You are on page 1of 216

A.

ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN


No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
A-01 1 M' Pagar Sementara Dari Kayu Tinggi 2 m
- Dolken Kayu 8-10 / 400 cm
Btg
1.2500
28,000.00
- Semen Portland
Kg
2.5000
1,406.00
- Pasir beton
M3
0.0050
255,400.00
- Koral Beton 2/3
M3
0.0090
211,100.00
- Kayu balok terentang
M3
0.0720
2,640,000.00
- Paku Biasa 2" - 5"
Kg
0.0600
23,400.00
- Residu
Kg
0.4000
8,100.00
- Pekerja
Oh
0.4000
42,000.00
- Tukang Kayu
Oh
0.2000
65,000.00
- Kepala Tukang
Oh
0.0200
75,000.00
- Mandor
Oh
0.0200
80,000.00
Jumlah
Dibulatkan
A-02 1 M' Pagar Sementara Seng Gelombang Tinggi 2 m
- Dolken Kayu 8-10 / 400 cm
Btg
1.2500
28,000.00
- Semen Portland
Kg
2.5000
1,406.00
- Seng Gelombang BJLS-30
Lbr
1.2000
62,900.00
- Pasir beton
M3
0.0050
255,400.00
- Koral Beton 2/3
M3
0.0090
211,100.00
- Kayu balok terentang
M3
0.0720
2,640,000.00
- Paku Biasa 2" - 5"
Kg
0.0600
23,400.00
- Meni Besi
Kg
0.4500
30,400.00
- Pekerja
Oh
0.4000
42,000.00
- Tukang Kayu
Oh
0.2000
65,000.00
- Kepala Tukang
Oh
0.0200
75,000.00
- Mandor
Oh
0.0200
80,000.00
Jumlah
Dibulatkan
A-03 1 M' Pagar SementaraKawat Duri Tinggi 1,80 m
- Dolken Kayu 8-10 / 400 cm
Btg
1.0000
28,000.00
- Semen Portland
Kg
2.0000
1,406.00
- Kawat Duri
Kg
2.5000
63,500.00
- Pasir beton
M3
0.0050
255,400.00
- Koral Beton 2/3
M3
0.0090
211,100.00
- Paku Biasa 2" - 5"
Kg
0.0600
23,400.00
- Pekerja
Oh
0.3000
42,000.00
- Tukang Kayu
Oh
0.2000
65,000.00
- Kepala Tukang
Oh
0.0200
75,000.00
- Mandor
Oh
0.0200
80,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
35,000.00
3,515.00
1,277.00
1,899.90
190,080.00
1,404.00
3,240.00
16,800.00
13,000.00
1,500.00
1,600.00
269,315.90
269,316.00
35,000.00
3,515.00
75,480.00
1,277.00
1,899.90
190,080.00
1,404.00
13,680.00
16,800.00
13,000.00
1,500.00
1,600.00
355,235.90
355,236.00
28,000.00
2,812.00
158,750.00
1,277.00
1,899.90
1,404.00
12,600.00
13,000.00
1,500.00
1,600.00
222,842.90
222,843.00

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
A-04 1 M2 Pengukuran Dan Pasang Bouwplank
- Kayu kaso 5/7
M3
0.0120
1,870,500.00
- Paku Biasa 2" - 5"
Kg
0.0200
23,400.00
- Kayu papan albasia
M3
0.0070
2,071,700.00
- Pekerja
Oh
0.1000
42,000.00
- Tukang Kayu
Oh
0.1000
65,000.00
- Kepala Tukang
Oh
0.0100
75,000.00
- Mandor
Oh
0.0050
80,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
22,446.00
468.00
14,501.90
4,200.00
6,500.00
750.00
400.00
49,265.90
49,266.00

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
A-05 1 M2 Pembuatan Kantor Sementara dgn Lantai Diplester
- Dolken Kayu 8-10 / 400 cm
Btg
1.2500
28,000.00
- Kayu Balok terentang
M3
0.1800
2,640,000.00
- Paku Biasa
Kg
0.8500
23,400.00
- Besi Strip
Kg
1.1000
26,800.00
- Semen Portland
Kg
35.0000
1,406.00
- Pasir Pasang
M3
0.1500
233,400.00
- Pasir beton
M3
0.1000
255,400.00
- Koral Beton2/3
M3
0.1500
211,100.00
- Bata Merah
Bh
30.0000
775.00
- Seng Plat
m'
0.2500
15,815.00
- Kawat harmonika
M2
2.0000
35,900.00
- Kaca Polos 3mm
M2
0.0800
87,400.00
- Kunci Tanam
Bh
0.1500
94,500.00
- Plywood 120 x 240 x 0,4 cm
Lbr
0.0600
140,000.00
- Pekerja
Oh
2.0000
42,000.00
- Tukang Kayu
Oh
2.0000
65,000.00
- Tukang Batu
Oh
1.0000
65,000.00
- Kepala Tukang
Oh
0.3000
75,000.00
- Mandor
Oh
0.0500
80,000.00
Jumlah
Dibulatkan
A-06 1 M2 Pembuatan Gudang Semen dan Alat-alat
- Dolken Kayu 8-10 / 400 cm
Btg
1.7000
28,000.00
- Kayu balok terentang
M3
0.2100
2,640,000.00
- Paku Biasa
Kg
0.3000
23,400.00
- Semen Portland
Kg
10.5000
1,406.00
- Pasir Beton
M3
0.0300
255,400.00
- Koral Beton 2/3
M3
0.0500
211,100.00
- Seng Gelombang BJLS 30
Lbr
1.5000
62,900.00
- Pekerja
Oh
1.0000
42,000.00
- Tukang Kayu
Oh
2.0000
65,000.00
- Kepala Tukang
Oh
0.2000
75,000.00
- Mandor
Oh
0.0500
80,000.00
Jumlah
Dibulatkan
A-07 1 M2 Pembuatan Bedeng Buruh
- Dolken Kayu 8-10 / 400 cm
Btg
1.2500
28,000.00
- Kayu balok terentang
M3
0.1860
2,640,000.00
- Paku Biasa
Kg
0.3000
23,400.00
- Semen Portland
Kg
18.0000
1,406.00
- Pasir Beton
M3
0.0300
255,400.00
- Koral Beton 2/3
M3
0.0500
211,100.00
- Seng Gelombang BJLS 30
Lbr
1.5000
62,900.00

HARGA
(Rp)
35,000.00
475,200.00
19,890.00
29,480.00
49,210.00
35,010.00
25,540.00
31,665.00
23,250.00
3,953.75
71,800.00
6,992.00
14,175.00
8,400.00
84,000.00
130,000.00
65,000.00
22,500.00
4,000.00
1,135,065.75
1,135,066.00
47,600.00
554,400.00
7,020.00
14,763.00
7,662.00
10,555.00
94,350.00
42,000.00
130,000.00
15,000.00
4,000.00
927,350.00
927,350.00
35,000.00
491,040.00
7,020.00
25,308.00
7,662.00
10,555.00
94,350.00

No.

URAIAN
-

Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
Oh
1.0000
42,000.00
Oh
2.0000
65,000.00
Oh
0.2000
75,000.00
Oh
0.0500
80,000.00

HARGA
(Rp)
42,000.00
130,000.00
15,000.00
4,000.00
861,935.00
861,935.00

No.
A-08

A-09

A-10

A-11

A-12

A-13

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Membersihkan Lapangan dan Perataan
- Pekerja
Oh
0.1000
42,000.00
- Mandor
Oh
0.0500
80,000.00
Jumlah
Dibulatkan
1M2 Pembuatan Jalan Sementara
- Batu Belah 15/20
M3
0.1500
205,500.00
- Batu Pecah 5/7
M3
0.0900
196,000.00
- Pasir Pasang
M3
0.0100
233,400.00
- Pekerja
Oh
1.0000
42,000.00
- Mandor
Oh
0.0500
80,000.00
Jumlah
Dibulatkan
1 M3 Bongkaran Beton Bertulang
- Pekerja
Oh
6.6670
42,000.00
- Mandor
Oh
0.3330
80,000.00
Jumlah
Dibulatkan
1 M3 Bongkaran Dinding Tembok Bata Merah
- Pekerja
Oh
6.6670
42,000.00
- Mandor
Oh
0.0330
80,000.00
Jumlah
Dibulatkan
1 M Pagar beton Pracetak ( 5 x 50 x 213 ) cm
- Panel Beton Pracetak
Lbr
0.9860
182,600.00
- Kolom Beton Pracetak
Btg
0.5250
264,000.00
- Pasir Beton
M3
0.0740
255,400.00
- Koral 2/3
M3
0.1460
211,100.00
- Semen abu - abu
Kg
45.0000
1,406.00
- Pekerja
Oh
0.3750
42,000.00
- Tukang Batu
Oh
0.1250
65,000.00
- Kepala Tukang
Oh
0.0120
75,000.00
- Mandor
Oh
0.0190
80,000.00
Jumlah
Dibulatkan
1 M Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'
- Kawat ram ayam
Lbr
0.4340
14,900.00
- Besi siku L 50.50.5
Kg
6.7860
18,300.00
- Besi pelat (1,2 x 3) mm
Kg
0.0424
18,300.00
- Baut
bh
4.0000
600.00
- Semen Portland
Kg
2.5000
1,406.00
- Pasir beton
M3
0.0050
255,400.00
- Koral Beton 2/3
M3
0.0090
211,100.00
- Pekerja
Oh
0.3750
42,000.00

HARGA
(Rp)
4,200.00
4,000.00
8,200.00
8,200.00
30,825.00
17,640.00
2,334.00
42,000.00
4,000.00
96,799.00
96,799.00
280,014.00
26,640.00
306,654.00
306,654.00
280,014.00
2,640.00
282,654.00
282,654.00
180,043.60
138,600.00
18,899.60
30,820.60
63,270.00
15,750.00
8,125.00
900.00
1,520.00
457,928.80
457,929.00
6,466.60
124,183.80
775.74
2,400.00
3,515.00
1,277.00
1,899.90
15,750.00

No.

URAIAN
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
Oh
0.1250
65,000.00
Oh
0.0120
75,000.00
Oh
0.0190
80,000.00

HARGA
(Rp)
8,125.00
900.00
1,520.00
166,813.04
166,813.00

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
A-14 1 M2 Pagar BRC lengkap dengan tiang
- BRC lengkap dengan tiang
Lbr
0.4340
171,300.00
- Semen Portland
Kg
2.0000
1,406.00
- Kawat Duri
Kg
2.5000
63,500.00
- Pasir beton
M3
0.0050
255,400.00
- Koral Beton 2/3
M3
0.0090
211,100.00
- Pekerja
Oh
0.3750
42,000.00
- Tukang Batu
Oh
0.1250
65,000.00
- Kepala Tukang
Oh
0.0120
75,000.00
- Mandor
Oh
0.0190
80,000.00
Jumlah
Dibulatkan
A-15 1 M2 Steiger Werk / perancah dari Bambu
btng
1.0000
- Bambu 6 - 10 (600) cm
25,000.00
kg
0.2500
- Tali ijuk
23,400.00
org
0.2500
- Pekerja
42,000.00
org
0.0170
- Tukang kayu
65,000.00
org
0.0020
- Kepala tukang
75,000.00
org
0.0130
- Mandor
80,000.00
Jumlah
Dibulatkan
A-16 1 M' Cerucuk Bambu
btng
1.2500
- Bambu 7 -10 (400) cm
25,000.00
org
0.5000
- Pekerja
42,000.00
org
0.0250
- Mandor
80,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
74,344.20
2,812.00
158,750.00
1,277.00
1,899.90
15,750.00
8,125.00
900.00
1,520.00
265,378.10
265,378.00
25,000.00
5,850.00
10,500.00
1,105.00
150.00
1,040.00
43,645.00
43,645.00
31,250.00
21,000.00
2,000.00
54,250.00
54,250.00

B. ANALISA HARGA SATUAN PEKERJAAN TANAH


No.
B-01

B-02

B-03

B-04

B-05

B-06

B-07

B-08

B-09

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M3 Galian Tanah Biasa sedalam 1 m
- Pekerja
Oh
0.4000
42,000.00
- Mandor
Oh
0.0400
80,000.00
Jumlah
Dibulatkan
1 M3 Galian Tanah Biasa Sedalam 2 m
- Pekerja
Oh
0.5260
42,000.00
- Mandor
Oh
0.0520
80,000.00
Jumlah
Dibulatkan
1 M3 Galian Tanah Biasa Sedalam 3 m
- Pekerja
Oh
0.7350
42,000.00
- Mandor
Oh
0.0730
80,000.00
Jumlah
Dibulatkan
1 M3 Galian Tanah Keras Sedalam 1 m
- Pekerja
Oh
0.6250
42,000.00
- Mandor
Oh
0.0620
80,000.00
Jumlah
Dibulatkan
1 M3 Galian Tanah Lumpur Sedalam 1 m
- Pekerja
Oh
0.8230
42,000.00
- Mandor
Oh
0.0830
80,000.00
Jumlah
Dibulatkan
1 M2 Pekerjaan Stripping Setinggi 10 cm
- Pekerja
Oh
0.0500
42,000.00
- Mandor
Oh
0.0050
80,000.00
Jumlah
Dibulatkan
1 M3 Pembuangan Tanah sejauh 150 m
- Pekerja
Oh
0.5160
42,000.00
- Mandor
Oh
0.0500
80,000.00
Jumlah
Dibulatkan
1 M3 Urugan Kembali
- Pekerja
Oh
0.1920
42,000.00
- Mandor
Oh
0.0190
80,000.00
Jumlah
Dibulatkan
1 M3 Pemadatan Tanah
- Pekerja
Oh
0.5000
42,000.00

HARGA
(Rp)
16,800.00
3,200.00
20,000.00
20,000.00
22,092.00
4,160.00
26,252.00
26,252.00
30,870.00
5,840.00
36,710.00
36,710.00
26,250.00
4,960.00
31,210.00
31,210.00
34,566.00
6,640.00
41,206.00
41,206.00
2,100.00
400.00
2,500.00
2,500.00
21,672.00
4,000.00
25,672.00
25,672.00
8,064.00
1,520.00
9,584.00
9,584.00
21,000.00

No.

URAIAN

- Mandor
Jumlah
Dibulatkan
B-10 1 M3 Urugaan Pasir
- Pasir Urug
- Pekerja
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
Oh
0.0500
80,000.00

M3
Oh
Oh

1.2000
0.3000
0.0100

175,300.00
42,000.00
80,000.00

HARGA
(Rp)
4,000.00
25,000.00
25,000.00
210,360.00
12,600.00
800.00
223,760.00
223,760.00

No.
B-11

B-12

B-13

B-14

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Pemasangan Lapisan Ijuk Tebal 10 cm
- Ijuk
m2
1.2000
22,000.00
- Pekerja
Oh
0.1500
42,000.00
- Mandor
Oh
0.0150
80,000.00
Jumlah
Dibulatkan
1 M3 Urugan Sirtu
- Sirtu
M3
1.2000
203,500.00
- Pekerja
Oh
0.2500
42,000.00
- Mandor
Oh
0.0250
80,000.00
Jumlah
Dibulatkan
1 M3 Urugan Tanah Pilihan
- Tanah urug pilihan
M3
1.2000
89,200.00
- Pekerja
Oh
0.2500
42,000.00
- Mandor
Oh
0.0250
80,000.00
Jumlah
Dibulatkan
1 M2 Pembuatan jalan sementara, tebal 25 cm
- Batu belah
M3
0.2750
205,500.00
- Kerikil
M3
0.0300
172,600.00
- Pasir Urug
M3
0.0500
175,300.00
- Pekerja
Oh
1.0000
42,000.00
- Mandor
Oh
0.1000
80,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
26,400.00
6,300.00
1,200.00
33,900.00
33,900.00
244,200.00
10,500.00
2,000.00
256,700.00
256,700.00
107,040.00
10,500.00
2,000.00
119,540.00
119,540.00
56,512.50
5,178.00
8,765.00
42,000.00
8,000.00
120,455.50
120,456.00

C. ANALISA HARGA SATUAN PEKERJAAN PONDASI


No.
C-01

C-02

C-03

C-04

C-05

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M3 Pasanag Pondasi batu Kali adk 1pc : 3 ps
- Batu Belah
M3
1.1000
205,500.00
- Semen Portland
Kg
202.0000
1,406.00
- Pasir Pasang
M3
0.4850
233,400.00
- Pekerja
Oh
1.5000
42,000.00
- Tukang Batu
Oh
0.6000
65,000.00
- Kepala Tukang
Oh
0.0600
75,000.00
- Mandor
Oh
0.0750
80,000.00
Jumlah
Dibulatkan
1 M3 Pasang Pondasi Batu kali adk 1pc : 4ps
- Batu Belah
M3
1.1000
205,500.00
- Semen Portland
Kg
163.0000
1,406.00
- Pasir Pasang
M3
0.5200
233,400.00
- Pekerja
Oh
1.5000
42,000.00
- Tukang Batu
Oh
0.6000
65,000.00
- Kepala Tukang
Oh
0.0600
75,000.00
- Mandor
Oh
0.0750
80,000.00
Jumlah
Dibulatkan
1 M3 Pasang Pondasi Batu kali adk 1pc : 5ps
- Batu Belah
M3
1.1000
205,500.00
- Semen Portland
Kg
136.0000
1,406.00
- Pasir Pasang
M3
0.5440
233,400.00
- Pekerja
Oh
1.5000
42,000.00
- Tukang Batu
Oh
0.6000
65,000.00
- Kepala Tukang
Oh
0.0600
75,000.00
- Mandor
Oh
0.0750
80,000.00
Jumlah
Dibulatkan
1 M3 Pasang Pondasi Batu Kosong (aanstamping)
- Batu Belah
M3
1.2000
205,500.00
- Pasir Urug
M3
0.3000
175,300.00
- Pekerja
Oh
0.7800
42,000.00
- Tukang Batu
Oh
0.3900
65,000.00
- Kepala Tukang
Oh
0.0390
75,000.00
- Mandor
Oh
0.0390
80,000.00
Jumlah
Dibulatkan
1 M3 Beton siklop adk 1pc : 2ps : 3kr + 40 % Batu Belah dgn besi tulangan
- Besi Beton
Kg
75.0000
16,500.00
- Semen Portland
Kg
202.0000
1,406.00
- Pasir Beton
m3
0.3200
255,400.00
- Koral Beton 2/3
m3
0.4900
211,100.00

HARGA
(Rp)
226,050.00
284,012.00
113,199.00
63,000.00
39,000.00
4,500.00
6,000.00
735,761.00
735,761.00
226,050.00
229,178.00
121,368.00
63,000.00
39,000.00
4,500.00
6,000.00
689,096.00
689,096.00
226,050.00
191,216.00
126,969.60
63,000.00
39,000.00
4,500.00
6,000.00
656,735.60
656,736.00
246,600.00
52,590.00
32,760.00
25,350.00
2,925.00
3,120.00
363,345.00
363,345.00
1,237,500.00
284,012.00
81,728.00
103,439.00

No.

URAIAN
- Kawat Beton
- Batu Belah
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
Kg
0.8000
27,700.00
m3
0.4500
205,500.00
Oh
3.0000
42,000.00
Oh
0.8500
65,000.00
Oh
0.0850
75,000.00
Oh
0.1500
80,000.00

HARGA
(Rp)
22,160.00
92,475.00
126,000.00
55,250.00
6,375.00
12,000.00
2,020,939.00
2,020,939.00

No.
C-06

C-07

C-08

C-09

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M3 Pasang Pondasi Sumuran adk 1pc:2ps:3kr + 40 % Batu Belah (D= 1m)
- Batu Belah
M3
0.4500
205,500.00
- Semen Portland
Kg
280.0000
1,406.00
- Pasir Beton
M3
0.4500
255,400.00
- Koral Beton
M3
0.6700
211,100.00
- Pekerja
Oh
2.3800
42,000.00
- Tukang Batu
Oh
0.3000
65,000.00
- Kepala Tukang
Oh
0.0300
75,000.00
- Mandor
Oh
0.0800
80,000.00
Jumlah
Dibulatkan
1 M3 Pondasi siklop adk 1pc:2ps:3kr + 40 % Batu Belah
- Batu Belah
M3
0.4500
205,500.00
- Semen Portland
Kg
202.0000
1,406.00
- Pasir Beton
M3
0.3200
255,400.00
- Koral Beton
M3
0.4900
211,100.00
- Pekerja
Oh
3.0000
42,000.00
- Tukang Batu
Oh
0.8500
65,000.00
- Kepala Tukang
Oh
0.0850
75,000.00
- Mandor
Oh
0.1500
80,000.00
Jumlah
Dibulatkan
1 M' Pembuatan Tiang Pancang (40x40) cm, Beton Tulang
- Pasir Urug
M3
0.0190
175,300.00
- Pasir Beton
M3
0.0940
255,400.00
- Koral Beton
M3
0.1500
211,100.00
- Semen Portland
Kg
60.5000
1,406.00
- Besi Beton
Kg
45.0000
16,500.00
- Kawat Beton
Kg
0.9000
27,700.00
- Kayu balok terentang
M3
0.0320
2,640,000.00
- Paku
Kg
0.1200
23,400.00
- Minyak Bekisting
Ltr
0.0900
55,000.00
- Plamir Tembok
Kg
0.2400
25,000.00
- Pekerja
Oh
1.0000
42,000.00
- Tukang Batu
Oh
0.6700
65,000.00
- Kepala Tukang
Oh
0.0670
75,000.00
- Mandor
Oh
0.0500
80,000.00
Jumlah
Dibulatkan
1 M' Pembuatan Tiang Pancang (35x35) cm, Beton Tulang
- Pasir Urug
M3
0.0160
175,300.00
- Pasir Beton
M3
0.0800
255,400.00
- Koral Beton
M3
0.1250
211,100.00
- Semen Portland
Kg
49.0000
1,406.00
- Besi Beton
Kg
34.5000
16,500.00
- Kawat Beton
Kg
0.7000
27,700.00

HARGA
(Rp)
92,475.00
393,680.00
114,930.00
141,437.00
99,960.00
19,500.00
2,250.00
6,400.00
870,632.00
870,632.00
92,475.00
284,012.00
81,728.00
103,439.00
126,000.00
55,250.00
6,375.00
12,000.00
761,279.00
761,279.00
3,330.70
24,007.60
31,665.00
85,063.00
742,500.00
24,930.00
84,480.00
2,808.00
4,950.00
6,000.00
42,000.00
43,550.00
5,025.00
4,000.00
1,104,309.30
1,104,309.00
2,804.80
20,432.00
26,387.50
68,894.00
569,250.00
19,390.00

No.

URAIAN
- Kayu balok terentang
- Paku
- Minyak Bekisting
- Plamir Tembok
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
M3
0.0270
2,640,000.00
Kg
0.1200
23,400.00
Ltr
0.0900
55,000.00
Kg
0.2000
25,000.00
Oh
0.8000
42,000.00
Oh
0.5000
65,000.00
Oh
0.0500
75,000.00
Oh
0.0400
80,000.00

HARGA
(Rp)
71,280.00
2,808.00
4,950.00
5,000.00
33,600.00
32,500.00
3,750.00
3,200.00
864,246.30
864,246.00

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
C-10 1 M' Pembuatan Tiang Pancang f 40 cm, Beton Tulang
- Pasir Urug
M3
0.0149
175,300.00
- Pasir Beton
M3
0.0738
255,400.00
- Koral Beton
M3
0.1178
211,100.00
- Semen Portland
Kg
47.4925
1,406.00
- Besi Beton
Kg
45.0000
16,500.00
- Kawat Beton
Kg
0.9000
27,700.00
- Kayu balok terentang
M3
0.0320
2,640,000.00
- Paku
Kg
0.1200
23,400.00
- Minyak Bekisting
Ltr
0.0900
55,000.00
- Plamir Tembok
Kg
0.2400
25,000.00
- Pekerja
Oh
1.0000
42,000.00
- Tukang Batu
Oh
0.6700
65,000.00
- Kepala Tukang
Oh
0.0670
75,000.00
- Mandor
Oh
0.0500
80,000.00
Jumlah
Dibulatkan
C-11 1 M' Memancang Tiang Pancang Beton Tulang
jam
0.1170
- Crawler crane lengkap
1,078,774.00
0.0400
- Pekerja
Oh
42,000.00
0.0020
- Mandor
Oh
80,000.00
Jumlah
Dibulatkan
C-12 1 Buah Memotong Tiang Pancang (40x40) cm Beton Tulang
jam
3.3200
- Pekerja
42,000.00
jam
0.0700
- Kepala Tukang
75,000.00
jam
0.2000
- Mandor
80,000.00
lot
0.3500
- Alat bantu
160,690.00
Jumlah
Dibulatkan
C-13 1 M' Menyambung Tiang Pancang Beton Bertulang
kg
18.3700
- Besi pelat
14,100.00
kg
6.06
- Besi beton
16,500.00
kg
2.20
23,600.00
- Kawat las
org
1.00
65,000.00
- Tukang las
org
2.0000
42,000.00
- Pembantu tukang las
org
0.2000
- Mandor
80,000.00
jam
2.0000
- Mesin las
26,325.00
Jumlah
Dibulatkan

HARGA
(Rp)
2,614.60
18,845.97
24,857.03
66,774.46
742,500.00
24,930.00
84,480.00
2,808.00
4,950.00
6,000.00
42,000.00
43,550.00
5,025.00
4,000.00
1,073,335.05
1,073,335.00
126,216.56
1,680.00
160.00
128,056.56
128,057.00
139,440.00
5,250.00
16,000.00
56,241.50
216,931.50
216,932.00
259,017.00
99,990.00
51,920.00
65,000.00
84,000.00
16,000.00
52,650.00
628,577.00
628,577.00

D. ANALISA HARGA SATUAN PEKERJAAN BETON


No.
D-01

D-02

D-03

D-04

D-05

URAIAN

SATUAN VOLUME

1 M3 Membuat Beton Tumbuk adk 1pc:3ps:5kr


- Semen Portland
Kg
- Pasir Beton
M3
- Batu Pecah Mesin 2/3
M3
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 M3 Membuat Beton Tumbuk adk 1pc:3ps:6kr
- Semen Portland
Kg
- Pasir Beton
M3
- Batu Pecah Mesin 2/3
M3
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 M3 Membuat Beton Tumbuk 1pc:2ps:3kr
- Semen Portland
Kg
- Pasir Beton
M3
- Batu Pecah Mesin 2/3
M3
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 M3 Membuat Tiang Pancang Beton Prestressed
- Semen Portland
Kg
- Pasir Beton
M3
- Batu Pecah Mesin 2/3
M3
- Rapidrant
Gln
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 M3 Membuat Beton Tumbuk adk 1pc:2ps:4kr

HARGA SATUAN
(Rp)

218.0000
0.5200
0.8700
1.6500
0.2500
0.0250
0.0800

1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00

197.0000
0.4700
0.9400
1.6500
0.2500
0.0250
0.0800

1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00

336.0000
0.5400
0.8100
2.0000
0.3500
0.0350
1.0000

1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00

440.0000
0.5000
0.8000
2.4600
1.6500
0.2500
0.0250
0.0800

1,406.00
255,400.00
211,100.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

No.

URAIAN
-

Semen Portland
Pasir Beton
Batu Pecah Mesin 2/3
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUME
Kg
M3
M3
Oh
Oh
Oh
Oh

291.0000
0.4700
0.9300
2.0000
0.3500
0.0350
1.0000

HARGA SATUAN
(Rp)
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00

No.
D-06

D-07

D-08

D-09

D-10

URAIAN

SATUAN VOLUME

1 M Memasang PVC Waterstop Lebar 200 mm


- Waterstop Lebar 200 mm
M
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 Kg Pembesian Dengan Besi Polos/ulir
- Besi Beton ( Polos / Ulir )
Kg
- Kawat Beton
Kg
- Pekerja
Oh
- Tukang Besi
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 M2 Pasang Bekesting Untuk Pondasi
- Kayu papan terentang
M3
- Paku Biasa 2" - 5"
Kg
- Minyak Bekisting
Ltr
- Pekerja
Oh
- Tukang Kayu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 M2 Pasang Bekisting Untuk Sloof
- Kayu papan terentang
M3
- Paku Biasa 2" - 5"
Kg
- Minyak Bekisting
Ltr
- Pekerja
Oh
- Tukang Kayu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 M2 Pasang Bekesting Untuk Kolom
- Kayu papan terentang
M3
- Paku Biasa 2" - 5"
Kg
- Minyak Bekisting
Ltr
- Kayu balok terentang
M3
- MultiPlek 9 mm 120 x 240
Lbr
- Dolken -8-10/4m
Btg

HARGA SATUAN
(Rp)

1.0500
0.0500
0.0350
0.0035
0.0020

57,900.00
42,000.00
65,000.00
75,000.00
80,000.00

1.0500
0.0150
0.0070
0.0070
0.0007
0.0003

16,500.00
27,700.00
42,000.00
65,000.00
75,000.00
80,000.00

0.0400
0.3000

2,850,000.00
23,400.00
55,000.00
42,000.00
65,000.00
75,000.00
80,000.00

0.3000
0.2600
0.0260
0.0050

0.0450
0.3000
0.3000
0.2600
0.0260
0.0050

0.0400
0.4000
0.0150
0.3500
2.0000

2,850,000.00
23,400.00
55,000.00
42,000.00
65,000.00
75,000.00
80,000.00

2,850,000.00
23,400.00
55,000.00
2,640,000.00
151,100.00
28,000.00

No.

URAIAN
-

Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUME
Oh
Oh
Oh
Oh

0.3000
0.3300
0.0330
0.0060

HARGA SATUAN
(Rp)
42,000.00
65,000.00
75,000.00
80,000.00

No.
D-11

D-12

D-13

D-14

URAIAN

SATUAN VOLUME

1 M2 Pasang Bekesting Untuk Balok


- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Kayu balok terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M2 Pasang Bekesting Untuk Lantai
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Kayu balok terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M2 Pasang Bekesting Untuk Tangga
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Kayu balok terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Membuat Beton Cor Mutu K-225
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Air

HARGA SATUAN
(Rp)

M3
Kg
Ltr
M3
Lbr
Btg
Oh
Oh
Oh
Oh

0.0400
0.4000
0.0180
0.3500
2.0000
0.3000
0.3300
0.0330
0.0060

2,850,000.00
23,400.00
55,000.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
75,000.00
80,000.00

M3
Kg
Ltr
M3
Lbr
Btg
Oh
Oh
Oh
Oh

0.0400
0.4000
0.2000
0.0150
0.3500
6.0000
0.3000
0.3300
0.0330
0.0060

2,850,000.00
23,400.00
55,000.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
75,000.00
80,000.00

M3
Kg
Ltr
M3
Lbr
Btg
Oh
Oh
Oh
Oh

0.0300
0.4000
0.1500
0.0150
0.3500
2.0000
0.3200
0.3300
0.0330
0.0060

2,850,000.00
23,400.00
55,000.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
75,000.00
80,000.00

Kg
m3
M3
ltr

388.0000
0.6500
0.6500
215.0000

1,406.00
255,400.00
211,100.00
3.00

No.

URAIAN
-

Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUME
Oh
Oh
Oh
Oh

6.0000
1.0000
0.1000
0.3000

HARGA SATUAN
(Rp)
42,000.00
65,000.00
75,000.00
80,000.00

No.
D-15

D-16

D-17

URAIAN

SATUAN VOLUME

1 M3 Membuat Beton Cor Mutu K-275


- Semen Portland
Kg
400.0000
- Pasir Beton
M3
0.4000
- Koral Beton 2/3
M3
0.8200
- Air
ltr
215.0000
- Pekerja
Oh
6.0000
- Tukang Batu
Oh
1.0000
- Kepala Tukang
Oh
0.1000
- Mandor
Oh
0.3000
Jumlah
Dibulatkan
1 M3 Pondasi Beton Tulang (150 kg besi + bekisting)
- Kayu papan terentang
M3
0.2000
- Paku Biasa 2" - 5"
Kg
1.5000
- Minyak Bekisting
Ltr
- Besi Beton
Kg
150.0000
- Kawat Beton
Kg
2.2500
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Pekerja
Oh
3.9000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
1.0400
- Tukang Besi
Oh
1.0500
- Kepala Tukang
Oh
0.2450
- Mandor
Oh
0.1650
Jumlah
Dibulatkan
1 M3 Sloof Beton Tulang (200 kg besi + bekisting)
- Kayu papan terentang
M3
0.2700
- Paku Biasa 2" - 5"
Kg
2.0000
- Minyak Bekisting
Ltr
0.6000
- Besi Beton
Kg
200.0000
- Kawat Beton
Kg
3.0000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Pekerja
Oh
4.8500
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
1.5600
- Tukang Besi
Oh
1.4000
- Kepala Tukang
Oh
0.3310
- Mandor
Oh
0.1700
Jumlah

HARGA SATUAN
(Rp)
1,406.00
255,400.00
211,100.00
3.00
42,000.00
65,000.00
75,000.00
80,000.00

2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00

2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00

No.

URAIAN

SATUAN VOLUME

HARGA SATUAN
(Rp)

Dibulatkan
D-17r1 1 M3 Sloof Beton Tulang 15/20 (150 kg besi + bekisting)
- Kayu papan terentang
M3
0.2700
2,850,000.00
- Paku Biasa 2" - 5"
Kg
2.0000
23,400.00
- Minyak Bekisting
Ltr
0.6000
55,000.00
- Besi Beton
Kg
150.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Pekerja
Oh
4.8500
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
1.5600
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.3310
75,000.00
- Mandor
Oh
0.1700
80,000.00
Jumlah
Dibulatkan
D-17r2 1 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15
- Kayu papan terentang
M3
0.2700
2,850,000.00
- Paku Biasa 2" - 5"
Kg
2.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
180.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Pekerja
Oh
4.8500
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
1.5600
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.3310
75,000.00
- Mandor
Oh
0.1700
80,000.00
Jumlah
Dibulatkan
1 M3 Sloof Beton Tulang 20/30 (150 kg besi + bekisting) Struktur bertingkat 4dia.16 8-15
- Kayu papan terentang
M3
0.2700
2,850,000.00
- Paku Biasa 2" - 5"
Kg
2.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
150.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00

No.

URAIAN
-

SATUAN VOLUME

HARGA SATUAN
(Rp)
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00

Pekerja
Oh
4.8500
Tukang Batu
Oh
0.3500
Tukang Kayu
Oh
1.5600
Tukang Besi
Oh
1.4000
Kepala Tukang
Oh
0.3310
Mandor
Oh
0.1700
Jumlah
Dibulatkan
1 M3 Sloof Beton Tulang 20/30 (200 kg besi + bekisting) Struktur bertingkat 6dia.16 8-15
- Kayu papan terentang
M3
0.2700
2,850,000.00
- Paku Biasa 2" - 5"
Kg
2.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
200.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Pekerja
Oh
4.8500
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
1.5600
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.3310
75,000.00
- Mandor
Oh
0.1700
80,000.00
Jumlah
Dibulatkan
1 M3 Sloof Beton Tulang 20/40 (240 kg besi + bekisting) Struktur bertingkat
- Kayu papan terentang
M3
0.2700
2,850,000.00
- Paku Biasa 2" - 5"
Kg
2.0000
23,400.00
- Minyak Bekisting
Ltr
0.6000
55,000.00
- Besi Beton
Kg
240.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Pekerja
Oh
4.8500
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
1.5600
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.3310
75,000.00
- Mandor
Oh
0.1700
80,000.00
Jumlah
Dibulatkan

No.

D-18

URAIAN

SATUAN VOLUME

1 M3 Kolom Beton Tulang (120 kg besi + bekisting)


- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
2.0000
- Besi Beton
Kg
120.0000
- Kawat Beton
Kg
1.8000

HARGA SATUAN
(Rp)

2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00

No.

URAIAN
-

D-18r

SATUAN VOLUME

HARGA SATUAN
(Rp)
1,406.00
255,400.00
211,100.00
2,640,000.00
235,000.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00

Semen Portland
Kg
323.0000
Pasir Beton
M3
0.5200
Koral Beton 2/3
M3
0.7800
Kayu Balok Terentang
M3
0.1500
Plywood Tebal 9 mm
Lbr
3.5000
Dolken -8-10/4m
Btg
20.0000
Pekerja
Oh
7.3000
Tukang Batu
Oh
0.3500
Tukang Kayu
Oh
3.3000
Tukang Besi
Oh
2.1000
Kepala Tukang
Oh
0.5700
Mandor
Oh
0.2500
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang 20/20 (140 kg besi + bekisting) 4dia. 12 8-15
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
140.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1500
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
3.3000
65,000.00
- Tukang Besi
Oh
2.1000
65,000.00
- Kepala Tukang
Oh
0.5700
75,000.00
- Mandor
Oh
0.2500
80,000.00
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang 15/20 (180 kg besi + bekisting) 4dia.12 8-15
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
180.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1500
2,640,000.00

No.

