You are on page 1of 57

DAFTAR HARGA SATUAN UPAH

WILAYAH KOTA TASIKMALAYA


TAHUN ANGGARAN 2010
NO
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

JENIS UPAH DAN BAHAN


2
Pekerja
Pekerja Setengah Terampil
Pekerja Terampil
Tukang Gali
Tukang Batu Setengah Terampil
Tukang Batu Terampil
Kepala Tukang Batu
Tukang Kayu Setengah Terampil
Tukang Kayu Terampil
Kepala Tukang Kayu
Tukang Cat / Plitur Setengah Terampil
Tukang Cat / Plitur Terampil
Kepala Tukang Cat / Plitur
Tukang Besi Beton Setengah Terampil
Tukang Besi Beton Terampil
Kepala Tukang Besi Beton
Tukang Besi Profil Setengah Terampil
Tukang Besi Profil Terampil
Kepala Tukang Besi Profil
Mandor
Operator Alat Besar
Pembantu Operator / Mekanik
Supir Truk
Kenek Truk / Pembantu Supir Truk
Penjaga Malam

SATUAN
3
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam
Hari / 8 Jam

2008
HARGA
Rp.
4
25,000
26,000
27,500
30,000
35,000
40,000
45,000
36,000
42,000
45,000
35,000
40,000
45,000
35,000
40,000
45,000
35,000
40,000
45,000
40,000
45,000
40,000
45,000
37,500
40,000

2009
HARGA
KENAIKAN 20%
5
30,000.00
31,200.00
33,000.00
36,000.00
42,000.00
48,000.00
54,000.00
43,200.00
50,400.00
54,000.00
42,000.00
48,000.00
54,000.00
42,000.00
48,000.00
54,000.00
42,000.00
48,000.00
54,000.00
48,000.00
54,000.00
48,000.00
54,000.00
45,000.00
48,000.00

HARGA 2010
KENAIKAN 20%
36,000.00
37,440.00
39,600.00
43,200.00
50,400.00
57,600.00
64,800.00
51,840.00
60,480.00
64,800.00
50,400.00
57,600.00
64,800.00
50,400.00
57,600.00
64,800.00
50,400.00
57,600.00
64,800.00
57,600.00
64,800.00
57,600.00
64,800.00
54,000.00
57,600.00

DAFTAR HARGA DASAR SATUAN BAHAN TANPA PPN


WILAYAH KOTA TASIKMALAYA TAHUN ANGGARAN 2010
NO

JENIS UPAH DAN BAHAN

SATUAN

HARGA 2007

HARGA 2008
Rp

Harga 2009

NO

JENIS UPAH DAN BAHAN

SATUAN

HARGA 2008
Rp
5

Rp.
4

Kenaikan 20%

Agregat Kasar , Bahan Perekat & Bahan Jadinya


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
17
18
19
20
21
22
18
19
20
21
22
23
24
25
26
27
28
29
30

Tanah Urug
Pasir Urug
Sirtu Tersaring Bergradasi
Pasir Kali
Pasir Gunung
Abu batu
Batu Gosok ( Apung )
Batu Belah
Batu Kali
Batu Pecah Tersaring Bergradasi
Batu Pecah 0,5 - 1 / Screen
Batu Pecah 1 - 2 (split)
Batu Pecah 2 - 3 (split)
Batu Pecah 3 - 5 (split)
Batu Pecah 5 - 7 (split)
Batu Pecah 10 -15
Batu Koral Beton Kali
Batu Tempel Hitam
Batu Pinggir Beton 10 x 20 x 35
Batu Pinggir Beton 11 x 35 ( K.225 )
Batu Telor
Batako Kecil 8x10x20
Batako Besar 8x20x30
Con Blok 8 x 20 x 40
Bata Merah
Paving Blok Natural 6 cm
Paving Blok Warna 6 cm
Paving Blok Natural 8 cm
Paving Blok Warna 8 cm
Kanstin Paving Blok
PC " Semen Portland " 50 Kg
PC " Semen Portland "
PC " Semen Portland "
PC. Semen Warna
Kanstin jalan Ukuran Besar ( Bina Marga ) 1 Bh = 0.60 M
Redymix Beton K.300 , tanpa pompa ( Selang )
Redymix Beton K.225 , tanpa pompa ( Selang )
Redymix Beton K.175 , tanpa pompa ( Selang )
Kapur pasang / Kapur Tembok
Biaya Kompa Redymix
Urugan Pilihan
Patok HM
Bibit Pohon

M3
M3
M3
M3
M3
M3
Kg
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
Bh
Bh
M3
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
ZAK
Kg
Tong
KG
Bh
M3
M3
M3
M3
M3
M3
Bh
Bt

20,250
25,000
64,000
50,000
35,000
56,000
7,000
45,000
47,500
66,000
68,000
79,000
67,000
61,000
50,000
47,500
60,500
63,250
7,500
16,000
14,300
550
1,500
3,200
250
13,500
14,000
17,000
19,000
12,100
31,350
627
106,590
2,500
27,500
355,300
328,350
299,750
71,500
19,250
30,000
82,500
11,000

24,300
57,000
84,000
84,000
84,000
108,000
8,400
69,000
69,000
120,000
132,000
150,000
140,000
132,000
90,000
78,000
72,600
75,900
9,000
19,200
17,160
660
1,800
3,840
300
16,200
16,800
20,400
22,800
14,520
34,200
690
117,249
2,750
33,000
426,360
394,020
359,700
85,800
23,100
36,000
99,000
13,200

29,160.00
68,400.00
100,800.00
100,800.00
100,800.00
129,600.00
10,080.00
82,800.00
82,800.00
144,000.00
158,400.00
180,000.00
168,000.00
158,400.00
108,000.00
93,600.00
87,120.00
91,080.00
10,800.00
23,040.00
20,592.00
792.00
2,160.00
4,608.00
360.00
19,440.00
20,160.00
24,480.00
27,360.00
17,424.00
41,040.00
827.64
140,698.80
3,300.00
39,600.00
511,632.00
472,824.00
431,640.00
102,960.00
27,720.00
43,200.00
118,800.00
15,840.00

Kg
Kg
Kg
Kg
Ton
Ton
Ton

2,750
2,750
4,000
3,500
325,000
320,000
315,000

3,025
3,025
4,400
3,850
357,500
352,000
346,500

3,630.00
3,630.00
5,280.00
4,620.00
429,000.00
422,400.00
415,800.00

Kg
Kg
Kg
Kg
M2
Kg
Kg
Kg
Kg
Kg
Kg
Kg
M'
M'
Kg
Kg
Kg
Kg
Rool
Rool
Lbr
Bh

7,500
17,500
4,400
5,750
43,800
4,600
4,850
4,000
4,150
3,800
8,625
4,000
2,000
650
6,500
9,500
8,500
17,500
935,000
1,294,000
35,000
5,000

