000.00
15,000.00
10,000.00
10,000.00
10,000.00
10,000.00
1

57,337.50
57,306.50
130,055.00
2,500.00
60,000.00
180,000.00
10,000.00
15,000.00
10,000.00
10,000.00
10,000.00
10,000.00
1

JUMLAH

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

860,062.50
707,499.20
50,000.00
-

Rp

1,617,561.70

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

832,540.50
406,812.04
36,300.00
-

Rp

1,275,652.54

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

682,316.25
1,159,883.56
738,712.40
33,750.00
180,000.00
40,000.00
90,000.00
40,000.00
40,000.00

Rp

3,004,662.21

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,276,298.75
332,377.70
1,124,715.64
113,875.00
460,920.00
180,000.00
20,000.00
45,000.00
-

Rp

4,553,187.09

JUMLAH
HARGA
(Rp)

UPAH
(Rp)
6

Rp
Rp

Rp
Rp

Rp
Rp

Rp
Rp

Rp

1,617,561.70

Rp

1,275,652.54

Rp

3,004,662.21

Rp

4,553,187.09

NO
1

33

34

35

36

URAIAN PEKERJAAN

KOFESIEN

PINTU P3
/ UNIT
Bahan :
Frame Alumunium
Frame Daun Jendela
Kaca Polos 5 mm
Karet Kaca/ Sealent
Gipsum Board 9 mm
Kunci Pintu 2 x Slagh
Grendel Pintu
Engsel Pintu
Tarikan Jendela/ Ventilasi Alumunium
Grendel Jendela Alumunium
Engsel Jendela Alumunium
Hak Angin Alumunium
Upah :
Pemasangan
PINTU P4
/ UNIT
Bahan :
Frame Alumunium
Frame Daun Jendela
Kaca Polos 5 mm
Karet Kaca/ Sealent
Gipsum Board 9 mm
Kunci Pintu 2 x Slagh
Grendel Pintu
Engsel Pintu
Tarikan Jendela/ Ventilasi Alumunium
Grendel Jendela Alumunium
Engsel Jendela Alumunium
Hak Angin Alumunium
Upah :
Pemasangan
PINTU P5
/ UNIT
Bahan :
Frame Alumunium
Frame Daun Jendela
Kaca Polos 5 mm
Karet Kaca/ Sealent
Pintu Alumunium+Asesoris
Kunci Pintu 2 x Slagh
Grendel Pintu
Engsel Pintu
Tarikan Jendela/ Ventilasi Alumunium
Grendel Jendela Alumunium
Engsel Jendela Alumunium
Hak Angin Alumunium
Upah :
Pemasangan
PINTU P6
/ UNIT
Bahan :
Frame Alumunium
Frame Daun Jendela
Kaca Polos 5 mm
Karet Kaca/ Sealent
Gipsum Board 9 mm
Kunci Pintu 2 x Slagh
Grendel Pintu
Engsel Pintu
Tarikan Jendela/ Ventilasi Alumunium
Grendel Jendela Alumunium
Engsel Jendela Alumunium
Hak Angin Alumunium
Upah :
Pemasangan

28.600
5.800
6.768
30.690
6.012
1.000
2.000
3.000
0.000
0.000
0.000
0.000

M'
M'
M2
M'
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Bh

M'
M'
M2
M'
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Bh

0.000 Bhn
Jumlah
Harga Satuan
5.000
0.000
0.000
0.000
1.670
1.000
2.000
3.000
0.000
0.000
0.000
0.000

M'
M'
M2
M'
M2
Bh
Bh
Bh
Bh
Bh
Bh
Bh

0.000 Bhn
Jumlah
Harga Satuan
32.150
0.000
6.768
36.120
6.012
0.000
0.000
3.000
0.000
0.000
0.000
0.000

BAHAN
(Rp)

0.000 Bhn
Jumlah
Harga Satuan
11.100
5.800
1.880
9.430
1.670
1.000
2.000
3.000
0.000
0.000
0.000
0.000

HARGA
SATUAN
(Rp)

M'
M'
M2
M'
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Bh

0.000 Bhn
Jumlah
Harga Satuan

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

57,337.50
57,306.50
130,055.00
2,500.00
60,000.00
180,000.00
10,000.00
15,000.00
10,000.00
10,000.00
10,000.00
10,000.00
1

57,337.50
57,306.50
130,055.00
2,500.00
60,000.00
180,000.00
10,000.00
15,000.00
10,000.00
10,000.00
10,000.00
10,000.00
1

57,337.50
57,306.50
130,055.00
2,500.00
3,000,000.00
180,000.00
10,000.00
15,000.00
10,000.00
10,000.00
10,000.00
10,000.00
1

57,337.50
57,306.50
130,055.00
2,500.00
60,000.00
180,000.00
10,000.00
15,000.00
10,000.00
10,000.00
10,000.00
10,000.00
1