URAIAN
-

SATUAN VOLUME

HARGA SATUAN
(Rp)
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00

MultiPlek 9 mm 120 x 240


Lbr
3.5000
Dolken -8-10/4m
Btg
20.0000
Pekerja
Oh
7.3000
Tukang Batu
Oh
0.3500
Tukang Kayu
Oh
3.3000
Tukang Besi
Oh
2.1000
Kepala Tukang
Oh
0.5700
Mandor
Oh
0.2500
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang Praktis 12/12 (175 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
- Besi Beton
Kg
175.0000
- Kawat Beton
Kg
1.8000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
- MultiPlek 9 mm 120 x 240
Lbr
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
3.3000
- Tukang Besi
Oh
2.1000
- Kepala Tukang
Oh
0.5700
- Mandor
Oh
0.2500
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang Praktis 12/12 (210 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
- Besi Beton
Kg
210.0000
- Kawat Beton
Kg
1.8000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
- MultiPlek 9 mm 120 x 240
Lbr
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000
- Tukang Batu
Oh
0.3500

2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00

2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00

No.

URAIAN
-

SATUAN VOLUME

HARGA SATUAN
(Rp)
65,000.00
65,000.00
75,000.00
80,000.00

Tukang Kayu
Oh
3.3000
Tukang Besi
Oh
2.1000
Kepala Tukang
Oh
0.5700
Mandor
Oh
0.2500
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang Praktis 12/12 (260 kg besi + bekisting) 4dia.10 8-15
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
260.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
3.3000
65,000.00
- Tukang Besi
Oh
2.1000
65,000.00
- Kepala Tukang
Oh
0.5700
75,000.00
- Mandor
Oh
0.2500
80,000.00
Jumlah
Dibulatkan

1 M3 Kolom Beton Tulang 20/20 (210 kg besi + bekisting) Struktur bertingkat 4dia.16 8-15
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
210.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1500
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00

No.

URAIAN
-

SATUAN VOLUME

HARGA SATUAN
(Rp)
65,000.00
65,000.00
75,000.00
80,000.00

Tukang Kayu
Oh
3.3000
Tukang Besi
Oh
2.1000
Kepala Tukang
Oh
0.5700
Mandor
Oh
0.2500
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang 20/30 (230 kg besi + bekisting) Struktur bertingkat 6dia.16 +2dia.12, 8-15
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
230.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1500
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
3.3000
65,000.00
- Tukang Besi
Oh
2.1000
65,000.00
- Kepala Tukang
Oh
0.5700
75,000.00
- Mandor
Oh
0.2500
80,000.00
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang 20/40 (250 kg besi + bekisting) Struktur bertingkat
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
2.0000
55,000.00
- Besi Beton
Kg
250.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1500
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
3.3000
65,000.00
- Tukang Besi
Oh
2.1000
65,000.00
- Kepala Tukang
Oh
0.5700
75,000.00
- Mandor
Oh
0.2500
80,000.00

No.

URAIAN

SATUAN VOLUME

HARGA SATUAN
(Rp)

Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang 30/30 (175 kg besi + bekisting) Struktur bertingkat 8dia.16, 8-15
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
175.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1500
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
3.3000
65,000.00
- Tukang Besi
Oh
2.1000
65,000.00
- Kepala Tukang
Oh
0.5700
75,000.00
- Mandor
Oh
0.2500
80,000.00
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang 30/30 (210 kg besi + bekisting) Struktur bertingkat 10dia.16, 8-15
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
210.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1500
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
3.3000
65,000.00
- Tukang Besi
Oh
2.1000
65,000.00
- Kepala Tukang
Oh
0.5700
75,000.00
- Mandor
Oh
0.2500
80,000.00
Jumlah
Dibulatkan

No.

URAIAN

SATUAN VOLUME

HARGA SATUAN
(Rp)
1 M3 Kolom Beton Tulang 30/40 (200 kg besi + bekisting) Struktur bertingkat
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
2.0000
55,000.00
- Besi Beton
Kg
200.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1500
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
3.3000
65,000.00
- Tukang Besi
Oh
2.1000
65,000.00
- Kepala Tukang
Oh
0.5700
75,000.00
- Mandor
Oh
0.2500
80,000.00
Jumlah
Dibulatkan

D-19

1 M3 Kolom Beton Tulang (140 kg besi + bekisting)


- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
2.0000
- Besi Beton
Kg
140.0000
- Kawat Beton
Kg
2.1000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1500
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000

2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00

No.

URAIAN
-

D-20

SATUAN VOLUME

Tukang Batu
Oh
0.3500
Tukang Kayu
Oh
3.3000
Tukang Besi
Oh
2.1000
Kepala Tukang
Oh
0.5700
Mandor
Oh
0.2500
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang (150 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
2.0000
- Besi Beton
Kg
150.0000
- Kawat Beton
Kg
2.4000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1500
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
3.3000
- Tukang Besi
Oh
2.1000
- Kepala Tukang
Oh
0.5700
- Mandor
Oh
0.2500
Jumlah
Dibulatkan

HARGA SATUAN
(Rp)
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00

2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00

No.
D-21

D-22

D-23

URAIAN

SATUAN VOLUME

1 M3 Kolom Beton Tulang (180 kg besi + bekisting)


- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
2.0000
- Besi Beton
Kg
180.0000
- Kawat Beton
Kg
2.7000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1500
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
3.3000
- Tukang Besi
Oh
2.1000
- Kepala Tukang
Oh
0.5700
- Mandor
Oh
0.2500
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang (200 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
2.0000
- Besi Beton
Kg
200.0000
- Kawat Beton
Kg
3.0000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1500
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
3.3000
- Tukang Besi
Oh
2.1000
- Kepala Tukang
Oh
0.5700
- Mandor
Oh
0.2500
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang (250 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
2.0000

HARGA SATUAN
(Rp)
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00

2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00

2,850,000.00
23,400.00
55,000.00

No.

URAIAN
-

Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton 2/3
Kayu Balok Terentang
MultiPlek 9 mm 120 x 240
Dolken -8-10/4m

SATUAN VOLUME
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg

250.0000
3.7500
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000

HARGA SATUAN
(Rp)
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00

No.

URAIAN
-

D-24

D-25

SATUAN VOLUME

Pekerja
Oh
7.3000
Tukang Batu
Oh
0.3500
Tukang Kayu
Oh
3.3000
Tukang Besi
Oh
2.1000
Kepala Tukang
Oh
0.5700
Mandor
Oh
0.2500
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang (300 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
2.0000
- Besi Beton
Kg
300.0000
- Kawat Beton
Kg
4.5000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1500
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
3.3000
- Tukang Besi
Oh
2.1000
- Kepala Tukang
Oh
0.5700
- Mandor
Oh
0.2500
Jumlah
Dibulatkan
1 M3 Balok Beton Tulang (120 kg besi + bekisting)
- Kayu papan terentang
M3
0.3200
- Paku Biasa 2" - 5"
Kg
3.2000
- Minyak Bekisting
Ltr
1.6000
- Besi Beton
Kg
120.0000
- Kawat Beton
Kg
1.8000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1400
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
- Dolken -8-10/4m
Btg
16.0000
- Pekerja
Oh
5.9600
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
2.8000
- Tukang Besi
Oh
1.4000

HARGA SATUAN
(Rp)
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00

2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00

2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00

No.

URAIAN
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUME
Oh
Oh

0.4550
0.2080

HARGA SATUAN
(Rp)
75,000.00
80,000.00

No.
D-26

D-26

URAIAN

SATUAN VOLUME

HARGA SATUAN
(Rp)

1 M3 Balok Beton Tulang 15/20 (150 kg besi + bekisting)


- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
1.6000
55,000.00
- Besi Beton
Kg
150.0000
16,500.00
- Kawat Beton
Kg
2.2500
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.8000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
- Mandor
Oh
0.2080
80,000.00
Jumlah
Dibulatkan
1 M3 Balok Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
180.0000
16,500.00
- Kawat Beton
Kg
2.2500
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.8000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
- Mandor
Oh
0.2080
80,000.00
Jumlah
Dibulatkan
1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk + balok poratl (180 kg besi + bekisting) 4dia. 12, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00

No.

URAIAN
-

Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton 2/3
Kayu Balok Terentang
MultiPlek 9 mm 120 x 240
Dolken -8-10/4m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUME
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh

180.0000
2.2500
323.0000
0.5200
0.7800
0.1400
2.8000
16.0000
5.9600
0.3500
2.8000
1.4000
0.4550
0.2080

HARGA SATUAN
(Rp)
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00

1 M3 Balok Beton Tulang 15/30 (190 kg besi + bekisting) Struktur bertingkat 4dia. 16, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
190.0000
16,500.00
- Kawat Beton
Kg
2.2500
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.8000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
- Mandor
Oh
0.2080
80,000.00
Jumlah
Dibulatkan

No.

D-27

URAIAN

SATUAN VOLUME

HARGA SATUAN
(Rp)

1 M3 Balok Beton Tulang 20/40 (200 kg besi + bekisting) Struktur bertingkat 7dia.16+2dia.12, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
200.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.8000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
- Mandor
Oh
0.2080
80,000.00
Jumlah
Dibulatkan
1 M3 Balok Beton Tulang 20/30 (200 kg besi + bekisting) Struktur bertingkat 6dia. 16, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
200.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.8000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
- Mandor
Oh
0.2080
80,000.00
Jumlah
Dibulatkan
1 M3 Balok Beton Tulang 20/30 (175 kg besi + bekisting) Struktur bertingkat 5dia. 16, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00

No.

URAIAN
- Paku Biasa 2" - 5"
- Minyak Bekisting
Paku Biasa 2" - 5"
- Kawat Beton
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Kayu Balok Terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
- Pekerja
- Tukang Batu
- Tukang Kayu
- Tukang Besi
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUME
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh

3.2000
175.0000
3.0000
323.0000
0.5200
0.7800
0.1400
2.8000
16.0000
5.9600
0.3500
2.8000
1.4000
0.4550
0.2080

HARGA SATUAN
(Rp)
23,400.00
55,000.00
23,400.00
55,000.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00

1 M3 Balok Beton Tulang 25/55 (140 kg besi + bekisting) Struktur bertingkat 8dia.16 +2dia.12, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
140.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.8000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
- Mandor
Oh
0.2080
80,000.00
Jumlah

No.

URAIAN

SATUAN VOLUME

HARGA SATUAN
(Rp)

Dibulatkan
1 M3 Balok Beton Tulang 30/60 (110 kg besi + bekisting) Struktur bertingkat 8dia.16 +2dia.12, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
110.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.8000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
- Mandor
Oh
0.2080
80,000.00
Jumlah
Dibulatkan
1 M3 Balok Beton Lintel 11/11 (300 kg besi + bekisting) 4dia.10 8-15
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
300.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
3.3000
65,000.00
- Tukang Besi
Oh
2.1000
65,000.00
- Kepala Tukang
Oh
0.5700
75,000.00
- Mandor
Oh
0.2500
80,000.00
Jumlah
Dibulatkan

No.

D-28

URAIAN

SATUAN VOLUME

1 M3 Balok Beton Tulang (230 kg besi + bekisting)


- Kayu papan terentang
M3
0.3200
- Paku Biasa 2" - 5"
Kg
3.2000
- Minyak Bekisting
Ltr
1.6000
- Besi Beton
Kg
230.0000
- Kawat Beton
Kg
3.4500
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1400
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
- Dolken -8-10/4m
Btg
16.0000
- Pekerja
Oh
5.9600

HARGA SATUAN
(Rp)

2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00

No.

URAIAN
-

D-29

D-30

D-31

SATUAN VOLUME

HARGA SATUAN
(Rp)
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00

Tukang Batu
Oh
0.3500
Tukang Kayu
Oh
2.8000
Tukang Besi
Oh
1.4000
Kepala Tukang
Oh
0.4550
Mandor
Oh
0.2080
Jumlah
Dibulatkan
1 M3 Tangga Beton Tulang (200 kg besi + bekisting)
- Kayu papan terentang
M3
0.2500
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.0000
23,400.00
- Minyak Bekisting
Ltr
1.2000
55,000.00
- Besi Beton
Kg
200.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1050
2,640,000.00
- Plywood Tebal 9 mm
Lbr
2.5000
151,100.00
- Dolken -8-10/4m
Btg
14.0000
28,000.00
- Pekerja
Oh
5.6000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.3000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4050
75,000.00
- Mandor
Oh
0.2020
80,000.00
Jumlah
Dibulatkan
1 M3 Pelat Lantai Beton Tulang T= 10 cm (90 kg besi + bekisting)
- Beton tulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
914,882.00
- Pasang Bekisting untuk lantai
M2
10.0000
431,850.00
- Besi Beton Polos
Kg
90.0000
18,566.00
Jumlah
Dibulatkan
1 M3 Pelat Lantai Beton Tulang T= 12 cm (110 kg besi + bekisting) dia.8-12,5
- Beton bertulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
914,882.00
- Pasang Bekisting untuk lantai
M2
8.3300
431,850.00
- Besi Beton Polos
Kg
110.0000
18,566.00
Jumlah
Dibulatkan
1 M3 Pelat Lantai Beton Tulang T= 12 cm (130 kg besi + bekisting) dia.10-20
- Beton bertulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
914,882.00
- Pasang Bekisting untuk lantai
M2
8.3300
431,850.00
- Besi Beton Polos
Kg
130.0000
18,566.00
Jumlah

No.

URAIAN

SATUAN VOLUME

HARGA SATUAN
(Rp)

Dibulatkan
D-32

D-33

1 M3 Pelat Lantai Beton Tulang T= 12 cm (130 kg besi + bekisting)


- Beton bertulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
- Pasang Bekisting untuk lantai
M2
8.3300
- Besi Beton Polos
Kg
130.0000
Jumlah
Dibulatkan
1 M3 Pelat Lantai Beton Tulang T= 15 cm (90 kg besi + bekisting)
- Beton bertulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
- Pasang Bekisting untuk lantai
M2
6.6700
- Besi Beton Polos
Kg
90.0000
Jumlah
Dibulatkan

914,882.00
431,850.00
18,566.00

914,882.00
431,850.00
18,566.00

No.
D-34

D-35

D-36

D-37

URAIAN

SATUAN VOLUME

HARGA SATUAN
(Rp)
1 M3 Pelat Lantai Beton Tulang T= 15 cm (115 kg besi + bekisting)
- Beton bertulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
914,882.00
- Pasang Bekisting untuk lantai
M2
6.6700
431,850.00
- Besi Beton Polos
Kg
115.0000
18,566.00
Jumlah
Dibulatkan
1 M' Kolom Praktis Beton Tulang (11x11) cm
- Kayu papan terentang
M3
0.0020
2,850,000.00
- Paku Biasa 2" - 5"
Kg
0.0100
23,400.00
- Besi Beton Polos
Kg
3.0000
16,500.00
- Kawat Beton
Kg
0.0450
27,700.00
- Semen Portland
Kg
4.0000
1,406.00
- Pasir Beton
M3
0.0060
255,400.00
- Koral Beton
M3
0.0090
211,100.00
- Pekerja
Oh
0.0600
42,000.00
- Tukang Batu
Oh
0.0200
65,000.00
- Tukang Kayu
Oh
0.0200
65,000.00
- Tukang Besi
Oh
0.0200
65,000.00
- Kepala Tukang
Oh
0.0060
75,000.00
- Mandor
Oh
0.0030
80,000.00
Jumlah
Dibulatkan
1 M' Ring Balok Beton Tulang (10x15) cm
- Kayu papan terentang
M3
0.0030
2,850,000.00
- Paku Biasa 2" - 5"
Kg
0.0200
23,400.00
- Besi Beton Polos
Kg
3.6000
16,500.00
- Kawat Beton
Kg
0.0500
27,700.00
- Semen Portland
Kg
5.5000
1,406.00
- Pasir Beton
M3
0.0090
255,400.00
- Koral Beton
M3
0.0150
211,100.00
- Pekerja
Oh
0.1000
42,000.00
- Tukang Batu
Oh
0.0330
65,000.00
- Tukang Kayu
Oh
0.0330
65,000.00
- Tukang Besi
Oh
0.0330
65,000.00
- Kepala Tukang
Oh
0.0100
75,000.00
- Mandor
Oh
0.0050
80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Bekesting Untuk Dinding
- Kayu papan terentang
M3
0.0300
2,850,000.00
- Paku Biasa 2" - 5"
Kg
0.4000
1,406.00
- Minyak Bekisting
Ltr
0.2000
55,000.00
- Kayu balok terentang
M3
0.0200
2,640,000.00
- Plywood Tebal 9 mm
Lbr
0.3500
151,100.00

No.

URAIAN
-

Dolken -8-10/4m
Formite/spacer
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUME
Btg
Buah
Oh
Oh
Oh
Oh

3.0000
4.0000
0.3200
0.0330
0.0330
0.0060

HARGA SATUAN
(Rp)
28,000.00
2,500.00
42,000.00
65,000.00
75,000.00
80,000.00

No.
D-38

D-39

D-40

URAIAN

SATUAN VOLUME

1 M3 Pelat Beton Tulang (150 kg besi + bekisting)


- Kayu papan terentang
M3
0.3200
- Paku Biasa 2" - 5"
Kg
3.2000
- Minyak Bekisting
Ltr
1.6000
- Besi Beton
Kg
150.0000
- Kawat Beton
Kg
2.2500
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1200
- Plywood Tebal 9 mm
Lbr
2.8000
- Dolken -8-10/4m
Btg
32.0000
- Pekerja
Oh
5.3000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
1.3000
- Tukang Besi
Oh
1.0500
- Kepala Tukang
Oh
0.2650
- Mandor
Oh
0.2650
Jumlah
Dibulatkan
1 M3 Dinding Beton Tulang (150 kg besi + bekisting)
- Kayu papan terentang
M3
0.2400
- Paku Biasa 2" - 5"
Kg
3.2000
- Minyak Bekisting
Ltr
1.6000
- Besi Beton
Kg
150.0000
- Kawat Beton
Kg
2.2500
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1600
- Plywood Tebal 9 mm
Lbr
2.8000
- Dolken -8-10/4m
Btg
24.0000
- Pekerja
Oh
5.6000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
2.6400
- Tukang Besi
Oh
1.0500
- Kepala Tukang
Oh
0.4000
- Mandor
Oh
0.1930
Jumlah
Dibulatkan
1 M3 Dinding Beton Tulang (200 kg besi + bekisting)
- Kayu papan terentang
M3
0.2500
- Paku Biasa 2" - 5"
Kg
3.0000
- Minyak Bekisting
Ltr
1.2000

HARGA SATUAN
(Rp)
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00

2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00

2,850,000.00
23,400.00
55,000.00

No.

URAIAN
-

Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton 2/3

SATUAN VOLUME
Kg
Kg
Kg
M3
M3

200.0000
3.0000
323.0000
0.5200
0.7800

HARGA SATUAN
(Rp)
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00

No.

URAIAN
-

D-41

D-42

D-43

SATUAN VOLUME

Kayu Balok Terentang


Plywood Tebal 9 mm
Dolken -8-10/4m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M3 Membuat Beton Cor Mutu K-300
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Membuat Beton Cor Mutu K-200
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Membuat Beton Cor Mutu K-250
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan

M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh

0.1050
2.8000
14.0000
5.6500
0.3500
1.5600
1.4000
0.3230
0.2830

HARGA SATUAN
(Rp)
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00

Kg
M3
M3
Oh
Oh
Oh
Oh

413.0000
0.4256
0.6807
1.6500
0.2750
0.0280
0.0830

1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00

Kg
M3
M3
Oh
Oh
Oh
Oh

352.0000
0.4569
0.6873
1.6500
0.2750
0.0280
0.0830

1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00

Kg
M3
M3
Oh
Oh
Oh
Oh

384.0000
0.4325
0.6927
1.6500
0.2750
0.0280
0.0830

1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00

ERJAAN BETON
HARGA
(Rp)
306,508.00
132,808.00
183,657.00
69,300.00
16,250.00
1,875.00
6,400.00
716,798.00
716,798.00
276,982.00
120,038.00
198,434.00
69,300.00
16,250.00
1,875.00
6,400.00
689,279.00
689,279.00
472,416.00
137,916.00
170,991.00
84,000.00
22,750.00
2,625.00
80,000.00
970,698.00
970,698.00
618,640.00
127,700.00
168,880.00
38,622.00
69,300.00
16,250.00
1,875.00
6,400.00
1,047,667.00
1,047,667.00

HARGA
(Rp)
409,146.00
120,038.00
196,323.00
84,000.00
22,750.00
2,625.00
80,000.00
914,882.00
914,882.00

HARGA
(Rp)
60,795.00
2,100.00
2,275.00
262.50
160.00
65,592.50
65,593.00
17,325.00
415.50
294.00
455.00
52.50
24.00
18,566.00
18,566.00
114,000.00
7,020.00
12,600.00
16,900.00
1,950.00
400.00
152,870.00
152,870.00
128,250.00
7,020.00
12,600.00
16,900.00
1,950.00
400.00
167,120.00
167,120.00
114,000.00
9,360.00
39,600.00
52,885.00
56,000.00

HARGA
(Rp)
12,600.00
21,450.00
2,475.00
480.00
308,850.00
308,850.00

HARGA
(Rp)
114,000.00
9,360.00
47,520.00
52,885.00
56,000.00
12,600.00
21,450.00
2,475.00
480.00
316,770.00
316,770.00
114,000.00
9,360.00
11,000.00
39,600.00
52,885.00
168,000.00
12,600.00
21,450.00
2,475.00
480.00
431,850.00
431,850.00
85,500.00
9,360.00
8,250.00
39,600.00
52,885.00
56,000.00
13,440.00
21,450.00
2,475.00
480.00
289,440.00
289,440.00
545,528.00
166,010.00
137,215.00
645.00

HARGA
(Rp)
252,000.00
65,000.00
7,500.00
24,000.00
1,197,898.00
1,197,898.00

HARGA
(Rp)
562,400.00
102,160.00
173,102.00
645.00
252,000.00
65,000.00
7,500.00
24,000.00
1,186,807.00
1,186,807.00
570,000.00
35,100.00
2,475,000.00
62,325.00
454,138.00
132,808.00
164,658.00
163,800.00
22,750.00
67,600.00
68,250.00
18,375.00
13,200.00
4,248,004.00
4,248,004.00
769,500.00
46,800.00
33,000.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
203,700.00
22,750.00
101,400.00
91,000.00
24,825.00
13,600.00
5,441,279.00

HARGA
(Rp)
5,441,279.00
769,500.00
46,800.00
33,000.00
2,475,000.00
83,100.00
454,138.00
132,808.00
164,658.00
203,700.00
22,750.00
101,400.00
91,000.00
24,825.00
13,600.00
4,616,279.00
4,616,279.00
769,500.00
46,800.00
2,970,000.00
83,100.00
454,138.00
132,808.00
164,658.00
203,700.00
22,750.00
101,400.00
91,000.00
24,825.00
13,600.00
5,078,279.00
5,078,279.00

ur bertingkat 4dia.16 8-15


769,500.00
46,800.00
2,475,000.00
83,100.00
454,138.00
132,808.00
164,658.00

HARGA
(Rp)
203,700.00
22,750.00
101,400.00
91,000.00
24,825.00
13,600.00
4,583,279.00
4,583,279.00

ur bertingkat 6dia.16 8-15


769,500.00
46,800.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
203,700.00
22,750.00
101,400.00
91,000.00
24,825.00
13,600.00
5,408,279.00
5,408,279.00
769,500.00
46,800.00
33,000.00
3,960,000.00
83,100.00
454,138.00
132,808.00
164,658.00
203,700.00
22,750.00
101,400.00
91,000.00
24,825.00
13,600.00
6,101,279.00
6,101,279.00

HARGA
(Rp)

1,140,000.00
93,600.00
110,000.00
1,980,000.00
49,860.00

HARGA
(Rp)
454,138.00
132,808.00
164,658.00
396,000.00
822,500.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
6,646,664.00
6,646,664.00
1,140,000.00
93,600.00
2,310,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
6,573,014.00
6,573,014.00
1,140,000.00
93,600.00
2,970,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00

HARGA
(Rp)
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,233,014.00
7,233,014.00
1,140,000.00
93,600.00
2,887,500.00
49,860.00
454,138.00
132,808.00
164,658.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
6,225,664.00
6,225,664.00
1,140,000.00
93,600.00
3,465,000.00
49,860.00
454,138.00
132,808.00
164,658.00
560,000.00
306,600.00
22,750.00

HARGA
(Rp)
214,500.00
136,500.00
42,750.00
20,000.00
6,803,164.00
6,803,164.00
1,140,000.00
93,600.00
4,290,000.00
49,860.00
454,138.00
132,808.00
164,658.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,628,164.00
7,628,164.00

tur bertingkat 4dia.16 8-15


1,140,000.00
93,600.00
3,465,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00

HARGA
(Rp)
214,500.00
136,500.00
42,750.00
20,000.00
7,728,014.00
7,728,014.00
tur bertingkat 6dia.16 +2dia.12, 8-15
1,140,000.00
93,600.00
3,795,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
8,058,014.00
8,058,014.00
1,140,000.00
93,600.00
110,000.00
4,125,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00

HARGA
(Rp)
8,498,014.00
8,498,014.00

tur bertingkat 8dia.16, 8-15


1,140,000.00
93,600.00
2,887,500.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,150,514.00
7,150,514.00

tur bertingkat 10dia.16, 8-15


1,140,000.00
93,600.00
3,465,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,728,014.00
7,728,014.00

HARGA
(Rp)
1,140,000.00
93,600.00
110,000.00
3,300,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,673,014.00
7,673,014.00

1,140,000.00
93,600.00
110,000.00
2,310,000.00
58,170.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00

HARGA
(Rp)
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
6,691,324.00
6,691,324.00
1,140,000.00
93,600.00
110,000.00
2,475,000.00
66,480.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
6,864,634.00
6,864,634.00

HARGA
(Rp)
1,140,000.00
93,600.00
110,000.00
2,970,000.00
74,790.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,367,944.00
7,367,944.00
1,140,000.00
93,600.00
110,000.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,706,254.00
7,706,254.00
1,140,000.00
93,600.00
110,000.00

HARGA
(Rp)
4,125,000.00
103,875.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00

HARGA
(Rp)
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
8,552,029.00
8,552,029.00
1,140,000.00
93,600.00
110,000.00
4,950,000.00
124,650.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
9,397,804.00
9,397,804.00
912,000.00
74,880.00
88,000.00
1,980,000.00
49,860.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00

HARGA
(Rp)
34,125.00
16,640.00
5,693,859.00
5,693,859.00

HARGA
(Rp)
912,000.00
74,880.00
88,000.00
2,475,000.00
62,325.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,201,324.00
6,201,324.00

912,000.00
74,880.00
2,970,000.00
62,325.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,608,324.00
6,608,324.00
tl (180 kg besi + bekisting) 4dia. 12, 8-15
912,000.00
74,880.00
-

HARGA
(Rp)
2,970,000.00
62,325.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,608,324.00
6,608,324.00

ur bertingkat 4dia. 16, 8-15


912,000.00
74,880.00
3,135,000.00
62,325.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,773,324.00
6,773,324.00

HARGA
(Rp)

ur bertingkat 7dia.16+2dia.12, 8-15


912,000.00
74,880.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,959,099.00
6,959,099.00

ur bertingkat 6dia. 16, 8-15


912,000.00
74,880.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,959,099.00
6,959,099.00

ur bertingkat 5dia. 16, 8-15


912,000.00

HARGA
(Rp)
74,880.00
4,095,000.00
165,000.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
7,835,999.00
7,835,999.00

ur bertingkat 8dia.16 +2dia.12, 8-15


912,000.00
74,880.00
2,310,000.00
83,100.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
5,969,099.00

HARGA
(Rp)
5,969,099.00
ur bertingkat 8dia.16 +2dia.12, 8-15
912,000.00
74,880.00
1,815,000.00
83,100.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
5,474,099.00
5,474,099.00
1,140,000.00
93,600.00
4,950,000.00
49,860.00
454,138.00
132,808.00
164,658.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
8,288,164.00
8,288,164.00

HARGA
(Rp)

912,000.00
74,880.00
88,000.00
3,795,000.00
95,565.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00

HARGA
(Rp)
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
7,554,564.00
7,554,564.00
712,500.00
70,200.00
66,000.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
277,200.00
377,750.00
392,000.00
235,200.00
22,750.00
149,500.00
91,000.00
30,375.00
16,160.00
6,575,339.00
6,575,339.00
914,882.00
4,318,500.00
1,670,940.00
6,904,322.00
6,904,322.00
914,882.00
3,597,310.50
2,042,260.00
6,554,452.50
6,554,453.00
914,882.00
3,597,310.50
2,413,580.00
6,925,772.50

HARGA
(Rp)
6,925,773.00

914,882.00
3,597,310.50
2,413,580.00
6,925,772.50
6,925,773.00
914,882.00
2,880,439.50
1,670,940.00
5,466,261.50
5,466,262.00

HARGA
(Rp)
914,882.00
2,880,439.50
2,135,090.00
5,930,411.50
5,930,412.00
5,700.00
234.00
49,500.00
1,246.50
5,624.00
1,532.40
1,899.90
2,520.00
1,300.00
1,300.00
1,300.00
450.00
240.00
72,846.80
72,847.00
8,550.00
468.00
59,400.00
1,385.00
7,733.00
2,298.60
3,166.50
4,200.00
2,145.00
2,145.00
2,145.00
750.00
400.00
94,786.10
94,786.00
85,500.00
562.40
11,000.00
52,800.00
52,885.00

HARGA
(Rp)
84,000.00
10,000.00
13,440.00
2,145.00
2,475.00
480.00
315,287.40
315,287.00

HARGA
(Rp)
912,000.00
74,880.00
88,000.00
2,475,000.00
62,325.00
454,138.00
132,808.00
164,658.00
316,800.00
423,080.00
896,000.00
222,600.00
22,750.00
84,500.00
68,250.00
19,875.00
21,200.00
6,438,864.00
6,438,864.00
684,000.00
74,880.00
88,000.00
2,475,000.00
62,325.00
454,138.00
132,808.00
164,658.00
422,400.00
423,080.00
672,000.00
235,200.00
22,750.00
171,600.00
68,250.00
30,000.00
15,440.00
6,196,529.00
6,196,529.00
712,500.00
70,200.00
66,000.00

HARGA
(Rp)
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00

HARGA
(Rp)
277,200.00
423,080.00
392,000.00
237,300.00
22,750.00
101,400.00
91,000.00
24,225.00
22,640.00
6,574,999.00
6,574,999.00
580,678.00
108,704.63
143,688.73
69,300.00
17,875.00
2,100.00
6,640.00
928,986.36
928,986.00
494,912.00
116,685.88
145,096.07
69,300.00
17,875.00
2,100.00
6,640.00
852,608.94
852,609.00
539,904.00
110,460.50
146,221.93
69,300.00
17,875.00
2,100.00
6,640.00
892,501.43
892,501.00

E. ANALISA HARGA SATUAN PEKERJAAN DINDING


No.
E-01

E-02

E-03

E-04

E-05

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 3ps
- Bata Merah
Bh
140.0000
775.00
- Semen Portland
Kg
32.9500
1,406.00
- Pasir Pasang
M3
0.0910
233,400.00
- Pekerja
Oh
0.6500
42,000.00
- Tukang Batu
Oh
0.2000
65,000.00
- Kepala Tukang
Oh
0.0200
75,000.00
- Mandor
Oh
0.0300
80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 4ps
- Bata Merah
Bh
140.0000
775.00
- Semen Portland
Kg
26.5500
1,406.00
- Pasir Pasang
M3
0.0930
233,400.00
- Pekerja
Oh
0.6500
42,000.00
- Tukang Batu
Oh
0.2000
65,000.00
- Kepala Tukang
Oh
0.0200
75,000.00
- Mandor
Oh
0.0300
80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 5ps
- Bata Merah
Bh
140.0000
775.00
- Semen Portland
Kg
22.2000
1,406.00
- Pasir Pasang
M3
0.1020
233,400.00
- Pekerja
Oh
0.6500
42,000.00
- Tukang Batu
Oh
0.2000
65,000.00
- Kepala Tukang
Oh
0.0200
75,000.00
- Mandor
Oh
0.0300
80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 3ps
- Bata Merah
Bh
70.0000
775.00
- Semen Portland
Kg
14.3700
1,406.00
- Pasir Pasang
M3
0.0400
233,400.00
- Pekerja
Oh
0.3200
42,000.00
- Tukang Batu
Oh
0.1000
65,000.00
- Kepala Tukang
Oh
0.0100
75,000.00
- Mandor
Oh
0.0150
80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 4ps
- Bata Merah
Bh
70.0000
775.00
- Semen Portland
Kg
11.5000
1,406.00
- Pasir Pasang
M3
0.0430
233,400.00

HARGA
(Rp)
108,500.00
46,327.70
21,239.40
27,300.00
13,000.00
1,500.00
2,400.00
220,267.10
220,267.00
108,500.00
37,329.30
21,706.20
27,300.00
13,000.00
1,500.00
2,400.00
211,735.50
211,736.00
108,500.00
31,213.20
23,806.80
27,300.00
13,000.00
1,500.00
2,400.00
207,720.00
207,720.00
54,250.00
20,204.22
9,336.00
13,440.00
6,500.00
750.00
1,200.00
105,680.22
105,680.00
54,250.00
16,169.00
10,036.20

No.

URAIAN
-

Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
Oh
0.3200
42,000.00
Oh
0.1000
65,000.00
Oh
0.0100
75,000.00
Oh
0.0150
80,000.00

HARGA
(Rp)
13,440.00
6,500.00
750.00
1,200.00
102,345.20
102,345.00

No.
E-06

E-07

E-08

E-09

E-10

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 5ps
- Bata Merah
Bh
70.0000
775.00
- Semen Portland
Kg
9.6800
1,406.00
- Pasir Pasang
M3
0.0450
233,400.00
- Pekerja
Oh
0.3200
42,000.00
- Tukang Batu
Oh
0.1000
65,000.00
- Kepala Tukang
Oh
0.0100
75,000.00
- Mandor
Oh
0.0150
80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Dinding Roster Beton 20 x 20 adk 1pc : 3ps
- Roster / Terawang
Bh
36.0000
14,800.00
- Semen Portland
Kg
12.8000
1,406.00
- Pasir Pasang
M3
0.0350
233,400.00
- Pekerja
Oh
0.3000
42,000.00
- Tukang Batu
Oh
0.1000
65,000.00
- Kepala Tukang
Oh
0.0100
75,000.00
- Mandor
Oh
0.0150
80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Dinding Roster Beton 20 x 20 adk 1pc : 4ps
- Roster / Terawang
Bh
36.0000
14,800.00
- Semen Portland
Kg
11.0000
1,406.00
- Pasir Pasang
M3
0.0350
233,400.00
- Pekerja
Oh
0.3000
42,000.00
- Tukang Batu
Oh
0.1000
65,000.00
- Kepala Tukang
Oh
0.0100
75,000.00
- Mandor
Oh
0.0150
80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Dinding Roster/terawng (12 x 11 x 24) cm
- Roster / Terawang
Bh
36.0000
14,800.00
- Semen Portland
Kg
12.8000
1,406.00
- Pasir Pasang
M3
0.0350
233,400.00
- Pekerja
Oh
0.3000
42,000.00
- Tukang Batu
Oh
0.1000
65,000.00
- Kepala Tukang
Oh
0.0100
75,000.00
- Mandor
Oh
0.0150
80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Dinding Batako Besar Pres uk. 8x20x30 adk. 1pc:4ps
- Batako
bh
13.0000
2,400.00
- PC
kg
12.0000
1,406.00
- Pasir Pasang
M3
0.0380
233,400.00
- Pekerja
Oh
0.3000
42,000.00
- Tukang Batu
Oh
0.1000
65,000.00

HARGA
(Rp)
54,250.00
13,610.08
10,503.00
13,440.00
6,500.00
750.00
1,200.00
100,253.08
100,253.00
532,800.00
17,996.80
8,169.00
12,600.00
6,500.00
750.00
1,200.00
580,015.80
580,016.00
532,800.00
15,466.00
8,169.00
12,600.00
6,500.00
750.00
1,200.00
577,485.00
577,485.00
532,800.00
17,996.80
8,169.00
12,600.00
6,500.00
750.00
1,200.00
580,015.80
580,016.00
31,200.00
16,872.00
8,869.20
12,600.00
6,500.00

No.