9,000
21,000
5,280
6,900
52,560
5,520
5,820
4,800
4,980
4,560
10,350
4,800
2,400
780
7,800
11,400
10,200
21,000
1,122,000
1,552,800
42,000
6,000

10,800.00
25,200.00
6,336.00
8,280.00
63,072.00
6,624.00
6,984.00
5,760.00
5,976.00
5,472.00
12,420.00
5,760.00
2,880.00
936.00
9,360.00
13,680.00
12,240.00
25,200.00
1,346,400.00
1,863,360.00
50,400.00
7,200.00

Bahan Pengikat Konstruksi Jalan


1
2
3
4
5
6
7

Aspal Bitumen
Aspal Curah
Aspal RC 70 ( Cilacap )
Aspal Minyak
Aspal Congcrete ( AC )/ Laston
HRS ( Hot Rolled Sheet )/ Lataston
ATB ( Aspalt Treatment Base )

Bahan Logam dan Bahan Jadinya


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
20
21

Besi Plat
Plat Hitam Tebal 3 mm
Besi Beton U.24 rata rata
Besi Beton U.39 / U. 32 rata rata
Pagar BRC Lengkap tiang ( Tanpa Pondasi )
IWF Ex DN SII
IWF Ex Japan
Besi Profil DN SII
Besi Profil Ex. Luar Negeri ( LN )
Besi CLip Chanel
Ongkos Galfanis Besi
Kawat Beton
Kawat Duri
Kawat Pengikat
Kawat Boronjong
Kawat Boronjong 4 MM
Kawat Boronjong 3 MM
Kawat Tembaga
Seng Plat BJLS 30 di 60 cm ( 100M)
Seng Plat BJLS 30 di 90 cm ( 100M)
Seng Plat BJLS 30 "
Sikat Kawat

1
22
23
24
25
26

2
Plat Besi Tipis 1 MM
Plat Besi Tipis 0.50 MM
Plat Besi Tipis 2 MM s.d 5 MM
Plat Besi Tipis 6 MM s.d 10 MM
Plat Besi Tipis 10 MM keatas

3
Kg
Kg
Kg
Kg
Kg

5
8,000
8,000
6,550
6,500
6,500

9,600
9,600
7,860
7,800
7,800

11,520.00
11,520.00
9,432.00
9,360.00
9,360.00

22 Lem Kuning ( aibond )


23 Lem Pox

Kg
Kg

11,500
9,000

13,800
10,800

16,560.00
12,960.00

M'
M'
M'
M'
M'
M'
Stk
Stk
Stk
Stk
Stk
Stk
Stk
Stk
kg

15,000
21,500
24,750
25,250
34,650
42,900
53,900
63,900
76,750
92,500
3,750
5,750
6,750
9,625
2,475

18,000
25,800
29,700
30,300
41,580
51,480
64,680
76,680
92,100
111,000
4,500
6,900
8,100
11,550
2,970

21,600.00
30,960.00
35,640.00
36,360.00
49,896.00
61,776.00
77,616.00
92,016.00
110,520.00
133,200.00
5,400.00
8,280.00
9,720.00
13,860.00
3,564.00

165,000
120,000
80,000
41,000
26,000
34,000
60,000
51,000
4,500
5,500
6,500
9,000
16,500
5,000
1,000
10,750
16,250
26,800
39,000
70,125
82,250
131,250
170,500
225,500
453,750
487,500
841,500
1,144,000
1,295,250
2,024,000
2,942,500
3,465,000
6,105,000
9,735,000
10,593,000
202,950,000
401,500,000
550,000,000
748,000,000
1,347,500,000
13,000
15,000
12,500
15,000
17,500
27,000
30,000
47,500

198,000
144,000
96,000
49,200
31,200
40,800
72,000
61,200
5,400
6,600
7,800
10,800
19,800
6,000
1,200
12,900
19,500
32,160
46,800
84,150
98,700
157,500
204,600
270,600
544,500
585,000
1,009,800
1,372,800
1,554,300
2,428,800
3,531,000
4,158,000
7,326,000
11,682,000
12,711,600
243,540,000
481,800,000
660,000,000
897,600,000
1,617,000,000
15,600
18,000
15,000
18,000
21,000
32,400
36,000
57,000

237,600.00
172,800.00
115,200.00
59,040.00
37,440.00
48,960.00
86,400.00
73,440.00
6,480.00
7,920.00
9,360.00
12,960.00
23,760.00
7,200.00
1,440.00
15,480.00
23,400.00
38,592.00
56,160.00
100,980.00
118,440.00
189,000.00
245,520.00
324,720.00
653,400.00
702,000.00
1,211,760.00
1,647,360.00
1,865,160.00
2,914,560.00
4,237,200.00
4,989,600.00
8,791,200.00
14,018,400.00
15,253,920.00
292,248,000.00
578,160,000.00
792,000,000.00
1,077,120,000.00
1,940,400,000.00
18,720.00
21,600.00
18,000.00
21,600.00
25,200.00
38,880.00
43,200.00
68,400.00

69,300
92,400
46,200
90,000
82,750
104,000

83,160
110,880
55,440
108,000
99,300
124,800

99,792.00
133,056.00
66,528.00
129,600.00
119,160.00
149,760.00

Bahan Saluran Kotor / Bersih


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Grefel U.20 cm
Grefel U.30 cm
Grefel U.40 cm
Buis Beton 20 Cm ( 1m')
Buis Beton 30 Cm ( 1m')
Buis Beton 40 Cm ( 1m')
Buis Beton 50 Cm ( 1m')
Buis Beton 60 Cm ( 1m')
Buis Beton 80 Cm ( 1m')
Buis Beton 100 Cm ( 1m')
Buis Tanah 10 Cm ( 0.5 M')
Buis Tanah 15 Cm ( 0.5 M')
Buis Tanah 20 Cm ( 0.5 M')
Buis Tanah 25 Cm ( 0.5 M')
Injuk

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

Pipa Galvanis Q 3"