JUMLAH

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,639,852.50
332,377.70
880,212.24
76,725.00
360,720.00
180,000.00
20,000.00
45,000.00
-

Rp

3,534,887.44

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

636,446.25
332,377.70
244,503.40
23,575.00
100,200.00
180,000.00
20,000.00
45,000.00
-

Rp

1,582,102.35

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

286,687.50
5,010,000.00
180,000.00
20,000.00
45,000.00
-

Rp

5,541,687.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,843,400.63
880,212.24
90,300.00
360,720.00
45,000.00
-

Rp

3,219,632.87

JUMLAH
HARGA
(Rp)

UPAH
(Rp)
6

Rp
Rp

Rp
Rp

Rp
Rp

Rp
Rp

Rp

3,534,887.44

Rp

1,582,102.35

Rp

5,541,687.50

Rp

3,219,632.87

NO
1

37

38

39

40

URAIAN PEKERJAAN

KOFESIEN

PINTU P7
/ UNIT
Bahan :
Frame Alumunium
Frame Daun Jendela
Kaca Polos 5 mm
Karet Kaca/ Sealent
Gipsum Board 9 mm
Kunci Pintu 2 x Slagh
Grendel Pintu
Engsel Pintu
Tarikan Jendela/ Ventilasi Alumunium
Grendel Jendela Alumunium
Engsel Jendela Alumunium
Hak Angin Alumunium
Upah :
Pemasangan
PINTU P13
/ UNIT
Bahan :
Frame Alumunium
Frame Daun Jendela
Kaca Polos 5 mm
Karet Kaca/ Sealent
Gipsum Board 9 mm
Kunci Pintu 2 x Slagh
Grendel Pintu
Engsel Pintu
Tarikan Jendela/ Ventilasi Alumunium
Grendel Jendela Alumunium
Engsel Jendela Alumunium
Hak Angin Alumunium
Upah :
Pemasangan
VENTILASI V1
/ UNIT
Bahan :
Frame Alumunium
Frame Daun Jendela
Kaca Polos 5 mm
Karet Kaca/ Sealent
Gipsum Board 9 mm
Kunci Pintu 2 x Slagh
Grendel Pintu
Engsel Pintu
Tarikan Jendela/ Ventilasi Alumunium
Grendel Jendela Alumunium
Engsel Jendela Alumunium
Hak Angin Alumunium
Upah :
Pemasangan
PEKERJAAN PENGELASAN/ 10 Cm
Bahan :
Solar
Minyak Pelumas
Kawat Las
Upah :
Pekerja
Tukang
Kepala Tukang
Mandor
Alat

38.700
0.000
8.178
0.000
7.265
0.000
0.000
0.000
0.000
0.000
0.000
0.000

M'
M'
M2
M'
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Bh

M'
M'
M2
M'
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Bh

0.000 Bhn
Jumlah
Harga Satuan
2.000
0.000
0.240
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

M'
M'
M2
M'
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Bh

0.000 Bhn
Jumlah
Harga Satuan
0.300
0.040
0.400
0.040
0.020
0.002
0.002
0.170

Jumlah
Harga Satuan

BAHAN
(Rp)

0.000 Bhn
Jumlah
Harga Satuan
30.800
5.800
7.740
36.120
4.068
1.000
2.000
3.000
0.000
0.000
0.000
0.000

HARGA
SATUAN
(Rp)

Ltr
Ltr
Btg

Org
Org
Org
Org
Bhn

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

JUMLAH

57,337.50
57,306.50
130,055.00
2,500.00
60,000.00
180,000.00
10,000.00
15,000.00
10,000.00
10,000.00
10,000.00
10,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,218,961.25
1,063,589.79
435,900.00
-

Rp

3,718,451.04

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,765,995.00
332,377.70
1,006,625.70
90,300.00
244,080.00
180,000.00
20,000.00
45,000.00
-

Rp

3,684,378.40

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

114,675.00
31,213.20
-

Rp

145,888.20

5,500.00
30,000.00
5,000.00

Rp
Rp
Rp

1,650.00
1,200.00
2,000.00

Rp

4,850.00

57,337.50
57,306.50
130,055.00
2,500.00
60,000.00
180,000.00
10,000.00
15,000.00
10,000.00
10,000.00
10,000.00
10,000.00
1

57,337.50
57,306.50
130,055.00
2,500.00
60,000.00
180,000.00
10,000.00
15,000.00
10,000.00
10,000.00
10,000.00
10,000.00
1

45,000.00
50,000.00
55,000.00
55,000.00
4,850.00

JUMLAH
HARGA
(Rp)