URAIAN
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
Oh
0.0100
75,000.00
Oh
0.0150
80,000.00

HARGA
(Rp)
750.00
1,200.00
77,991.20
77,991.00

No.
E-11

E-12

E-13

E-14

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Pasang Dinding hollowblock (HB-20)
- HB-20
Bh
12.5000
5,000.00
- PC (50 kg)
Kg
13.5000
1,406.00
- Pasir Pasang
m3
0.0480
233,400.00
- Besi angkur f 8 mm
Kg
1.9500
16,500.00
- Pekerja
Oh
0.3500
42,000.00
- Tukang Batu
Oh
0.1500
65,000.00
- Kepala Tukang
Oh
0.0150
75,000.00
- Mandor
Oh
0.0170
80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Dinding hollowblock (HB-15)
- HB-15
Bh
12.5000
4,000.00
- PC (50 kg)
Kg
10.4500
1,406.00
- Pasir Pasang
m3
0.0380
233,400.00
- Besi angkur f 8 mm
Kg
1.9500
16,500.00
- Pekerja
Oh
0.3200
42,000.00
- Tukang Batu
Oh
0.1200
65,000.00
- Kepala Tukang
Oh
0.0120
75,000.00
- Mandor
Oh
0.0150
80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Dinding hollowblock (HB-10)
- HB-10
Bh
12.5000
3,000.00
- PC (50 kg)
Kg
7.5000
1,406.00
- Pasir Pasang
m3
0.0270
233,400.00
- Besi angkur f 8 mm
Kg
1.9500
16,500.00
- Pekerja
Oh
0.3200
42,000.00
- Tukang Batu
Oh
0.1200
65,000.00
- Kepala Tukang
Oh
0.0120
75,000.00
- Mandor
Oh
0.0150
80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Dinding Conblock (CB-20)
- CB-20
Bh
12.5000
5,000.00
- PC (50 kg)
Kg
14.0500
1,406.00
- Pasir beton
M3
0.0040
255,400.00
- Pasir Pasang
M3
0.0420
233,400.00
- Besi angkur f 8 mm
Kg
3.8700
16,500.00
- Paku Biasa 2" - 5"
kg
0.0060
23,400.00
- Kayu terentang
M3
0.0010
2,850,000.00
- Kawat beton
kg
0.0300
27,700.00
- Koral beton
M3
0.0050
211,100.00
- Pekerja
Oh
0.3700
42,000.00
- Tukang Batu
Oh
0.1570
65,000.00
- Tukang Besi
Oh
0.0070
75,000.00

HARGA
(Rp)
62,500.00
18,981.00
11,203.20
32,175.00
14,700.00
9,750.00
1,125.00
1,360.00
151,794.20
151,794.00
50,000.00
14,692.70
8,869.20
32,175.00
13,440.00
7,800.00
900.00
1,200.00
129,076.90
129,077.00
37,500.00
10,545.00
6,301.80
32,175.00
13,440.00
7,800.00
900.00
1,200.00
109,861.80
109,862.00
62,500.00
19,754.30
1,021.60
9,802.80
63,855.00
140.40
2,850.00
831.00
1,055.50
15,540.00
10,205.00
525.00

No.

URAIAN
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
Oh
0.0164
75,000.00
Oh
0.0185
80,000.00

HARGA
(Rp)
1,230.00
1,480.00
190,790.60
190,791.00

No.
E-15

E-16

E-17

E-18

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Pasang Dinding Conblock (CB-15)
- CB-15
Bh
12.5000
4,000.00
- PC (50 kg)
Kg
10.4600
1,406.00
- Pasir beton
M3
0.0030
255,400.00
- Pasir Pasang
M3
0.0320
233,400.00
- Besi angkur f 8 mm
Kg
0.8700
16,500.00
- Paku Biasa 2" - 5"
kg
0.0040
23,400.00
- Kayu terentang
M3
0.0010
2,850,000.00
- Kawat beton
kg
0.0200
27,700.00
- Koral beton
M3
0.0040
211,100.00
- Pekerja
Oh
0.3400
42,000.00
- Tukang Batu
Oh
0.1300
65,000.00
- Tukang Besi
Oh
0.0070
75,000.00
- Kepala Tukang
Oh
0.0137
75,000.00
- Mandor
Oh
0.0170
80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Dinding Conblock (CB-10)
- CB-10
Bh
12.5000
3,000.00
- PC (50 kg)
Kg
10.4600
1,406.00
- Pasir beton
M3
0.0030
255,400.00
- Pasir Pasang
M3
0.0320
233,400.00
- Besi angkur f 8 mm
Kg
0.8700
16,500.00
- Paku Biasa 2" - 5"
kg
0.0040
23,400.00
- Kayu terentang
M3
0.0010
2,850,000.00
- Kawat beton
kg
0.0200
27,700.00
- Koral beton
M3
0.0040
211,100.00
- Pekerja
Oh
0.3400
42,000.00
- Tukang Batu
Oh
0.1300
65,000.00
- Tukang Besi
Oh
0.0070
75,000.00
- Kepala Tukang
Oh
0.0137
75,000.00
- Mandor
Oh
0.0170
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik Corak 10 x 20 cm Setara Mulia
- Keramik Corak 10 x 20 cm
m2
1.0000
56,000.00
- Semen abu-abu
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0180
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.1875
42,000.00
- Tukang batu
Oh
0.3750
65,000.00
- Kepala tukang
Oh
0.0450
75,000.00
- Mandor
Oh
0.0188
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik polos 10 x 20 cm Setara Mulia

HARGA
(Rp)
50,000.00
14,706.76
766.20
7,468.80
14,355.00
93.60
2,850.00
554.00
844.40
14,280.00
8,450.00
525.00
1,027.50
1,360.00
117,281.26
117,281.00
37,500.00
14,706.76
766.20
7,468.80
14,355.00
93.60
2,850.00
554.00
844.40
14,280.00
8,450.00
525.00
1,027.50
1,360.00
104,781.26
104,781.00
56,000.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
108,782.30
108,782.00

No.

URAIAN
-

Keramik 10 x 20 cm
Semen abu-abu
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
m2
1.0000
54,500.00
Kg
8.0000
1,406.00
M3
0.0180
233,400.00
Kg
0.0130
15,700.00
Oh
0.1875
42,000.00
Oh
0.3750
65,000.00
Oh
0.0450
75,000.00
Oh
0.0188
80,000.00

HARGA
(Rp)
54,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
107,282.30
107,282.00

No.
E-19

E-20

E-21

E-22

E-23

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Dinding Keramik corak 20 x 20 cm setara Mulia
- Keramik 20 x 20 cm
m2
1.0000
62,500.00
- Semen abu-abu
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0180
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.1875
42,000.00
- Tukang batu
Oh
0.3750
65,000.00
- Kepala tukang
Oh
0.0450
75,000.00
- Mandor
Oh
0.0188
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik polos 20 x 20 cm Setara Mulia
- Keramik 20 x 20 cm
m2
1.0000
54,500.00
- Semen abu-abu
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0180
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.1875
42,000.00
- Tukang batu
Oh
0.3750
65,000.00
- Kepala tukang
Oh
0.0450
75,000.00
- Mandor
Oh
0.0188
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik polos 20 x 25 cm Setara Mulia
- Keramik 20 x 25 cm
m2
1.0000
54,500.00
- Semen abu-abu
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0180
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.1875
42,000.00
- Tukang batu
Oh
0.3750
65,000.00
- Kepala tukang
Oh
0.0450
75,000.00
- Mandor
Oh
0.0188
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik Corak 20 x 25 cm Setara Mulia
- Keramik corak 20 x 25 cm
m2
1.0000
62,500.00
- Semen abu-abu
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0180
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.1875
42,000.00
- Tukang batu
Oh
0.3750
65,000.00
- Kepala tukang
Oh
0.0450
75,000.00
- Mandor
Oh
0.0188
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik Polos 30 x 30 cm Setara Mulia
- Keramik polos 30 x 30 cm
m2
1.0000
53,000.00

HARGA
(Rp)
62,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
115,282.30
115,282.00
54,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
107,282.30
107,282.00
54,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
107,282.30
107,282.00
62,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
115,282.30
115,282.00
53,000.00

No.

URAIAN
-

Semen abu-abu
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
Kg
8.0000
1,406.00
M3
0.0180
233,400.00
Kg
0.0130
15,700.00
Oh
0.1875
42,000.00
Oh
0.3750
65,000.00
Oh
0.0450
75,000.00
Oh
0.0188
80,000.00

HARGA
(Rp)
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
105,782.30
105,782.00

No.
E-24

E-25

E-26

E-27

E-28

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Dinding Keramik Corak 30 x 30 cm Setara Mulia
- Keramik corak 30 x 30 cm
m2
1.0000
58,000.00
- Semen abu-abu
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0180
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.1875
42,000.00
- Tukang batu
Oh
0.3750
65,000.00
- Kepala tukang
Oh
0.0450
75,000.00
- Mandor
Oh
0.0188
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik Polos 40 x 40 cm Setara Mulia
- Keramik polos 40 x 40 cm
m2
1.0000
56,800.00
- Semen abu-abu
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0180
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.1875
42,000.00
- Tukang batu
Oh
0.3750
65,000.00
- Kepala tukang
Oh
0.0450
75,000.00
- Mandor
Oh
0.0188
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik Corak 40 x 40 cm Setara Mulia
- Keramik corak 40 x 40 cm
m2
1.0000
65,500.00
- Semen abu-abu
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0180
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.1875
42,000.00
- Tukang batu
Oh
0.3750
65,000.00
- Kepala tukang
Oh
0.0450
75,000.00
- Mandor
Oh
0.0188
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik Corak 10 x 20 cm Setara Roman
- Keramik Corak 10 x 20 cm
m2
1.0000
72,200.00
- Semen abu-abu
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0180
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.1875
42,000.00
- Tukang batu
Oh
0.3750
65,000.00
- Kepala tukang
Oh
0.0450
75,000.00
- Mandor
Oh
0.0188
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik polos 10 x 20 cm Setara Roman
- Keramik 10 x 20 cm
m2
1.0000
64,400.00

HARGA
(Rp)
58,000.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
110,782.30
110,782.00
56,800.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
109,582.30
109,582.00
65,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
118,282.30
118,282.00
72,200.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
124,982.30
124,982.00
64,400.00

No.

URAIAN
-

Semen abu-abu
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
Kg
8.0000
1,406.00
M3
0.0180
233,400.00
Kg
0.0130
15,700.00
Oh
0.1875
42,000.00
Oh
0.3750
65,000.00
Oh
0.0450
75,000.00
Oh
0.0188
80,000.00

HARGA
(Rp)
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
117,182.30
117,182.00

No.
E-29

E-30

E-31

E-32

E-33

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Dinding Keramik corak 20 x 20 cm setara Roman
- Keramik 20 x 20 cm
m2
1.0000
75,200.00
- Semen abu-abu
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0180
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.1875
42,000.00
- Tukang batu
Oh
0.3750
65,000.00
- Kepala tukang
Oh
0.0450
75,000.00
- Mandor
Oh
0.0188
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik polos 20 x 20 cm Setara Roman
- Keramik 20 x 20 cm
m2
1.0000
64,400.00
- Semen abu-abu
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0180
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.1875
42,000.00
- Tukang batu
Oh
0.3750
65,000.00
- Kepala tukang
Oh
0.0450
75,000.00
- Mandor
Oh
0.0188
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik polos 20 x 25 cm Setara Roman
- Keramik 20 x 25 cm
m2
1.0000
72,900.00
- Semen abu-abu
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0180
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.1875
42,000.00
- Tukang batu
Oh
0.3750
65,000.00
- Kepala tukang
Oh
0.0450
75,000.00
- Mandor
Oh
0.0188
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik Corak 20 x 25 cm Setara Roman
- Keramik corak 20 x 25 cm
m2
1.0000
75,200.00
- Semen abu-abu
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0180
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.1875
42,000.00
- Tukang batu
Oh
0.3750
65,000.00
- Kepala tukang
Oh
0.0450
75,000.00
- Mandor
Oh
0.0188
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik Polos 30 x 30 cm Setara Roman
- Keramik polos 30 x 30 cm
m2
1.0000
68,900.00

HARGA
(Rp)
75,200.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
127,982.30
127,982.00
64,400.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
117,182.30
117,182.00
72,900.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
125,682.30
125,682.00
75,200.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
127,982.30
127,982.00
68,900.00

No.

URAIAN
-

Semen abu-abu
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
Kg
8.0000
1,406.00
M3
0.0180
233,400.00
Kg
0.0130
15,700.00
Oh
0.1875
42,000.00
Oh
0.3750
65,000.00
Oh
0.0450
75,000.00
Oh
0.0188
80,000.00

HARGA
(Rp)
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
121,682.30
121,682.00

No.
E-34

E-35

E-36

E-37

E-38

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Dinding Keramik Corak 30 x 30 cm Setara Roman
- Keramik corak 30 x 30 cm
m2
1.0000
76,600.00
- Semen abu-abu
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0180
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.1875
42,000.00
- Tukang batu
Oh
0.3750
65,000.00
- Kepala tukang
Oh
0.0450
75,000.00
- Mandor
Oh
0.0188
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik Polos 40 x 40 cm Setara Roman
- Keramik polos 40 x 40 cm
m2
1.0000
72,500.00
- Semen abu-abu
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0180
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.1875
42,000.00
- Tukang batu
Oh
0.3750
65,000.00
- Kepala tukang
Oh
0.0450
75,000.00
- Mandor
Oh
0.0188
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik Corak 40 x 40 cm Setara Roman
- Keramik corak 40 x 40 cm
m2
1.0000
77,000.00
- Semen abu-abu
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0180
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.1875
42,000.00
- Tukang batu
Oh
0.3750
65,000.00
- Kepala tukang
Oh
0.0450
75,000.00
- Mandor
Oh
0.0188
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Marmer
- Marmer
M2
1.0200
550,000.00
- Paku pancing 60 x 230
Bh
2.0000
900.00
- Semen abu-abu
Kg
12.4400
1,406.00
- Pasir pasang
M3
0.0250
233,400.00
- Semen warna
Kg
1.5000
15,700.00
- Pekerja
Oh
0.7200
42,000.00
- Tukang batu
Oh
0.6500
65,000.00
- Kepala tukang
Oh
0.0650
75,000.00
- Mandor
Oh
0.0350
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Batu Tempel Hitam

HARGA
(Rp)
76,600.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
129,382.30
129,382.00
72,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
125,282.30
125,282.00
77,000.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
129,782.30
129,782.00
561,000.00
1,800.00
17,490.64
5,835.00
23,550.00
30,240.00
42,250.00
4,875.00
2,800.00
689,840.64
689,841.00

No.

URAIAN
-

Batu tempel hitam


Semen abu-abu
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
M2
1.0500
96,600.00
Kg
11.7500
1,406.00
M3
0.0350
233,400.00
Oh
0.6200
42,000.00
Oh
0.3500
65,000.00
Oh
0.0350
75,000.00
Oh
0.0300
80,000.00

HARGA
(Rp)
101,430.00
16,520.50
8,169.00
26,040.00
22,750.00
2,625.00
2,400.00
179,934.50
179,935.00

No.
E-39

E-40

E-41

E-42

E-43

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Dinding Porselen (11 x 11) cm
- Porselen
M2
1.0000
63,300.00
- Semen abu-abu
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0180
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.1875
42,000.00
- Tukang batu
Oh
0.3750
65,000.00
- Kepala tukang
Oh
0.0450
75,000.00
- Mandor
Oh
0.0188
80,000.00
Jumlah
Dibulatkan
1 M2 Wall paper
- Wall paper
M2
1.0500
55,700.00
- Lem
Kg
0.2500
35,700.00
- Pekerja
Oh
0.3500
42,000.00
- Tukang batu
Oh
0.1750
65,000.00
- Kepala tukang
Oh
0.0170
75,000.00
- Mandor
Oh
0.0020
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper Medan
- Kayu Balok Kamper Medan
M3
0.0280
5,692,600.00
- Paku Biasa 2" - 5"
Kg
0.1500
23,800.00
- Lem Kayu
Ltr
0.5600
23,900.00
- Teakwood 120 x 240 x 0,4 cm
Lbr
0.8600
131,700.00
- Pekerja
Oh
0.1500
42,000.00
- Tukang Kayu
Oh
0.4500
65,000.00
- Kepala Tukang
Oh
0.0450
75,000.00
- Mandor
Oh
0.0080
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper Medan
- Kayu Balok Kamper Medan
M3
0.0280
5,692,600.00
- Paku Biasa 2" - 5"
Kg
0.1500
23,800.00
- Lem Kayu
Ltr
0.5600
23,900.00
- Plywood 120 x 240 x 9 mm
Lbr
0.8600
235,000.00
- Pekerja
Oh
0.2000
42,000.00
- Tukang Kayu
Oh
0.6000
65,000.00
- Kepala Tukang
Oh
0.0600
75,000.00
- Mandor
Oh
0.0100
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Pemisah Triplek 4 mm Rangkap, Rangka Kayu Kamper Medan
- Kayu Balok Kamper Medan
M3
0.0280
5,692,600.00
- Paku Biasa 2" - 5"
Kg
0.1500
23,800.00
- Lem Kayu
Ltr
0.5600
23,900.00

HARGA
(Rp)
63,300.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
116,082.30
116,082.00
58,485.00
8,925.00
14,700.00
11,375.00
1,275.00
160.00
94,920.00
94,920.00
159,392.80
3,570.00
13,384.00
113,262.00
6,300.00
29,250.00
3,375.00
640.00
329,173.80
329,174.00
159,392.80
3,570.00
13,384.00
202,100.00
8,400.00
39,000.00
4,500.00
800.00
431,146.80
431,147.00
159,392.80
3,570.00
13,384.00

No.

URAIAN
-

Triplek (120x240x0,4) cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
Lbr
0.8600
64,400.00
Oh
0.2000
42,000.00
Oh
0.6000
65,000.00
Oh
0.0600
75,000.00
Oh
0.0100
80,000.00

HARGA
(Rp)
55,384.00
8,400.00
39,000.00
4,500.00
800.00
284,430.80
284,431.00

No.
E-44

E-44

E-45

E-46

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Dinding Pemisah GRC t = 4 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
0.4150
29,200.00
- Hollow 2/4 Zincromate
Btg
0.1500
22,600.00
- GRC ( 120 x 240 x 4 ) mm
Lbr
0.3640
67,500.00
- Paku GRC
kg
0.1100
35,000.00
- Ramset / dina bolt
Bh
4.0000
7,200.00
- Cotton plaster
Bh
0.0720
23,900.00
- Compoun
Zak
0.1250
75,000.00
- Pekerja
Oh
0.1000
42,000.00
- Tukang kayu
Oh
0.0500
65,000.00
- Kepala tukang
Oh
0.0050
75,000.00
- Mandor
Oh
0.0050
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Pemisah Gypsum t = 4 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
0.4150
29,200.00
- Hollow 2/4 Zincromate
Btg
0.1500
22,600.00
- Gypsum
Lbr
0.3640
79,800.00
- Paku GRC
kg
0.1100
35,000.00
- Ramset / dina bolt
Bh
4.0000
7,200.00
- Cotton plaster
Bh
0.0720
23,900.00
- Compoun
Zak
0.1250
75,000.00
- Pekerja
Oh
0.1000
42,000.00
- Tukang kayu
Oh
0.0500
65,000.00
- Kepala tukang
Oh
0.0050
75,000.00
- Mandor
Oh
0.0050
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Pemisah Plywood t = 4 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
0.4150
29,200.00
- Hollow 2/4 Zincromate
Btg
0.1500
22,600.00
- Plywood 120 x 240, 9 mm
Lbr
0.3640
235,000.00
- Paku
kg
0.1100
23,800.00
- Ramset / dina bolt
Bh
4.0000
7,200.00
- Pekerja
Oh
0.1000
42,000.00
- Tukang kayu
Oh
0.0500
65,000.00
- Kepala tukang
Oh
0.0050
75,000.00
- Mandor
Oh
0.0050
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding Pemisah teakwood t = 4 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
0.4150
29,200.00
- Hollow 2/4 Zincromate
Btg
0.1500
22,600.00
- Teakwood ( 120 x 240 x 4 ) mm
Lbr
0.3640
131,700.00
- Paku
kg
0.1100
23,800.00
- Ramset / dina bolt
Bh
4.0000
7,200.00

HARGA
(Rp)
12,118.00
3,390.00
24,570.00
3,850.00
28,800.00
1,720.80
9,375.00
4,200.00
3,250.00
375.00
400.00
92,048.80
92,049.00
12,118.00
3,390.00
29,047.20
3,850.00
28,800.00
1,720.80
9,375.00
4,200.00
3,250.00
375.00
400.00
96,526.00
96,526.00
12,118.00
3,390.00
85,540.00
2,618.00
28,800.00
4,200.00
3,250.00
375.00
400.00
140,691.00
140,691.00
12,118.00
3,390.00
47,938.80
2,618.00
28,800.00

No.

URAIAN
-

Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
Oh
0.1000
42,000.00
Oh
0.0500
65,000.00
Oh
0.0050
75,000.00
Oh
0.0050
80,000.00

HARGA
(Rp)
4,200.00
3,250.00
375.00
400.00
103,089.80
103,090.00

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
E-47 1 M2 Pasang Dinding Glass Block 20 x 20 adk 1pc : 4ps
- Glass block 20 x 20
Bh
36.0000
22,000.00
- Semen Portland
Kg
11.0000
1,406.00
- Pasir Pasang
M3
0.0350
233,400.00
- Pekerja
Oh
0.3000
42,000.00
- Tukang Batu
Oh
0.1000
65,000.00
- Kepala Tukang
Oh
0.0100
75,000.00
- Mandor
Oh
0.0150
80,000.00
Jumlah
Dibulatkan
E-48 1 M2 Pasang Dinding anyaman bambu, rangka kayu
- Bilik bambu
M2
1.5000
22,700.00
- Kayu kaso 5/7
M3
0.0140
3,356,800.00
- Paku
Kg
0.0112
23,800.00
- List kayu 2/4
m3
0.0030
5,280,000.00
- Pekerja
Oh
0.1000
42,000.00
- Tukang Batu
Oh
0.0500
65,000.00
- Kepala Tukang
Oh
0.0050
75,000.00
- Mandor
Oh
0.0020
80,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
792,000.00
15,466.00
8,169.00
12,600.00
6,500.00
750.00
1,200.00
836,685.00
836,685.00
34,050.00
46,995.20
266.56
15,840.00
4,200.00
3,250.00
375.00
160.00
105,136.76
105,137.00

F. ANALISA HARGA SATUAN PEKERJAAN PLESTERAN


No.
F-01

F-02

F-03

F-04

F-05

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Plesteran adk. 1pc : 2ps Tebal 15 mm
- Semen Portland
Kg
8.5200
1,406.00
- Pasir Pasang
M3
0.0170
233,400.00
- Pekerja
Oh
0.2000
42,000.00
- Tukang Batu
Oh
0.1500
65,000.00
- Kepala Tukang
Oh
0.0150
75,000.00
- Mandor
Oh
0.0100
80,000.00
Jumlah
Dibulatkan
1 M2 Plesteran adk. 1pc : 3ps Tebal 15 mm
- Semen Portland
Kg
6.4800
1,406.00
- Pasir Pasang
M3
0.0190
233,400.00
- Pekerja
Oh
0.2000
42,000.00
- Tukang Batu
Oh
0.1500
65,000.00
- Kepala Tukang
Oh
0.0150
75,000.00
- Mandor
Oh
0.0100
80,000.00
Jumlah
Dibulatkan
1 M2 Plesteran adk. 1pc : 4ps Tebal 15 mm
- Semen Portland
Kg
5.2000
1,406.00
- Pasir Pasang
M3
0.0200
233,400.00
- Pekerja
Oh
0.2000
42,000.00
- Tukang Batu
Oh
0.1500
65,000.00
- Kepala Tukang
Oh
0.0150
75,000.00
- Mandor
Oh
0.0100
80,000.00
Jumlah
Dibulatkan
1 M2 Plesteran adk. 1pc : 3ps Tebal 20 mm
- Semen Portland
Kg
10.8000
1,406.00
- Pasir Pasang
M3
0.0260
233,400.00
- Pekerja
Oh
0.2500
42,000.00
- Tukang Batu
Oh
0.2000
65,000.00
- Kepala Tukang
Oh
0.0200
75,000.00
- Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Plesteran adk. 1pc : 4ps Tebal 20 mm
- Semen Portland
Kg
8.6800
1,406.00
- Pasir Pasang
M3
0.0280
233,400.00
- Pekerja
Oh
0.2500
42,000.00
- Tukang Batu
Oh
0.2000
65,000.00
- Kepala Tukang
Oh
0.0200
75,000.00
- Mandor
Oh
0.0125
80,000.00
Jumlah

HARGA
(Rp)
11,979.12
3,967.80
8,400.00
9,750.00
1,125.00
800.00
36,021.92
36,022.00
9,110.88
4,434.60
8,400.00
9,750.00
1,125.00
800.00
33,620.48
33,620.00
7,311.20
4,668.00
8,400.00
9,750.00
1,125.00
800.00
32,054.20
32,054.00
15,184.80
6,068.40
10,500.00
13,000.00
1,500.00
1,000.00
47,253.20
47,253.00
12,204.08
6,535.20
10,500.00
13,000.00
1,500.00
1,000.00
44,739.28

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)

Dibulatkan
F-06 1 M2 Plesteran adk. 1pc:5ps tebal 20 mm
- Semen Portland
Kg
7.2900
- Pasir Pasang
M3
0.0260
- Pekerja
Oh
0.2500
- Tukang Batu
Oh
0.2000
- Kepala Tukang
Oh
0.0200
- Mandor
Oh
0.0125
Jumlah
Dibulatkan
1 M2 Plesteran adk. 1pc:5ps tebal 15 mm + Acian
- Semen Portland
Kg
4.3200

HARGA
(Rp)
44,739.00

1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00

10,249.74
6,068.40
10,500.00
13,000.00
1,500.00
1,000.00
42,318.14
42,318.00

1,406.00

6,073.92

- Pasir Pasang

M3

0.0220

233,400.00

5,134.80

- Pekerja

Oh

0.2000

42,000.00

8,400.00

- Tukang Batu

Oh

0.1500

65,000.00

9,750.00

- Kepala Tukang

Oh

0.0150

75,000.00

1,125.00

- Mandor

Oh

0.0100

80,000.00

800.00

Jumlah
Dibulatkan

31,283.72
31,284.00

No.
F-07

F-08

F-09

F-10

F-11

F-12

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Berapen adk. 1pc : 5ps Tebal 15 mm
- Semen Portland
Kg
5.6700
1,406.00
- Pasir Pasang
M3
0.0230
233,400.00
- Pekerja
Oh
0.1500
42,000.00
- Tukang Batu
Oh
0.0700
65,000.00
- Kepala Tukang
Oh
0.0070
75,000.00
- Mandor
Oh
0.0080
80,000.00
Jumlah
Dibulatkan
1 M2 Plesteran Beton adk. 1pc : 2ps Tebal 15 mm
- Semen Portland
Kg
9.3000
1,406.00
- Pasir Pasang
M3
0.0180
233,400.00
- Pekerja
Oh
0.2600
42,000.00
- Tukang Batu
Oh
0.2000
65,000.00
- Kepala Tukang
Oh
0.0200
75,000.00
- Mandor
Oh
0.0130
80,000.00
Jumlah
Dibulatkan
1 M2 Plesteran Beton adk. 1pc : 3ps Tebal 15 mm
- Semen Portland
Kg
7.0700
1,406.00
- Pasir Pasang
M3
0.0210
233,400.00
- Pekerja
Oh
0.2600
42,000.00
- Tukang Batu
Oh
0.2000
65,000.00
- Kepala Tukang
Oh
0.0200
75,000.00
- Mandor
Oh
0.0130
80,000.00
Jumlah
Dibulatkan
1 M2 Plesteran Skoning adk. 1pc : 2ps, tebal 10mm
- Semen Portland
Kg
0.5000
1,406.00
- Pasir Pasang
M3
0.0130
233,400.00
- Pekerja
Oh
0.0800
42,000.00
- Tukang Batu
Oh
0.4000
65,000.00
- Kepala Tukang
Oh
0.0400
75,000.00
- Mandor
Oh
0.0040
80,000.00
Jumlah
Dibulatkan
1 M2 Acian Plesteran
- Semen Portland
Kg
4.0000
1,406.00
- Pekerja
Oh
0.1430
42,000.00
- Tukang batu
Oh
0.1070
65,000.00
- Kepala Tukang
Oh
0.0105
75,000.00
- Mandor
Oh
0.0105
80,000.00
Jumlah
Dibulatkan
1 M2 Plesteran Siar adk. 1pc : 2ps batu belah
- Semen Portland
Kg
6.3400
1,406.00

HARGA
(Rp)
7,972.02
5,368.20
6,300.00
4,550.00
525.00
640.00
25,355.22
25,355.00
13,075.80
4,201.20
10,920.00
13,000.00
1,500.00
1,040.00
43,737.00
43,737.00
9,940.42
4,901.40
10,920.00
13,000.00
1,500.00
1,040.00
41,301.82
41,302.00
703.00
3,034.20
3,360.00
26,000.00
3,000.00
320.00
36,417.20
36,417.00
5,624.00
6,006.00
6,955.00
787.50
840.00
20,212.50
20,213.00
8,914.04

No.

URAIAN
-

Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
M3
0.0120
233,400.00
Oh
0.3000
42,000.00
Oh
0.1500
65,000.00
Oh
0.0150
75,000.00
Oh
0.0150
80,000.00

HARGA
(Rp)
2,800.80
12,600.00
9,750.00
1,125.00
1,200.00
36,389.84
36,390.00

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
F-13 1 M2 Plesteran Siar adk. 1pc : 2ps dinding bata merah
- Semen Portland
Kg
4.3200
1,406.00
- Semen Portland
M3
0.0160
233,400.00
- Pekerja
Oh
0.1500
42,000.00
- Tukang Batu
Oh
0.0700
65,000.00
- Kepala Tukang
Oh
0.0070
75,000.00
- Mandor
Oh
0.0080
80,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
6,073.92
3,734.40
6,300.00
4,550.00
525.00
640.00
21,823.32
21,823.00

G. ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAP


No.

URAIAN

SATUAN VOLUMEHARGA SATUAN


(Rp)

G-01 1 M2 Pasang Atap Genteng Palentong


- Genteng palentong
Bh
25.0000
- Pekerja
Oh
0.1500
- Tukang kayu
Oh
0.0750
- Kepala tukang
Oh
0.0080
- Mandor
Oh
0.0080
Jumlah
Dibulatkan
G-02 1 M2 Pasang Genteng Bubung Palentong
- Genteng bubung palentong
Bh
5.0000
- Semen Portland
Kg
8.0000
- Pasir pasang
M3
0.0320
- Pekerja
Oh
0.4000
- Tukang kayu
Oh
0.2000
- Kepala tukang
Oh
0.0200
- Mandor
Oh
0.0020
Jumlah
Dibulatkan
G-03 1 M2 Pasang Roof Light Fibreglass ( 180 x 90 ) cm
- Roof light fibreglass
Lbr
0.6000
- Paku biasa " - 1"
Kg
0.0500
- Pekerja
Oh
0.1400
- Tukang kayu
Oh
0.0670
- Kepala tukang
Oh
0.0070
- Mandor
Oh
0.0070
Jumlah
Dibulatkan
G-04 1 M2 Pasang Atap Asbes Gelombang ( 3,00 x 1,05 m ) x 4 mm
- Asbes gelombang
Lbr
0.3500
- Paku seng
Kg
0.1200
- Pekerja
Oh
0.1400
- Tukang kayu
Oh
0.0700
- Kepala tukang
Oh
0.0070
- Mandor
Oh
0.0070
Jumlah
Dibulatkan
G-05 1 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m ) x 4 mm
- Asbes gelombang
Lbr
0.4200
- Paku seng
Kg
0.1200
- Pekerja
Oh
0.1400
- Tukang kayu
Oh
0.0700
- Kepala tukang
Oh
0.0070
- Mandor
Oh
0.0070
Jumlah
Dibulatkan

HARGA
(Rp)

1,900.00
42,000.00
65,000.00
75,000.00
80,000.00

47,500.00
6,300.00
4,875.00
600.00
640.00
59,915.00
59,915.00

6,000.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00

30,000.00
11,248.00
7,468.80
16,800.00
13,000.00
1,500.00
160.00
80,176.80
80,177.00

100,000.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

60,000.00
1,190.00
5,880.00
4,355.00
525.00
560.00
72,510.00
72,510.00

80,000.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

28,000.00
2,856.00
5,880.00
4,550.00
525.00
560.00
42,371.00
42,371.00

73,300.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

30,786.00
2,856.00
5,880.00
4,550.00
525.00
560.00
45,157.00
45,157.00

No.

URAIAN

SATUAN VOLUMEHARGA SATUAN


(Rp)
G-06 1 M2 Pasang Atap Asbes Gelombang ( 2,40 x 1,05 m ) x 4 mm
- Asbes gelombang
Lbr
0.4400
65,900.00
- Paku seng
Kg
0.1200
23,800.00
- Pekerja
Oh
0.1400
42,000.00
- Tukang kayu
Oh
0.0670
65,000.00
- Kepala tukang
Oh
0.0070
75,000.00
- Mandor
Oh
0.0070
80,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
28,996.00
2,856.00
5,880.00
4,355.00
525.00
560.00
43,172.00
43,172.00

No.
G-07

G-08

G-09

G-10

G-11

G-12

URAIAN

SATUAN VOLUMEHARGA SATUAN


(Rp)
1 M2 Pasang Atap Asbes Gelombang ( 2,10 x 1,05 m ) x 4 mm
- Asbes gelombang
Lbr
0.5100
58,500.00
- Paku seng
Kg
0.1200
23,800.00
- Pekerja
Oh
0.1400
42,000.00
- Tukang kayu
Oh
0.0670
65,000.00
- Kepala tukang
Oh
0.0070
75,000.00
- Mandor
Oh
0.0070
80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Atap Asbes Gelombang ( 1,50 x 1,05 m ) x 4 mm
- Asbes gelombang
Lbr
0.8000
42,300.00
- Paku seng
Kg
0.1200
23,800.00
- Pekerja
Oh
0.1400
42,000.00
- Tukang kayu
Oh
0.0670
65,000.00
- Kepala tukang
Oh
0.0070
75,000.00
- Mandor
Oh
0.0070
80,000.00
Jumlah
Dibulatkan
1 M Pasang Nok Stel Gelombang 1,05 m
- Nok stel gelombang
Lbr
2.1000
38,100.00
- Paku sekrup 3,5"
Bh
6.0000
800.00
- Pekerja
Oh
0.0840
42,000.00
- Tukang kayu
Oh
0.1250
65,000.00
- Kepala tukang
Oh
0.0130
75,000.00
- Mandor
Oh
0.0040
80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Atap Genteng Beton
- Genteng beton
bh
11.0000
8,500.00
- Paku biasa 2" - 5"
Kg
0.0300
23,400.00
- Pekerja
Oh
0.2000
42,000.00
- Tukang kayu
Oh
0.1000
65,000.00
- Kepala tukang
Oh
0.0100
75,000.00
- Mandor
Oh
0.0100
80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Atap Genteng Murando Natural
- Genteng murando natural
bh
18.0000
2,700.00
- Pekerja
Oh
0.1500
42,000.00
- Tukang kayu
Oh
0.0750
65,000.00
- Kepala tukang
Oh
0.0080
75,000.00
- Mandor
Oh
0.0080
80,000.00
Jumlah
Dibulatkan
1 M2 Pasang Atap Genteng Murando Glazur
- Genteng murando glazur
bh
18.0000
4,000.00
- Pekerja
Oh
0.1500
42,000.00

HARGA
(Rp)
29,835.00
2,856.00
5,880.00
4,355.00
525.00
560.00
44,011.00
44,011.00
33,840.00
2,856.00
5,880.00
4,355.00
525.00
560.00
48,016.00
48,016.00
80,010.00
4,800.00
3,528.00
8,125.00
975.00
320.00
97,758.00
97,758.00
93,500.00
702.00
8,400.00
6,500.00
750.00
800.00
110,652.00
110,652.00
48,600.00
6,300.00
4,875.00
600.00
640.00
61,015.00
61,015.00
72,000.00
6,300.00

No.

URAIAN
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUMEHARGA SATUAN


(Rp)
Oh
0.0750
65,000.00
Oh
0.0080
75,000.00
Oh
0.0080
80,000.00

HARGA
(Rp)
4,875.00
600.00
640.00
84,415.00
84,415.00

No.