Pipa Galvanis Q 2,5"
Pipa Galvanis Q 2"
Pipa Galvanis Q 1"
Pipa Galvanis Q 1/2"
Pipa Galvanis Q 3/4"
Pipa Galvanis Q 1 1/2"
Pipa Galvanis Q 1 1/4"
Paralon Q 1/2"
Paralon Q 3/4"
Paralon Q 1"
Paralon Q 2"
Talang 4 M'
Gantungan Plat
Gantungan Plastik
Pipa PVC Diameter 20 MM
Pipa PVC Diameter 25 MM
Pipa PVC Diameter 32 MM
Pipa PVC Diameter 40 MM
Pipa PVC Diameter 50 MM
Pipa PVC Diameter 63 MM
Pipa PVC Diameter 75 MM
Pipa PVC Diameter 90 MM
Pipa PVC Diameter 110 MM
Pipa PVC Diameter 140 MM
Pipa PVC Diameter 160 MM
Pipa PVC Diameter 200 MM
Pipa PVC Diameter 225 MM
Pipa PVC Diameter 250 MM
Pipa PVC Diameter 315 MM
Pipa PVC Diameter 355 MM
Pipa PVC Diameter 400 MM
Pipa PVC Diameter 500 MM
Pipa PVC Diameter 630 MM
Ground Resevoir 50 M3
Ground Resevoir 100 M3
Ground Resevoir 200 M3
Ground Resevoir 300 M3
Ground Resevoir 500 M3
Ground Resevoir 1000 M3
Grevel Buis Beton 1/2 Q 20 cm
Grevel Buis Beton 1/2 Q 30 cm
Gorong - Gorong Buis Beton Q 15 cm
Gorong - Gorong Buis Beton Q 25 cm
Gorong - Gorong Buis Beton Q 30 cm
Gorong - Gorong Buis Beton Q 40 cm
Gorong - Gorong Buis Beton Q 60 cm Panjang 50 cm
Gorong - Gorong Buis Beton Q 80 cm Panjang 50 cm

Pipa Polyvinyl Chlorid ( PVC )


Lente
Lente
Lente
Lente
Lente
Lente
Lente
Lente
Lente
Lente
Lente
Lente
Lente
BH
BH
Bt
Bt
Bt
Bt
Bt
Bt
Bt
Bt
Bt
Bt
Bt
Bt
Bt
Bt
Bt
Bt
Bt
Bt
Bt
Unit
Unit
Unit
Unit
Unit
Unit
BH
BH
BH
BH
BH
BH
BH
BH

Bahan Fasilitas Pengairan


1
2
3
4
5
6

1
7
8
9
10
11
12
13
14

Karet Penyekat Air / Rubber Water Stop Lebar 150 Cm


Karet Penyekat Air / Rubber Water Stop Lebar 225 Cm
Plat karet untuk Perletakan Jembatan type 4 kx
Penutup Sambungan / Joint Seater tebal 25 mm
Pengisi Sambungan / Joint Seater Tebal 10 MM
Pengisi Sambungan / Joint Seater Tebal 20 MM

M
M
M
M
M2
M2

2
Mistar Ukuran Panjang 0.50 - 1.00 Meter
Mistar Ukuran Panjang 1.00 - 1.50 Meter
Mistar Ukuran Panjang 1.50 - 2.00 Meter
Mistar Ukuran Panjang 2.00 - 3.00 Meter
Mistar Ukuran Panjang 3.00 - 4.00 Meter
Papan Nama Bendung
Papan Nama Bangunan / Nomenklatur
Papan Nama Saluran

3
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

4
57,750
57,750
115,500
231,000
288,750
173,250
46,200
288,750

5
69,300
69,300
138,600
277,200
346,500
207,900
55,440
346,500

83,160.00
83,160.00
166,320.00
332,640.00
415,800.00
249,480.00
66,528.00
415,800.00

15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

Papan Oprasi Bendung


Bh
Kotak Baja Penyimpan Data
Bh
Exploitasi
Bh
Plat Tanda Muka Air / Peil Sehal
Bh
Patok Hektometer ( Pengairan )
Bh
Pintu Angkat Type 1.B = 0.30 Meter
Bh
Pintu Angkat Type 1.B = 0.40 Meter
Bh
Pintu Angkat Type 1.B = 0.50 Meter
Bh
Pintu Angkat Type II.B = 0.30 Meter
Bh
Pintu Angkat Type II.B = 0.40 Meter
Bh
Pintu Angkat Type II.B = 0.50 Meter
Bh
Pintu Sorong baja type 1A ukuran ( B=0.30-0.60)&(H=0.30-0.60 ) m Bh
Pintu Sorong baja type 2A ukuran ( B=0.60-0.80)&(H=0.30-1.00 ) m Bh
Pintu Sorong baja type 3A ukuran ( B=0.30-1.20)&(H=0.40-1.50 ) m Bh
Pintu Sorong baja type 4A ukuran ( B=1.00-1.00)&(H=0.50-2.00 ) m Bh
Pintu Sorong baja type 5A ukuran ( B=1.00-1.50)&(H=0.70-0.90 ) m Bh
Pintu Sorong baja type 6A ukuran ( B=1.60-2.00)&(H=0.90-1.35 ) m Bh
Pintu Sorong baja type 7A ukuran ( B=2.10-2.50)&(H=1.35-1.70 ) m Bh
Pintu sorong bja type 2 draadstang ulir dengan 3 stl roda gigi b = 1.00M;H=1.60
Bh
M
Pintu sorong bja type 2 draadstang ulir dengan 3 stl roda gigi b = 1.20M;H=1.70
Bh
M
Pintu sorong bja type 2 draadstang ulir dengan 3 stl roda gigi b = 1.50M;H=1.80
Bh
M
Pintu sorong bja type 2 draadstang ulir dengan 3 stl roda gigi b = 2.00M;H=2.00
Bh
M

288,750
57,750
288,750
57,750
46,200
288,750
346,500
519,750
404,250
519,750
635,250
1,732,500
1,443,750
1,732,500
2,021,250
2,310,000
2,598,750
2,887,500
11,550,000
14,437,500
17,902,500
20,212,500

346,500
69,300
346,500
69,300
55,440
346,500
415,800
623,700
485,100
623,700
762,300
2,079,000
1,732,500
2,079,000
2,425,500
2,772,000
3,118,500
3,465,000
13,860,000
17,325,000
21,483,000
24,255,000

415,800.00
83,160.00
415,800.00
83,160.00
66,528.00
415,800.00
498,960.00
748,440.00
582,120.00
748,440.00
914,760.00
2,494,800.00
2,079,000.00
2,494,800.00
2,910,600.00
3,326,400.00
3,742,200.00
4,158,000.00
16,632,000.00
20,790,000.00
25,779,600.00
29,106,000.00

12,650
18,150
34,650
962,500
3,382,500
1,739,100
1,300,000
1,500,000
2,612,500
2,398,000
325,000
2,250,000
1,860,000
1,800,000
1,500
1,094,500
1,400,000
1,100
950,000
1,100,000
1,100,000
600
2,100,000
1,750,000
1,800,000
2,500
3,500,000
3,200,000
600,000
4,427,500
4,708,000
23,413,500
15,812,500
9,425,900
5,079,250
11,550
15,950
1,500
2,250
5,000
8,000
15,500
85,500
24,750
900
1,500
2,000
4,550