UPAH
(Rp)
6

Rp
Rp

Rp
Rp

Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp

1,800.00
1,000.00
110.00
110.00
824.50
3,844.50

Rp

3,718,451.04

Rp

3,684,378.40

Rp

145,888.20

Rp

8,694.50

NO
1

41

42

43

44

45

46

URAIAN PEKERJAAN

KOFESIEN

PASANG TERALIS PINTU/ JENDELA/ M2


Bahan :
Besi Beton 10
Besi Strip # 5 mm
Pengelasan
Upah :
Pekerja
Tukang
Kepala Tukang
Mandor
PAS. BATU BATA 1:4/ M2
Bahan :
Batu Bata
Portland Cement (PC)
Pasir Pasang
Upah :
Pekerja
Tukang Batu
Kepala Tukang
Mandor
PAS. BATU BATA 1:2/ M2
Bahan :
Batu Bata
Portland Cement (PC)
Pasir Pasang
Upah :
Pekerja
Tukang Batu
Kepala Tukang
Mandor
PLESTERAN 1:4/ M2
Bahan :
Portland Cement (PC)
Pasir Pasang
Upah :
Pekerja
Tukang Batu
Kepala Tukang
Mandor
PLESTERAN 1:2/ M2
Bahan :
Portland Cement (PC)
Pasir Pasang
Upah :
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.670
1.670
0.167
0.083

Org
Org
Org
Org

70.000
11.500
0.043

Bh
Kg
M3

0.300
0.100
0.010
0.015

Org
Org
Org
Org

70.000
18.950
0.038

Bh
Kg
M3

Jumlah
Harga Satuan

0.300
0.100
0.010
0.015

Org
Org
Org
Org

6.240
0.024

Kg
M3

Jumlah
Harga Satuan

0.300
0.150
0.015
0.015

Org
Org
Org
Org

10.224
0.024

Kg
M3

Jumlah
Harga Satuan

0.300
0.150
0.015
0.010

Jumlah
Harga Satuan
PASANG KERAMIK DINDING KM/ WC Uk. 25x40 Cm/ M2
Bahan :
Keramik Dinding KM/ WC Uk. 25 x 40
10.000
Portland Cement (PC)
0.228
Pasir Pasang
0.042
Tepung AA
1.500
Upah :
Pekerja
0.620
Tukang Batu
0.350
Kepala Tukang
0.035
Mandor
0.030
Jumlah
Harga Satuan

BAHAN
(Rp)

6.000
Kg
0.230
Kg
0.043 10 Cm

Jumlah
Harga Satuan

HARGA
SATUAN
(Rp)

Org
Org
Org
Org

Bh
Zak
M3
Kg

Org
Org
Org
Org

Rp
Rp
Rp

JUMLAH

Rp
Rp
Rp
Rp

11,000.00
10,000.00
8,694.50

Rp
Rp
Rp

66,000.00
2,300.00
373.86

Rp

68,673.86

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,000.00
1,140.00
80,000.00

Rp
Rp
Rp

70,000.00
13,110.00
3,440.00

Rp

86,550.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,000.00
1,140.00
80,000.00

Rp
Rp
Rp

70,000.00
21,603.00
3,040.00

Rp

94,643.00

Rp
Rp
Rp
Rp
Rp
Rp

1,140.00
80,000.00

Rp
Rp

7,113.60
1,920.00

Rp

9,033.60

Rp
Rp
Rp
Rp
Rp
Rp

1,140.00
80,000.00

Rp
Rp

11,655.36
1,920.00

Rp

13,575.36

Rp
Rp
Rp
Rp

5,000.00
57,000.00
80,000.00
4,000.00

Rp
Rp
Rp
Rp

50,000.00
12,996.00
3,360.00
6,000.00

Rp

72,356.00

Rp
Rp
Rp
Rp

45,000.00
50,000.00
55,000.00
55,000.00

45,000.00
50,000.00
55,000.00
55,000.00

45,000.00
50,000.00
55,000.00
55,000.00

45,000.00
50,000.00
55,000.00
55,000.00

45,000.00
50,000.00
55,000.00
55,000.00

45,000.00
50,000.00
55,000.00
55,000.00

JUMLAH
HARGA
(Rp)

UPAH
(Rp)
6

Rp
Rp
Rp
Rp
Rp

75,150.00
83,500.00
9,185.00
4,565.00
172,400.00

Rp
Rp
Rp
Rp
Rp

13,500.00
5,000.00
550.00
825.00
19,875.00

Rp
Rp
Rp
Rp
Rp

13,500.00
5,000.00
550.00
825.00
19,875.00

Rp
Rp
Rp
Rp
Rp

13,500.00
7,500.00
825.00
825.00
22,650.00

Rp
Rp
Rp
Rp
Rp

13,500.00
7,500.00
825.00
550.00
22,375.00

Rp
Rp
Rp
Rp
Rp

27,900.00
17,500.00
1,925.00
1,650.00
48,975.00

Rp

241,073.86

Rp

106,425.00

Rp

114,518.00

Rp

31,683.60

Rp

35,950.36

Rp

121,331.00

You might also like