URAIAN

G-13 1 M2 Pasang Atap Genteng Metal


- Genteng metal
- Paku biasa 2" - 5"
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
G-14 1 M Pasang Nok Genteng Beton
- Nok genteng beton
- Paku biasa 2" - 5"
- Semen abu-abu
- Pasir pasang
- Semen warna
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
G-15 1 M Pasang Nok Genteng Metal
- Nok genteng metal
- Paku biasa " - 1"
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
G-16 1 M2 Pasang Atap Seng Gelombang
- Seng gelombang 180x80, 5mm
- Paku biasa " - 1"
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
G-17 1 M2 Pasang Atap Nok Seng
- Seng plat 3" x 6" BJLS 30
- Paku biasa " - 1"
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah

SATUAN VOLUMEHARGA SATUAN


(Rp)

HARGA
(Rp)

m2
Kg
Oh
Oh
Oh
Oh

1.0200
0.2000
0.2000
0.1000
0.0100
0.0010

203,100.00
23,400.00
42,000.00
65,000.00
75,000.00
80,000.00

207,162.00
4,680.00
8,400.00
6,500.00
750.00
80.00
227,572.00
227,572.00

Bh
Kg
Kg
M3
Kg
Oh
Oh
Oh
Oh

3.5000
0.0500
10.8000
0.0320
1.0000
0.4000
0.2000
0.0200
0.0200

10,500.00
23,400.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00

36,750.00
1,170.00
15,184.80
7,468.80
15,700.00
16,800.00
13,000.00
1,500.00
1,600.00
109,173.60
109,174.00

Lbr
Kg
Oh
Oh
Oh
Oh

1.1000
0.0500
0.2500
0.1500
0.0150
0.0130

138,500.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

152,350.00
1,190.00
10,500.00
9,750.00
1,125.00
1,040.00
175,955.00
175,955.00

Lbr
Kg
Oh
Oh
Oh
Oh

0.7000
0.0200
0.1200
0.0600
0.0060
0.0060

83,100.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

58,170.00
476.00
5,040.00
3,900.00
450.00
480.00
68,516.00
68,516.00

Lbr
Kg
Oh
Oh
Oh
Oh

0.3000
0.0400
0.1500
0.0700
0.0080
0.0060

37,500.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00

11,250.00
952.00
6,300.00
4,550.00
600.00
480.00
24,132.00

No.

URAIAN

SATUAN VOLUMEHARGA SATUAN


(Rp)

Dibulatkan
G-18 1 M2 Pasang Alluminium Foil / Sisalation
- Sisalation / alluminium foil
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan

M2
Oh
Oh
Oh
Oh

1.0500
0.1500
0.0500
0.0050
0.0080

19,600.00
42,000.00
65,000.00
75,000.00
80,000.00

HARGA
(Rp)
24,132.00
20,580.00
6,300.00
3,250.00
375.00
640.00
31,145.00
31,145.00

No.

URAIAN

SATUAN VOLUMEHARGA SATUAN


(Rp)

G-19 1 M2 Pasang Atap Alluminium Natural


- Atap Alumunium Natural USR 26
Lbr
- Paku hak panjang 15 cm
Kg
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
G-20 1 M2 Pasang Atap Alluminium warna
- Atap Alumunium Warna USR 26
Lbr
- Paku hak panjang 15 cm
Kg
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
G-21 1 M2 Pasang Nok Alluminium
- Nok standar
M2
- Paku hak panjang 15 cm
Kg
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
G-22 1 M' Pasang Lisplank GRC ukuran 30 cm
- GRC
M2
- Paku GRC
kg
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan

HARGA
(Rp)

1.0500
0.0200
0.1500
0.7500
0.0080
0.0060

140,600.00
20,000.00
42,000.00
65,000.00
75,000.00
80,000.00

147,630.00
400.00
6,300.00
48,750.00
600.00
480.00
204,160.00
204,160.00

1.0500
0.0200
0.1500
0.7500
0.0080
0.0060

164,700.00
20,000.00
42,000.00
65,000.00
75,000.00
80,000.00

172,935.00
400.00
6,300.00
48,750.00
600.00
480.00
229,465.00
229,465.00

1.2000
0.0400
0.1000
1.0000
0.0100
0.0100

75,000.00
20,000.00
42,000.00
65,000.00
75,000.00
80,000.00

90,000.00
800.00
4,200.00
65,000.00
750.00
800.00
161,550.00
161,550.00

0.3300
0.0500
0.1000
0.2000
0.0200
0.0050

67,500.00
35,000.00
42,000.00
65,000.00
75,000.00
80,000.00

22,275.00
1,750.00
4,200.00
13,000.00
1,500.00
400.00
43,125.00
43,125.00

H. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANGIT-LANGIT


No.
H-01

H-02

H-03

H-04

H-05

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 5 mm
- Pelat asbes tebal 4 mm
m2
1.1000
22,500.00
- Paku seng
Kg
0.0100
23,800.00
- Pekerja
Oh
0.0300
42,000.00
- Tukang kayu
Oh
0.0700
65,000.00
- Kepala tukang
Oh
0.0070
75,000.00
- Mandor
Oh
0.0015
80,000.00
Jumlah
Dibulatkan
1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 3,5 mm
- Pelat asbes tebal 3,5 mm
Lbr
1.1000
19,500.00
- Paku seng
Kg
0.0100
23,800.00
- Pekerja
Oh
0.0300
42,000.00
- Tukang kayu
Oh
0.0700
65,000.00
- Kepala tukang
Oh
0.0070
75,000.00
- Mandor
Oh
0.0015
80,000.00
Jumlah
Dibulatkan
1 M2 Langit-langit Akustik ( 60 x 120 ) cm
- Akustik 600 x 1200
Lbr
1.5000
132,800.00
- Paku
Kg
0.0500
23,800.00
- Pekerja
Oh
0.0600
42,000.00
- Tukang kayu
Oh
0.1000
65,000.00
- Kepala tukang
Oh
0.0100
75,000.00
- Mandor
Oh
0.0030
80,000.00
Jumlah
Dibulatkan
1 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka Alluminium
- Profil Alluminium "T"
M
3.6000
12,200.00
- Kawat f 4 mm
Kg
0.1500
28,200.00
- Ramset / dina bolt
Bh
1.0500
7,200.00
- Akustik 600 x 1200
Lbr
1.5000
132,800.00
- Pekerja
Oh
0.1500
42,000.00
- Tukang kayu
Oh
0.5000
65,000.00
- Kepala tukang
Oh
0.0500
75,000.00
- Mandor
Oh
0.0075
80,000.00
Jumlah
Dibulatkan
1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka kayu borneo super
- Kayu Balok Borneo Super
M3
0.0230
2,640,000.00
- Paku biasa 2" - 5"
Kg
0.0600
23,400.00

HARGA
(Rp)
24,750.00
238.00
1,260.00
4,550.00
525.00
120.00
31,443.00
31,443.00
21,450.00
238.00
1,260.00
4,550.00
525.00
120.00
28,143.00
28,143.00
199,200.00
1,190.00
2,520.00
6,500.00
750.00
240.00
210,400.00
210,400.00
43,920.00
4,230.00
7,560.00
199,200.00
6,300.00
32,500.00
3,750.00
600.00
298,060.00
298,060.00
60,720.00
1,404.00

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
- Teakwood 120 cm x 240 cm x 0,4 cm
Lbr
0.3900
131,700.00
- Pekerja
Oh
0.2700
42,000.00
- Tukang kayu
Oh
0.4000
65,000.00
- Kepala tukang
Oh
0.0400
75,000.00
- Mandor
Oh
0.0135
80,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
51,363.00
11,340.00
26,000.00
3,000.00
1,080.00
154,907.00
154,907.00

No.
H-06

H-07

H-08

H-09

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Langit-langit Teakwood 3 mm + Rangka Kayu Borneo Super
- Kayu Balok Borneo Super
M3
0.0230
2,640,000.00
- Paku biasa 2" - 5"
Kg
0.0600
23,400.00
- Teakwood (120 x 240x 0,3) cm
Lbr
0.3900
129,100.00
- Pekerja
Oh
0.2700
42,000.00
- Tukang kayu
Oh
0.4000
65,000.00
- Kepala tukang
Oh
0.0400
75,000.00
- Mandor
Oh
0.0135
80,000.00
Jumlah
Dibulatkan
1 M2 Langit-langit Triplek 4 mm + Rangka Kayu Borneo Super
- Kayu Balok Borneo Super
M3
0.0230
2,640,000.00
- Paku biasa 2" - 5"
Kg
0.0600
23,800.00
- Triplek 120 cm x 240 cm x 0,4 cm
Lbr
0.3900
64,400.00
- Pekerja
Oh
0.2700
42,000.00
- Tukang kayu
Oh
0.4000
65,000.00
- Kepala tukang
Oh
0.0400
75,000.00
- Mandor
Oh
0.0135
80,000.00
Jumlah
Dibulatkan
1 M2 Langit-langit Gypsum Board, tebal 9 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
0.4150
29,200.00
- Hollow 2/4 Zincromate
Btg
0.1500
22,600.00
- Gypsum board ( 120 x 240 x 9 ) mm
Lbr
0.3640
79,800.00
- Paku gypsum
kg
0.1100
17,500.00
- Ramset / dina bolt
Bh
4.0000
7,200.00
- Cotton plaster
Bh
0.0720
15,000.00
- Compoun
Zak
0.1250
75,000.00
- Pekerja
Oh
0.1000
42,000.00
- Tukang kayu
Oh
0.0500
65,000.00
- Kepala tukang
Oh
0.0050
75,000.00
- Mandor
Oh
0.0050
80,000.00
Jumlah
Dibulatkan
1 M2 Langit-langit GRC t = 4 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
0.4150
29,200.00
- Hollow 2/4 Zincromate
Btg
0.1500
22,600.00
- GRC ( 120 x 240 x 4 ) mm
Lbr
0.3640
67,500.00
- Paku GRC
kg
0.1100
35,000.00
- Ramset / dina bolt
Bh
4.0000
7,200.00
- Cotton plaster
Bh
0.0720
15,000.00
- Compoun
Zak
0.1250
75,000.00
- Pekerja
Oh
0.1000
42,000.00

HARGA
(Rp)
60,720.00
1,404.00
50,349.00
11,340.00
26,000.00
3,000.00
1,080.00
153,893.00
153,893.00
60,720.00
1,428.00
25,116.00
11,340.00
26,000.00
3,000.00
1,080.00
128,684.00
128,684.00
12,118.00
3,390.00
29,047.20
1,925.00
28,800.00
1,080.00
9,375.00
4,200.00
3,250.00
375.00
400.00
93,960.20
93,960.00
12,118.00
3,390.00
24,570.00
3,850.00
28,800.00
1,080.00
9,375.00
4,200.00

No.

URAIAN
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
Oh
0.0500
65,000.00
Oh
0.0050
75,000.00
Oh
0.0050
80,000.00

HARGA
(Rp)
3,250.00
375.00
400.00
91,408.00
91,408.00

No.
H-10

H-11

H-12

H-13

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Langit-langit gypsum t = 9 mm + Rangka Kayu Borneo Super
- Kayu Balok Borneo Super
M3
0.0230
2,640,000.00
- Paku biasa 2" - 5"
Kg
0.0600
23,800.00
- Gypsum board ( 120 x 240 x 9 ) mm
Lbr
0.3900
79,800.00
- Paku sekrup
kg
0.1100
17,500.00
- Pekerja
Oh
0.2700
42,000.00
- Tukang kayu
Oh
0.4000
65,000.00
- Kepala tukang
Oh
0.0400
75,000.00
- Mandor
Oh
0.0135
80,000.00
Jumlah
Dibulatkan
1 M2 Langit-langit GRC t = 4 mm + Rangka Kayu Borneo Super
- Kayu Balok Borneo Super
M3
0.0230
2,640,000.00
- Paku biasa 2" - 5"
Kg
0.0600
23,800.00
- GRC ( 120 x 240 x 4 ) mm
Lbr
0.3900
67,500.00
- Paku GRC
kg
0.1100
35,000.00
- Pekerja
Oh
0.2700
42,000.00
- Tukang kayu
Oh
0.4000
65,000.00
- Kepala tukang
Oh
0.0400
75,000.00
- Mandor
Oh
0.0135
80,000.00
Jumlah
Dibulatkan
1 M List Langit-langit Kayu Profil 10 cm
- List Kayu profil
M
1.0500
29,400.00
- Paku
Kg
0.0100
23,800.00
- Pekerja
Oh
0.0500
42,000.00
- Tukang kayu
Oh
0.0500
65,000.00
- Kepala tukang
Oh
0.0050
75,000.00
- Mandor
Oh
0.0030
80,000.00
Jumlah
Dibulatkan
1 M List Langit-langit Gypsum 10 cm
- List gypsum
M
1.0500
8,500.00
- Tepung gypsum
Kg
0.1500
12,500.00
- Pekerja
Oh
0.0500
42,000.00
- Tukang kayu
Oh
0.0500
65,000.00
- Kepala tukang
Oh
0.0050
75,000.00
- Mandor
Oh
0.0030
80,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
60,720.00
1,428.00
31,122.00
1,925.00
11,340.00
26,000.00
3,000.00
1,080.00
136,615.00
136,615.00
60,720.00
1,428.00
26,325.00
3,850.00
11,340.00
26,000.00
3,000.00
1,080.00
133,743.00
133,743.00
30,870.00
238.00
2,100.00
3,250.00
375.00
240.00
37,073.00
37,073.00
8,925.00
1,875.00
2,100.00
3,250.00
375.00
240.00
16,765.00
16,765.00

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)

HARGA
(Rp)

I. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN


DINDING
No.
I-01

I-02

I-03

I-04

URAIAN

SATUAN VOLUMEHARGA SATUAN


(Rp)
1 M2 Lantai Ubin Granito ukuran 40 x 40 cm Setara Essenza
- Granito 40 x 40 cm
m2
1.0500
345,000.00
- Semen portland
Kg
9.8000
1,406.00
- Pasir pasang
M3
0.0215
233,400.00
- Semen warna
Kg
1.3000
15,700.00
- Pekerja
Oh
0.2500
42,000.00
- Tukang batu
Oh
0.1200
65,000.00
- Kepala tukang
Oh
0.0120
75,000.00
- Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Ubin Granito ukuran 30 x 30 cm Setara Essenza
- Granito 30 x 30 cm
m2
1.0500
322,800.00
- Semen portland
Kg
10.0000
1,406.00
- Pasir pasang
M3
0.0215
233,400.00
- Semen warna
Kg
1.5000
15,700.00
- Pekerja
Oh
0.2600
42,000.00
- Tukang batu
Oh
0.1250
65,000.00
- Kepala tukang
Oh
0.0125
75,000.00
- Mandor
Oh
0.0130
80,000.00
Jumlah
Dibulatkan
1 M Plint Ubin Granito ukuran 10 x 40 cm Setara Essenza
- Plint granito 10 x 40 cm
Bh
2.6500
27,600.00
- Semen portland
Kg
1.2000
1,406.00
- Pasir pasang
M3
0.0030
233,400.00
- Semen warna
Kg
0.1000
15,700.00
- Pekerja
Oh
0.0600
42,000.00
- Tukang batu
Oh
0.0300
65,000.00
- Kepala tukang
Oh
0.0030
75,000.00
- Mandor
Oh
0.0030
80,000.00
Jumlah
Dibulatkan
1 M Plint Ubin Granito ukuran 10 x 30 cm Setara Essenza
- Plint granito 10 x 30 cm
Bh
3.3300
25,900.00
- Semen portland
Kg
1.6500
1,406.00
- Pasir pasang
M3
0.0032
233,400.00
- Semen warna
Kg
0.1000
15,700.00
- Pekerja
Oh
0.0900
42,000.00
- Tukang batu
Oh
0.0900
65,000.00
- Kepala tukang
Oh
0.0090
75,000.00
- Mandor
Oh
0.0045
80,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
362,250.00
13,778.80
5,018.10
20,410.00
10,500.00
7,800.00
900.00
1,000.00
421,656.90
421,657.00
338,940.00
14,060.00
5,018.10
23,550.00
10,920.00
8,125.00
937.50
1,040.00
402,590.60
402,591.00
73,140.00
1,687.20
700.20
1,570.00
2,520.00
1,950.00
225.00
240.00
82,032.40
82,032.00
86,247.00
2,319.90
746.88
1,570.00
3,780.00
5,850.00
675.00
360.00
101,548.78
101,549.00

No.

URAIAN

SATUAN VOLUMEHARGA SATUAN


(Rp)
I-05 1 M2 Lantai Keramik Corak 10 x 20 cm setara Mulia
- Keramik corak 10 x 20 cm
m2
1.0000
56,000.00
- Semen portland
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0215
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.2500
42,000.00
- Tukang batu
Oh
0.1200
65,000.00
- Kepala tukang
Oh
0.0120
75,000.00
- Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
56,000.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
92,670.20
92,670.00

No.
I-06

I-07

I-08

I-09

I-10

URAIAN

SATUAN VOLUMEHARGA SATUAN


(Rp)
1 M2 Lantai Keramik corak 20 x 20 cm setara Mulia
- Keramik corak 20 x 20 cm
m2
1.0000
62,500.00
- Semen portland
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0215
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.2500
42,000.00
- Tukang batu
Oh
0.1200
65,000.00
- Kepala tukang
Oh
0.0120
75,000.00
- Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik polos 30 x 30 cm setara Mulia
- Keramik polos 30 x 30 cm
m2
1.0000
53,000.00
- Semen portland
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0215
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.2500
42,000.00
- Tukang batu
Oh
0.1200
65,000.00
- Kepala tukang
Oh
0.0120
75,000.00
- Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik corak 30 x 30 cm Setara Mulia
- Keramik corak 30 x 30 cm
m2
1.0000
58,000.00
- Semen portland
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0215
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.2500
42,000.00
- Tukang batu
Oh
0.1200
65,000.00
- Kepala tukang
Oh
0.0120
75,000.00
- Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik polos 40 x 40 cm Setara Mulia
- Keramik polos 40 x 40 cm
m2
1.0000
56,800.00
- Semen portland
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0215
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.2500
42,000.00
- Tukang batu
Oh
0.1200
65,000.00
- Kepala tukang
Oh
0.0120
75,000.00
- Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik corak 40 x 40 cm Setara Mulia
- Keramik corak 40 x 40 cm
m2
1.0000
65,500.00
- Semen portland
Kg
8.0000
1,406.00

HARGA
(Rp)
62,500.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
99,170.20
99,170.00
53,000.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
89,670.20
89,670.00
58,000.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
94,670.20
94,670.00
56,800.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
93,470.20
93,470.00
65,500.00
11,248.00

No.

URAIAN
-

Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUMEHARGA SATUAN


(Rp)
M3
0.0215
233,400.00
Kg
0.0130
15,700.00
Oh
0.2500
42,000.00
Oh
0.1200
65,000.00
Oh
0.0120
75,000.00
Oh
0.0125
80,000.00

HARGA
(Rp)
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
102,170.20
102,170.00

No.
I-11

I-12

I-13

I-14

I-15

URAIAN

SATUAN VOLUMEHARGA SATUAN


(Rp)
1 M2 Lantai Keramik Corak 10 x 20 cm setara Roman
- Keramik corak 10 x 20 cm
m2
1.0000
72,200.00
- Semen portland
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0215
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.2500
42,000.00
- Tukang batu
Oh
0.1200
65,000.00
- Kepala tukang
Oh
0.0120
75,000.00
- Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik corak 20 x 20 cm setara Roman
- Keramik corak 20 x 20 cm
m2
1.0000
75,200.00
- Semen portland
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0215
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.2500
42,000.00
- Tukang batu
Oh
0.1200
65,000.00
- Kepala tukang
Oh
0.0120
75,000.00
- Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik polos 30 x 30 cm setara Roman
- Keramik polos 30 x 30 cm
m2
1.0000
68,900.00
- Semen portland
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0215
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.2500
42,000.00
- Tukang batu
Oh
0.1200
65,000.00
- Kepala tukang
Oh
0.0120
75,000.00
- Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik corak 30 x 30 cm Setara Roman
- Keramik corak 30 x 30 cm
m2
1.0000
76,600.00
- Semen portland
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0215
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.2500
42,000.00
- Tukang batu
Oh
0.1200
65,000.00
- Kepala tukang
Oh
0.0120
75,000.00
- Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik polos 40 x 40 cm setara Roman
- Keramik polos 40 x 40 cm
m2
1.0000
72,500.00
- Semen portland
Kg
8.0000
1,406.00

HARGA
(Rp)
72,200.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
108,870.20
108,870.00
75,200.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
111,870.20
111,870.00
68,900.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
105,570.20
105,570.00
76,600.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
113,270.20
113,270.00
72,500.00
11,248.00

No.

URAIAN
-

Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUMEHARGA SATUAN


(Rp)
M3
0.0215
233,400.00
Kg
0.0130
15,700.00
Oh
0.2500
42,000.00
Oh
0.1200
65,000.00
Oh
0.0120
75,000.00
Oh
0.0125
80,000.00

HARGA
(Rp)
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
109,170.20
109,170.00

No.
I-16

I-17

I-18

I-19

I-20

URAIAN

SATUAN VOLUMEHARGA SATUAN


(Rp)
1 M2 Lantai Keramik corak 40 x 40 cm Setara Roman
- Keramik corak 40 x 40 cm
m2
1.0000
77,000.00
- Semen portland
Kg
8.0000
1,406.00
- Pasir pasang
M3
0.0215
233,400.00
- Semen warna
Kg
0.0130
15,700.00
- Pekerja
Oh
0.2500
42,000.00
- Tukang batu
Oh
0.1200
65,000.00
- Kepala tukang
Oh
0.0120
75,000.00
- Mandor
Oh
0.0125
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Marmer
- Marmer
m2
1.0600
550,000.00
- Semen portland
Kg
8.1900
1,406.00
- Pasir pasang
M3
0.0450
233,400.00
- Semen warna
Kg
0.6500
15,700.00
- Pekerja
Oh
0.7000
42,000.00
- Tukang batu
Oh
0.3500
65,000.00
- Kepala tukang
Oh
0.0350
75,000.00
- Mandor
Oh
0.0350
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai Parquet Jati
- Parquet jati
M2
1.0500
375,400.00
- Lem vinyl
Kg
0.6000
44,000.00
- Pekerja
Oh
0.6500
42,000.00
- Tukang
Oh
0.3500
65,000.00
- Kepala tukang
Oh
0.0350
75,000.00
- Mandor
Oh
0.0325
80,000.00
Jumlah
Dibulatkan
1 M Plint Keramik ukuran (10 x 40) cm
- Plint keramik (10 x 40) cm
Bh
2.6500
4,000.00
- Semen portland
Kg
1.2000
1,406.00
- Pasir pasang
M3
0.0030
233,400.00
- Semen warna
Kg
0.1000
15,700.00
- Pekerja
Oh
0.0600
42,000.00
- Tukang batu
Oh
0.0300
65,000.00
- Kepala tukang
Oh
0.0030
75,000.00
- Mandor
Oh
0.0030
80,000.00
Jumlah
Dibulatkan
1 M Plint Keramik ukuran (10 x 30) cm
- Plint keramik (10 x 30) cm
Bh
3.5000
3,500.00
- Semen portland
Kg
1.6500
1,406.00
- Pasir pasang
M3
0.0032
233,400.00
- Semen warna
Kg
0.1000
15,700.00

HARGA
(Rp)
77,000.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
113,670.20
113,670.00
583,000.00
11,515.14
10,503.00
10,205.00
29,400.00
22,750.00
2,625.00
2,800.00
672,798.14
672,798.00
394,170.00
26,400.00
27,300.00
22,750.00
2,625.00
2,600.00
475,845.00
475,845.00
10,600.00
1,687.20
700.20
1,570.00
2,520.00
1,950.00
225.00
240.00
19,492.40
19,492.00
12,250.00
2,319.90
746.88
1,570.00

No.

URAIAN
-

Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUMEHARGA SATUAN


(Rp)
Oh
0.0900
42,000.00
Oh
0.0900
65,000.00
Oh
0.0090
75,000.00
Oh
0.0045
80,000.00

HARGA
(Rp)
3,780.00
5,850.00
675.00
360.00
27,551.78
27,552.00

No.
I-21

I-22

I-23

I-24

I-25

URAIAN

SATUAN VOLUMEHARGA SATUAN


(Rp)
1 M' Plint kayu kamper Samarinda (2 x 10) cm
- Papan kayu kamper samarinda
M3
0.0024
8,724,300.00
- Paku
Kg
0.0500
23,800.00
- Pekerja
Oh
0.1200
42,000.00
- Tukang batu
Oh
0.1200
65,000.00
- Kepala tukang
Oh
0.0120
75,000.00
- Mandor
Oh
0.0060
80,000.00
Jumlah
Dibulatkan
1 M' Plint keramik ukuran (10 x 20) cm
- Plint keramik
Bh
5.3000
3,000.00
- Semen abu-abu
Kg
1.1400
1,406.00
- Pasir pasang
M3
0.0030
233,400.00
- Semen warna
Kg
0.0250
15,700.00
- Pekerja
Oh
0.0900
42,000.00
- Tukang batu
Oh
0.0900
65,000.00
- Kepala tukang
Oh
0.0090
75,000.00
- Mandor
Oh
0.0050
80,000.00
Jumlah
Dibulatkan
1 M2 Lantai karpet
- Karpet
M2
1.0500
353,500.00
- Lem
Kg
0.3500
35,700.00
- Pekerja
Oh
0.1700
42,000.00
- Tukang batu
Oh
0.1700
65,000.00
- Kepala tukang
Oh
0.0170
75,000.00
- Mandor
Oh
0.0085
80,000.00
Jumlah
Dibulatkan
1 M2 Paving block natural 8 cm
1.050
- Paving block natural
M2
81,100.00
0.100
- Pasir pasang
Kg
233,400.00
0.2500
- Pekerja
Oh
42,000.00
0.5000
- Tukang batu
Oh
65,000.00
0.0250
- Kepala tukang
Oh
75,000.00
0.00250
- Mandor
Oh
80,000.00
Jumlah
Dibulatkan
1 M2 Paving block warna 8 cm
1.050
- Paving block warna
M2
108,600.00
0.100
- Pasir pasang
Kg
233,400.00
0.2500
- Pekerja
Oh
42,000.00
0.5000
- Tukang batu
Oh
65,000.00
0.0250
- Kepala tukang
Oh
75,000.00
0.00250
- Mandor
Oh
80,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
20,938.32
1,190.00
5,040.00
7,800.00
900.00
480.00
36,348.32
36,348.00
15,900.00
1,602.84
700.20
392.50
3,780.00
5,850.00
675.00
400.00
29,300.54
29,301.00
371,175.00
12,495.00
7,140.00
11,050.00
1,275.00
680.00
403,815.00
403,815.00
85,155.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
153,570.00
153,570.00
114,030.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
182,445.00
182,445.00

No.

URAIAN

I-26 1 M2 Paving block natural 6 cm


- Paving block natural
- Pasir pasang
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUMEHARGA SATUAN


(Rp)
M2
Kg
Oh
Oh
Oh
Oh

1.050
0.100
0.2500
0.5000
0.0250
0.00250

76,000.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00

HARGA
(Rp)
79,800.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
148,215.00
148,215.00

No.

URAIAN

I-27 1 M2 Paving block warna 6 cm


- Paving block warna
- Pasir pasang
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
I-28 1 M2 Grass Block 20 x 20
- Grass block
- Pasir pasang
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
I-29 1 M2 Grass Block 30 x 30
- Grass block
- Pasir pasang
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUMEHARGA SATUAN


(Rp)

HARGA
(Rp)

M2
Kg
Oh
Oh
Oh
Oh

1.050
0.100
0.2500
0.5000
0.0250
0.00250

86,000.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00

90,300.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
158,715.00
158,715.00

Bh
Kg
Oh
Oh
Oh
Oh

26.250
0.100
0.2500
0.5000
0.0250
0.00250

9,700.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00

254,625.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
323,040.00
323,040.00

Bh
Kg
Oh
Oh
Oh
Oh

11.670
0.100
0.2500
0.5000
0.0250
0.00250

22,500.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00

262,575.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
330,990.00
330,990.00

J. ANALISA HARGA SATUAN PEKERJAAN KAYU


No.
J-01

J-02

J-03

J-04

J-05

J-06

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M3 Kusen Pintu & jendela kayu Kamper Samarinda
- Kayu Balok Kamper Samarinda
m3
1.2000
8,633,700.00
- Pekerja
Oh
6.0000
42,000.00
- Tukang Kayu
Oh
18.0000
65,000.00
- Kepala Tukang
Oh
2.0000
75,000.00
- Mandor
Oh
0.3000
80,000.00
Jumlah
Dibulatkan
1 M3 Kusen Pintu & jendela kayu Kamper Medan/Kruing
- Kayu Balok Kamper Medan
M3
1.2000
5,692,600.00
- Pekerja
Oh
6.0000
42,000.00
- Tukang Kayu
Oh
18.0000
65,000.00
- Kepala Tukang
Oh
2.0000
75,000.00
- Mandor
Oh
0.3000
80,000.00
Jumlah
Dibulatkan
1 M3 Kusen Pintu & jendela kayu Borneo Super
- Kayu Borneo Balok Super
M3
1.2000
5,280,000.00
- Pekerja
Oh
6.0000
42,000.00
- Tukang Kayu
Oh
18.0000
65,000.00
- Kepala Tukang
Oh
2.0000
75,000.00
- Mandor
Oh
0.3000
80,000.00
Jumlah
Dibulatkan
1 M2 Pintu Panel Kayu Kamper Samarinda
- Kayu Papan Kamper Samarinda
M3
0.0400
8,633,700.00
- Paku Biasa 2" - 5"
Kg
0.0500
23,400.00
- Pekerja
Oh
1.0000
42,000.00
- Tukang Kayu
Oh
2.5000
65,000.00
- Kepala Tukang
Oh
0.2500
75,000.00
- Mandor
Oh
0.0500
80,000.00
Jumlah
Dibulatkan
1 M2 Pintu Panel Kayu Kamper Medan/Kruing
- Kayu Papan Kamper Medan
M3
0.0400
5,692,600.00
- Paku Biasa 2" - 5"
Kg
0.0500
23,400.00
- Pekerja
Oh
1.0000
42,000.00
- Tukang Kayu
Oh
2.5000
65,000.00
- Kepala Tukang
Oh
0.2500
75,000.00
- Mandor
Oh
0.0500
80,000.00
Jumlah
Dibulatkan
1 M2 Pintu & Jendela Kaca Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
0.0350
5,692,600.00
- Pekerja
Oh
0.8000
42,000.00
- Tukang Kayu
Oh
2.0000
65,000.00

HARGA
(Rp)
10,360,440.00
252,000.00
1,170,000.00
150,000.00
24,000.00
11,956,440.00
11,956,440.00
6,831,120.00
252,000.00
1,170,000.00
150,000.00
24,000.00
8,427,120.00
8,427,120.00
6,336,000.00
252,000.00
1,170,000.00
150,000.00
24,000.00
7,932,000.00
7,932,000.00
345,348.00
1,170.00
42,000.00
162,500.00
18,750.00
4,000.00
573,768.00
573,768.00
227,704.00
1,170.00
42,000.00
162,500.00
18,750.00
4,000.00
456,124.00
456,124.00
199,241.00
33,600.00
130,000.00

No.

URAIAN
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
Oh
0.2000
75,000.00
Oh
0.0400
80,000.00

HARGA
(Rp)
15,000.00
3,200.00
381,041.00
381,041.00

No.
J-07

J-08

J-09

J-10

J-11

J-12

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Pintu & Jendela Kaca Kayu Borneo
- Kayu Papan Borneo Super
M3
0.0350
5,595,800.00
- Pekerja
Oh
0.8000
42,000.00
- Tukang Kayu
Oh
2.0000
65,000.00
- Kepala Tukang
Oh
0.2000
75,000.00
- Mandor
Oh
0.0400
80,000.00
Jumlah
Dibulatkan
1 M2 Pintu & Jendela Jalusi Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
0.0640
5,692,600.00
- Pekerja
Oh
1.0000
42,000.00
- Tukang Kayu
Oh
3.0000
65,000.00
- Kepala Tukang
Oh
0.3000
75,000.00
- Mandor
Oh
0.5000
80,000.00
Jumlah
Dibulatkan
1 M2 Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
0.0196
5,692,600.00
- Paku Biasa " - 1"
Kg
0.0300
23,800.00
- Lem Kayu
Ltr
0.3000
23,900.00
- Triplek 120 x 240 x 0,4 cm
Lbr
1.0000
64,400.00
- Pekerja
Oh
0.6000
42,000.00
- Tukang Kayu
Oh
2.0000
65,000.00
- Kepala Tukang
Oh
0.2000
75,000.00
- Mandor
Oh
0.0300
80,000.00
Jumlah
Dibulatkan
1 M2 Jalusi Mati Kusen Kayu kamper Medan
- Kayu Papan Kamper Medan
M3
0.0600
5,692,600.00
- Paku Biasa " - 1"
Kg
0.1500
23,800.00
- Pekerja
Oh
0.5000
42,000.00
- Tukang Kayu
Oh
2.0000
65,000.00
- Kepala Tukang
Oh
0.2000
75,000.00
- Mandor
Oh
0.0250
80,000.00
Jumlah
Dibulatkan
1 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super
- Kayu Papan Borneo Super
M3
0.0196
5,595,800.00
- Paku Biasa " - 1"
Kg
0.0300
23,800.00
- Lem Kayu
Ltr
0.3000
23,900.00
- Triplek 120 x 240 x 0,4 cm
Lbr
1.0000
64,400.00
- Pekerja
Oh
0.6000
42,000.00
- Tukang Kayu
Oh
2.0000
65,000.00
- Kepala Tukang
Oh
0.2000
75,000.00
- Mandor
Oh
0.0300
80,000.00
Jumlah
Dibulatkan
1 M2 Pintu Teakwood Rangkap, rangka Kayu Kamper Medan

HARGA
(Rp)
195,853.00
33,600.00
130,000.00
15,000.00
3,200.00
377,653.00
377,653.00
364,326.40
42,000.00
195,000.00
22,500.00
40,000.00
663,826.40
663,826.00
111,574.96
714.00
7,170.00
64,400.00
25,200.00
130,000.00
15,000.00
2,400.00
356,458.96
356,459.00
341,556.00
3,570.00
21,000.00
130,000.00
15,000.00
2,000.00
513,126.00
513,126.00
109,677.68
714.00
7,170.00
64,400.00
25,200.00
130,000.00
15,000.00
2,400.00
354,561.68
354,562.00

No.

URAIAN
- Kayu Papan Kamper Medan
- Paku Biasa " - 1"
- Lem Kayu
- Teakwood 4 mm
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
M3
0.0196
5,692,600.00
Kg
0.3000
23,800.00
Ltr
0.3000
23,900.00
Lbr
1.0000
131,700.00
Oh
0.6000
42,000.00
Oh
2.0000
65,000.00
Oh
0.2000
75,000.00
Oh
0.0300
80,000.00

HARGA
(Rp)
111,574.96
7,140.00
7,170.00
131,700.00
25,200.00
130,000.00
15,000.00
2,400.00
430,184.96
430,185.00

No.
J-13

J-14

J-15

J-16

J-17

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Pintu Triplek & Formika, Rangka Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
0.0196
5,692,600.00
- Paku Biasa " - 1"
Kg
0.3000
23,800.00
- Lem Kayu
Ltr
0.8000
23,900.00
- Triplek 120 x 240 x 0,4 cm
Lbr
1.0000
64,400.00
- Formica 3" x 6"
Lbr
0.5000
132,900.00
- Pekerja
Oh
0.8000
42,000.00
- Tukang Kayu
Oh
2.5000
65,000.00
- Kepala Tukang
Oh
0.2500
75,000.00
- Mandor
Oh
0.0400
80,000.00
Jumlah
Dibulatkan
1 M2 Pintu Teakwood & Formika, Rangka Kayu Kamper Medan (dipolitur)
- Kayu Papan Kamper Medan
M3
0.0196
5,692,600.00
- Paku Biasa " - 1"
Kg
0.3000
23,800.00
- Lem Kayu
Ltr
0.8000
23,900.00
- Teakwood 120 x 240 x 0,4 cm
Lbr
1.0000
131,700.00
- Formica 4" x 8"
Lbr
0.5000
238,100.00
- Pekerja
Oh
0.8000
42,000.00
- Tukang Kayu
Oh
2.5000
65,000.00
- Kepala Tukang
Oh
0.2500
75,000.00
- Mandor
Oh
0.0400
80,000.00
Jumlah
Dibulatkan
1 M3 Kuda-kuda Kayu Kamper Medan
- Kayu Balok Kamper Medan
M3
1.1000
5,692,600.00
- Besi Strip
Kg
15.0000
26,800.00
- Paku Biasa 2" - 5"
Kg
0.8000
23,800.00
- Pekerja
Oh
4.0000
42,000.00
- Tukang Kayu
Oh
12.0000
65,000.00
- Kepala Tukang
Oh
1.2000
75,000.00
- Mandor
Oh
0.2000
80,000.00
Jumlah
Dibulatkan
1 M3 Kuda-kuda Kayu Borneo Super
- Kayu balok Borneo super
M3
1.1000
5,280,000.00
- Besi Strip
Kg
15.0000
26,800.00
- Paku Biasa 2" - 5"
Kg
0.8000
23,800.00
- Pekerja
Oh
4.0000
42,000.00
- Tukang Kayu
Oh
12.0000
65,000.00
- Kepala Tukang
Oh
1.2000
75,000.00
- Mandor
Oh
0.2000
80,000.00
Jumlah
Dibulatkan
1 M2 Kaso + Reng Genteng Plentong Kayu Borneo Super
- Kayu balok Borneo super
m3
0.0120
5,280,000.00
- Paku Biasa 2" - 5"
Kg
0.1500
23,800.00
- Pekerja
Oh
0.1000
42,000.00

HARGA
(Rp)
111,574.96
7,140.00
19,120.00
64,400.00
66,450.00
33,600.00
162,500.00
18,750.00
3,200.00
486,734.96
486,735.00
111,574.96
7,140.00
19,120.00
131,700.00
119,050.00
33,600.00
162,500.00
18,750.00
3,200.00
606,634.96
606,635.00
6,261,860.00
402,000.00
19,040.00
168,000.00
780,000.00
90,000.00
16,000.00
7,736,900.00
7,736,900.00
5,808,000.00
402,000.00
19,040.00
168,000.00
780,000.00
90,000.00
16,000.00
7,283,040.00
7,283,040.00
63,360.00
3,570.00
4,200.00

No.