15,180
21,780
41,580
1,155,000
4,059,000
2,086,920
1,560,000
1,800,000
3,135,000
2,877,600
750,000
2,700,000
2,232,000
2,160,000
1,800
2,500,000
1,680,000
1,320
2,000,000
2,250,000
2,000,000
720
2,520,000
2,100,000
2,160,000
3,000
4,200,000
3,840,000
720,000
5,313,000
5,649,600
28,096,200
18,975,000
11,311,080
6,095,100
13,860
19,140
1,800
2,700
6,000
9,600
18,600
102,600
29,700
1,080
1,800
2,400
5,460

18,216.00
26,136.00
49,896.00
1,386,000.00
4,870,800.00
2,504,304.00
1,872,000.00
2,160,000.00
3,762,000.00
3,453,120.00
900,000.00
3,240,000.00
2,678,400.00
2,592,000.00
2,160.00
3,000,000.00
2,016,000.00
1,584.00
2,400,000.00
2,700,000.00
2,400,000.00
864.00
3,024,000.00
2,520,000.00
2,592,000.00
3,600.00
5,040,000.00
4,608,000.00
864,000.00
6,375,600.00
6,779,520.00
33,715,440.00
22,770,000.00
13,573,296.00
7,314,120.00
16,632.00
22,968.00
2,160.00
3,240.00
7,200.00
11,520.00
22,320.00
123,120.00
35,640.00
1,296.00
2,160.00
2,880.00
6,552.00

Bahan Kayu Berikut Bahan Jadinya


1
2
3
4
5
6
7
8
9
10
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47

Bambu Diameter 5 s/d 7 cm


Bambu Diameter 7 s/d 10 cm
Bambu Gombong
Kayu Terentang
Kayu Kamper Singkil ( K. Samarinda Kls II )
Kayu Balok Borneo Super
Balok Borneo 6/12, 8/12, 8/15 *
Papan Borneo*
Kayu Balok Kamper Medan ( Kruing )
Kayu Papan Kamper Medan ( Kruing )
Papan Kayu Gunung Klas III ( Albasia )*
Papan Kamper Banjar*
Balok Kamper Banjar 6/12, 8/12, 8/15*
Kaso 5/7, 5/10 Kamper Banjar*
Reng 2/3 Kamper Banjar*
Kayu Balok Rasamala*
Kaso 5/7, 5/10 Borneo*
Reng 2/3 Borneo*
Papan Kayu Gunung Klas II *
Balok Kayu Gunung Klas II 6/12, 8/12, 8/15*
Kaso 5/7, 5/10 Kayu Gunung Klas II*
Reng 2/3 Kayu Gunung Klas II*
Papan Kamper Medan*
Balok Kamper Medan 6/12, 8/12, 8/15*
Kaso 5/7, 5/10 Kamper Medan*
Reng 2/3 Kamper Medan*
Papan Damar Laut*
Balok Damar Laut 6/12, 8/12, 8/15*
Kayu Klas II ( Cayur )*
Kayu Balok Kamper Samarinda
Kayu Papan Kamper Samarinda
Kayu Jati Jatim Lepas Mata dari 80 CM ke atas
Kayu Jati Jateng Tua Lepas Mata dari 80 CM ke atas
Kayu Jati Jabar Tua Lepas Mata dari 80 CM ke atas
Kayu Jati Jabar 40 CM ke bawah
Dolken 5 s.d 7
Dolken 7 s.d 10
List Frofil Kamper 1 cm
List Frofil Kamper 2 cm
List Frofil Kamper 4 cm
List Frofil Kamper 5 cm
List Frofil Kamper 10 cm
Pegangan Tangga Profil Jati
Pegangan Tangga Profil Kamper
Kayu reng 2/3 Borneo Super
Kayu reng 2/3 Kamper Banjar
Kayu reng 3/4 Kamper Banjar
Kayu Stoot

Bt
Bt
Bt
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M'
M3
M3
M'
M3
M3
M3
M'
M3
M3
M3
M'
M3
M3
M3
M3
M3
M3
M3
M3
M3
Bt
Bt
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
Btg

Bahan Penutup Rangka Plapond


1
2
3
4
5
6

Eternit 1x1 M2
Eternit 1x1 M2
Bahan Plapon Eternit 4 MM
Bahan Plapon Hardpleks 5 mm 120 x 240 cm
Gypsun 120 x 240 cm , t = 9 mm ex DN
Gypsun 120 x 240 cm , t = 9 mm ex luar

Bh
Peti
M2
Lbr
Lbr
Lbr

6,400
36,500
6,600
54,000
41,000
52,750

7,680
43,800
7,920
64,800
49,200
63,300

9,216.00
52,560.00
9,504.00
77,760.00
59,040.00
75,960.00

Lbr

37,400

44,880

53,856.00

Bahan Kayu Lapis


1 Triplek 3 mm 120 x 240

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

Triplek 4 mm 120 x 240


Triplek 4 mm Uk. Pintu
Multiplek 6 mm 120 x 240
Jabar wood 4 mm
Bilik Bambu Tanpa Kulit
Bilik Bambu dengan Kulit
Bilik Bambu Hitam Pariasi
Wallpaper ( Lelas Menengah )
Multiplek 9 mm 120 x 240
Multiplek 12 mm 120 x 240
Multiplek 18 mm 120 x 240
Play Wood 18 mm 120 x 240
Teak Wood 3 mm 120 x 240
Teak Wood 4 mm 120 x 240
Teak Wood 3 mm Uk. Pintu
Teak Wood 4 mm Uk. Pintu
Melamin 4 mm 120 x 240
Melamin TIK 4 mm
Fornika 120 x 240
Fornika Ukuran Pintu

Lbr
Lbr
Lbr
Lbr
M2
M2
M2
M2
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr

45,500
32,500
66,500
60,300
5,800
9,000
12,100
30,150
88,000
114,450
150,700
198,550
72,050
81,500
54,050
66,400
78,400
118,600
96,600
72,350

54,600
39,000
79,800
72,360
6,960
10,800
14,520
36,180
105,600
137,340
180,840
238,260
86,460
97,800
64,860
79,680
94,080
142,320
115,920
86,820

65,520.00
46,800.00
95,760.00
86,832.00
8,352.00
12,960.00
17,424.00
43,416.00
126,720.00
164,808.00
217,008.00
285,912.00
103,752.00
117,360.00
77,832.00
95,616.00
112,896.00
170,784.00
139,104.00
104,184.00

Per 4Kg
Per 12 Kg
Gln
Gln
Gln
Kg
Kg
Kg
Kg
Kg
Kg
Bh
Bh
Bh
5 Ltr
Kg
Bh
Bh
Kg
Lt
Lt
Lt
Kg
Lbr
Kg
Kg
Kg
KG
KG
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Kg

