Annexure I Project Cost - Oyster Mushroom (1000 kg/cycle) A 1

2 a. b. c. d. f.

Fixed costs Temporary Shed :20'x12'x6'(240 sq.ft.)


Equipments Racks Bamboos for racks Knap sack Sprayer : One Vessels, heating equipment Misc.(for knives, trays, rope etc.) Sub-total

(Amount Rs.) 12000


2000 1600 2000 500 500 18600

Operational cost (per cycle) Paddy Straw Cost of bags Cost of pasteurisation Cost of Bavistin & Formaldehyde Spawn cost Labour Charges Fuel / Power cost Lumpsum Sub-total 1800 2400 1200 750 6000 2250 4000 18400

Total Cost (A + B)

37000