URAIAN
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
Oh
0.1000
65,000.00
Oh
0.0100
75,000.00
Oh
0.0050
80,000.00

HARGA
(Rp)
6,500.00
750.00
400.00
78,780.00
78,780.00

No.
J-18

J-19

J-20

J-21

J-22

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Kaso + Reng Genteng Beton Kayu Borneo Super
- Kayu balok Borneo super
M3
0.0140
5,280,000.00
- Paku Biasa 2" - 5"
Kg
0.1500
23,800.00
- Pekerja
Oh
0.1000
42,000.00
- Tukang Kayu
Oh
0.1000
65,000.00
- Kepala Tukang
Oh
0.0100
75,000.00
- Mandor
Oh
0.0050
80,000.00
Jumlah
Dibulatkan
1 M' Lisplang uk (3x20)cm, Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
0.0072
5,823,400.00
- Paku Biasa 2" - 5"
Kg
0.0500
23,800.00
- Pekerja
Oh
0.1000
42,000.00
- Tukang Kayu
Oh
0.2000
65,000.00
- Kepala Tukang
Oh
0.0200
75,000.00
- Mandor
Oh
0.0050
80,000.00
Jumlah
Dibulatkan
1 M' Lisplang uk (3x30)cm, Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
0.0110
5,692,600.00
- Paku Biasa 2" - 5"
Kg
0.0500
23,800.00
- Pekerja
Oh
0.1100
42,000.00
- Tukang Kayu
Oh
0.2200
65,000.00
- Kepala Tukang
Oh
0.0220
75,000.00
- Mandor
Oh
0.0050
80,000.00
Jumlah
Dibulatkan
1 M List Plafond + kayu Profil 10 cm
- Kayu Profil 10 cm
M'
1.0500
29,400.00
- Pekerja
Oh
0.0210
42,000.00
- Tukang Kayu
Oh
0.0210
65,000.00
- Kepala Tukang
Oh
0.0020
75,000.00
- Mandor
Oh
0.0010
80,000.00
Jumlah
Dibulatkan
7,26 M2 Kusen Partisi Dobel Triplek
- Kayu balok borneo super
M3
0.1050
5,280,000.00
- Triplek 120 x 240 x 0,4 cm
Lbr
5.0000
64,400.00
- Paku 1 s/d 3 cm
Kg
2.0000
23,800.00
- Ampelas
Lbr
2.0000
5,000.00
- Engsel
Bh
4.0000
21,000.00
- Slot
Bh
4.0000
31,500.00
- Pekerja
Oh
0.3000
42,000.00
- Tukang Kayu terampil
Oh
1.3000
65,000.00
- Kepala Tukang kayu
Oh
0.1300
75,000.00
- Mandor
Oh
0.0130
80,000.00
Jumlah
1 M2 Pekerjaan partisi

HARGA
(Rp)
73,920.00
3,570.00
4,200.00
6,500.00
750.00
400.00
89,340.00
89,340.00
41,928.48
1,190.00
4,200.00
13,000.00
1,500.00
400.00
62,218.48
62,218.00
62,618.60
1,190.00
4,620.00
14,300.00
1,650.00
400.00
84,778.60
84,779.00
30,870.00
882.00
1,365.00
150.00
80.00
33,347.00
33,347.00
554,400.00
322,000.00
47,600.00
10,000.00
84,000.00
126,000.00
12,600.00
84,500.00
9,750.00
1,040.00
1,251,890.00
172,436.64

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)

Dibulatkan
J-23 1 M2 Rangka Langit-langit (1,00 x 1,00) m, Kayu borneo super
m
0.0120
- Kayu Borneo super
2,640,000.00
Paku 5 s.d. 7 cm
kg
0.1000
23,800.00
0.1500
- Pekerja
Oh
42,000.00
0.2500
- Tukang Kayu
Oh
65,000.00
0.0250
- Kepala Tukang
Oh
75,000.00
0.0750
- Mandor
Oh
80,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
172,437.00
31,680.00
2,380.00
6,300.00
16,250.00
1,875.00
6,000.00
64,485.00
64,485.00

No.
J-24

J-25

J-26

J-27

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Rangka langit-langit ( 0,50 x 1,00 ) m, Kayu Borneo Super
- Kayu Balok Borneo Super
m3
0.0154
2,640,000.00
- Paku Biasa 2" - 5"
kg
0.2000
23,800.00
- Pekerja
Oh
0.1500
42,000.00
- Tukang Kayu
Oh
0.3000
65,000.00
- Kepala Tukang
Oh
0.0300
75,000.00
- Mandor
Oh
0.0750
80,000.00
Jumlah
Dibulatkan
1 M' Reuter Kayu kamper Medan
m
0.0040
- Kayu kamper Medan
2,640,000.00
0.1000
- Pekerja
Oh
42,000.00
0.2000
- Tukang Kayu
Oh
65,000.00
0.0200
- Kepala Tukang
Oh
75,000.00
0.0050
- Mandor
Oh
80,000.00
Jumlah
Dibulatkan
1 M3 Gording kayu kelas II
m
1.1000
- Balok kayu
5,692,600.00
- Besi Strip
Kg
15.0000
26,800.00
- Paku Biasa 2" - 5"
Kg
3.0000
23,800.00
2.4000
- Pekerja
Oh
42,000.00
7.2000
- Tukang Kayu
Oh
65,000.00
0.7200
- Kepala Tukang
Oh
75,000.00
0.1200
- Mandor
Oh
80,000.00
Jumlah
Dibulatkan
1 M2 Dinding bilik, rangka kayu borneo
m2
1.1000
- Bilik bambu
22,700.00
- Kaso 5/7
m3
0.0140
2,640,000.00
- Paku Biasa 2" - 5"
Kg
0.0120
23,800.00
- List kayu 2/4
m3
0.0030
10,000.00
0.1000
- Pekerja
Oh
42,000.00
0.0500
- Tukang Kayu
Oh
65,000.00
0.0050
- Kepala Tukang
Oh
75,000.00
0.0050
- Mandor
Oh
80,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
40,656.00
4,760.00
6,300.00
19,500.00
2,250.00
6,000.00
79,466.00
79,466.00
10,560.00
4,200.00
13,000.00
1,500.00
400.00
29,660.00
29,660.00
6,261,860.00
402,000.00
71,400.00
100,800.00
468,000.00
54,000.00
9,600.00
7,367,660.00
7,367,660.00
24,970.00
36,960.00
285.60
30.00
4,200.00
3,250.00
375.00
400.00
70,470.60
70,471.00

K. ANALISA HARGA SATUAN PEKERJAAN PENUTUP BESI & ALLUMINIUM


No.

URAIAN

K-01 1 Kg Besi profil


- Besi profil WF
- Meni besi
- Pekerja
- Tukang besi
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
K-02 1 Kg Perakitan baja
- Solar
- Minyak pelumas
- Sewa alat
- Pekerja
- Tukang besi
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
K-03 1 Cm Pengelasan dengan las listrik
- kawat las
- Solar
- Minyak pelumas
- Sewa alat
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
K-04 1 m2 Pintu Rolling Door
- Rolling door
- Pekerja
- Tukang besi
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
K-05 1 m2 Pintu Alluminium Natural
- Pintu alluminium natural
- Pekerja
- Tukang besi

SAT

VOLUME

HARGA SAT
(Rp)

Kg
Kg
Oh
Oh
Oh
Oh

1.1000
0.0800
0.0600
0.0060
0.0060
0.0003

24,000.00
30,400.00
42,000.00
65,000.00
75,000.00
80,000.00

26,400.00
2,432.00
2,520.00
390.00
450.00
24.00
32,216.00
32,216.00

m'
m'
jam
Oh
Oh
Oh
Oh

0.0100
0.0010
0.0080
0.0010
0.00001
0.00001
0.00005

7,150.0000
55,000.0000
100,000.0000
42,000.0000
65,000.0000
75,000.0000
80,000.0000

71.50
55.00
800.00
42.00
0.65
0.75
4.00
973.90
974.00

kg
ltr
ltr
jam
org
org
org
org

0.0400
0.0300
0.0040
0.0170
0.0040
0.0020
0.0002
0.0002

23,600.00
7,150.00
55,000.00
100,000.00
42,000.00
65,000.00
75,000.00
80,000.00

944.00
214.50
220.00
1,700.00
168.00
130.00
15.00
16.00
2,463.50
2,464.00

M2
Oh
Oh
Oh
Oh

1.0000
1.0500
1.5000
0.1050
0.0052

306,600.00
42,000.00
65,000.00
75,000.00
80,000.00

306,600.00
44,100.00
97,500.00
7,875.00
416.00
456,491.00
456,491.00

m2
Oh
Oh

1.0000
1.0500
1.0500

211,800.00
42,000.00
65,000.00

211,800.00
44,100.00
68,250.00

Page 143

HARGA
(Rp)

No.

URAIAN
- Kepala tukang
- Mandor
Jumlah
Dibulatkan

SAT

VOLUME

Oh
Oh

Page 144

0.1050
0.0052

HARGA SAT
(Rp)
75,000.00
80,000.00

HARGA
(Rp)
7,875.00
416.00
332,441.00
332,441.00

No.

URAIAN

SAT

VOLUME

K-06 1 m2 Terali Besi


- Besi strip 2 x 3
m'
11.5000
- Pekerja
Oh
1.2000
- Tukang las
Oh
1.2000
- Kepala tukang
Oh
0.0120
- Mandor
Oh
0.0006
Jumlah
Dibulatkan
K-07 1 m2 Kawat Harmonika 4 cm
- Kawat harmonika
M2
1.1000
- Paku biasa " - 1"
kg
0.0200
- Papan kayu kamper
M2
0.0018
- Pekerja
Oh
0.1000
- Tukang kayu
Oh
0.1000
- Kepala tukang
Oh
0.0100
- Mandor
Oh
0.0050
Jumlah
Dibulatkan
K-08 1 m' Talang Datar, Seng BJLS 28 lebar 90 cm
- Seng plat 3' x 6' BJLS 30
m'
1.0500
- Paku biasa " - 1"
Kg
0.0150
- Kayu papan borneo super
M3
0.0096
- Flincote / meni besi
Kg
0.2500
- Pekerja
Oh
0.1500
- Tukang kayu
Oh
0.4000
- Kepala tukang
Oh
0.0250
- Mandor
Oh
0.0013
Jumlah
Dibulatkan
K-09 1 m' Talang Miring, Seng BJLS 28 lebar 90 cm
- Seng plat 3' x 6' BJLS 30
m'
1.0500
- Paku biasa " - 1"
Kg
0.0150
- Kayu papan borneo super
M3
0.0190
- Flincote / meni besi
Kg
0.3000
- Pekerja
Oh
0.2000
- Tukang kayu
Oh
0.4000
- Kepala tukang
Oh
0.0250
- Mandor
Oh
0.0013
Jumlah
Dibulatkan
K-10 1 m' Talang 1/2 lingkaran D-15 cm, seng pelat BJLS 28 lebar 90 cm
- Seng plat 3' x 6' BJLS 30
m'
1.0500
- Paku biasa " - 1"
Kg
0.1000
- Kayu papan borneo super
kg
0.0190

Page 145

HARGA SAT
(Rp)

HARGA
(Rp)

5,500.00
42,000.00
65,000.00
75,000.00
80,000.00

63,250.00
50,400.00
78,000.00
900.00
48.00
192,598.00
192,598.00

35,900.00
23,800.00
5,692,600.00
42,000.00
65,000.00
75,000.00
80,000.00

39,490.00
476.00
10,246.68
4,200.00
6,500.00
750.00
400.00
62,062.68
62,063.00

20,801.00
23,800.00
5,595,800.00
30,400.00
42,000.00
65,000.00
75,000.00
80,000.00

21,841.05
357.00
53,719.68
7,600.00
6,300.00
26,000.00
1,875.00
104.00
117,796.73
117,797.00

20,801.00
23,800.00
5,595,800.00
30,400.00
42,000.00
65,000.00
75,000.00
80,000.00

21,841.05
357.00
106,320.20
9,120.00
8,400.00
26,000.00
1,875.00
100.00
174,013.25
174,013.00

20,801.00
23,800.00
5,595,800.00

21,841.05
2,380.00
106,320.20

No.

URAIAN
- Besi strip
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan

SAT

VOLUME

Kg
Oh
Oh
Oh
Oh

Page 146

0.5000
0.1500
0.3000
0.0300
0.0080

HARGA SAT
(Rp)
26,800.00
42,000.00
65,000.00
75,000.00
80,000.00

HARGA
(Rp)
13,400.00
6,300.00
19,500.00
2,250.00
640.00
172,631.25
172,631.00

No.

URAIAN

SAT

VOLUME

K-11 1 m' Pasang kusen pintu/jendela alluminium natural 4"


- Alumunium profil natural 4"
m'
- Skrup fixer
bh
- Sealant
m'
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
K-12 1 m' Pasang kusen pintu/jendela alluminium warna 4"
- Alumunium profil warna 4"
m'
- Skrup fixer
bh
- Sealant
m'
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
K-13 1 m' Pasang kusen pintu/jendela alluminium natural 3"
- Alumunium profil natural 3"
m'
Skrup
fixer
bh
- Sealant
m'
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
K-14 1 m' Pasang kusen pintu/jendela alluminium warna 3"
- Alumunium profil warna 3"
m'
- Skrup fixer
bh
- Sealant
m'
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
K-15 1 m2 Pintu alluminium strip lebar 8 cm
- Alumunium profil 4" natural
m'
- Alumunium strip 6mm
m2
- Pekerja
Oh

Page 147

HARGA SAT
(Rp)

HARGA
(Rp)

1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021

151,100.00
250.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00

166,210.00
500.00
7,500.00
1,806.00
2,795.00
322.50
168.00
179,301.50
179,302.00

1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021

163,000.00
250.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00

179,300.00
500.00
7,500.00
1,806.00
2,795.00
322.50
168.00
192,391.50
192,392.00

1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021

81,000.00
250.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00

89,100.00
500.00
7,500.00
1,806.00
2,795.00
322.50
168.00
102,191.50
102,192.00

1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021

102,000.00
250.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00

112,200.00
500.00
7,500.00
1,806.00
2,795.00
322.50
168.00
125,291.50
125,292.00

4.4000
1.0500
0.0850

151,100.00
171,800.00
42,000.00

664,840.00
180,390.00
3,570.00

No.

URAIAN
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan

SAT

VOLUME

Oh
Oh
Oh

Page 148

0.0850
0.0085
0.0042

HARGA SAT
(Rp)
65,000.00
75,000.00
80,000.00

HARGA
(Rp)
5,525.00
637.50
336.00
855,298.50
855,299.00

No.

URAIAN

SAT

VOLUME

K-16 1 m2 Pintu/jendela kaca rangka alluminium natural 4"


- Alumunium profil natural 4"
m'
4.4000
- Profil alluminium T
m'
4.5000
- Sealant
tube
0.2700
- Pekerja
Oh
0.0850
- Tukang kayu
Oh
0.0850
- Kepala tukang
Oh
0.0085
- Mandor
Oh
0.0050
Jumlah
Dibulatkan
K-17 1 m2 Pintu/jendela kaca rangka alluminium warna 4"
- Alumunium profil warna 4"
m'
4.4000
- Profil alluminium T
m'
4.5000
- Sealant
tube
0.2700
- Pekerja
Oh
0.0850
- Tukang kayu
Oh
0.0850
- Kepala tukang
Oh
0.0085
- Mandor
Oh
0.0050
Jumlah
Dibulatkan
K-18 1 m2 Jendela nako & teralis (10 klips)
- Jendela nako (rangka + kaca 5 mm)
m2
1.1000
Paku
skrup
1cm
2,5cm
bh
10.0000
- Besi strip
m'
7.0000
- Pekerja
Oh
0.2000
- Tukang kayu
Oh
0.2000
- Kepala tukang
Oh
0.0200
- Mandor
Oh
0.0010
Jumlah
Dibulatkan
K-19 1 m2 Pintu pelat baja tebal 2mm rangkap, rangka baja siku
- Besi siku L 30.30.3
Kg
15.0000
- Baja pelat
Kg
32.8000
- kawat las
Kg
0.0500
- Pekerja
Oh
0.2000
- Tukang kayu
Oh
0.2000
- Kepala tukang
Oh
0.0200
- Mandor
Oh
0.0010
Jumlah
Dibulatkan
K-20 1 m2 Rangka jendela besi square tube (5 x 5) cm
- Besi square tube
- Besi lis kaca (1 x 1) cm
- Pengelasan

M
Kg
Cm

Page 149

4.7600
4.5220
20.0000

HARGA SAT
(Rp)

HARGA
(Rp)

151,100.00
12,200.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00

664,840.00
54,900.00
2,025.00
3,570.00
5,525.00
637.50
400.00
731,897.50
731,898.00

163,000.00
12,200.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00

717,200.00
54,900.00
2,025.00
3,570.00
5,525.00
637.50
400.00
784,257.50
784,258.00

300,000.00
250.00
5,500.00
42,000.00
65,000.00
75,000.00
80,000.00

330,000.00
2,500.00
38,500.00
8,400.00
13,000.00
1,500.00
80.00
393,980.00
393,980.00

24,000.00
24,000.00
23,600.00
42,000.00
65,000.00
75,000.00
80,000.00

360,000.00
787,200.00
1,180.00
8,400.00
13,000.00
1,500.00
80.00
1,171,360.00
1,171,360.00

7,300.00
24,000.00
2,464.00

34,748.00
108,528.00
49,280.00

No.

URAIAN
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan

SAT

VOLUME

Oh
Oh
Oh
Oh

Page 150

0.6500
0.6500
0.0650
0.0320

HARGA SAT
(Rp)
42,000.00
65,000.00
75,000.00
80,000.00

HARGA
(Rp)
27,300.00
42,250.00
4,875.00
2,560.00
269,541.00
269,541.00

No.

URAIAN

SAT

VOLUME

HARGA SAT
(Rp)

1.0000
1.0500
1.0500
0.1050
0.0052

501,700.00
42,000.00
65,000.00
75,000.00
80,000.00

501,700.00
44,100.00
68,250.00
7,875.00
416.00
622,341.00
622,341.00

1.0000
0.3500
0.3500
0.0350
0.0018

537,300.00
42,000.00
65,000.00
75,000.00
80,000.00

537,300.00
14,700.00
22,750.00
2,625.00
144.00
577,519.00
577,519.00

K-21 1 m2 Pintu lipat (folding door) bahan besi


- Pintu lipat
M2
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1
K-22 m2 Tirai (venetions blinds and vertical blinds)
- Tirai
M2
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan

Page 151

HARGA
(Rp)

L. ANALISA HARGA SATUAN PEKERJAAN KUNCI & KACA


No.

URAIAN

SAT

VOLUME

L-01 1 Buah Pasang Kunci Tanam 2 slaag


- Kunci tanam
Bh
1.0000
- Pekerja
Oh
0.0600
- Tukang kayu
Oh
0.6000
- Kepala tukang
Oh
0.0600
- Mandor
Oh
0.0030
Jumlah
Dibulatkan
L-02 1 Buah Pasang Kunci Tanam Biasa
- Kunci tanam biasa
Bh
1.0000
- Pekerja
Oh
0.0100
- Tukang kayu
Oh
0.5000
- Kepala tukang
Oh
0.0100
- Mandor
Oh
0.0050
Jumlah
Dibulatkan
L-03 1 Buah Pasang Kunci Tanam Kamar Mandi
- Kunci tanam km mandi
Bh
1.0000
- Pekerja
Oh
0.0050
- Tukang kayu
Oh
0.5000
- Kepala tukang
Oh
0.0050
- Mandor
Oh
0.0025
Jumlah
Dibulatkan
L-04 1 Buah Pasang Engsel Pintu
- Engsel pintu
Bh
1.0000
- Pekerja
Oh
0.0150
- Tukang kayu
Oh
0.1500
- Kepala tukang
Oh
0.0150
- Mandor
Oh
0.0008
Jumlah
Dibulatkan
L-05 1 Buah Pasang Engsel Jendela Kupu-kupu
- Engsel jendela
Bh
1.0000
- Pekerja
Oh
0.0100
- Tukang kayu
Oh
0.1000
- Kepala tukang
Oh
0.0100
- Mandor
Oh
0.0005
Jumlah
Dibulatkan
L-06 1 Buah Pasang Kait Angin
- Kait angin
Bh
1.0000
- Pekerja
Oh
0.0150

HARGA SAT
(Rp)

HARGA
(Rp)

335,900.00
42,000.00
65,000.00
75,000.00
80,000.00

335,900.00
2,520.00
39,000.00
4,500.00
240.00
382,160.00
382,160.00

165,300.00
42,000.00
65,000.00
75,000.00
80,000.00

165,300.00
420.00
32,500.00
750.00
400.00
199,370.00
199,370.00

94,500.00
42,000.00
65,000.00
75,000.00
80,000.00

94,500.00
210.00
32,500.00
375.00
200.00
127,785.00
127,785.00

21,000.00
42,000.00
65,000.00
75,000.00
80,000.00

21,000.00
630.00
9,750.00
1,125.00
64.00
32,569.00
32,569.00

15,000.00
42,000.00
65,000.00
75,000.00
80,000.00

15,000.00
420.00
6,500.00
750.00
40.00
22,710.00
22,710.00

3,550.00
42,000.00

3,550.00
630.00

No.

URAIAN
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan

SAT
Oh
Oh
Oh

VOLUME
0.1500
0.0150
0.0008

HARGA SAT
(Rp)
65,000.00
75,000.00
80,000.00

HARGA
(Rp)
9,750.00
1,125.00
64.00
15,119.00
15,119.00

No.

URAIAN

SAT

VOLUME

L-07 1 Buah Pasang Door Closer


- Door closer
Bh
1.0000
- Pekerja
Oh
0.0500
- Tukang kayu
Oh
0.5000
- Kepala tukang
Oh
0.0500
- Mandor
Oh
0.0025
Jumlah
Dibulatkan
L-08 1 Buah Pasang Pegangan Pintu / Door Holder
- Door holder
Bh
1.0000
- Pekerja
Oh
0.0500
- Tukang kayu
Oh
0.5000
- Kepala tukang
Oh
0.0500
- Mandor
Oh
0.0025
Jumlah
Dibulatkan
L-09 1 M2 Pasang Kaca , tebal 3 mm
- Kaca
M2
1.1000
- Pekerja
Oh
0.0150
- Tukang kayu
Oh
0.1500
- Kepala tukang
Oh
0.0150
- Mandor
Oh
0.0008
Jumlah
Dibulatkan
L-10 1 M2 Pasang Kaca , tebal 5 mm
- Kaca
M2
1.1000
- Pekerja
Oh
0.0150
- Tukang kayu
Oh
0.1500
- Kepala tukang
Oh
0.0150
- Mandor
Oh
0.0008
Jumlah
Dibulatkan

HARGA SAT
(Rp)

HARGA
(Rp)

420,000.00
42,000.00
65,000.00
75,000.00
80,000.00

420,000.00
2,100.00
32,500.00
3,750.00
200.00
458,550.00
458,550.00

205,400.00
42,000.00
65,000.00
75,000.00
80,000.00

205,400.00
2,100.00
32,500.00
3,750.00
200.00
243,950.00
243,950.00

87,400.00
42,000.00
65,000.00
75,000.00
80,000.00

96,140.00
630.00
9,750.00
1,125.00
60.00
107,705.00
107,705.00

111,000.00
42,000.00
65,000.00
75,000.00
80,000.00

122,100.00
630.00
9,750.00
1,125.00
64.00
133,669.00
133,669.00

M. PEKERJAAN SANITASI
No.
M-01

M-02

M-03

M-04

M-05

URAIAN

SAT VOLUME

1 Buah Closet jongkok Porselen Standar


Closet jongkok
bh
1.00
P.C (50 gk)
Kg
6.00
Pasir pasang
m3
0.01
Pekerja
org
1.0000
Tukang batu
org
1.5000
Kepala Tukang
org
1.5000
Mandor
org
0.1600
Jumlah
Dibulatkan
1 Buah Urinoir
Urinoir
bh
1.00
P.C (50 gk)
Kg
6.00
Pasir pasang
m3
0.01
Pekerja
org
1.0000
Tukang batu
org
1.0000
Kepala Tukang
org
0.1000
Mandor
org
0.0010
Perlengkapan 30 % harga urinoir
lot
0.3000
Jumlah
Dibulatkan
1 Buah Wastafel
wastafel standar
unit
1.00
P.C (50 gk)
Kg
6.00
Pasir pasang
m3
0.01
Pekerja
org
1.2000
Tukang batu
org
1.4500
Kepala Tukang
org
0.1500
Mandor
org
0.1000
Perlengkapan 12 % harga wastafel
lot
0.1200
Jumlah
Dibulatkan
1 Buah bak Mandi Fibreglass Volume 0,30 m3
Bak fibreglass 0.60m x 0.60m
bh
1.00
Pekerja
org
1.8000
Tukang batu
org
2.7000
Kepala Tukang
org
0.5400
Mandor
org
0.1100
Perlengkapan 18 % harga bak
lot
0.1800
Jumlah
Dibulatkan
1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm
Buis beton 30 cm
bh
1.10

HARGA SAT
(Rp)

HARGA
(Rp)

188,200.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00

188,200.00
8,436.00
2,334.00
42,000.00
97,500.00
112,500.00
12,800.00
463,770.00
463,770.00

1,773,400.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
1,773,400.00

1,773,400.00
8,436.00
2,334.00
42,000.00
65,000.00
7,500.00
80.00
532,020.00
2,430,770.00
2,430,770.00

1,012,700.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
1,773,400.00

1,012,700.00
8,436.00
2,334.00
50,400.00
94,250.00
11,250.00
8,000.00
212,808.00
1,400,178.00
1,400,178.00

255,300.00
42,000.00
65,000.00
75,000.00
80,000.00
255,300.00

255,300.00
75,600.00
175,500.00
40,500.00
8,800.00
45,954.00
601,654.00
601,654.00

61,700.00

67,870.00

No.

URAIAN
Bata merah
P.C (50 gk)
Pasir pasang
Pasir urug
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

SAT VOLUME
bh
Kg
m3
m3
org
org
org
org

25.00
10.300
0.061
0.069
0.3800
0.1900
0.0190
0.0190

HARGA SAT
(Rp)
775.00
1,406.00
233,400.00
175,300.00
42,000.00
65,000.00
75,000.00
80,000.00

HARGA
(Rp)
19,375.00
14,481.80
14,237.40
12,095.70
15,960.00
12,350.00
1,425.00
1,520.00
159,314.90
159,315.00

No.
M-06

M-07

M-08

M-09

URAIAN

SAT VOLUME

1 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cm


Bata merah
bh
186.00
P.C (50 gk)
Kg
114.000
Pasir pasang
m3
0.184
Batu pecah 2/3
m3
0.033
Besi beton
m3
4.850
Pasir beton
m3
0.120
Pekerja
org
2.1600
Tukang batu
org
0.7200
Kepala Tukang
org
0.0720
Mandor
org
0.1080
Tukang gali
org
0.1000
Jumlah
Dibulatkan
1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm
Bata merah
bh
53.00
P.C (50 gk)
Kg
44.000
Pasir pasang
m3
0.070
Batu pecah 2/3
m3
0.070
Besi beton
m3
1.600
Pasir beton
m3
0.060
Pekerja
org
3.2000
Tukang batu
org
1.0150
Kepala Tukang
org
0.0015
Mandor
org
0.0160
Jumlah
Dibulatkan
1 M' Pipa PVC 1/2" (AW)
Pipa pvc 1/2"
m'
1.2000
Pekerja
org
0.0360
Tukang batu
org
0.0600
Kepala Tukang
org
0.0060
Mandor
org
0.0018
Perlengkapan 35 % harga pipa
lot
0.3500
Jumlah
Dibulatkan
1 M' Pipa PVC 1" (AW)
Pipa pvc 1"
m'
1.2000
Pekerja
org
0.0360
Tukang batu
org
0.0600
Kepala Tukang
org
0.0060
Mandor
org
0.0018
Perlengkapan 35 % harga pipa
lot
0.3500
Jumlah
Dibulatkan

HARGA SAT
(Rp)

HARGA
(Rp)

775.00
1,406.00
233,400.00
211,100.00
16,500.00
255,400.00
42,000.00
65,000.00
75,000.00
80,000.00
42,000.00

144,150.00
160,284.00
42,945.60
6,966.30
80,025.00
30,648.00
90,720.00
46,800.00
5,400.00
8,640.00
4,200.00
620,778.90
620,779.00

775.00
1,406.00
233,400.00
211,100.00
16,500.00
255,400.00
42,000.00
65,000.00
75,000.00
80,000.00

41,075.00
61,864.00
16,338.00
14,777.00
26,400.00
15,324.00
134,400.00
65,975.00
112.50
1,280.00
377,545.50
377,546.00

10,025.00
42,000.00
65,000.00
75,000.00
80,000.00
12,030.00

12,030.00
1,512.00
3,900.00
450.00
144.00
4,210.50
22,246.50
22,247.00

15,800.00
42,000.00
65,000.00
75,000.00
80,000.00
18,960.00

18,960.00
1,512.00
3,900.00
450.00
144.00
6,636.00
31,602.00
31,602.00

No.
M-10

URAIAN
1 M' Pipa PVC 11/2" (AW)
Pipa pvc 11/2"
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan

SAT VOLUME

m'
org
org
org
org
lot

1.2000
0.0360
0.0600
0.0060
0.0018
0.3500

HARGA SAT
(Rp)
26,475.00
42,000.00
65,000.00
75,000.00
80,000.00
31,770.00

HARGA
(Rp)
31,770.00
1,512.00
3,900.00
450.00
144.00
11,119.50
48,895.50
48,896.00

No.

URAIAN

M-11

1 M' Pipa PVC 2" (AW)


Pipa pvc 2"
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan
1 M' Pipa PVC 4" (AW)
Pipa pvc 4"
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan
1 M' Pipa PVC 3/4" (AW)
Pipa pvc 3/4"
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan
1 Buah Bak Cuci piring Stainless steel
Bak cuci stainless steel + asesoris lengkap
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 Buah Kran 1/2" - 3/4"
Kran air
Seal tape
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 Buah Floor Drain

M-12

M-13

M-14

M-15

M-16

SAT VOLUME

HARGA SAT
(Rp)

HARGA
(Rp)

m'
org
org
org
org
lot

1.2000
0.0360
0.0600
0.0060
0.0018
0.3500

27,675.00
42,000.00
65,000.00
75,000.00
80,000.00
31,770.00

33,210.00
1,512.00
3,900.00
450.00
144.00
11,119.50
50,335.50
50,336.00

m'
org
org
org
org
lot

1.2000
0.0810
0.1350
0.0135
0.0041
0.3500

86,975.00
42,000.00
65,000.00
75,000.00
80,000.00
104,370.00

104,370.00
3,402.00
8,775.00
1,012.50
328.00
36,529.50
154,417.00
154,417.00

m'
org
org
org
org
lot

1.2000
0.0810
0.1350
0.0135
0.0041
0.3500

13,050.00
42,000.00
65,000.00
75,000.00
80,000.00
15,660.00

15,660.00
3,402.00
8,775.00
1,012.50
328.00
5,481.00
34,658.50
34,659.00

bh
org
org
org
org

1.0000
0.0300
0.3000
0.0300
0.0015

397,800.00
42,000.00
65,000.00
75,000.00
80,000.00

397,800.00
1,260.00
19,500.00
2,250.00
120.00
420,930.00
420,930.00

bh
bh
org
org
org
org

1.0000
0.0250
0.0100
0.1000
0.0100
0.0050

40,900.00
4,200.00
42,000.00
65,000.00
75,000.00
80,000.00

40,900.00
105.00
420.00
6,500.00
750.00
400.00
49,075.00
49,075.00

No.

URAIAN
Floor drain
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

SAT VOLUME
bh
org
org
org
org

1.0000
0.0100
0.1000
0.0100
0.0050

HARGA SAT
(Rp)
66,600.00
42,000.00
65,000.00
75,000.00
80,000.00

HARGA
(Rp)
66,600.00
420.00
6,500.00
750.00
400.00
74,670.00
74,670.00

No.
M-17

M-18

M-19

M-20

M-21

URAIAN

SAT VOLUME

1 M' Grafel beton U 30 cm -60 cm


Pipa beton U
bh
Bata merah
bh
P.C (50 gk)
zak
Pasir pasang
m3
Pasir urug
m3
Pekerja
org
Tukang batu
org
Kepala Tukang
org
Mandor
org
Jumlah
Dibulatkan
1 M' Pasang Talang Plastik PVC U 15 cm (AW)
Talang plastik PVC
m'
Perlengkapan 35 % harga talang
lot
Pekerja
org
Tukang batu
org
Kepala Tukang
org
Mandor
org
Jumlah
Dibulatkan
1 M' Saluran Air Limbah Buis Beton 60 cm
Buis beton 60 cm
bh
Bata merah
bh
P.C (50 gk)
zak
Pasir pasang
m3
Pasir urug
m3
Pekerja
org
Tukang batu
org
Kepala Tukang
org
Mandor
org
Jumlah
Dibulatkan
1 M' Pasang Talang Seng Datar
Seng pelat 3" x 6"
lbr
Paku
kg
Kayu kelas II
m3
Meni besi
kg
Pekerja
org
Tukang batu
org
Kepala Tukang
org
Mandor
org
Jumlah
Dibulatkan
1 Buah Closet Duduk

HARGA SAT
(Rp)

HARGA
(Rp)

1.1000
12.0000
0.1030
0.0305
0.0345
0.0100
0.1000
0.0100
0.0050

44,300.00
775.00
1,406.00
233,400.00
175,300.00
42,000.00
65,000.00
75,000.00
80,000.00

48,730.00
9,300.00
144.82
7,118.70
6,047.85
420.00
6,500.00
750.00
400.00
79,411.37
79,411.00

1.05000
0.3500
0.1500
0.4000
0.0250
0.0013

60,000.00
63,000.00
42,000.00
65,000.00
75,000.00
80,000.00

63,000.00
22,050.00
6,300.00
26,000.00
1,875.00
100.00
119,325.00
119,325.00

1.10
25.00
0.206
0.061
0.069
0.3800
0.1900
0.0190
0.0190

130,900.00
775.00
1,406.00
233,400.00
175,300.00
42,000.00
65,000.00
75,000.00
80,000.00

143,990.00
19,375.00
289.64
14,237.40
12,095.70
15,960.00
12,350.00
1,425.00
1,520.00
221,242.74
221,243.00

0.50000
0.01500
0.00960
0.2500
0.1500
0.4000
0.0250
0.0013

20,801.00
23,400.00
2,850,000.00
30,400.00
42,000.00
65,000.00
75,000.00
80,000.00

10,400.50
351.00
27,360.00
7,600.00
6,300.00
26,000.00
1,875.00
100.00
79,986.50
79,987.00

No.