5,000
12,500
126,500
93,500
60,500
5,300
5,600
18,750
41,250
43,750
37,400
15,000
4,400
4,900
20,000
12,500
7,400
10,000
21,450
2,000
8,800
13,400
24,750
2,000
10,000
7,500
27,000
22,500
22,500
27,000
72,600
32,450
1,800
5,400
72,000
5,000
14,500

6,000
15,000
151,800
112,200
72,600
6,360
6,720
22,500
49,500
52,500
44,880
18,000
5,280
5,880
24,000
15,000
8,880
12,000
25,740
2,400
10,560
16,080
29,700
2,400
12,000
9,000
32,400
27,000
27,000
32,400
87,120
38,940
2,160
6,480
86,400
6,000

7,200.00
18,000.00
182,160.00
134,640.00
87,120.00
7,632.00
8,064.00
27,000.00
59,400.00
63,000.00
53,856.00
21,600.00
6,336.00
7,056.00
28,800.00
18,000.00
10,656.00
14,400.00
30,888.00
2,880.00
12,672.00
19,296.00
35,640.00
2,880.00
14,400.00
10,800.00
38,880.00
32,400.00
32,400.00
38,880.00
104,544.00
46,728.00
2,592.00
7,776.00
103,680.00
7,200.00

25,850
30,000
40,000
67,100
209,000
343,750
822,800
2,695,000
11,000
52,600

31,020
36,000
48,000
80,520
250,800
412,500
987,360
3,234,000
13,200
63,120

37,224.00
43,200.00
57,600.00
96,624.00
300,960.00
495,000.00
1,184,832.00
3,880,800.00
15,840.00
75,744.00

Bahan Finishing :
Laburan , Pengisian dan Alatnya
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

Plamir Tembok
Plamour Cat
Cat Tembok ICI Eksterior
Cat Tembok ICI interior ( Flapond & Dinding )
Cat Tembok stara Sanlex
Cat Tembok stara Sanlex ( Putih )
Cat Tembok stara Sanlex
Cat Tahan Asam
Cat Marka / Spotlight
Water Profing Emulision
Water Profing Membrance
Rol cat Tembok
Kape Tembok
Kape Kayu
Cat Suligneum Galon
Cat Plincote
Kawas 3 "
Kawas 4 "
Dempul Halus / Infra ( Wood Filler )
Terpentin
Tiner A
Tiner B
Kumpon
Ampelas
Dempul Kayu
Meni Kayu / Besi
Sincromat
Cat Kayu stara Avian
Cat Kayu stara Siev
Cat Besi Siev
Cat Duco Danaglon / ICI
Cat Bron
Oker Putih
Oker Coklat
Sirlak Ex India
Spirtus
Cat Genting

1
2
3
4
5
6
7
8
9
10

Kaca Polos 2 mm
Kaca Polos 3 mm
Kaca Polos 5 mm
Kaca Ryben 5 mm
Kaca Ryben 8 mm
Kaca Ryben 12 mm
Kaca Patri Lokal Terpasang
Kaca Patri Lokal Terpasang Ex. LN
Glas Block
Glas Block Dn 20 x 20 Ex.LN

Bahan Kaca

M2
M2
M2
M2
M2
M2
M2
M2
Bh
Bh

Bahan Paku dan Mur


1
2
3
4
5
6
7
8
9
10
11
6

Paku Berbagai Macam Ukuran


Paku Kait Lengkap
Paku Beton 2 s.d 5 cm
Paku Cacing
Besi Beugel Kuda - kuda
Dak Angker
Mur Baut Berikut Ring 20 s.d 35 Cm
Angker Mur Baud dia 19 panjang 60 cm
Mur Baut HTM dia 19 s.d 16 cm
Mur Baut Biasa 19 s.d 16 ( 15 cm )
Piser dia 12 s/d 20 cm
Baut/Mur

Bahan Perpipaan

Kg
Kg
Bh
Kg
Kg
Kg
Bh
Bh
Bh
Bh
Bh
Kg

6,000
300
600
19,250
7,000
7,000
750
19,250
5,750
3,400
2,800
8,400

7,200
360
720
23,100
8,400
8,400
900
23,100
6,900
4,080
3,360
-

12,960.00
432.00
864.00
27,720.00
10,080.00
10,080.00
1,080.00
27,720.00
8,280.00
4,896.00
4,032.00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Besi Pipa untuk Hydrant BSP dia 1"


Besi Pipa untuk Hydrant BSP dia 1,25"
Besi Pipa untuk Hydrant BSP dia 1,5"
Besi Pipa untuk Hydrant BSP dia 2"
Shower dengan tiang
Shower tanpa tiang
Kran Tembok diameter 0,5 "
Kran Bebek 0,5 "
Kran Panas Dingin Standar
Stop kran 1 " KIT
Stop kran 1 " KIT
Tempat Sabun Poslin
Wastafel Bulat Warna Standar Lengkap
Watafel Lengkap TOTO LW 230
Watafel Lengkap INA
Closet Jongkok Poslen Warna
Closet Jongkok Poslen Warna Putrih Standar
Closet Duduk Keramik Komplit LN
Closet Duduk Warna Standar INA Lengkap
Urinoar lengkap Warna Standar
Penyekat Urinoar
Kitchen Zink Stailess Standar lokal ( 1 Lobang )
Kitchen Zink Stailess Non Standar franke ( 1 Lobang )
Kitchen Zink Stailess Non Standar franke ( 2 Lobang )
Kitchen Zink Stailess Lengkap Sipon & Sparing

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

Atap Plastik bergelombang 80 x 180


Atap Fiber Glass Tipis 80 x 180 ( Gelombang )
Atap Fiber Glass Tebal 80 x 180 ( Gelombang )
Atap Asbes Gel Kecil 4 mm 80 x 180
Atap Asbes Gel Besar 5 mm 80 x 180
Genting Palentong
Genting Bubungan
Asbes gelombang besar
Bubung Asbes
Konblok
Rooster 20 x 20
Rooster 30 x 30
Genting Morando nat
Bubung Morando nat
Genting Morando Glasur
Bubung Morando Glasur
Genting Mardional nat
Genting Mardional Glasur
Genting Finenze nat
Genting Finenze Glasur
Genting Kodok nat
Genting Kodok Glasur
Genting Turbo nat
Genting Turbo Glasur
Aksesoris nat
Genting Vlam pres mesin
Terakorta 10 x 20
Atap Genteng Beton Warna 14,5/m2
Genteng Beton Natural
Sirap Kelas I ( 80/M2 )
Genteng Murando Natural 18 bh/m2
Genteng Murando Glasur 18 bh/m2
Genteng Bubung Kramik
Genteng Beton Pres
Bubungan Genteng Beton Pres

