METRO RAILWAY

KOLKATA.
ABSTRACT OF COST OF WORK (OUTER SHEET)
Option I: (Proposal with 25 KV AC traction and EMU operation)
Department: Engineering/Civil.

Office: Chief Engineer.

Estimate No.: 5/(2009-10) of Metro Railway, Kolkata.


Framed by: Sri S Mitra
Designation: Dy. Chief Engineer/HQ.
Name of work: Abstract Estimate for Extension of Metro Railway from Dum Dum to Barasat.
Sl.
No.

Work
Cash (Rs.)

Amount in Rupees.
Estimate Cost
Stores (Rs.)
Total (Rs.)

1.

Civil Engineering works.

693,55,60,000.00

23,53,90,000.00

717,09,50,000.00

2.

Electrical works

91,49,87,546.00

186,04,64,155.00

277,54,51,701.00

3 (i).

S & T works

12,79,39,341.00

30,68,01,670.00

43,47,41,011.00

377,72,84,461.00

227,12,55,825.00

604,85,40,286.00

Total = Rs.

The proposal has the concurrence of associated finance and approval of General Manager,
Metro Railway.
Report and Justification: Enclosed
Specification ________X_______

Signature _______________

Drawings and Annexure _______X_____________


Designation: Chief Engineer.
==============================================
No. MRTS/W-90/2/2______________
Dated ______________________
Incidence and allocation verified. This requiresSanction registered as
the sanction of GM, Metro Railway.
No. _________________ Date ____________
Financial Adviser and
Chief Accounts Officer.

General Manager.
METRO RAILWAY
KOLKATA.

ABSTRACT OF COST OF WORK (OUTER SHEET)


Option II: (Proposal with 750 Volt DC traction with Metro rakes)
Department: Engineering/Civil.

Office: Chief Engineer.

Estimate No.: 5/(2009-10) of Metro Railway, Kolkata.


Framed by: Sri S Mitra
Designation: Dy. Chief Engineer/HQ.
Name of work: Abstract Estimate for Extension of Metro Railway from Dum Dum to Barasat.
Sl.
No.

Work
Cash (Rs.)

Amount in Rupees.
Estimate Cost
Stores (Rs.)
Total (Rs.)

1.

Civil Engineering works.

904,24,60,000.00

20,26,60,000.00

924,51,20,000.00

2.

Electrical works

91,49,87,546.00

186,04,64,155.00

277,54,51,701.00

3 (i).

S & T works

12,79,39,341.00

30,68,01,670.00

43,47,41,011.00

0.00

32,00,00,000.00

32,00,00,000.00

377,72,84,461.00

227,12,55,825.00

604,85,40,286.00

3 (ii). S & T (AFC)


Total = Rs.

The proposal has the concurrence of associated finance and approval of General Manager,
Metro Railway.
Report and Justification: Enclosed
Specification ________X_______

Signature _______________

Drawings and Annexure _______X_____________


Designation: Chief Engineer.
==============================================
No. MRTS/W-90/2/2______________
Dated ______________________
Incidence and allocation verified. This requiresSanction registered as
the sanction of GM, Metro Railway.
No. _________________ Date ____________
Financial Adviser and
Chief Accounts Officer.