URAIAN
Closet duduk
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 6 % harga closet
Jumlah
Dibulatkan

SAT VOLUME
bh
org
org
org
org
lot

1.00
3.3000
1.1000
0.0010
0.1600
0.0600

HARGA SAT
(Rp)
1,724,700.00
42,000.00
65,000.00
75,000.00
80,000.00
1,724,700.00

HARGA
(Rp)
1,724,700.00
138,600.00
71,500.00
75.00
12,800.00
103,482.00
2,051,157.00
2,051,157.00

No.
M-22

M-23

M-24

URAIAN

SAT VOLUME

1 Buah Tangki Air fibreglass Volume 1 m3


Bak fibreglass kapasitas 1 m3
bh
Pekerja
org
Tukang batu
org
Kepala Tukang
org
Mandor
org
Perlengkapan 6 % harga bak
lot
Jumlah
Dibulatkan
1 Unit Septictank 2x1,50x1,50 m + Rembesan
Galian tanah
m3
Pasir urug
m3
lantai kerja
m3
Pas bata adk 1pc : 3ps
m2
Pelat beton K-225
m3
Plesteran adk 1pc : 3ps
m2
Pipa PVC 4" jenis AW
m'
Pipa GIP 1 1/2"
m'
Galian tanah untuk rembesan
m3
Pas ijuk
kg
Urugan kerikil 3/5
m3
Pipa PVC 4" berlubang jenis AW
m'
Urugan dan perataan tanah
m3
Jumlah
Dibulatkan
1 Unit Septictank 1x1,50x1,50 m + Rembesan
Galian tanah
m3
Pasir urug
m3
lantai kerja
m3
Pas bata adk 1pc : 3ps
m2
Pelat beton K-225
m3
Plesteran adk 1pc : 3ps
m2
Pipa PVC 4" jenis AW
m'
Pipa GIP 1 1/2"
m'
Galian tanah untuk rembesan
m3
Pas ijuk
kg
Urugan kerikil 3/5
m3
Pipa PVC 4" berlubang jenis AW
m'
Urugan dan perataan tanah
m3
Jumlah
Dibulatkan

HARGA SAT
(Rp)

HARGA
(Rp)

1.00
3.3000
1.1000
0.0010
0.1600
0.0600

1,316,400.00
42,000.00
65,000.00
75,000.00
80,000.00
1,316,400.00

1,316,400.00
138,600.00
71,500.00
75.00
12,800.00
78,984.00
1,618,359.00
1,618,359.00

4.500
0.214
2.250
15.000
0.300
15.000
5.400
5.000
3.375
5.400
1.050
9.000
1.125

26,252.00
175,300.00
716,798.00
220,267.10
6,438,864.00
41,301.82
256,800.00
46,750.00
20,000.00
23,400.00
205,000.00
36,700.00
34,584.00

118,134.00
37,514.20
1,612,795.50
3,304,006.50
1,931,659.20
619,527.30
1,386,720.00
233,750.00
67,500.00
126,360.00
215,250.00
330,300.00
38,907.00
10,022,423.70
10,022,424.00

2.250
0.107
1.125
7.500
0.150
7.500
9.000
2.500
1.688
2.700
0.525
9.000
0.563

20,000.00
175,300.00
716,798.00
220,267.10
6,438,864.00
41,301.82
256,800.00
46,750.00
20,000.00
23,400.00
205,000.00
36,700.00
34,584.00

45,000.00
18,757.10
806,397.75
1,652,003.25
965,829.60
309,763.65
2,311,200.00
116,875.00
33,760.00
63,180.00
107,625.00
330,300.00
19,470.79
6,780,162.14
6,780,162.00

N. ANALISA HARGA SATUAN PEKERJAAN PENGECATAN


No.

URAIAN

SAT

VOLUME

N-01 1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama


- Soda api
Kg
0.0500
- Pekerja
Oh
0.1500
- Mandor
Oh
0.0025
Jumlah
Dibulatkan
N-02 1 M2 Mendempul Dan Menggosok Kayu
- Dempul
Kg
0.0800
- Minyak cat
Kg
0.0200
- Batu apung
Kg
0.0100
- Pekerja
Oh
0.0400
- Tukang cat
Oh
0.0400
- Kepala tukang
Oh
0.0040
- Mandor
Oh
0.0025
Jumlah
Dibulatkan
N-03 1 M2 Pengecatan Bidang Kayu Lama Setara Sieve
- Plamir
Kg
0.1500
- Cat dasar
Kg
0.1700
- Cat penutup setara sieve 2x
Kg
0.1700
- Pekerja
Oh
0.0700
- Tukang cat
Oh
0.0750
- Kepala tukang
Oh
0.0075
- Mandor
Oh
0.0025
Jumlah
Dibulatkan
N-04 1 M2 Pengecatan Bidang Kayu Baru Setara Sieve
- Cat meni
Kg
0.2000
- Plamir
Kg
0.1500
- Cat dasar
Kg
0.1700
- Cat penutup 3x setara sieve
Kg
0.3500
- Pekerja
Oh
0.0700
- Tukang cat
Oh
0.1050
- Kepala tukang
Oh
0.0040
- Mandor
Oh
0.0025
Jumlah
Dibulatkan
N-05 1 M2 Pelaburan Bidang Kayu dengan Politur
- Politur
Ltr
0.1500
- Politur jadi
Ltr
0.3720
- Ampelas
Lbr
2.0000
- Tukang cat
Oh
0.0600

HARGA SAT

HARGA

35,600.00
42,000.00
80,000.00

1,780.00
6,300.00
200.00
8,280.00
8,280.00

35,800.00
38,400.00
29,600.00
42,000.00
65,000.00
75,000.00
80,000.00

2,864.00
768.00
296.00
1,680.00
2,600.00
300.00
200.00
8,708.00
8,708.00

25,000.00
30,000.00
41,700.00
42,000.00
65,000.00
75,000.00
80,000.00

3,750.00
5,100.00
7,089.00
2,940.00
4,875.00
562.50
200.00
24,516.50
24,517.00

30,400.00
25,000.00
30,000.00
41,700.00
42,000.00
65,000.00
75,000.00
80,000.00

6,080.00
3,750.00
5,100.00
14,595.00
2,940.00
6,825.00
300.00
200.00
39,790.00
39,790.00

48,000.00
112,700.00
5,000.00
65,000.00

7,200.00
41,924.40
10,000.00
3,900.00

No.

URAIAN

SAT

VOLUME

HARGA SAT

HARGA

- Kepala tukang
Oh
0.0160
- Mandor
Oh
0.0025
Jumlah
Dibulatkan
N-06 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
- Residu atau ter
Ltr
0.3500
- Pekerja
Oh
0.1000
- Mandor
Oh
0.0060
Jumlah
Dibulatkan

75,000.00
80,000.00

1,200.00
200.00
64,424.40
64,424.00

8,100.00
42,000.00
80,000.00

2,835.00
4,200.00
480.00
7,515.00
7,515.00

No.

URAIAN

SAT

VOLUME

N-07 1 M2 Pengecatan Tembok Baru Setara ICI


- Plamir tembok
Kg
- Cat dasar
Kg
- Cat penutup 2x setara ICI
Kg
- Pekerja
Oh
- Tukang cat
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
N-08 1 M2 Pengecatan Tembok Lama Setara ICI
- Cat dasar
Kg
- Cat penutup 2 x
Kg
- Pekerja
Oh
- Tukang cat
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
N-09 1 M2 Pengecatan Plafond ( 3x ) Setara ICI
- Cat tembok setara ICI
Kg
- Plamir tembok
Kg
- Rol cat
Bh
- Steger werk
Ls
- Ampelas
Lbr
- Pekerja
Oh
- Tukang cat
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
N-10 1 M2 Pengecatan Plafond ( 3x ) Setara Vinilex
- Cat tembok setara Vinilex
Kg

HARGA SAT

HARGA

0.1000
0.1000
0.2600
0.0200
0.0630
0.0063
0.0025

25,000.00
30,000.00
75,000.00
42,000.00
65,000.00
75,000.00
80,000.00

2,500.00
3,000.00
19,500.00
840.00
4,095.00
472.50
200.00
30,607.50
30,608.00

0.1200
0.1800
0.0280
0.0420
0.0042
0.0025

30,000.00
75,000.00
42,000.00
65,000.00
75,000.00
80,000.00

3,600.00
13,500.00
1,176.00
2,730.00
315.00
200.00
21,521.00
21,521.00

0.2000
0.1600
0.0100
1.0000
0.5000
0.2000
0.3000
0.0300
0.0100

75,000.00
25,000.00
32,500.00
1,000.00
5,000.00
42,000.00
65,000.00
75,000.00
80,000.00

15,000.00
4,000.00
325.00
1,000.00
2,500.00
8,400.00
19,500.00
2,250.00
800.00
53,775.00
53,775.00

0.2000

25,000.00

5,000.00
4,000.00

- Plamir tembok

Kg

0.1600

25,000.00

- Rol cat

Bh

0.0100

32,500.00

325.00

- Steger werk

Ls

1.0000

1,000.00

1,000.00

- Ampelas

Lbr

0.5000

5,000.00

2,500.00

- Pekerja

Oh

0.2000

42,000.00

8,400.00

- Tukang cat

Oh

0.3000

65,000.00

19,500.00

- Kepala tukang

Oh

0.0300

75,000.00

2,250.00

- Mandor

Oh

0.0100

80,000.00

Jumlah
Dibulatkan
N-10-r' 1 M2 Pengecatan Plafond ( 2x ) Setara Vinilex

800.00
43,775.00
43,775.00

No.

URAIAN
-

Cat tembok setara Vinilex


Plamir tembok
Rol cat
Steger werk
Ampelas
Pekerja
Tukang cat
Kepala tukang
Mandor
Jumlah
Dibulatkan

N-11 1 M2 Memasang Wallpaper


- Wallpaper
- Lem Perekat
- Pekerja
- Tukang cat
- Kepala tukang
- Mandor
Jumlah
Dibulatkan

SAT

VOLUME

HARGA SAT

HARGA

Kg
Kg
Bh
Ls
Lbr
Oh
Oh
Oh
Oh

0.1300
0.1100
0.1000
0.6700
0.3300
0.1300
0.2000
0.0200
0.0100

25,000.00
25,000.00
32,500.00
1,000.00
5,000.00
42,000.00
65,000.00
75,000.00
80,000.00

3,250.00
2,750.00
3,250.00
670.00
1,650.00
5,460.00
13,000.00
1,500.00
800.00
32,330.00
32,330.00

m2
Kg
Oh
Oh
Oh
Oh

1.2000
0.2500
0.3500
0.1750
0.0170
0.0017

55,700.00
35,700.00
42,000.00
65,000.00
75,000.00
80,000.00

66,840.00
8,925.00
14,700.00
11,375.00
1,275.00
136.00
103,251.00
103,251.00

No.

URAIAN

SAT

VOLUME

HARGA SAT

N-12 1 M2 Pengecatan Permukaan Baja dengan Meni Besi


- Meni besi
Kg
0.1000
30,400.00
- Kuas 3"
Bh
0.0100
16,000.00
- Pekerja
Oh
0.0200
42,000.00
- Tukang cat
Oh
0.2000
65,000.00
- Kepala tukang
Oh
0.0200
75,000.00
- Mandor
Oh
0.0100
80,000.00
Jumlah
Dibulatkan
N-13 1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah
- Meni besi
Kg
0.1000
30,400.00
- Kuas 3"
Bh
0.0100
16,000.00
- Kayu perancah
m3
0.0020
2,069,800.00
- Pekerja
Oh
0.2500
42,000.00
- Tukang cat
Oh
0.2250
65,000.00
- Kepala tukang
Oh
0.0225
75,000.00
- Mandor
Oh
0.0075
80,000.00
Jumlah
Dibulatkan
N-14 1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um
- Cat besi setara ICI
Kg
0.3000
67,700.00
- Pekerja
Oh
0.0060
42,000.00
- Tukang cat
Oh
0.0600
65,000.00
- Kepala tukang
Oh
0.0120
75,000.00
- Mandor
Oh
0.0060
80,000.00
Jumlah
Dibulatkan
N-15 1 M2 Pengecatan Tembok Baru Setara Vinilex (2 x laburan)
- Plamir tembok
Kg
0.1000
25,000.00
- Cat dasar
Kg
0.1000
30,000.00
- Cat penutup 2x setara vinilex
Kg
0.2600
25,000.00
- Pekerja
Oh
0.0200
42,000.00
- Tukang cat
Oh
0.0630
65,000.00
- Kepala tukang
Oh
0.0063
75,000.00
- Mandor
Oh
0.0025
80,000.00
Jumlah
Dibulatkan
N-15r' 1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan)
- Plamir tembok
Kg
0.1000
25,000.00
- Cat dasar
Kg
0.1000
30,000.00
- Cat penutup 3x setara vinilex
Kg
0.3900
25,000.00
- Pekerja
Oh
0.0300
42,000.00
- Tukang cat
Oh
0.0945
65,000.00
- Kepala tukang
Oh
0.0095
75,000.00

HARGA

3,040.00
160.00
840.00
13,000.00
1,500.00
800.00
19,340.00
19,340.00
3,040.00
160.00
4,139.60
10,500.00
14,625.00
1,687.50
600.00
34,752.10
34,752.00
20,310.00
252.00
3,900.00
900.00
480.00
25,842.00
25,842.00
2,500.00
3,000.00
6,500.00
840.00
4,095.00
472.50
200.00
17,607.50
17,608.00
2,500.00
3,000.00
9,750.00
1,260.00
6,142.50
712.50

No.

URAIAN
- Mandor
Jumlah
Dibulatkan

SAT

VOLUME

HARGA SAT

0.0038

80,000.00

304.00
23,669.00
23,669.00

0.1200
0.1800
0.0280
0.0420
0.0042
0.0025

30,000.00
25,000.00
42,000.00
65,000.00
75,000.00
80,000.00

3,600.00
4,500.00
1,176.00
2,730.00
315.00
200.00
12,521.00
12,521.00

Oh

N-16 1 M2 Pengecatan Tembok Lama Setara Vinilex


- Cat dasar
Kg
- Cat penutup 2 x
Kg
- Pekerja
Oh
- Tukang cat
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan

HARGA

O. PEKERJAAN PENANAMAN POHON


NO.
URAIAN
KOEF SAT.
O-01 1 Lubang (70x70x70) cm, tanam pohon pelindung tinggi 2m
Pupuk kandang
0.0800
krg
Furadan
0.0010
kg
Pohon pelindung
1.0000 btng
Pekerja
0.0250
org
Mandor
0.0025
org
Jumlah
Dibulatkan
O-02 1 Lubang (70x70x70) cm, tanam bambu krisik/jepang
Pupuk kandang
0.0800
krg
Furadan
0.0010
kg
Bambu krisik/jepang
1.0000 btng
Pekerja
0.0250
org
Mandor
0.0025
org
Jumlah
Dibulatkan
1
O-03 Lubang (40x40x40) cm, tanam pohon perdu (polibag)
Pupuk kandang
0.0400
krg
Furadan
0.0010
kg
Pohon perdu
1.0000 btng
Pekerja
0.0200
org
Mandor
0.0020
org
Jumlah
Dibulatkan
O-04 1 M2 Tanam rumput gajah (silang papan catur)
Pupuk kandang
0.0400
krg
Rumput gajah mini
0.5000
m2
Pekerja
0.0400
org
Mandor
0.0040
org
Jumlah
Dibulatkan

HARGA SAT. (Rp)

HARGA (Rp)

25,000.00
24,000.00
25,000.00
42,000.00
80,000.00

2,000.00
24.00
25,000.00
1,050.00
200.00
28,274.00
28,274.00

25,000.00
24,000.00
50,000.00
42,000.00
80,000.00

2,000.00
24.00
50,000.00
1,050.00
200.00
53,274.00
53,274.00

25,000.00
24,000.00
10,000.00
42,000.00
80,000.00

1,000.00
24.00
10,000.00
840.00
160.00
12,024.00
12,024.00

25,000.00
15,000.00
42,000.00
80,000.00

1,000.00
7,500.00
1,680.00
320.00
10,500.00
10,500.00

K(2) Analisa Biaya Konstruksi Pekerjaan Kusen Alumunium


1

1 UNIT Pasang partisi Alumunium, Daun partisi Multiplek rangka kayu Kamper
Bahan
7.6200
m'
Kusen Alumunium Natural Uk 4" + upah 20%
181,320.00
1.3500
lbr Multiplek 9 mm
151,100.00
0.0300 m3 Kayu papan kamper medan
5,823,400.00
11.7000
m'
List kayu profil 1 cm
8,900.00
0.1000
kg Paku biasa " - 1"
23,800.00
0.2500
kg Lem putih FOX
23,900.00
4.0000
bh Grendel jendela 2"
5,500.00
2.0000
bh Handle partisi
33,000.00
1.5400 m2 Cat kayu
39,790.00
4.8600 m2 Cat tembok
17,608.00
Jumlah I
Tenaga

0.3000
1.3000
0.1300
0.0130

Oh
Oh
Oh
Oh

Pekerja Terampil
Tukang kayu Terampil
Kepla Tukang Kayu
Mandor

42,000.00
65,000.00
75,000.00
80,000.00
Jumlah II
Jumlah I + II

1 UNIT Pek. Kusen Jendela Alumunium uk. 2 X 1,50 M' ( 3 lubang ) dgn 2 Daun Jendela
Bahan
12.0000
m'
Profil aluminium 4" natural + upah 20%
181,320.00
5.4000
m'
Profil daun jendela alm. + upah 20%
118,560.00
1.8100 m2 Kaca polos 5 mm
111,000.00
2.0000
ps
Engsel jendela 3"
15,000.00
2.0000
bh Slot Handle jendela
33,000.00
2.0000
bh Hak Kait angin jendela biasa
7,100.00
0.0000
ls
Acesories ( 5 % )
150,848.70

1 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb. Jendela + 1 lb. Pintu )
Bahan
14.1000
m'
Profil aluminium 4" natural + upah 20%
181,320.00
2.7000
m'
Profil daun jendela alm. + upah 20%
118,560.00
1.6500 m2 Kaca polos 5 mm
111,000.00
1.6800 m2 Daun pintu panel Multiplek 9 mm
356,459.00
rangka ky. Kamper Medan/Kruing
1.0000
ps
Engsel jendela 3"
15,000.00
1.0000
bh Slot Handle jendela
33,000.00
2.0000
bh Hak Kait angin jendela biasa
7,100.00
1.5000
ps
Engsel pintu 4"
21,000.00
1.0000
bh Grendel pintu 2"
5,500.00
1.0000
bh Kunci tanam 2 slaagh (Royal)
126,500.00
0.0000
ls
Acesories ( 5 % )
152,993.70

1 UNIT Pekerjaan Kusen Pintu Alumunium uk. 0,8 X 2,70 M'


Bahan
7.0000
m'
Profil aluminium 4" natural + upah 20%
0.3700 m2 Kaca polos 5 mm
1.6800 m2 Daun pintu panel Multiplek 9 mm
rangka ky. Kamper Medan/Kruing
1.5000
ps
Engsel pintu 4"
1.0000
bh Grendel pintu 2"
1.0000
bh Kunci tanam 2 slaagh (Royal)
0.0000
ls
Acesories ( 5 % )

Page 171

1,381,658.40
203,985.00
174,702.00
104,130.00
2,380.00
5,975.00
22,000.00
66,000.00
61,276.60
85,574.88
2,107,681.88
12,600.00
84,500.00
9,750.00
1,040.00
107,890.00
2,215,571.88

2,175,840.00
640,224.00
200,910.00
30,000.00
66,000.00
14,200.00
150,848.70
3,278,022.700

2,556,612.00
320,112.00
183,150.00
598,851.12
15,000.00
33,000.00
14,200.00
31,500.00
5,500.00
126,500.00
152,993.70
4,037,418.820

181,320.00
111,000.00
356,459.00

1,269,240.00
41,070.00
598,851.12

21,000.00
5,500.00
126,500.00
95,458.06

31,500.00
5,500.00
126,500.00
95,458.06
2,168,119.176

K (2)

1 UNIT Pek. Kusen Jendela Alumunium uk. 2,65 X 1,50 M' ( 4 lubang ) dgn 2 Daun Jendela
Bahan
15.4500
m'
Profil aluminium 4" natural + upah 20%
181,320.00
5.4000
m'
Profil daun jendela alm. + upah 20%
118,560.00
2.5500 m2 Kaca polos 5 mm
111,000.00
2.0000
ps
Engsel jendela 3"
15,000.00
2.0000
bh Slot Handle jendela
33,000.00
2.0000
bh Hak Kait angin jendela biasa
7,100.00
0.0000
ls
Acesories ( 5 % )
186,233.40

Page 172

2,801,394.00
640,224.00
283,050.00
30,000.00
66,000.00
14,200.00
186,233.40
4,021,101.400

K (2)

10

11

1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk. 2,85 X 2,70 M' ( 3 lb. Jendela + 1 lb. Pintu )
Bahan
17.5500
m'
Profil aluminium 4" natural + upah 20%
181,320.00
5.4000
m'
Profil daun jendela alm. + upah 20%
118,560.00
2.4000 m2 Kaca polos 5 mm
111,000.00
1.6800 m2 Daun pintu panel Multiplek 9 mm
356,459.00
rangka ky. Kamper Medan/Kruing
2.0000
ps
Engsel jendela 3"
15,000.00
2.0000
bh Slot Handle jendela
33,000.00
2.0000
bh Hak Kait angin jendela biasa
7,100.00
1.5000
ps
Engsel pintu 4"
21,000.00
1.0000
bh Grendel pintu 2"
5,500.00
1.0000
bh Kunci tanam 2 slaagh (Royal)
126,500.00
0.0000
ls
Acesories ( 5 % )
204,439.50

1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,30 X 2,80 M' ( 2 Daun Pintu )
Bahan
8.9000
m'
Profil aluminium 4" natural + upah 20%
181,320.00
0.6500 m2 Kaca polos 5 mm
111,000.00
2.7300 m2 Daun pintu panel Multiplek 9 mm
356,459.00
rangka ky. Kamper Medan/Kruing
1.5000
ps
Engsel pintu 4"
21,000.00
1.0000
ps
spagnolet tanam
51,600.00
1.0000
bh Kunci tanam 2 slaagh (Royal)
126,500.00
0.0000
ls
Acesories ( 5 % )
132,951.55

1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,70 M' ( 2 Daun Pintu )
Bahan
8.8000
m'
Profil aluminium 4" natural + upah 20%
181,320.00
0.7000 m2 Kaca polos 5 mm
111,000.00
2.9400 m2 Daun pintu panel Multiplek 9 mm
356,459.00
rangka ky. Kamper Medan/Kruing
1.5000
ps
Engsel pintu 4"
21,000.00
1.0000
ps
spagnolet tanam
51,600.00
1.0000
bh Kunci tanam 2 slaagh (Royal)
126,500.00
0.0000
ls
Acesories ( 5 % )
136,065.27

1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu )
Bahan
10.7500
m'
Profil aluminium 4" natural + upah 20%
181,320.00
1.0700 m2 Kaca polos 5 mm
111,000.00
1.6800 m2 Daun pintu panel Multiplek 9 mm
356,459.00
rangka ky. Kamper Medan/Kruing
1.5000
ps
Engsel pintu 4"
21,000.00
1.0000
ps
spagnolet tanam
51,600.00
1.0000
bh Kunci tanam 2 slaagh (Royal)
126,500.00
0.0000
ls
Acesories ( 5 % )
133,340.56

3,182,166.00
640,224.00
266,400.00
598,851.12
30,000.00
66,000.00
14,200.00
31,500.00
5,500.00
126,500.00
204,439.50
5,165,780.620

1,613,748.00
72,150.00
973,133.07
31,500.00
51,600.00
126,500.00
132,951.55
3,001,582.624

1,595,616.00
77,700.00
1,047,989.46
31,500.00
51,600.00
126,500.00
136,065.27
3,066,970.733

1,949,190.00
118,770.00
598,851.12
31,500.00
51,600.00
126,500.00
133,340.56
3,009,751.676

1 UNIT Pekerjaan Jalusi Alumunium Sofi-sofi


Bahan
5.1000
m'
Profil aluminium 4" natural + upah 20%
8.0000
m2 Jalusi Alm
0.0000
ls
Acesories ( 5 % )

181,320.00
35,000.00
60,236.60

924,732.00
280,000.00
60,236.60
1,264,968.600

1 UNIT Pek. Kusen Bouvenlight Alumunium ( 1 lubang ) uk. 0,70 x 0,60 m


Bahan
4.0000
m'
Profil aluminium 4" natural + upah 20%

181,320.00

725,280.00

Page 173

K (2)

0.2400
0.0000

12

m2
ls

Kaca polos 5 mm
Acesories ( 5 % )

1 UNIT Pek. Kusen Bouvenlight Alumunium ( 2 lubang ) uk. 1,35 x 0,60 m


Bahan
4.5000
m'
Profil aluminium 4" natural + upah 20%
0.4800 m2 Kaca polos 5 mm
0.0000
ls
Acesories ( 5 % )

Page 174

111,000.00
37,596.00

26,640.00
37,596.00
789,516.000

181,320.00
111,000.00
43,461.00

815,940.00
53,280.00
43,461.00
912,681.000

K (2)

13

14

1 UNIT Pek. Kusen Bouvenlight Alumunium ( 3 lubang ) uk. 2,00 x 0,60 m


Bahan
6.4000
m'
Profil aluminium 4" natural + upah 20%
0.7200 m2 Kaca polos 5 mm
0.0000
ls
Acesories ( 5 % )

181,320.00
111,000.00
62,018.40

1,160,448.00
79,920.00
62,018.40
1,302,386.400

1 UNIT Pek. Kusen Bouvenlight Alumunium ( 4 lubang ) uk. 2,65 x 0,60 m


Bahan
8.3000
m'
Profil aluminium 4" natural + upah 20%
0.9600 m2 Kaca polos 5 mm
0.0000
ls
Acesories ( 5 % )

181,320.00
111,000.00
80,575.80

1,504,956.00
106,560.00
80,575.80
1,692,091.800

Page 175

K (2)

DAFTAR HARGA SATUAN UPAH

NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

URAIAN
Mandor
Kepala Tukang Batu
Kepala Tukang Kayu
Kepala Tukang Besi
Kepala Tukang Cat
Kepala Tukang Listrik
Kepala Tukang
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Tukang Cat
Tukang Listrik
Tukang Pipa
Tukang Plitur
Tukang Taman
Tukang
Pembantu Tukang
Pekerja Biasa
Penjaga Malam
Sopir
Operator
Mekanik
Pembantu Sopir
Pembantu Operator
Pembantu Mekanik

SATUAN
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

UPAH (Rp.)
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

80,000.00
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
42,000.00
42,000.00
42,000.00
65,000.00
75,000.00
65,000.00
42,000.00
50,000.00
42,000.00

KETERANGAN

DAFTAR HARGA SATUAN BAHAN BANGUNAN

NO
A.

MATERIAL

SAT

HARGA (Rp)

AGREGAT KASAR,BAHAN PEREKAT & BAHAN JADINYA


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

Pasir Urug
Tanah Urug Pilihan
Sirtu
Pasir Teras
Pasir Pasang Kali
Pasir Beton
Abu Batu
Batu Gosok ( Apung )
Batu Pecah Mesin 1/2
Batu Pecah Mesin 2/3
Batu Pecah Mesin 3/5
Batu Pecah Mesin 5/7
Batu Belah Pondasi
Batu Bronjol ( Untuk Bronjong )
Batu Koral Beton Kali
Batu Tempel Hitam
Batu Pinggir Beton 10 x 20 x 35
Batu Pinggir Beton 15 x 35 x 50 ( K-225 )
Batu Telor
Batako Kecil 8 x 10 x 20
Batako Besar 8 x 20 x 30
Con Blok 8 x 20 x 40
Bata Merah Bakar kelas I
Bata Merah Bakar kelas II
Bata Merah Oven ( Klingker )
Roster Beton 20 x 20
Roster Beton 30 x 30
Grass Blok 20 x 20
Grass Blok 30 x 30
Paving Blok Natural 8 cm
Paving Blok Warna 8 cm
Paving Blok Natural 6 cm
Paving Blok Warna 6 cm
Canstin Paving Blok
Semen PC /50 kg
Semen Putih
Kanstin Jalan Ukuran Besar ( Bina Marga ) 1bh =60cm
Readymix Beton K500, Tanpa Pompa ( Selang )
Readymix Beton K400, Tanpa Pompa ( Selang )

Page 177

m3
m3
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m3
m3
m3
m3
bh
bh
m3
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m1
zak
zak
bh
m3
m3

175,300.00
89,200.00
203,500.00
174,200.00
233,400.00
255,400.00
259,000.00
29,600.00
223,600.00
211,100.00
205,000.00
196,000.00
205,500.00
180,800.00
172,600.00
96,600.00
14,100.00
73,700.00
97,800.00
2,000.00
2,400.00
5,400.00
775.00
675.00
1,800.00
14,800.00
15,500.00
9,700.00
22,500.00
81,100.00
108,600.00
76,000.00
86,000.00
34,900.00
70,300.00
92,700.00
58,900.00
1,105,000.00
903,500.00

BHN

NO
40
41
42
43
44
45
46
47
48

MATERIAL

SAT

Readymix Beton K350, Tanpa Pompa ( Selang )


Readymix Beton K300, Tanpa Pompa ( Selang )
Readymix Beton K225, Tanpa Pompa ( Selang )
Readymix Beton K175, Tanpa Pompa ( Selang )
Kapur Pasang / Kapur Tembok
Kapur Sirih
Semen Warna
Tanah liat
Air

Page 178

m3
m3
m3
m3
m3
kg
kg
m3
ltr

HARGA (Rp)
877,500.00
925,000.00
850,000.00
825,000.00
353,300.00
18,300.00
15,700.00
31,300.00
3.00

BHN

NO
49
50
51
52
B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

MATERIAL

SAT

HARGA (Rp)

Formite/spacer
Hollow/Con Blok 8 x 20 x 40
Hollow/Con Blok 8 x 15 x 40
Hollow/Con Blok 8 x 10 x 40

bh
bh
bh
bh

2,500.00
5,000.00
4,000.00
3,000.00

LABURAN,PENGISI DAN ALATNYA


Plamir Tembok
Cat Tembok ICI Eksterior ( Beton )
Cat Tembok ICI Interior ( Plafon Dan Dinding )
Cat Tembok Vinilex
Cat Dasar ICI untuk Interior ( 2 Pelapis )
Cat Tembok Sanlek
Cat Dasar
Cat Tahan Asam
Pelapis Alkali ICI ( Cat Dasar Beton Ekterior )
Cat Marka / Spotlight
Water Profing Emulsion
Water Profing Membrance
Rool Cat Tembok
Kape Tembok
Kape Kayu
Soligneum 1 Blek
Plincote
Penawetan Kayu
Pegopenan Kayu
Kwas 3"
Oker
Oyan
Oten ( Pewarna Plitur )
Spirtus
Bahan Pelitur Kripik ( Sirlak India )
Dempul Lilin
Dempul Plitur
Dempul Halus / Imfra ( Wood Filler )
Dempul Jadi
Politur
Politur Jadi
Terpentin
Tiner A
Tiner B
Kumpon
Melamik
Dempul Plastik

kg
lt
lt
kg
lt
kg
kg
lt
kg
kg
ml
bh
bh
bh
5 lt
kg
m3
m3
bh
bh
bks
bks
lt
kg
kg
kg
kg
lt
kg
lt
lt
kg
kg
kg
lbr
kg
kg

25,000.00
120,000.00
75,000.00
25,000.00
75,000.00
20,000.00
30,000.00
40,000.00
90,000.00
185,000.00
70,000.00
62,500.00
32,500.00
8,500.00
10,000.00
25,000.00
29,000.00
382,600.00
370,000.00
16,000.00
22,000.00
5,200.00
5,500.00
15,000.00
110,000.00
34,200.00
37,700.00
37,700.00
35,800.00
48,000.00
112,700.00
19,500.00
23,900.00
21,400.00
30,800.00
52,500.00
39,200.00

Page 179

BHN

NO
38
39
40
41
42
43
44
45

MATERIAL

SAT

Dempul Duco
Ampelas
Dempul Kayu Cap Kucing
Meni Kayu / Besi
Sincromat
Cat Kayu Sieve
Cat Besi
Cat Besi Duco Danaglos / ICI

kg
lbr
kg
kg
kg
lt
lt
bh

Page 180

HARGA (Rp)
35,800.00
5,000.00
24,400.00
30,400.00
40,900.00
41,700.00
44,000.00
76,300.00

BHN

NO

MATERIAL

SAT

HARGA (Rp)

46
47
48
49
50

Cat Bron
Karet lis
Minyak cat
Glass beet
Residu

kg
bh
kg
kg
lt

67,700.00
3,300.00
38,400.00
50,100.00
8,100.00

C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

BAHAN KAYU BERIKUT BAHAN JADINYA


Bambu 5 s.d 7
Bambu 7 s.d 10
Bambu Gombong
Kayu Kamper Singkil / Kapur ( Kayu Samarinda kls II )
Kayu Balok Borneo Super
Kayu Papan Borneo Super
Kayu Balok Kamper Medan (Kruing )
Kayu Papan Kamper Medan (Kruing )
Kayu Balok Kamper Banjar
Kayu Papan Kamper Banjar
Kayu Balok Kamper Samarinda
Kayu Papan Kamper Samarinda
Kayu Balok Rasamala
Kayu Jati Jatim Tua dia. 40 cm
Kayu Jati Jateng Tua dia. 40 cm
Kayu Jati Jabar Tua dia. 40 cm
Kayu Jati Jabar Tua dia. 40 cm kebawah
Kayu Hutan Kelas I ( Segeng,Mahoni, Laban )
Kayu Balok Albasia
Kayu Papan Albasia
Dolken 5 s/d 7
Dolken 7 s/d 10
List Profil Kamper 1 cm
List Profil Kamper 2 cm
List Profil Kamper 4 cm
List Profil Kamper 5 cm
List Profil Kamper 10 cm
Pegangan Tangga Profil Jati
Pegangan Tangga Profil Kamper
Kayu Kaso 4/6
Kayu Kaso 5/7
Kayu Reng 2/3 Borneo Super
Kayu Reng 2/3 Kamper Banjar
Kayu Reng 3/4 Kamper Banjar
Kayu Papan Terentang
Kayu Balok Terentang

bt
bt
bt
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
bt
bt
m1
m1
m1
m1
m1
m1
m1
m3
m3
m1
m1
m3
m3
m3

17,700.00
25,000.00
37,200.00
7,094,450.00
5,280,000.00
5,595,800.00
5,692,600.00
5,823,400.00
6,363,600.00
6,645,300.00
8,633,700.00
8,724,300.00
2,658,000.00
20,772,000.00
22,188,400.00
13,625,400.00
12,736,100.00
2,069,800.00
1,870,500.00
2,071,700.00
22,600.00
28,000.00
8,900.00
10,000.00
14,300.00
17,200.00
29,400.00
160,100.00
122,500.00
2,772,000.00
3,356,800.00
2,500.00
3,300.00
4,000.00
2,850,000.00
2,640,000.00

Page 181

BHN

NO

MATERIAL

SAT

HARGA (Rp)

37
38
39
40
41

Batang Kelapa
Tali Ijuk
lapisan Ijuk tebal 10 cm
Venetion Blind
Vertikal Blind

bt
kg
m2
m2
m2

139,500.00
23,400.00
22,000.00
537,300.00
351,200.00

D
1
2

BAHAN PENUTUP RANGKA PLAFOND


Plafond Enternit 4 mm
Plafond hardpleks 5 mm 120 x 240

m2
lbr

17,400.00
62,400.00

Page 182

BHN

NO

MATERIAL

SAT

HARGA (Rp)

3
4
5
6
7
8
9
10
11
12

Plafond Asbes Semen 5 mm


Plafond Asbes Semen 3,5 mm
Gypsum 120 x 240 t= 9 mm ex DN
Gypsum 120 x 240 t= 9 mm ex Luar
Tepung gypsum
Acustik Amstrong 60 x 120
Cotton Plester
GRC (120 x 240) cm, t = 4 mm
Cornice Coumpound
List gypsum

m2
m2
lbr
lbr
kg
lbr
bh
lbr
zak
m'

22,500.00
19,500.00
79,800.00
83,800.00
12,500.00
132,800.00
15,000.00
67,500.00
75,000.00
8,500.00

E
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

BAHAN KAYU LAPIS


Triplek 3 mm 120 x 240
Triplek 4 mm 120 x 240
Triplek 4 mm ukuran Pintu
Triplek 6 mm 120 x 240
Triplek 9 mm 120 x 240
Jabar Wood 4 mm
Bilik Bambu ( tanpa kulit )
Bilik Bambu ( dengan kulit )
Bilik Bambu Hitam Variasi
Wall paper
MultiPlek 9 mm 120 x 240
MultiPlek 12 mm 120 x 240
MultiPlek 18 mm 120 x 240
Ply Wood 18 mm 120 x 240
Ply Wood 9 mm 120 x 240
Ply Wood 4 mm 120 x 240
Teak Wood 3 mm 120 x 240
Teak Wood 4 mm 120 x 240
Teak Wood 3 mm 120 x 240 ukuran Pintu
Teak Wood ukuran Pintu 4 mm
Tacon ( Tahan Bakar )
Supercon
Melamin 4 mm 120 x 240
Melamin TOK 4 mm
Formika 120 x 240
Formika ukuran Pintu
Formika Warna 4" x 8"

lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
m2
m2
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
lbr
lbr
lbr
lbr
lbr

61,700.00
64,400.00
56,200.00
92,000.00
166,600.00
119,000.00
19,800.00
22,700.00
34,200.00
55,700.00
151,100.00
195,000.00
255,400.00
323,900.00
235,000.00
140,000.00
129,100.00
131,700.00
127,200.00
114,700.00
128,200.00
57,900.00
89,200.00
133,400.00
170,000.00
132,900.00
238,100.00