Bt
Bt
Bt
Bt
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Bh
Bh
Bh
Bh
Unit
Unit
Bh
Lbr
Bh
Bh
Bh
Bh

45,100
47,850
52,250
63,250
123,750
68,750
19,250
35,750
71,000
22,500
17,500
33,000
275,000
178,750
151,250
200,750
90,750
1,000,000
577,500
330,000
151,250
123,750
178,750
302,500
250,000

Lbr
Lbr
Lbr
Lbr
Lbr
BH
BH
LBR
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
M2
M2
Bh
Bh
Bh
Bh
Bh
Bh

13,300
24,200
48,950
45,500
63,100
750
1,500
30,000
15,000
1,900
4,000
5,500
900
3,500
1,750
3,000
1,500
2,750
1,500
3,500
1,000
3,800
1,750
3,500
3,000
700
1,200
57,750
54,900
600
3,100
3,950
4,500
1,600
2,250

Bahan Penutup Atap

54,120
57,420
62,700
75,900
148,500
82,500
23,100
42,900
85,200
27,000
21,000
39,600
330,000
214,500
181,500
240,900
108,900
1,200,000
693,000
396,000
181,500
148,500
214,500
363,000
300,000
15,960
29,040
58,740
54,600
75,720
900
1,800
36,000
18,000
2,300
4,800
6,600
1,080
4,200
2,100
3,600
1,800
3,300
1,800
4,200
1,200
4,560
2,100
4,200
3,600
850
1,500
69,300
65,880
720
3,720
4,740
5,400
1,920
2,700

64,944.00
68,904.00
75,240.00
91,080.00
178,200.00
99,000.00
27,720.00
51,480.00
102,240.00
32,400.00
25,200.00
47,520.00
396,000.00
257,400.00
217,800.00
289,080.00
130,680.00
1,440,000.00
831,600.00
475,200.00
217,800.00
178,200.00
257,400.00
435,600.00
360,000.00

19,152.00
34,848.00
70,488.00
65,520.00
90,864.00
1,080.00
2,160.00
43,200.00
21,600.00
2,760.00
5,760.00
7,920.00
1,296.00
5,040.00
2,520.00
4,320.00
2,160.00
3,960.00
2,160.00
5,040.00
1,440.00
5,472.00
2,520.00
5,040.00
4,320.00
1,020.00
1,800.00
83,160.00
79,056.00
864.00
4,464.00
5,688.00
6,480.00
2,304.00
3,240.00

Bahan Mekanikal
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Lampu Pijar 25 Watt


Lampu Pijar 40 Watt
Lampu TL 1 x 20 Watt
Lampu TL 2 x 20 Watt
Lampu TL 1 x 40 Watt
Lampu TL RM 2 x 20 Watt
Lampu TL RM 4 x 20 Watt
Lampu spot light 120 Watt / 150 Watt
Lampu spot light 300 Wattt
Lampu Hologin 500 Watt + Box
Lampu Dinding
Lampu Gantung uk. Kecil
Lampu Gantung uk. Sedang
Lampu Gantung Uk. Besar
Lampu SLE 15 Watt
Lampu SL 18 Watt

BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
BH
UNIT
UNIT
UNIT
BH
BH

4,500
5,000
45,000
90,000
50,000
175,000
300,000
300,000
325,000
150,000
150,000
250,000
450,000
1,200,000
35,000
45,000

5,400
6,000
54,000
108,000
60,000
210,000
360,000
360,000
390,000
180,000
180,000
300,000
540,000
1,440,000
42,000
54,000

6,480.00
7,200.00
64,800.00
129,600.00
72,000.00
252,000.00
432,000.00
432,000.00
468,000.00
216,000.00
216,000.00
360,000.00
648,000.00
1,728,000.00
50,400.00
64,800.00

17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

Lampu Baret 30 cm + Neon


Lampu Sorot Philips 40 Watt
Lampu Down Light sedang
Lampu Tanam
Box Sikring in bouw C4
Box Sikring out bouw C1 + Patron Broco
Saklar tunggal Broco
Saklar Ganda Broco
Stop kontak Broco
Jarum Penangkal Petir 16 s.d19
Kawat Penagkal Petir ( Tembaga ) 16
Lampu Mercury 60 Watt
Trafo 80 Watt / 220
MLL 160 Watt
Panel SDP
Panel LP-A
Panel LP-B
Panel LP-C
Panel LP-D
Panel LP-E
Arde / Grounding panel / box sikring Komplit
BP dan UJL 1200 Watt + tiang 2 Bh
BP dan UJL 1300 Watt
BP dan UJL 2200 Watt
Titik Cahaya
Pasang telepon
Canopy Impralon
Tiang Listrik

SET
BH
BH
BH
BH
BH
BH
BH
BH
UNIT
KG
BH
BH
BH
BH
BH
BH
BH
BH
BH
Ls
Ls
Ls
Ls
Ttk
Ls
M2
BH

165,000
70,000
35,000
75,000
25,000
25,000
7,000
9,000
7,500
220,000
7,500
150,000
250,000
80,000
100,000
200,000
300,000
172,500
172,500
172,500
600,000
2,000,000
773,500
1,602,000
50,000
600,000
275,000
2,500,000

198,000
84,000
42,000
90,000
30,000
30,000
8,400
10,800
9,000
264,000
9,000
180,000
300,000
96,000
120,000
240,000
360,000
207,000
207,000
207,000
720,000
2,400,000
928,200
1,922,400
60,000
720,000
330,000
3,000,000

237,600.00
100,800.00
50,400.00
108,000.00
36,000.00
36,000.00
10,080.00
12,960.00
10,800.00
316,800.00
10,800.00
216,000.00
360,000.00
115,200.00
144,000.00
288,000.00
432,000.00
248,400.00
248,400.00
248,400.00
864,000.00
2,880,000.00
1,113,840.00
2,306,880.00
72,000.00
864,000.00
396,000.00
3,600,000.00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