F
1
2

BAHAN LANTAI DAN PELAPIS DINDING


Tegel PC 20 x 20
Plin Tegel PC 10 x 20

bh
bh

3,400.00
2,400.00

Page 183

BHN

NO
3
4
5
6
7
8
9
10

MATERIAL

SAT

Tegel PC 30 x 30
Plin Tegel PC 15 x 30
Tegel Warna 20 x 20
Plin Tegel Warna 10 x 20
Tegel Warna 30 x 30
Plin Tegel Warna 15 x 30
Tegel Wafel PC 20 x 20
Tegel Wafel Warna 20 x 20

bh
bh
bh
bh
bh
bh
bh
bh

Page 184

HARGA (Rp)
3,400.00
2,800.00
3,600.00
3,400.00
5,700.00
6,300.00
3,200.00
2,500.00

BHN

NO
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53

MATERIAL

SAT

Tegel Badak PC 30 x 30
Poslin 11 x 11 Warna Standar DN
Poslin 11 x 11 Warna khusus DN
Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Mulia
Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Mulia
Keramik 20 x 20 (KM) KW I DN Corak/Warna /Anti Slip Mulia
Keramik 20 x 20 (KM) KW I DN Putih Polos Mulia
Keramik 20 x 25 Dinding KM KW I DN Corak Mulia
Keramik 30 x 30 KWI DN Putih Polos Mulia
Keramik 30 x 30 KWI DN Warna/Corak (ANTI SLIP) Mulia
Keramik 40 x 40 KWI DN Putih Polos Mulia
Keramik 40 x 40 KWI DN Warna/Corak (ANTI SLIP) Mulia
Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Roman
Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Roman
Keramik 20 x 20 (KM) KW I DN Corak/Warna/Anti Slip Roman
Keramik 20 x 20 (KM) KW I DN Putih Polos Roman
Keramik 20 x 25 Dinding KM KW I DN Corak Roman
Keramik 20 x 25 KW I DN Putih Polos Roman
Keramik 30 x 30 KW I DN Polos Roman
Keramik 30 x 30 KW I DN Warna/Corak (ANTI SLIP) Roman
Keramik 40 x 40 KW I DN Polos Roman
Keramik 40 x 40 KW I DN Warna/Corak (ANTI SLIP) Roman
Vinyl Lantai Standar
Karpet Kelas Baik LN
Karpet Kelas Sedang LN
Parquet Jati
Stairnosing Keramik 10/20
Stairnosing Fiber
Taraso Kerang 30 x 30
Plin Taraso 10 x 30
Granit Alam LN Ukuran Besar
Granit Alam LN Ukuran Kecil
Granit Alam DN Ukuran Besar
Granit Alam DN Ukuran Kecil
Granito Tile Essenza Ukuran 40 x 40 Polis
Granito Tile Essenza Ukuran 30 x 30
Granito Tile Essenza Ukuran 40 x 40 UnPolis
Marmer
Marmer Alam Lampung Ukuran Besar
Marmer Alam Lampung Ukuran kecil
Marmer Alam Citatah Ukuran Besar
Marmer Alam Citatah Ukuran Kecil
Marmer Sintetis

Page 185

bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
m
m2
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

HARGA (Rp)
4,100.00
63,300.00
67,300.00
54,500.00
56,000.00
62,500.00
54,500.00
62,500.00
53,000.00
58,000.00
56,800.00
65,500.00
64,400.00
72,200.00
75,200.00
72,900.00
75,200.00
72,900.00
68,900.00
76,600.00
72,500.00
77,000.00
56,000.00
1,025,500.00
353,500.00
375,400.00
13,700.00
25,000.00
31,800.00
13,500.00
1,848,400.00
1,612,900.00
1,331,100.00
1,299,400.00
345,000.00
322,800.00
204,900.00
550,000.00
550,200.00
345,700.00
340,800.00
237,600.00
157,900.00

BHN

NO
54
55
56
57
58
59
60

MATERIAL

SAT

Granito Tile Essenza 60 x 60 Polis


Granito Tile Essenza 60 x 60 UnPolis
Batu Tempel Hitam
Bata Karawang
Campuran untuk Kedap Air ( AM )
Plint keramik 10 x 20
Plint keramik 10 x 25

m2
m2
m2
bh
ltr
bh
bh

Page 186

HARGA (Rp)
358,100.00
231,800.00
96,500.00
600.00
37,600.00
3,000.00
3,250.00

BHN

NO

MATERIAL

SAT

HARGA (Rp)

61
62
63
64
65
66
67
68

Plint keramik 10 x 30
Plint keramik 10 x 40
Plint keramik 15 x 30
Plint keramik 15 x 40
Plint granito 10 x 30
Plint granito 10 x 40
Plint granito 15 x 30
Plint granito 15 x 40

bh
bh
bh
bh
bh
bh
bh
bh

3,500.00
4,000.00
4,500.00
5,250.00
25,900.00
27,600.00
31,100.00
41,300.00

G
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

BAHAN SALURAN AIR KOTOR / BERSIH


Grafel U 20 cm'
Grafel U 30 cm'
Grafel U 40 cm'
Buis Beton 20 cm ( 1 M' )
Buis Beton 30 cm ( 1 M' )
Buis Beton 40 cm ( 1 M' )
Buis Beton 50 cm ( 1 M' )
Buis Beton 60 cm ( 1 M' )
Buis Beton 100 cm ( 0.50 M' )
Buis Beton 80 cm ( 0.50 M' )
BuisTanah 10 cm ( 0.50 M' )
BuisTanah 15 cm ( 0.50 M' )
BuisTanah 20 cm ( 0.50 M' )
BuisTanah 25 cm ( 0.50 M' )
Injuk

m1
m1
m1
m1
m1
m1
stk
stk
stk
stk
stk
stk
stk
stk
kg

44,300.00
56,400.00
74,200.00
49,200.00
61,700.00
80,900.00
94,300.00
130,900.00
299,800.00
298,500.00
9,600.00
12,700.00
16,800.00
22,800.00
17,400.00

H
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

BAHAN LOGAM DAN BAHAN JADINYA


Besi Beton U-24 Rata-rata
Besi Beton U-39 / U-32 Rata-rata
Pagar BRC lengkap tiang ( Tanpa Pondasi )
Bondek
Besi WF Ex DN SII
Besi WF Ex Jepang
Besi Profil DN SII
Besi Profil Ex LN
Besi C Lip Chanel
Ongkos Galfanis Besi
Kawat Beton
Kawat Duri
Kawat Pengikat
Kawat Bronjong 4 mm
Kawat Tembaga
Ram Nyamuk Hijau

kg
kg
m2
m2
kg
kg
kg
kg
kg
kg
kg
kg
m1
kg
kg
m2

16,500.00
20,700.00
171,300.00
185,000.00
24,000.00
23,900.00
18,300.00
21,600.00
19,200.00
10,600.00
27,700.00
63,500.00
1,000.00
28,200.00
41,400.00
13,400.00

Page 187

BHN

NO
17
18
19
20
21
22
23
24

MATERIAL

SAT

Ram Kawat 1 x 1 cm
Ram Ayam
Kawat Kasa 1 x 1 ( Putih )
Kawat Harmonika 4 cm
Kawat Harmonika 2 cm
Kawat Las Listrik
Wiremesh M8
Wiremesh M6

m2
m2
m2
m2
m2
kg
m2
m2

Page 188

HARGA (Rp)
15,300.00
14,900.00
32,100.00
35,900.00
28,600.00
23,600.00
51,900.00
38,700.00

BHN

NO
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67

MATERIAL

SAT

Timah
Timah Hitam
Ram nyamuk Alumunium
Plat Srip 2 x 30 mm ( 6 m1 )
Plat Srip 3 x 30 mm ( 6 m1 )
Plat Strip
Besi Strip
Plat Alumunium 0.2 mm
Plat Alumunium 0.3 mm
Plat Alumunium 0.4 mm
Plat Alumunium 0.5 mm
Plat Alumunium 0.6 mm
Plat Alumunium 0.1 mm
Kusen Alumunium Natural 1.3 mm t= 1,3 mm ( 4 " )
Kusen Alumunium Warna 1.3 mm t= 1,3 mm ( 4 " )
Kusen Alumunium Natural 1.3 mm t= 1,3 mm ( 3 " )
Kusen Alumunium Warna 1.3 mm t= 1,3 mm ( 3 " )
Daun Jendela Alumunium Natural ( tanpa kaca dan accessories )
Daun Jendela Alumunium Warna ( tanpa kaca dan accessories )
Daun Pintu Alumunium Natural ( tanpa kaca dan accessories )
Daun Pintu Alumunium Warna ( tanpa kaca dan accessories )
Handle Alumunium ( Tarikan Pintu Alumunium )
Kait Angin Alumunium
Karet Asisoris Kusen / Pintu Alumunium
Jalusi Alluminium
Sunscreen Almunium
Seng Plat BJLS 30 60 cm ( 100 m1 )
Seng Plat BJLS 30 90 cm ( 100 m1 )
Plat Besi Tipis 1 mm
Plat Besi Tipis 0.5 mm
Plat Besi 2 mm s/d 5 mm
Plat Besi 6 mms/d 10 mm
Plat Besi 10 mm keatas
Kabel presstressed polos
Jaring Kawat Baja
Lem Kuning ( Aibond )
Lem Fox
Lem Vinyl
Besi Strip Kaca Nako
Profil alumunium "T"
Besi Hallow ( 2 x 4 x 4) cm (400cm)
Besi Hallow ( 4 x 4) cm (400 cm)
Besi Rail Pengamanan

Page 189

kg
kg
m2
bt
bt
bt
kg
m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m2
m2
m2
m2
bh
ps
m1
m'
m2
roll
roll
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
m1
btg
btg
kg

HARGA (Rp)
46,300.00
43,300.00
32,400.00
33,000.00
33,100.00
18,200.00
26,800.00
89,800.00
110,500.00
141,400.00
143,100.00
171,800.00
56,300.00
151,100.00
163,000.00
81,000.00
102,000.00
98,800.00
148,800.00
211,800.00
207,500.00
345,200.00
104,500.00
7,500.00
35,000.00
380,200.00
1,581,500.00
2,080,100.00
16,800.00
17,700.00
14,100.00
14,100.00
14,700.00
26,700.00
28,900.00
35,700.00
23,900.00
44,000.00
11,000.00
12,200.00
22,600.00
29,200.00
459,300.00

BHN

NO
68
69
70
71
72
73
74
75

MATERIAL

SAT

Jendela Besi
Jendela Besi tahan api
Pintu gulung besi
Pintu Roliing Door
Jendela nako kaca ryben + tralis 6 klips
Jendela nako kaca ryben + tralis 7 klips
Jendela nako kaca ryben + tralis 8 klips
Jendela nako kaca ryben + tralis 10 klips

m2
m2
m2
m2
set
set
set
set

Page 190

HARGA (Rp)
390,200.00
501,700.00
501,700.00
306,600.00
170,000.00
200,000.00
230,000.00
290,000.00

BHN

NO

MATERIAL

SAT

HARGA (Rp)

76
77
78
79
80
81

Jendela nako kaca bening + tralis 4 klips


Jendela nako kaca bening + tralis 5 klips
Jendela nako kaca bening + tralis 6 klips
Jendela nako kaca bening + tralis 7 klips
Jendela nako kaca bening + tralis 8 klips
Jendela nako kaca bening + tralis 10 klips

set
set
set
set
set
set

120,000.00
140,000.00
170,000.00
210,000.00
230,000.00
300,000.00

I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

BAHAN KACA
Kaca Polos 2 mm ( ASAHI )
Kaca Polos 3 mm ( ASAHI )
Kaca Polos 5 mm ( ASAHI )
Kaca Polos 8 mm ( ASAHI )
Kaca Rayband 5 mm ( ASAHI )
Kaca Rayband 8 mm ( ASAHI )
Kaca Rayband 12 mm ( ASAHI )
Kaca cermin 5 mm
Kaca cermin 6 mm
Kaca cermin 8 mm
Kaca Patri Lokal Terpasang ( ASAHI )
Kaca Patri Ex Luar Negeri Terpasang
Kaca 6 mm Gravver
Glass Block DN 20 x 20 ( Kedawung )
Glass Block DN 20 x 20 Ex LN
Sealant
Jendela Nako

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
kg
bh

69,000.00
87,400.00
111,000.00
183,100.00
148,700.00
323,400.00
627,000.00
150,500.00
186,400.00
234,300.00
1,621,100.00
3,425,700.00
1,263,900.00
22,000.00
125,700.00
211,800.00
109,200.00

J
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

BAHAN PAKU DAN MUR BAUT


Paku 1/2" s/d 2"
Paku 2" s/d 5"
Paku 8 cm s/d 15 cm
Paku Beton 2 cm s/d 5 cm
Paku Kait Lengkap
Paku Cacing
Besi Beugel Kuda - Kuda
Duk Angker
Angker Mur Baut dia. 19 / Panjang 60 cm
Mur Baut HTB dia. 19 s/d 16 ( 5 cm )
Mur Baut Biasa dia. 19 s/d 16 ( 5 cm )
Piser dia.12 s/d 20 cm
Paku skrup 3"
Ramset / Dinabolt
Baut Besar
Baut Kecil

kg
kg
kg
bh
bh
kg
kg
bh
bh
bh
bh
bh
bh
bh
bh
bh

23,800.00
23,400.00
20,000.00
1,600.00
900.00
57,100.00
21,700.00
7,500.00
71,800.00
15,900.00
9,300.00
5,300.00
800.00
7,200.00
600.00
300.00

Page 191

BHN

NO

MATERIAL

SAT

HARGA (Rp)

17
18
19

Paku GRC
Paku gypsum
Sekrup fixer

kg
kg
bh

35,000.00
17,500.00
250.00

K
1
2
3

BAHAN PERPIPAAN
Besi Pipa Untuk Hydrant BSP 1"
Besi Pipa Untuk Hydrant BSP 1.25"
Besi Pipa Untuk Hydrant BSP 1.5"

bt
bt
bt

166,700.00
210,200.00
298,000.00

Page 192

BHN

NO
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

MATERIAL

SAT

Besi Pipa Untuk Hydrant BSP 2"


Besi Pipa Untuk Hydrant BSP 2.5"
Besi Pipa Untuk Hydrant BSP 3"
Besi Pipa Untuk Hydrant BSP 4"
Besi Pipa Untuk Hydrant BSP 6"
Besi Pipa Hitam 1" t = 2 mm
Besi Pipa Hitam 2" t = 2 mm
Besi Pipa Hitam 3" t = 2mm
Besi Pipa Hitam 4" t = 2 mm
Besi Pipa Hitam 6" t = 2 mm
Pipa GIP Medium A 1/2" ( 6 m1 )
Pipa GIP Medium A 3/4" ( 6 m1 )
Pipa GIP Medium A 1" ( 6 m1 )
Pipa GIP Medium A 1 1/4" ( 6 m1 )
Pipa GIP Medium A 1 1/2" ( 6 m1 )
Pipa GIP Medium A 1 3/4" ( 6 m1 )
Pipa GIP Medium A 2" ( 6 m1 )
Pipa GIP Medium A 2 1/2" ( 6 m1 )
Pipa GIP Medium A 3" ( 6 m1 )
Pipa GIP Medium A 4" ( 6 m1 )
Macam2 Sambungan GIP 1/2"
Macam2 Sambungan GIP 3/4"
Macam2 Sambungan GIP 1"
Macam2 Sambungan GIP 1 1/4"
Macam2 Sambungan GIP 1 1/2"
Macam2 Sambungan GIP 1 3/4"
Macam2 Sambungan GIP 2"
Macam2 Sambungan GIP 2 1/2"
Macam2 Sambungan GIP 3"
Macam2 Sambungan GIP 4"
Pipa PVC RUCIKA type AW 1/2"
Pipa PVC RUCIKA type AW 3/4"
Pipa PVC RUCIKA type AW 1"
Pipa PVC RUCIKA type AW 1 1/4"
Pipa PVC RUCIKA type AW 1 1/2"
Pipa PVC RUCIKA type AW 2"
Pipa PVC RUCIKA type AW 2 1/2"
Pipa PVC RUCIKA type AW 3"
Pipa PVC RUCIKA type AW 4"
Pipa PVC RUCIKA type AW 6"
Pipa PVC RUCIKA type AW 8"
Pipa PVC MASPION ABU ( AW ) 1/2"
Pipa PVC MASPION ABU ( AW ) 3/4"

bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt

Page 193

HARGA (Rp)
351,800.00
439,300.00
595,000.00
869,600.00
1,423,400.00
172,300.00
227,900.00
365,800.00
573,100.00
772,400.00
109,100.00
159,400.00
181,500.00
259,300.00
280,500.00
326,400.00
467,400.00
672,100.00
849,900.00
920,300.00
6,300.00
8,600.00
16,700.00
19,800.00
20,700.00
22,700.00
51,200.00
60,400.00
75,900.00
118,600.00
40,100.00
52,200.00
63,200.00
79,900.00
105,900.00
110,700.00
167,100.00
205,100.00
347,900.00
640,000.00
818,300.00
22,500.00
27,800.00

BHN

NO
47
48
49
50
51
52
53

MATERIAL

SAT

Pipa PVC MASPION ABU ( AW ) 1"


Pipa PVC MASPION ABU ( AW ) 1 1/4"
Pipa PVC MASPION ABU ( AW ) 1 1/2"
Pipa PVC MASPION ABU ( AW ) 2"
Pipa PVC MASPION ABU ( AW ) 2 1/2"
Pipa PVC MASPION ABU ( AW ) 3"
Pipa PVC MASPION ABU ( AW ) 4"

bt
bt
bt
bt
bt
bt
bt

Page 194

HARGA (Rp)
40,500.00
58,500.00
60,200.00
75,800.00
126,300.00
145,700.00
256,800.00

BHN

NO

MATERIAL

SAT

HARGA (Rp)

54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73

Macam2 Sambungan Paralon 1/2"


Macam2 Sambungan Paralon 3/4"
Macam2 Sambungan Paralon 1"
Macam2 Sambungan Paralon 1 1/4"
Macam2 Sambungan Paralon 1 1/2"
Macam2 Sambungan Paralon 1 3/4"
Macam2 Sambungan Paralon 2"
Macam2 Sambungan Paralon 2 1/2"
Macam2 Sambungan Paralon 3"
Macam2 Sambungan Paralon 4"
Sambungan Pipa PVC Jenis AW 4" TY
Lem Paralon
Solatip Ledeng
Pipa PVC 4" Berlobang Jenis AW
PVC Waterstop lebar 150
PVC Waterstop lebar 200
PVC Waterstop lebar 230
PVC Waterstop lebar 250
PVC Waterstop lebar 300
PVC Waterstop lebar 320

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
tb
gl
m1
m1
m1
m1
m1
m1
m1

4,400.00
4,700.00
4,900.00
7,200.00
9,500.00
13,500.00
15,800.00
26,400.00
29,700.00
34,000.00
89,900.00
10,100.00
4,200.00
36,700.00
53,500.00
57,900.00
65,700.00
74,700.00
83,600.00
92,500.00

L
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

BAHAN SANITAIR
Stop Kran 3/4" KIT
Stop Kran 1" KIT
Stop Kran 1 1/2" KIT
Stop Kran 2" KIT
Stop Kran 2 1/2" KIT
Stop Kran 3" KIT
Check Valve 1/2"
Double Neple 1/2"
Water Mur 1/2"
Gate walve 1/2"
Saringan Air Lt. KM Stainless Steel
Apooer Bath Tube
Kran Stainless Lokal Kait
Shower Dengan Tiang
Shower Tanpa Tiang
Kran Tembok Sun Eui dia. 1/2"
Kran Tembok ITAP dia. 1/2"
Kran Bebek Sun Eui 1/2"
Kran Bebek ITAP 1/2"
Kran Panas Dingin San Eui Standard
Bath Cape Washteren

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
unit

103,900.00
124,200.00
208,000.00
267,900.00
713,200.00
830,300.00
86,400.00
32,400.00
40,200.00
55,500.00
66,600.00
267,800.00
46,100.00
221,000.00
134,800.00
86,900.00
40,900.00
144,600.00
51,500.00
228,400.00
2,098,700.00

Page 195

BHN

NO
22
23
24
25
26
27

MATERIAL

SAT

Tempat Sabun Poslin


Wastafel Lengkap TOTO LW 230
Wastafel Lengkap INA
Closet Jongkok Poslin Warna TOTO
Closet Jongkok Standard Putih Poslin TOTO
Closet Jongkok Lengkap Sistem Jet TOTO

bh
unit
unit
unit
unit
unit

Page 196

HARGA (Rp)
46,300.00
1,012,700.00
699,900.00
205,600.00
188,200.00
2,032,900.00

BHN

NO

MATERIAL

SAT

HARGA (Rp)

28
29
30
31
32
33
34
35
36

Closet Duduk Warna Standard TOTO C 240 Lengkap


Wastafel Bulat Warna Standard Lengkap
Closet Duduk Warna Standard INA Lengkap
Urinoir Lengkap TOTO Warna Standard Lengkap
Penyekat Poslin Urinoar TOTO
Kitchen Zink Stainless Standard Lokal ( 1 Lubang )
Kitchen Zink Stainless Non Standard Franke ( 1 Lubang )
Kitchen Zink Stainless Non Standard Franke ( 2 Lubang )
Talang PVC U - 15 cm

unit
unit
bh
unit
lbr
bh
bh
bh
btng

1,724,700.00
910,800.00
1,272,100.00
1,773,400.00
495,900.00
397,800.00
1,272,300.00
1,650,200.00
60,000.00

M
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

BAHAN PENUTUP ATAP


Atap Plastik Gelombang 80 x 180
Atap Fiber Glass Tipis 80 x 180 ( Gelombang )
Atap Fiber Glass Tebal 80 x 180 ( Gelombang )
Atap Alumunium Natural USR 26 ( JAINDO )
Atap Alumunium Warna USR 26 ( JAINDO )
Atap Asbes Gel. Kecil 80 x 180 x 4 mm
Atap Asbes Gel. Besar 80 x 180 x 5 mm
Atap Seng Gelombang 80 cm x 180 cm x 3 mm
Atap Seng Gelombang 80 cm x 180 cm x 5 mm
Atap Seng Gelombang 270 cm x 105 cm x 4mm
Atap Seng Gelombang 240 cm x 105 cm x 4mm
Atap Seng Gelombang 210 cm x 105 cm x 4mm
Atap Seng Gelombang 150 cm x 105 cm x 4mm
Atap Seng Gelombang 150 cm x 102 cm x 5mm
Atap Seng Gelombang 180 cm x 102 cm x 5mm
Atap Asbes Gelombang 300 cm x 105 cm x 4 mm
Atap Tegola Kubota, lengkap
Atap Tegola Kwalitas Sedang
Alumunium Foile
Atap Genteng Plentong pres Bakar KW I
Atap Genteng Plentong pres Molen Oven KW I
Atap Genteng Flam pres Molen Oven Jatiwangi
Bubung Genteng pres Bulat Ex Jatiwangi
Genteng Bubungan Ex Jatiwangi Segi Tiga
Genteng Bubungan Beton
Genteng Metal ( Rainbow Roof )
Genteng Metal Hana
Nok Atas Metal ( Rainbow Roof )
Nok Atas Metal Hana
Nok Pingir Metal ( Rainbow Roof )
Nok Pingir Metal Hana
Wall Flasing ( Rainbow Roof )

lbr
lbr
lbr
m2
m2
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
m2
bh
bh
bh
bh
bh
bh
m2
m2
lbr
lbr
lbr
lbr
lbr

33,100.00
47,100.00
100,000.00
140,600.00
164,700.00
77,200.00
111,100.00
62,900.00
83,100.00
73,300.00
65,900.00
58,500.00
42,300.00
78,500.00
97,200.00
80,000.00
487,100.00
283,600.00
19,600.00
1,900.00
2,700.00
2,300.00
7,500.00
4,800.00
10,500.00
203,100.00
172,700.00
138,500.00
80,900.00
105,300.00
100,800.00
83,900.00

Page 197

BHN

NO
33
34
35
36
37
38
39
40

MATERIAL

SAT

Wall Flasing Hana


Atap Genteng Beton Warna 14.5/m2
Genteng Beton Natural
Sirap Kelas I ( 80 / m2 )
Genteng Keramik Natural Intan 14.5 / m2
Genteng Keramik Glasur Standard 14.5 /m2
Genteng Keramik Glasur Special 14.5 /m2
Genteng Keramik Glasur Premium 14.5 /m2

lbr
m2
bh
m2
m2
m2
m2
m2

Page 198

HARGA (Rp)
88,700.00
96,700.00
8,500.00
26,400.00
112,400.00
142,200.00
139,300.00
145,100.00

BHN

NO

MATERIAL

SAT
bh
bh
bh
bh
bh
bh
bh
bh
bh
lbr
lbr
m2
lbr
lbr
m1
m1
m1
m1
bh
m1
bh

HARGA (Rp)

41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61

Genteng Murando Natural 1m2 = 18 bh


Genteng Murando Glasur 1m2 = 18 bh
Bubung Murando Natural
Bubung Murando Glasur
Bubungan Genteng Keramik
Atap Genteng Kodok
Bubungan Genteng Kodok
Bubungan Genteng Plentong
Bubungan Stel Gelombang
Nok Stel Gelombang
Nok Atap Seng
Nok standar 40 cm 18, SWG 22
Pelat Asbes tebal 4 mm
Pelat Asbes tebal 3.5 mm
Trusses ZAM-75 t=0.8 Rangka Utama
Trusses ZAM-75 t=0.5 Rangka Utama
Reng 16-DB Roof Battens t=0.48 mm
Foot Plate t= 1.22 mm
PLD - Diafragma Plate
WIND Bracing
Tensioner ( Pengaku Tali angin )

N
1
2
3
4
5
6
7
8
9
10
11
12
13

BAHAN MEKANIKAL
Jockey Pump kap. 80 gln/menit 100 m1 ( 18.6 kW )
Electrical Pump kap. 750 gln/menit 120 m1 ( 90 kW )
Diesel Pump kap. 750 gln/menit 120 m1 ( 105 kW )
Presure Tank kap. 500 liter lengkap
Hydran Box dlm Gedung ( Lengkap )
Fire House 1.5 x 30 m + nose
Exhose Fan H 360 W 60 x 60 cm
Exhose Fan H 380 W CFM 55 x 55 cm
Exhose Fan H 100 W 40 x 40 cm
AC Split 3 PK Setara TOSHIBA
AC Split 2 PK Setara TOSHIBA
AC Split 1 PK Setara TOSHIBA
Mesin AC Split DAIKIN ( Indoor / Outdoor Unit )

unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
1 BTU

71,396,400.00

O
1
2
3
4
5

BAHAN ELEKTRIKAL
Kabel NYA 1 x 1.5 Prima ( 1 rol = 50 m' )
Kabel NYA 1 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 1.5 Prima ( 1 rol = 50 m' )
Kabel NYM 3 x 1.5 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 2.5 Prima ( 1 rol = 50 m' )

ROLL
ROLL
m'
m'
m'

102,700.00
151,700.00
6,600.00
7,600.00
4,900.00

Page 199

2,700.00
4,000.00
7,500.00
10,700.00
10,000.00
3,000.00
4,500.00
6,000.00
7,500.00
38,100.00
37,500.00
75,000.00
21,000.00
16,400.00
34,500.00
22,000.00
11,000.00
7,200.00
2,200.00
1,700.00
7,200.00

216,358,900.00
591,647,100.00

36,997,300.00
6,854,400.00
4,866,100.00
6,862,900.00
5,491,100.00
1,092,600.00
30,791,800.00
21,926,500.00
5,174,100.00
4,200,000.00

BHN

NO

MATERIAL

6
7
8
9
10
11
12

Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' )


Kabel NYM 4 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 4 Prima ( 1 rol = 50 m' )
Kabel NYM 3 x 4 Prima ( 1 rol = 50 m' )
Kabel NYM 4 x 4 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYM 3 x 6 Supreme ( 1 rol = 50 m' )

SAT
m'
m'
m'
m'
m'
m'
m'

Page 200

HARGA (Rp)
10,900.00
7,600.00
6,300.00
15,400.00
20,700.00
11,800.00
13,700.00

BHN

NO
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55

MATERIAL

SAT

Kabel NYM 4 x 6 Supreme ( 1 rol = 50 m' )


Kabel NYM 2 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYM 3 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYM 4 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYM 4 x 16 Supreme ( 1 rol = 50 m' )
Kabel NYY 2 x 4 Supreme ( 1 rol = 50 m' )
Kabel NYY 3 x 4 Supreme ( 1 rol = 50 m' )
Kabel NYY 4 x 4 Supreme ( 1 rol = 50 m' )
Kabel NYY 2 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYY 3 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYY 4 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYY 2 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYY 3 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYY 4 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYY 4 x 16 Supreme ( 1 rol = 50 m' )
NSFB FUJI EA - 100 A
NSFB FUJI EA - 150 A
Rumah Panel 30 x 60 cm ( Kosong )
Skring Kas 2 grop Biasa
Skring Kas 3 grop Biasa
Skring Kas 5 grop Biasa
MCB 1 PAS
MCB 3 PAS
Tahanan 50 A Merk Fuji
Saklar Broko Tunggal Standard ( 1 Phase )
Saklar Broko Seri Standard ( 1 Phase )
Stop Kontak Broko Standard ( 1 Phase )
Stop Kontak Broko 3 Phase (Out Bow)
Stop Kontak Broko 3 Phase ( In Bow)
Stop Kontak Handle 3 Phase
Instalas Titik Lampu / Stop Kontak (Upah dan Alat)
Lampu pijar 25 Watt s/d 100 Watt
Lampu Neon Phillips 20 Watt
Lampu Neon Phillips 40 Watt
Trapo TL 20 W (Phillips)
Trapo TL 40 W (Phillips)
Trapo TL 20 W (Sinar)
Trapo TL 40 W (sinar)
Stater Neon Phillips
Stater Neon Biasa
Rumah TL In Bow / Out Bow 2 x 20 W (kosongan)
Down Light + SL 25 W
Lampu SL Philip 25 W

Page 201

m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
bh
bh
unt
unt
unt
unt
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

HARGA (Rp)
18,600.00
17,600.00
119,700.00
26,500.00
29,700.00
12,000.00
19,300.00
23,800.00
14,500.00
19,200.00
18,500.00
20,400.00
25,800.00
35,500.00
41,900.00
841,900.00
2,182,600.00
153,500.00
204,800.00
222,600.00
468,800.00
55,100.00
106,000.00
521,100.00
23,800.00
26,300.00
23,800.00
87,700.00
144,900.00
87,800.00
179,600.00
61,200.00
29,700.00
35,200.00
41,800.00
37,900.00
40,600.00
41,300.00
8,300.00
6,500.00
144,000.00
306,900.00
306,900.00

BHN

NO
56
57
58
59
60
61
62
63
64

MATERIAL

SAT

Lampu Sirkel TL 20 W Lengkap


Lampu Mercuri 80 W
Lampu Taman + Tiang + Lampu 1 Buah
Lampu Baret 30 cm + Neon
Lampu Neon Arcrilik 2 x 40 W Lengkap
Jarum Penangkal Petir 16
Kawat BC ( Tembaga )
Pentanahan Penangkal Petir
Pentanahan Panel

bh
bh
bh
bh
bh
bh
kg
ttk
ttk

Page 202

HARGA (Rp)
67,900.00
147,400.00
307,600.00
221,700.00
738,000.00
101,500.00
65,100.00
423,700.00
296,100.00

BHN

NO

MATERIAL

SAT

HARGA (Rp)

P
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

BAHAN ALAT PENGANTUNG DAN KUNCI


Kunci Silinder ALFA untuk Pintu Alumunium
Tarikan Pintu Alumunium
Kunci 2 Slaag ROYAL
Rel Henderson Lengkap
Rel maraton I Pintu
Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226
Kunci 2 Slaag Ancor Asli
Kunci 2 Slaag ISO
Kunci KM Bulat Kualitas Biasa
Kunci kM Bulat ALFA
Kunci 2 Slaag Silinder Utama Standard
Kunci Gembok Besar
Kunci 2 Slaag Kuda Terbang
Kunci Lemari
Espangolet
Grendel 15 cm
Grendel 5 cm
Hak Angin Kait Jendela Biasa
Hak Angin Jendela Antik
Hak Angin Sendok Stainless / Kuningan
Sloot Pintu Berikut Rantai
Sloot Jendela Tunggal
Engsel Pintu Unilon Standard
Engsel Jendela Unilon
Engsel Patrun
Engsel Harmonika
Door Closer Kelas Standard ( Kelas Sedang )
Door Closer Kelas Standard ( Kelas Baik )
Door Closer Kelas Rendah
Door Holder
Door Stoper
Tarikan Almari Rata-rata
Seng BJLS 30 Lebar 60 cm ( 1 rol 50 m' )
Seng BJLS 30 Lebar 90 cm ( 1 rol 50 m' )
Seng BJLS 30 / 3 x 0.3 mm
Seng Plat
Waterstop Lebar 200 mm

bh
bh
bh
bh
unt
bh
bh
bh
bh
bh
bh
bh
bh
bh
ps
bh
bh
ps
ps
bh
bh
bh
ps
ps
ps
m1
unt
unt
unt
unt
unt
bh
m1
m1
lbr
lbr
m1

410,900.00
408,600.00
126,500.00
864,300.00
193,100.00
335,900.00
165,300.00
207,300.00
54,400.00
102,700.00
586,600.00
85,200.00
94,500.00
46,800.00
51,600.00
49,800.00
5,500.00
7,100.00
29,000.00
32,200.00
31,500.00
33,000.00
21,000.00
15,000.00
13,700.00
9,100.00
420,000.00
597,500.00
200,000.00
205,400.00
255,500.00
19,500.00
43,500.00
53,500.00
86,900.00
50,100.00
57,900.00

Q
1
2

BAHAN PENGIKAT UNTUK KONSTRUKSI JALAN


Aspal Bitumen
Aspal Emulsi

kg
kg

12,459.00
12,459.00

Page 203

BHN

NO

MATERIAL

SAT

HARGA (Rp)

3
4
5
6

Aspal Curah
Aspal Concrete / Laston( AC -WC)
Aspal Threated Base ( ATB )
Lataston /Hot Rolls Sheet ( HRS )

kg
ton
ton
ton

10,890.00
1,348,300.00
1,200,200.00
1,666,900.00

R
1
2

BAHAN PENGISAP AIR SUMUR DALAM


Pompa Kodok
Pompa Dragon Tegal

unit
unit

172,600.00
243,800.00

Page 204

BHN

NO

MATERIAL

SAT

HARGA (Rp)

3
4
5
6
7
8
9
10
11

Pompa Dragon Asli


Mesin Pompa Air 100 W - Sanyo
Mesin Pompa Air 150 W - Sanyo
Pompa Zet Pump 250 W - Sanyo
Pompa Zet Pump 450 W - Sanyo
Pompa Submersible kap. 150 liter / menit 3 KW
Gear Pump Kap. 60 liter / menit
Deep Well dengan kelengkapannya kap. 150 liter / menit
Hand Oil Pump

unit
unit
unit
unit
unit
unit
unit
unit
unit

718,500.00
1,100,200.00
1,890,700.00
4,961,500.00
7,878,000.00
27,151,200.00
15,702,700.00
172,052,500.00
5,195,300.00

S
1
2
3
4
5
6

BAHAN PENAMPUNG AIR


Tangki Air Fiber Glass 0.5 m3 ( Excel )
Tangki Air Fiber Glass 1 m3 ( Excel )
Tangki Air Fiber Glass 2 m3 ( Excel )
Bak KM Fiber 60 x 60
Bak Taraso WC 40 x 40
Bak KM Taraso 60 x 60

bh
bh
bh
bh
bh
bh

1,172,500.00
1,316,400.00
1,954,200.00
255,300.00
118,500.00
161,100.00

T
1
2
3
4
5
6
7
8
9
10

ALAT TUKANG
Palu 0.5 kg
Cangkul
Singkup
Sekrop
Pengki
Linggis
Rool Meter 30 meter ( Bahan Plastik )
Rool Meter 5 meter ( Bahan Besi )
Selang Plastik untuk Water Pas dia. 0.5 cm
Water Pas Alumunium 60 cm

bh
bh
bh
bh
bh
bh
bh
bh
m
bh

39,300.00
24,500.00
41,400.00
50,100.00
12,300.00
41,700.00
101,000.00
37,800.00
1,600.00
88,200.00

U
1
2
3
4
5
6
7
8
9
10
11
12

BAHAN BAKAR DAN PELUMAS


Minyak Tanah
Kayu Bakar dari Kayu Karet
Bahan Bakar Residu
Minyak Solar
Bensin Premium
Plus Oil
Oil Mesran 40 SAE
Elpiji / botol
Asitilin / Botol
Angin ( O2 ) / botol
Karbit
Minyak Bekisting

lt
m3
lt
lt
lt
lt
lt
15 kg
15.1 kg btl
btl
kg
ltr

18,000.00
151,100.00
28,435.00
7,150.00
7,800.00
3,300.00
55,000.00
104,600.00
88,900.00
66,400.00
19,400.00
40,500.00

Page 205

BHN

NO

MATERIAL

SAT

HARGA (Rp)

13
14
15
16
17

Rapidrant
Soda Api
Sabun
Arang Kayu
Kawat Las

Gln
kg
kg
kg
bh

15,700.00
35,600.00
2,400.00
11,100.00
1,400.00

V
1
2

BAHAN PAGAR
Panel Beton Pracetak
Kolom Beton Pracetak

lbr
btg

182,600.00
264,000.00

Page 206

BHN

NO

B.
1
2
3
4
5
6
7
8
9
10

MATERIAL

SAT

BIDANG PERTAMANAN
Aglonema
Bambu krisik/jepang
Furadan
Kompos/pupuk kandang
M atoa (2 m)
Palm (botol, ekor tupai, putri, dll) tinggi 2 m
Philo
Pohon pelindung (angsana, mahoni, kamboja dll) tinggi 2m
Pohon perdu (kaca piring, puring, mawar, melati, dll)
Rumput gajah mini

Page 207

batang
batang
kg
karung
batang
batang
batang
batang
batang
m2

HARGA (Rp)

50,000.00
50,000.00
24,000.00
25,000.00
40,000.00
100,000.00
75,000.00
25,000.00
10,000.00
15,000.00

BHN

DAFTAR HARGA SATUAN PEKERJAAN


NO
A.

URAIAN PEKERJAAN

KODE

HARGA

ANL

(Rp)

A-01

269,316.00

A-02
A-03
A-04
A-05
A-06
A-07
A-08
A-09
A-10
A-11
A-12
A-13
A-14
A-15
A-16

355,236.00
222,843.00
49,266.00
1,135,066.00
927,350.00
861,935.00
8,200.00
96,799.00
306,654.00
282,654.00
457,929.00
166,813.00
265,378.00
43,645.00
54,250.00

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

PEKERJAAN PERSIAPAN
1 M' Pagar Sementara Dari Kayu Tinggi 2 m
1 M' Pagar Sementara Seng Gelombang Tinggi 2 m
1 M' Pagar SementaraKawat Duri Tinggi 1,80 m
1 M2 Pengukuran Dan Pasang Bouwplank
1 M2 Pembuatan Kantor Sementara dgn Lantai Diplester
1 M2 Pembuatan Gudang Semen dan Alat-alat
1 M2 Pembuatan Bedeng Buruh
1 M2 Membersihkan Lapangan dan Perataan
1M2 Pembuatan Jalan Sementara
1 M3 Bongkaran Beton Bertulang
1 M3 Bongkaran Dinding Tembok Bata Merah
1 M Pagar beton Pracetak ( 5 x 50 x 213 ) cm
1 M Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'
1 M2 Pagar BRC lengkap dengan tiang
1 M2 Steiger Werk / perancah dari Bambu
1 M' Cerucuk Bambu

1
2
3
4
5
6
7
8
9
10
11
12
13
14

PEKERJAAN TANAH
1 M3 Galian Tanah Biasa sedalam 1 m
1 M3 Galian Tanah Biasa Sedalam 2 m
1 M3 Galian Tanah Biasa Sedalam 3 m
1 M3 Galian Tanah Keras Sedalam 1 m
1 M3 Galian Tanah Lumpur Sedalam 1 m
1 M2 Pekerjaan Stripping Setinggi 10 cm
1 M3 Pembuangan Tanah sejauh 150 m
1 M3 Urugan Kembali
1 M3 Pemadatan Tanah
1 M3 Urugaan Pasir
1 M2 Pemasangan Lapisan Ijuk Tebal 10 cm
1 M3 Urugan Sirtu
1 M3 Urugan Tanah Pilihan
1 M2 Pembuatan jalan sementara, tebal 25 cm

B-01
B-02
B-03
B-04
B-05
B-06
B-07
B-08
B-09
B-10
B-11
B-12
B-13
B-14

20,000.00
26,252.00
36,710.00
31,210.00
41,206.00
2,500.00
25,672.00
9,584.00
25,000.00
223,760.00
33,900.00
256,700.00
119,540.00
120,456.00

PEKERJAAN PONDASI
1 M3 Pasanag Pondasi batu Kali adk 1pc : 3 ps
1 M3 Pasang Pondasi Batu kali adk 1pc : 4ps
1 M3 Pasang Pondasi Batu kali adk 1pc : 5ps
1 M3 Pasang Pondasi Batu Kosong (aanstamping)
1 M3 Beton siklop adk 1pc : 2ps : 3kr + 40 % Batu Belah dgn besi tulangan
1 M3 Pasang Pondasi Sumuran adk 1pc:2ps:3kr + 40 % Batu Belah (D= 1m)
1 M3 Pondasi siklop adk 1pc:2ps:3kr + 40 % Batu Belah
1 M' Pembuatan Tiang Pancang (40x40) cm, Beton Tulang
1 M' Pembuatan Tiang Pancang (35x35) cm, Beton Tulang

C-01
C-02
C-03
C-04
C-05
C-06
C-07
C-08
C-09

735,761.00
689,096.00
656,736.00
363,345.00
2,020,939.00
870,632.00
761,279.00
1,104,309.00
864,246.00

B.

C.
1
2
3
4
5
6
7
8
9

Page 208

HRGST

NO

URAIAN PEKERJAAN

KODE
ANL

10
11
12
13
D.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

1 M' Pembuatan Tiang Pancang f 40 cm, Beton Tulang


1 M' Memancang Tiang Pancang Beton Tulang
1 Buah Memotong Tiang Pancang (40x40) cm Beton Tulang
1 M' Menyambung Tiang Pancang Beton Bertulang

C-10
C-11
C-12
C-13

PEKERJAAN BETON
1 M3 Membuat Beton Tumbuk adk 1pc:3ps:5kr
D-01
1 M3 Membuat Beton Tumbuk adk 1pc:3ps:6kr
D-02
1 M3 Membuat Beton Tumbuk 1pc:2ps:3kr
D-03
1 M3 Membuat Tiang Pancang Beton Prestressed
D-04
1 M3 Membuat Beton Tumbuk adk 1pc:2ps:4kr
D-05
1 M Memasang PVC Waterstop Lebar 200 mm
D-06
1 Kg Pembesian Dengan Besi Polos/ulir
D-07
1 M2 Pasang Bekesting Untuk Pondasi
D-08
1 M2 Pasang Bekisting Untuk Sloof
D-09
1 M2 Pasang Bekesting Untuk Kolom
D-10
1 M2 Pasang Bekesting Untuk Balok
D-11
1 M2 Pasang Bekesting Untuk Lantai
D-12
1 M2 Pasang Bekesting Untuk Tangga
D-13
1 M3 Membuat Beton Cor Mutu K-225
D-14
1 M3 Membuat Beton Cor Mutu K-275
D-15
1 M3 Pondasi Beton Tulang (150 kg besi + bekisting)
D-16
1 M3 Sloof Beton Tulang (200 kg besi + bekisting)
D-17
1 M3 Sloof Beton Tulang 15/20 (150 kg besi + bekisting)
D-17r1
1 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15
D-17r2
1 M3 Sloof Beton Tulang 20/30 (150 kg besi + bekisting) Struktur bertingkat 4dia.16 8-15
1 M3 Sloof Beton Tulang 20/30 (200 kg besi + bekisting) Struktur bertingkat 6dia.16 8-15
1 M3 Sloof Beton Tulang 20/40 (240 kg besi + bekisting) Struktur bertingkat
1 M3 Kolom Beton Tulang (120 kg besi + bekisting)
D-18
1 M3 Kolom Beton Tulang 20/20 (140 kg besi + bekisting) 4dia. 12 8-15
D-18r
1 M3 Kolom Beton Tulang 15/20 (180 kg besi + bekisting) 4dia.12 8-15
1 M3 Kolom Beton Tulang Praktis 12/12 (175 kg besi + bekisting)
1 M3 Kolom Beton Tulang Praktis 12/12 (210 kg besi + bekisting)
1 M3 Kolom Beton Tulang 20/20 (210 kg besi + bekisting) Struktur bertingkat 4dia.16 8-15
1 M3 Kolom Beton Tulang 20/30 (230 kg besi + bekisting) Struktur bertingkat 6dia.16 +2dia.12, 8-15
1 M3 Kolom Beton Tulang 20/40 (250 kg besi + bekisting) Struktur bertingkat
1 M3 Kolom Beton Tulang 30/30 (175 kg besi + bekisting) Struktur bertingkat 8dia.16, 8-15
1 M3 Kolom Beton Tulang 30/40 (200 kg besi + bekisting) Struktur bertingkat
1 M3 Kolom Beton Tulang (140 kg besi + bekisting)
D-19
1 M3 Kolom Beton Tulang (150 kg besi + bekisting)
D-20
1 M3 Kolom Beton Tulang (180 kg besi + bekisting)
D-21
1 M3 Kolom Beton Tulang (200 kg besi + bekisting)
D-22
1 M3 Kolom Beton Tulang (250 kg besi + bekisting)
D-23
1 M3 Kolom Beton Tulang (300 kg besi + bekisting)
D-24
1 M3 Balok Beton Tulang (120 kg besi + bekisting)
D-25
1 M3 Balok Beton Tulang 15/20 (150 kg besi + bekisting)
D-26
1 M3 Balok Beton Tulang 15/30 (190 kg besi + bekisting) Struktur bertingkat 4dia. 16, 8-15

Page 209

HARGA
(Rp)
1,073,335.00
128,057.00
216,932.00
628,577.00

716,798.00
689,279.00
970,698.00
1,047,667.00
914,882.00
65,593.00
18,566.00
152,870.00
167,120.00
308,850.00
316,770.00
431,850.00
289,440.00
1,197,898.00
1,186,807.00
4,248,004.00
5,441,279.00
4,616,279.00
5,078,279.00
4,583,279.00
5,408,279.00
6,101,279.00
6,646,664.00
6,573,014.00
7,233,014.00
6,225,664.00
6,803,164.00
7,728,014.00
8,058,014.00
8,498,014.00
7,150,514.00
7,673,014.00
6,691,324.00
6,864,634.00
7,367,944.00
7,706,254.00
8,552,029.00
9,397,804.00
5,693,859.00
6,201,324.00
6,773,324.00

HRGST

NO

URAIAN PEKERJAAN

KODE
ANL

42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

1 M3 Balok Beton Tulang 20/40 (200 kg besi + bekisting) Struktur bertingkat 7dia.16+2dia.12, 8-15
1 M3 Balok Beton Tulang 20/30 (200 kg besi + bekisting) Struktur bertingkat 6dia. 16, 8-15
1 M3 Balok Beton Tulang 25/55 (140 kg besi + bekisting) Struktur bertingkat 8dia.16 +2dia.12, 8-15
1 M3 Balok Beton Tulang (230 kg besi + bekisting)
1 M3 Tangga Beton Tulang (200 kg besi + bekisting)
1 M3 Pelat Lantai Beton Tulang T= 10 cm (90 kg besi + bekisting)
1 M3 Pelat Lantai Beton Tulang T= 12 cm (110 kg besi + bekisting) dia.8-12,5
1 M3 Pelat Lantai Beton Tulang T= 12 cm (130 kg besi + bekisting)
1 M3 Pelat Lantai Beton Tulang T= 15 cm (90 kg besi + bekisting)
1 M3 Pelat Lantai Beton Tulang T= 15 cm (115 kg besi + bekisting)
1 M' Kolom Praktis Beton Tulang (11x11) cm
1 M' Ring Balok Beton Tulang (10x15) cm
1 M2 Pasang Bekesting Untuk Dinding
1 M3 Pelat Beton Tulang (150 kg besi + bekisting)
1 M3 Dinding Beton Tulang (150 kg besi + bekisting)
1 M3 Dinding Beton Tulang (200 kg besi + bekisting)
1 M3 Membuat Beton Cor Mutu K-300
1 M3 Membuat Beton Cor Mutu K-200
1 M3 Membuat Beton Cor Mutu K-250

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

PEKERJAAN PASANGAN DINDING


1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 3ps
1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 4ps
1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 5ps
1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 3ps
1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 4ps
1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 5ps
1 M2 Pasang Dinding Roster Beton 20 x 20 adk 1pc : 3ps
1 M2 Pasang Dinding Roster Beton 20 x 20 adk 1pc : 4ps
1 M2 Pasang Dinding Roster/terawng (12 x 11 x 24) cm
1 M2 Pasang Dinding Batako Besar Pres uk. 8x20x30 adk. 1pc:4ps
1 M2 Pasang Dinding hollowblock (HB-20)
1 M2 Pasang Dinding hollowblock (HB-15)
1 M2 Pasang Dinding hollowblock (HB-10)
1 M2 Pasang Dinding Conblock (CB-20)
1 M2 Pasang Dinding Conblock (CB-15)
1 M2 Pasang Dinding Conblock (CB-10)
1 M2 Dinding Keramik Corak 10 x 20 cm Setara Mulia
1 M2 Dinding Keramik polos 10 x 20 cm Setara Mulia
1 M2 Dinding Keramik corak 20 x 20 cm setara Mulia
1 M2 Dinding Keramik polos 20 x 20 cm Setara Mulia
1 M2 Dinding Keramik polos 20 x 25 cm Setara Mulia
1 M2 Dinding Keramik Corak 20 x 25 cm Setara Mulia
1 M2 Dinding Keramik Polos 30 x 30 cm Setara Mulia
1 M2 Dinding Keramik Corak 30 x 30 cm Setara Mulia
1 M2 Dinding Keramik Polos 40 x 40 cm Setara Mulia
1 M2 Dinding Keramik Corak 40 x 40 cm Setara Mulia

E.

Page 210

D-27

HARGA
(Rp)

D-28
D-29
D-30
D-31
D-32
D-33
D-34
D-35
D-36
D-37
D-38
D-39
D-40
D-41
D-42
D-43

6,959,099.00
6,959,099.00
5,969,099.00
7,554,564.00
6,575,339.00
6,904,322.00
6,554,453.00
6,925,773.00
5,466,262.00
5,930,412.00
72,847.00
94,786.00
315,287.00
6,438,864.00
6,196,529.00
6,574,999.00
928,986.00
852,609.00
892,501.00

E-01
E-02
E-03
E-04
E-05
E-06
E-07
E-08
E-09
E-10
E-11
E-12
E-13
E-14
E-15
E-16
E-17
E-18
E-19
E-20
E-21
E-22
E-23
E-24
E-25
E-26

220,267.00
211,736.00
207,720.00
105,680.00
102,345.00
100,253.00
580,016.00
577,485.00
580,016.00
77,991.00
151,794.00
129,077.00
109,862.00
190,791.00
117,281.00
104,781.00
108,782.00
107,282.00
115,282.00
107,282.00
107,282.00
115,282.00
105,782.00
110,782.00
109,582.00
118,282.00

HRGST

NO

URAIAN PEKERJAAN

27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

1 M2 Dinding Keramik Corak 10 x 20 cm Setara Roman


1 M2 Dinding Keramik polos 10 x 20 cm Setara Roman
1 M2 Dinding Keramik corak 20 x 20 cm setara Roman
1 M2 Dinding Keramik polos 20 x 20 cm Setara Roman
1 M2 Dinding Keramik polos 20 x 25 cm Setara Roman
1 M2 Dinding Keramik Corak 20 x 25 cm Setara Roman
1 M2 Dinding Keramik Polos 30 x 30 cm Setara Roman
1 M2 Dinding Keramik Corak 30 x 30 cm Setara Roman
1 M2 Dinding Keramik Polos 40 x 40 cm Setara Roman
1 M2 Dinding Keramik Corak 40 x 40 cm Setara Roman
1 M2 Dinding Marmer
1 M2 Dinding Batu Tempel Hitam
1 M2 Dinding Porselen (11 x 11) cm
1 M2 Wall paper
1 M2 Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper Medan
1 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper Medan
1 M2 Dinding Pemisah Triplek 4 mm Rangkap, Rangka Kayu Kamper Medan
1 M2 Dinding Pemisah GRC t = 4 mm + rangka besi hollow
1 M2 Dinding Pemisah Plywood t = 4 mm + rangka besi hollow
1 M2 Dinding Pemisah teakwood t = 4 mm + rangka besi hollow
1 M2 Pasang Dinding Glass Block 20 x 20 adk 1pc : 4ps
1 M2 Pasang Dinding anyaman bambu, rangka kayu

17
18
19
20
21
22
23
24
25
26
27
28
29
30

PEKERJAAN PLESTERAN DAN SIARAN


1 M2 Plesteran adk. 1pc : 2ps Tebal 15 mm
1 M2 Plesteran adk. 1pc : 3ps Tebal 15 mm
1 M2 Plesteran adk. 1pc : 4ps Tebal 15 mm
1 M2 Plesteran adk. 1pc : 3ps Tebal 20 mm
1 M2 Plesteran adk. 1pc : 4ps Tebal 20 mm
1 M2 Plesteran adk. 1pc:5ps tebal 20 mm
1 M2 Plesteran adk. 1pc:5ps tebal 15 mm + Acian
1 M2 Berapen adk. 1pc : 5ps Tebal 15 mm
1 M2 Plesteran Beton adk. 1pc : 2ps Tebal 15 mm
1 M2 Plesteran Beton adk. 1pc : 3ps Tebal 15 mm
1 M2 Plesteran Skoning adk. 1pc : 2ps, tebal 10mm
1 M2 Acian Plesteran
1 M2 Plesteran Siar adk. 1pc : 2ps batu belah
1 M2 Plesteran Siar adk. 1pc : 2ps dinding bata merah

F.

G.
1
2
3
4
5
6
7

PEKERJAAN ATAP
1 M2 Pasang Atap Genteng Palentong
1 M2 Pasang Genteng Bubung Palentong
1 M2 Pasang Roof Light Fibreglass ( 180 x 90 ) cm
1 M2 Pasang Atap Asbes Gelombang ( 3,00 x 1,05 m ) x 4 mm
1 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m ) x 4 mm
1 M2 Pasang Atap Asbes Gelombang ( 2,40 x 1,05 m ) x 4 mm
1 M2 Pasang Atap Asbes Gelombang ( 2,10 x 1,05 m ) x 4 mm

Page 211

KODE

HARGA

ANL

(Rp)

E-27
E-28
E-29
E-30
E-31
E-32
E-33
E-34
E-35
E-36
E-37
E-38
E-39
E-40
E-41
E-42
E-43
E-44
E-45
E-46
E-47
E-48

124,982.00
117,182.00
127,982.00
117,182.00
125,682.00
127,982.00
121,682.00
129,382.00
125,282.00
129,782.00
689,841.00
179,935.00
116,082.00
94,920.00
329,174.00
431,147.00
284,431.00
92,049.00
140,691.00
103,090.00
836,685.00
105,137.00

F-01
F-02
F-03
F-04
F-05
F-06
F-07
F-08
F-09
F-10
F-11
F-12
F-13

36,022.00
33,620.00
32,054.00
47,253.00
44,739.00
42,318.00
31,284.00
25,355.00
43,737.00
41,302.00
36,417.00
20,213.00
36,390.00
21,823.00

G-01
G-02
G-03
G-04
G-05
G-06
G-07

59,915.00
80,177.00
72,510.00
42,371.00
45,157.00
43,172.00
44,011.00

HRGST

NO

URAIAN PEKERJAAN

KODE

HARGA

ANL

(Rp)

1 M2 Pasang Atap Asbes Gelombang ( 1,50 x 1,05 m ) x 4 mm


1 M Pasang Nok Stel Gelombang 1,05 m
1 M2 Pasang Atap Genteng Beton
1 M2 Pasang Atap Genteng Murando Natural
1 M2 Pasang Atap Genteng Murando Glazur
1 M2 Pasang Atap Genteng Metal
1 M Pasang Nok Genteng Beton
1 M Pasang Nok Genteng Metal
1 M2 Pasang Atap Seng Gelombang
1 M2 Pasang Atap Nok Seng
1 M2 Pasang Alluminium Foil / Sisalation
1 M2 Pasang Atap Alluminium Natural
1 M2 Pasang Atap Alluminium warna
1 M2 Pasang Nok Alluminium
1 M' Pasang Lisplank GRC ukuran 30 cm

G-08
G-09
G-10
G-11
G-12
G-13
G-14
G-15
G-16
G-17
G-18
G-19
G-20
G-21
G-22

48,016.00
97,758.00
110,652.00
61,015.00
84,415.00
227,572.00
109,174.00
175,955.00
68,516.00
24,132.00
31,145.00
204,160.00
229,465.00
161,550.00
43,125.00

1
2
3
4
5
6
7
8
9
10
11
12
13

PEKERJAAN LANGIT-LANGIT
1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 5 mm
1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 3,5 mm
1 M2 Langit-langit Akustik ( 60 x 120 ) cm
1 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka Alluminium
1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka kayu borneo super
1 M2 Langit-langit Teakwood 3 mm + Rangka Kayu Borneo Super
1 M2 Langit-langit Triplek 4 mm + Rangka Kayu Borneo Super
1 M2 Langit-langit Gypsum Board, tebal 9 mm + rangka besi hollow
1 M2 Langit-langit GRC t = 4 mm + rangka besi hollow
1 M2 Langit-langit gypsum t = 9 mm + Rangka Kayu Borneo Super
1 M2 Langit-langit GRC t = 4 mm + Rangka Kayu Borneo Super
1 M List Langit-langit Kayu Profil 10 cm
1 M List Langit-langit Gypsum 10 cm

H-01
H-02
H-03
H-04
H-05
H-06
H-07
H-08
H-09
H-10
H-11
H-12
H-13

31,443.00
28,143.00
210,400.00
298,060.00
154,907.00
153,893.00
128,684.00
93,960.00
91,408.00
136,615.00
133,743.00
37,073.00
16,765.00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

PEKERJAAN LANTAI
1 M2 Lantai Ubin Granito ukuran 40 x 40 cm Setara Essenza
1 M2 Lantai Ubin Granito ukuran 30 x 30 cm Setara Essenza
1 M Plint Ubin Granito ukuran 10 x 40 cm Setara Essenza
1 M Plint Ubin Granito ukuran 10 x 30 cm Setara Essenza
1 M2 Lantai Keramik Corak 10 x 20 cm setara Mulia
1 M2 Lantai Keramik corak 20 x 20 cm setara Mulia
1 M2 Lantai Keramik polos 30 x 30 cm setara Mulia
1 M2 Lantai Keramik corak 30 x 30 cm Setara Mulia
1 M2 Lantai Keramik polos 40 x 40 cm Setara Mulia
1 M2 Lantai Keramik corak 40 x 40 cm Setara Mulia
1 M2 Lantai Keramik Corak 10 x 20 cm setara Roman
1 M2 Lantai Keramik corak 20 x 20 cm setara Roman
1 M2 Lantai Keramik polos 30 x 30 cm setara Roman
1 M2 Lantai Keramik corak 30 x 30 cm Setara Roman
1 M2 Lantai Keramik polos 40 x 40 cm setara Roman

I-01
I-02
I-03
I-04
I-05
I-06
I-07
I-08
I-09
I-10
I-11
I-12
I-13
I-14
I-15

421,657.00
402,591.00
82,032.00
101,549.00
92,670.00
99,170.00
89,670.00
94,670.00
93,470.00
102,170.00
108,870.00
111,870.00
105,570.00
113,270.00
109,170.00

8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
H.

I.

Page 212

HRGST

NO

URAIAN PEKERJAAN

KODE

HARGA

ANL

(Rp)

16
17
18
19
20
21
22
23
24
25
26
27
28
29

1 M2 Lantai Keramik corak 40 x 40 cm Setara Roman


1 M2 Lantai Marmer
1 M2 Lantai Parquet Jati
1 M Plint Keramik ukuran (10 x 40) cm
1 M Plint Keramik ukuran (10 x 30) cm
1 M' Plint kayu kamper Samarinda (2 x 10) cm
1 M' Plint keramik ukuran (10 x 20) cm
1 M2 Lantai karpet
1 M2 Paving block natural 8 cm
1 M2 Paving block warna 8 cm
1 M2 Paving block natural 6 cm
1 M2 Paving block warna 6 cm
1 M2 Grass Block 20 x 20
1 M2 Grass Block 30 x 30

I-16
I-17
I-18
I-19
I-20
I-21
I-22
I-23
I-24
I-25
I-26
I-27
I-28
I-29

113,670.00
672,798.00
475,845.00
19,492.00
27,552.00
36,348.00
29,301.00
403,815.00
153,570.00
182,445.00
148,215.00
158,715.00
323,040.00
330,990.00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

PEKERJAAN KAYU
1 M3 Kusen Pintu & jendela kayu Kamper Samarinda
1 M3 Kusen Pintu & jendela kayu Kamper Medan/Kruing
1 M3 Kusen Pintu & jendela kayu Borneo Super
1 M2 Pintu Panel Kayu Kamper Samarinda
1 M2 Pintu Panel Kayu Kamper Medan/Kruing
1 M2 Pintu & Jendela Kaca Kayu Kamper Medan
1 M2 Pintu & Jendela Kaca Kayu Borneo
1 M2 Pintu & Jendela Jalusi Kayu Kamper Medan
1 M2 Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan
1 M2 Jalusi Mati Kusen Kayu kamper Medan
1 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super
1 M2 Pintu Teakwood Rangkap, rangka Kayu Kamper Medan
1 M2 Pintu Triplek & Formika, Rangka Kayu Kamper Medan
1 M2 Pintu Teakwood & Formika, Rangka Kayu Kamper Medan (dipolitur)
1 M3 Kuda-kuda Kayu Kamper Medan
1 M3 Kuda-kuda Kayu Borneo Super
1 M2 Kaso + Reng Genteng Plentong Kayu Borneo Super
1 M2 Kaso + Reng Genteng Beton Kayu Borneo Super
1 M' Lisplang uk (3x20)cm, Kayu Kamper Medan
1 M' Lisplang uk (3x30)cm, Kayu Kamper Medan
1 M List Plafond + kayu Profil 10 cm
1 M2 Pekerjaan partisi
1 M2 Rangka Langit-langit (1,00 x 1,00) m, Kayu borneo super
1 M2 Rangka langit-langit ( 0,50 x 1,00 ) m, Kayu Borneo Super
1 M' Reuter Kayu kamper Medan
1 M3 Gording kayu kelas II
1 M2 Dinding bilik, rangka kayu borneo

J-01
J-02
J-03
J-04
J-05
J-06
J-07
J-08
J-09
J-10
J-11
J-12
J-13
J-14
J-15
J-16
J-17
J-18
J-19
J-20
J-21
J-22
J-23
J-24
J-25
J-26
J-27

11,956,440.00
8,427,120.00
7,932,000.00
573,768.00
456,124.00
381,041.00
377,653.00
663,826.00
356,459.00
513,126.00
354,562.00
430,185.00
486,735.00
606,635.00
7,736,900.00
7,283,040.00
78,780.00
89,340.00
62,218.00
84,779.00
33,347.00
172,437.00
64,485.00
79,466.00
29,660.00
7,367,660.00
70,471.00

K-01
K-02

32,216.00
974.00

J.

K.

PEKERJAAN BESI DAN ALLUMINIUM


1 1 Kg Besi profil
2 1 Kg Perakitan baja

Page 213

HRGST

NO

URAIAN PEKERJAAN

3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

1 Cm Pengelasan dengan las listrik


1 m2 Pintu Rolling Door
1 m2 Pintu Alluminium Natural
1 m2 Terali Besi
1 m2 Kawat Harmonika 4 cm
1 m' Talang Datar, Seng BJLS 28 lebar 90 cm
1 m' Talang Miring, Seng BJLS 28 lebar 90 cm
1 m' Talang 1/2 lingkaran D-15 cm, seng pelat BJLS 28 lebar 90 cm
1 m' Pasang kusen pintu/jendela alluminium natural 4"
1 m' Pasang kusen pintu/jendela alluminium warna 4"
1 m' Pasang kusen pintu/jendela alluminium natural 3"
1 m' Pasang kusen pintu/jendela alluminium warna 3"
1 m2 Pintu alluminium strip lebar 8 cm
1 m2 Pintu/jendela kaca rangka alluminium natural 4"
1 m2 Pintu/jendela kaca rangka alluminium warna 4"
1 m2 Jendela nako & teralis (10 klips)
1 m2 Pintu pelat baja tebal 2mm rangkap, rangka baja siku
1 m2 Rangka jendela besi square tube (5 x 5) cm
1 m2 Pintu lipat (folding door)bahan besi
1 m2 Tirai (venetions blinds and vertical blinds)
1 m2 Rangka atap baja ringan
1 UNIT Pasang partisi Alumunium, Daun partisi Multiplek rangka kayu Kamper
1 UNIT Pek. Kusen Jendela Alumunium uk. 2 X 1,50 M' ( 3 lubang ) dgn 2 Daun Jendela
1 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb. Jendela + 1 lb. Pintu )
1 UNIT Pekerjaan Kusen Pintu Alumunium uk. 0,8 X 2,70 M'
1 UNIT Pek. Kusen Jendela Alumunium uk. 2,65 X 1,50 M' ( 4 lubang ) dgn 2 Daun Jendela
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk. 2,85 X 2,70 M' ( 3 lb. Jendela + 1 lb. Pintu )
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,30 X 2,80 M' ( 2 Daun Pintu )
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,70 M' ( 2 Daun Pintu )
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu )
1 UNIT Pekerjaan Jalusi Alumunium Sofi-sofi
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 1 lubang ) uk. 0,70 x 0,60 m
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 2 lubang ) uk. 1,35 x 0,60 m
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 3 lubang ) uk. 2,00 x 0,60 m
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 4 lubang ) uk. 2,65 x 0,60 m

1
2
3
4
5
6
7
8
9
10

PEKERJAAN KACA DAN KUNCI


1 Buah Pasang Kunci Tanam 2 slaag
1 Buah Pasang Kunci Tanam Biasa
1 Buah Pasang Kunci Tanam Kamar Mandi
1 Buah Pasang Engsel Pintu
1 Buah Pasang Engsel Jendela Kupu-kupu
1 Buah Pasang Kait Angin
1 Buah Pasang Door Closer
1 Buah Pasang Pegangan Pintu / Door Holder
1 M2 Pasang Kaca , tebal 3 mm
1 M2 Pasang Kaca , tebal 5 mm

L.

Page 214

KODE

HARGA

ANL

(Rp)

K-03
K-04
K-05
K-06
K-07
K-08
K-09
K-10
K-11
K-12
K-13
K-14
K-15
K-16
K-17
K-18
K-19
K-20
K-21
K-22

2,464.00
456,491.00
332,441.00
192,598.00
62,063.00
117,797.00
174,013.00
172,631.00
179,302.00
192,392.00
102,192.00
125,292.00
855,299.00
731,898.00
784,258.00
393,980.00
1,171,360.00
269,541.00
622,341.00
577,519.00
196,000.00
2,215,571.88
3,278,022.70
4,037,418.82
2,168,119.18
4,021,101.40
5,165,780.62
3,001,582.62
3,066,970.73
3,009,751.68
1,264,968.60
789,516.00
912,681.00
1,302,386.40
1,692,091.80

L-01
L-02
L-03
L-04
L-05
L-06
L-07
L-08
L-09
L-10

382,160.00
199,370.00
127,785.00
32,569.00
22,710.00
15,119.00
458,550.00
243,950.00
107,705.00
133,669.00

HRGST

NO

M.

URAIAN PEKERJAAN

KODE

HARGA

ANL

(Rp)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

PEKERJAAN SANITASI
1 Buah Closet jongkok Porselen Standar
1 Buah Urinoir
1 Buah Wastafel
1 Buah bak Mandi Fibreglass Volume 0,30 m3
1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm
1 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cm
1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm
1 M' Pipa PVC 1/2" (AW)
1 M' Pipa PVC 1" (AW)
1 M' Pipa PVC 11/2" (AW)
1 M' Pipa PVC 2" (AW)
1 M' Pipa PVC 4" (AW)
1 M' Pipa PVC 3/4" (AW)
1 Buah Bak Cuci piring Stainless steel
1 Buah Kran 1/2" - 3/4"
1 Buah Floor Drain
1 M' Grafel beton U 30 cm -60 cm
1 M' Pasang Talang Plastik PVC U 15 cm (AW)
1 M' Saluran Air Limbah Buis Beton 60 cm
1 M' Pasang Talang Seng Datar
1 Buah Closet Duduk
1 Buah Tangki Air fibreglass Volume 1 m3
1 Unit Septictank 2x1,50x1,50 m + Rembesan
1 Unit Septictank 1x1,50x1,50 m + Rembesan

M-01
M-02
M-03
M-04
M-05
M-06
M-07
M-08
M-09
M-10
M-11
M-12
M-13
M-14
M-15
M-16
M-17
M-18
M-19
M-20
M-21
M-22
M-23
M-24

463,770.00
2,430,770.00
1,400,178.00
601,654.00
159,315.00
620,779.00
377,546.00
22,247.00
31,602.00
48,896.00
50,336.00
154,417.00
34,659.00
420,930.00
49,075.00
74,670.00
79,411.00
119,325.00
221,243.00
79,987.00
2,051,157.00
1,618,359.00
10,022,424.00
6,780,162.00

1
2
3
4
4
5
6
7
8
9
10
11
12
13
14
15
16
17

PEKERJAAN PENGECATAN
1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama
1 M2 Mendempul Dan Menggosok Kayu
1 M2 Pengecatan Bidang Kayu Lama Setara Sieve
1 M2 Pengecatan Bidang Kayu Baru Setara Sieve
1 M2 Pelaburan Bidang Kayu dengan Politur
1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
1 M2 Pengecatan Tembok Baru Setara ICI
1 M2 Pengecatan Tembok Lama Setara ICI
1 M2 Pengecatan Plafond ( 3x ) Setara ICI
1 M2 Pengecatan Plafond ( 3x ) Setara Vinilex
1 M2 Pengecatan Plafond ( 2x ) Setara Vinilex
1 M2 Memasang Wallpaper
1 M2 Pengecatan Permukaan Baja dengan Meni Besi
1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah
1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um
1 M2 Pengecatan Tembok Baru Setara Vinilex (2 x laburan)
1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan)
1 M2 Pengecatan Tembok Lama Setara Vinilex

N-01
N-02
N-03
N-04
N-05
N-06
N-07
N-08
N-09
N-10
N-15r'
N-11
N-12
N-13
N-14
N-15
N-15r'
N-16

8,280.00
8,708.00
24,517.00
39,790.00
64,424.00
7,515.00
30,608.00
21,521.00
53,775.00
43,775.00
32,330.00
103,251.00
19,340.00
34,752.00
25,842.00
17,608.00
23,669.00
12,521.00

Page 215

HRGST

NO
O.
1
2
3
4

URAIAN PEKERJAAN
PEKERJAAN PERTAMANAN
1 Lubang (70x70x70) cm, tanam pohon pelindung tinggi 2m
1 Lubang (70x70x70) cm, tanam bambu krisik/jepang
1 Lubang (40x40x40) cm, tanam pohon perdu (polibag)
1 M2 Tanam rumput gajah (silang papan catur)

K(2)
1
2
2
3
3
4
4
5
5
6
6

PEKERJAAN KUSEN SD
1 UNIT Pasang partisi Alumunium, Daun partisi Multiplek rangka kayu Kamper
1 UNIT Pek. Kusen Jendela Alumunium uk. 2 X 1,50 M' ( 3 lubang ) dgn 2 Daun Jendela
1 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb. Jendela + 1 lb. Pintu )
1 UNIT Pekerjaan Kusen Pintu Alumunium uk. 0,8 X 2,70 M'
1 UNIT Pek. Kusen Jendela Alumunium uk. 2,65 X 1,50 M' ( 4 lubang ) dgn 2 Daun Jendela
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk. 2,85 X 2,70 M' ( 3 lb. Jendela + 1 lb. Pintu )
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,30 X 2,80 M' ( 2 Daun Pintu )
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,70 M' ( 2 Daun Pintu )
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu )
1 UNIT Pekerjaan Jalusi Alumunium Sofi-sofi
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 1 lubang ) uk. 0,70 x 0,60 m
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 2 lubang ) uk. 1,35 x 0,60 m
7 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 3 lubang ) uk. 2,00 x 0,60 m
7 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 4 lubang ) uk. 2,65 x 0,60 m

Page 216

KODE

HARGA

ANL

(Rp)

O-01
O-02
O-03
O-04

28,274.00
53,274.00
12,024.00
10,500.00

2,215,572
3,278,023
4,037,419
2,168,119
4,021,101
5,165,781
3,001,583
3,066,971
3,009,752
1,264,969
789,516
912,681
1,302,386

1,692,092