Bahan Alat Penggantungan Kunci


Kunci Silinder ALFA untuk Pintu Alumunium
Kunci 2 Slaag Sekualitas "ANCOR" / "ASTON"
Kunci KM/WC Merk Alpa
Tarikan Pintu Almunium
Rel Henderson Lengkap
Rel Maraton 1 Pintu
Kunci Slaag Silinder SEIS Asli Type 210 s.d 226
Kunci Slaag ANCOR ASLI
Kunci Slaag ISO
Kunci Kamar Bulat Kualitas Biasa
Kunci Kamar Bulat Kualitas ALFA
Espangnolet
Grendel 15 cm
Grendel 5 cm
Hak Angin Kait Jendela Biasa
Hak Angin Biasa
Hak Angin Jendela Antik
Hak Angin endok Stanless/Kuningan
Nako Lengkap + Tralis Daun
Slot Pintu Berikut Rantai
Slot Pintu 5 cm
Slot Jendela
Engsel Pintu
Engsel Jendela
Engsel Pintu Standar Unilon
Engsel Jendela Standar Unilon
Tarikan Almari Rata - rata
Seng BJLS 30 Lebar 60 cm ( 1. Rol 50 M')
Seng BJLS 30 Lebar 90 cm ( 1. Rol 50 M')

BH
BH
BH
BH
BH
Unit
BH
BH
BH
Bh
Bh
Ps
Bh
Bh
Ps
Ps
Ps
Bh
Bh
Set
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M'
M'

249,100
75,000
40,000
225,000
510,400
108,900
226,600
94,600
108,900
22,000
50,500
17,500
8,600
2,100
3,300
5,000
14,100
31,900
13,750
49,200
3,000
3,000
7,000
4,000
10,150
7,150
3,300
19,800
28,600

298,920
90,000
48,000
270,000
612,480
130,680
271,920
113,520
130,680
26,400
60,600
21,000
10,320
2,520
3,960
6,000
16,920
38,280
16,500
59,040
3,600
3,600
8,400
4,800
12,180
8,580
3,960
23,760
34,320

358,704.00
108,000.00
57,600.00
324,000.00
734,976.00
156,816.00
326,304.00
136,224.00
156,816.00
31,680.00
72,720.00
25,200.00
12,384.00
3,024.00
4,752.00
7,200.00
20,304.00
45,936.00
19,800.00
70,848.00
4,320.00
4,320.00
10,080.00
5,760.00
14,616.00
10,296.00
4,752.00
28,512.00
41,184.00

1
1
2
3
4
5
6
7
8
9
10
11
12

1
2
3
4
5
6

2
Bahan Pengisap Sumur Air Dalam
Pompa Kodok
Pompa Dragon Tegel
Pompa Dragon Asli
Pompa listrik 100 Watt Setara "SANYO"
Pompa listrik 250 Watt Setara "SANYO"
Pompa listrik 500 Watt Setara "SANYO"
Pompa Zet Pump 250 W Sanyo
Pompa Zet Pump 450 W Sanyo
Pompa Sumbersible Kap 150 Liter/menit 3 KW
Gear Pump Kap./Menit
Depp Welll Dengan kelengkapannya Kap.150 Ltr/menit
Hand Oil pump
Alat Tukang
Palu
Cangkul
singkup
Sekrop
Pengki
Linggis

3
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT
UNIT

Bh
Bh
Bh
Bh
Bh
Bh

115,500
162,250
467,500
450,000
1,300,000
1,800,000
4,125,000
4,675,000
20,350,000
11,550,000
170,500,000
3,355,000

138,600
194,700
561,000
540,000
1,560,000
2,160,000
4,950,000
5,610,000
24,420,000
13,860,000
204,600,000
4,026,000

166,320.00
233,640.00
673,200.00
648,000.00
1,872,000.00
2,592,000.00
5,940,000.00
6,732,000.00
29,304,000.00
16,632,000.00
245,520,000.00
4,831,200.00

19,250
28,200
23,300
33,550
2,000
22,000

23,100
33,840
27,960
40,260
2,400
26,400

27,720.00
40,608.00
33,552.00
48,312.00
2,880.00
31,680.00

7
8
9
10
11
12
13

Rool Meter 30 Meter ( Bahan Plastik )


Rool Meter 5 Meter ( Bahan besi )
Slang Plastik untuk Water Pas di.0.5cm
Water Pass Alumunium
Kawat Las Listrik
Karbit
Alat Bantu

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

Standar Rata Rata Sewa Alat Berat / Besar, Kendaraan


Truk Kendaraan Roda Empat & Lainnya
Three Wheel Roller ( E. 16 )
Tandem Roller 6 - 8 ( E. 17)
Tire Roller 8 -10 Ton ( E. 18 )
Roller Vibrator 5 - 8 Ton ( E. 19 )
Pendesterian Roller ( E. 24 )
Roller Pneumatic 8 -15 ton /5jam/ton
Wheel Loader 1.0 - 1.6 M"( E.15)
Crane 10 -15 Ton ( E.7 )
Exavator Bachoe 5 Jam / hari
Draklint
Track Loader 75 - 100 HP ( E.14)
Buldozer 100 - 150 HP( E.04 )
Exavator 80 - 140 HP(E.10 )
Backu
Motor Grader 100 HP ( E.13 )
Pheunumatic Drill Hamer 3jam/hr
Vibroroller
Stone Cusher ( E.21)
AMP ( E. 01 )
Teractor Equament 2 jam/hr
Screning Plent 5 jam / hari
Aspalt Fhisisher ( E.02 )
Aspalt mileting Kalte
Aspalt Spayer ( E.03 )
Aspalt Miixing Plant ( E. 01 )
Spayer Self.- Prop 10001 4 jam/hr
Tamper .Viberator Palte ( E.25 )
Crueher / SCR ( E.21 )
Concrete Mixer 0.125 M3
Concrete Mixer 0.3-0.6 m ( E. 06 )
Concrete Vibrator ( E.20 )
Pick Up
Dump Truck 3 -4 m ( E. 08 )
Dump Truck 5 Ton 125 HP ( E.09 )
Flatbad Truck 3.5 ton ( E. 11 )
Truck 3/4 ( Colt Diesel )
Truck Fuso
Mesin Las Listrik 18 PK 8 jam
Menin Pompa Air 3 "
Jack hammer ( E. 26 )
Compressor 4000 - 6500/m( E.05 )
Pump water 70 - 100 mm ( E. 22 )
Trailer Towed 1 Ton 3jam/hr
Water Tank 3000-4500 L ( E.23 )

1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

2
Bahan Lantai Dan Pelapis Dinding
Tegel PC 20 x 20 cm
Plin Tegel PC 20 x 20 cm
Tegel PC 30 x 30 cm
Plin Tegel PC 15 x 30 cm
Tegel Warna 20 x 20 cm
Plin Tegel Warna 10 x 20 cm
Tegel Warna 30 x 30 cm
Tegel Wefel PC.20 x 20 cm
Tegel Wefel Warna .20 x 20 cm
Tegel Badak PC. 30 x 30
Poslin 11 x 11 Warna Standar
Keramik 10 x 20 dan 20 x 20 KW I DN Putih Polos
Keramik 10 x 20 dan 20 x 20 KW I DN Warna Anti Slip
Keramik 20 x 20 KW I DN Corak / Warna Anti Slip
Keramik 30 x 30 KW I DN Putih Polos
Keramik 30 x 30 KW I DN Warna Anti Slip
Stairnosing Keramik 10/20
Stairnosing Fiber
Granit Alam LN Ukuran Besar
Granit Alam LN Ukuran Kecil
Granit Alam DN Ukuran Besar
Granit Alam DN Ukuran Kecil
Granito Tile Essenza Ukuran 40x 40 Polis

Bh
Bh
Bh
Bh
Kg
Kg
Set

66,550
22,000
850
55,000
7,300
4,100
50,000

79,860
26,400
1,020
66,000
8,760
4,920
60,000

95,832.00
31,680.00
1,224.00
79,200.00
10,512.00
5,904.00
72,000.00

Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari

161,000
205,000
280,000
304,000
68,000
250,000
366,000
324,000
525,000
125,000
415,000
542,000
289,000
100,000
430,000
175,000
75,000
1,037,000
2,600,000
60,000
300,000
369,000
95,000
82,000
2,600,000
105,000
40,000
1,037,000
60,000
77,000
41,000
175,000
184,000
273,000
326,000
200,000
280,000
80,000
75,000
40,000
152,000
38,000
30,000
160,000

193,200
246,000
336,000
364,800
81,600
300,000
439,200
388,800
630,000
150,000
498,000
650,400
346,800
120,000
516,000
210,000
90,000
1,244,400
3,120,000
72,000
360,000
442,800
114,000
98,400
3,120,000
126,000
48,000
1,244,400
72,000
92,400
49,200
210,000
220,800
327,600
391,200
240,000
336,000
96,000
90,000
48,000
182,400
45,600
36,000
192,000

231,840.00
295,200.00
403,200.00
437,760.00
97,920.00
360,000.00
527,040.00
466,560.00
756,000.00
180,000.00
597,600.00
780,480.00
416,160.00
144,000.00
619,200.00
252,000.00
108,000.00
1,493,280.00
3,744,000.00
86,400.00
432,000.00
531,360.00
136,800.00
118,080.00
3,744,000.00
151,200.00
57,600.00
1,493,280.00
86,400.00
110,880.00
59,040.00
252,000.00
264,960.00
393,120.00
469,440.00
288,000.00
403,200.00
115,200.00
108,000.00
57,600.00
218,880.00
54,720.00
43,200.00
230,400.00

3
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2/DUS
M2/DUS
M2/DUS
M2/DUS
M2/DUS
Bh
Bh
M2
M2
M2
M2
M2/DUS

4
850
750
1,250
850
1,250
850
1,750
1,500
1,000
1,300
28,000
27,500
30,000
38,500
25,000
41,250
2,200
2,000
1,178,000
991,000
867,000
805,000
159,000

5
1,020
900
1,500
1,020
1,500
1,020
2,100
1,800
1,200
1,560
33,600
33,000
36,000
46,200
30,000
49,500
2,640
2,400
1,413,600
1,189,200
1,040,400
966,000
190,800

1,224.00
1,080.00
1,800.00
1,224.00
1,800.00
1,224.00
2,520.00
2,160.00
1,440.00
1,872.00
40,320.00
39,600.00
43,200.00
55,440.00
36,000.00
59,400.00
3,168.00
2,880.00
1,696,320.00
1,427,040.00
1,248,480.00
1,159,200.00
228,960.00

24
25
26
27
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47

Granito Tile Essenza Ukuran 40x 40 Unpolis


Granito Tile Essenza 60x 60 Polis
Granito Tile Essenza 60x 60 Unpolis
Bata Ketawang
Bahan Bahan Lainnya
Kusen Pintu WC Aluminium
Eternit 1 x 1 m2
Eternit 1 x 1 m2
Ampelas Kayu
Cat Plincut
Lem Putih ( Pox )
Bak mandi fiber glass kecil
Tarikan Jendela
Tangkai Air Fiber 0,5 m3
Ubin Abu - abu 20 x 20 cm
Batu Kerikil Hias
Kayu bakar
Angker Kusen dan nut
Angker sloof ke pondasi besi Q 12 mm
Papan Nama Proyek (SD/MI) Uk. 50 x 100 cm
Papan Nama Proyek (Ke - PU an ) Uk. 100 x 150 cm
Papan nama Sekolah rangka besi
Elastomer ( Type A)
Elastomer ( Type B)
L 50.50 4 Pj. 6 M
L 50.50 5 Pj. 6 M
Lempeng Besi baja Fropil Desain Galvanis
Tiang Penyangga Besi st 32 Galvanis
Besi Pengikat Baja Profil Desai ( blocking)
Mur Baut blocking 12x25 mm
Mur Baut Post 16 x 48 mm
Mur Baut Post 18 x 30 mm
Terminal endsection
Reflektor
Thermo Plastic
Glass Bead
Cat Primer
Tutup Pipa 2 "
Daun RPPJ dengan reflextif Sheting 120 x 160 cm
Daun rambu dengan Reflektif Sheting 60 x 60 cm
Daun rambu fortable dengan Reflektif Sheting 75 x 75 cm
Controller 4 Phase 2 Pendestrial 8 Box Luar
Box Lampu 3 Aspek
Box Lampu 2 Aspek untuk Treffic Ligth
Tiang Lengkung untuk Teffic Light
Tiang Lurus
Terminal Kabel
Control WL dengan Konfigurasi
Kerucut Lalulintas
Bok Lampu 2 Aspek Warning Light
Armatur
Alumunium 0.30 mm

2
1
2
3
4
5
6
7
8
9

HARGA BBM *)
Premium
Solar
Minyak Tanah
Minyak Plux
Minyak Bakar
Olie SAE 20
Olie SAE 40
Olie SAE 90
Olie SAE 140

M2/DUS
M2/DUS
M2/DUS
Bh
SET
BH
Peti
LBR
KG
KG
BH
BH
UNIT
BH
KG
M3
BH
BH
BH
BH
BH
BH
BH
Lente
Lente
M3
bh
BH
BH
BH
BH
BH
BH
KG
KG
KG
BH
BH
BH
BH
BH
BH
BH
BH
BH
Btg
Bh
Bh
Bh
Set
Lbr

3
LTR
LTR
LTR
LTR
LTR
LTR
LTR
LTR
LTR

91,300
197,000
110,000
8,250

109,560
236,400
132,000
9,900

131,472.00
283,680.00
158,400.00
11,880.00

300,000
6,400
36,500
2,000
12,500
7,500
65,000
3,500
275,000
1,200
6,000
60,000
2,000
2,500
250,000
300,000
500,000
350,000
450,000
48,000
60,000
209,000
110,000
99,000
7,700
9,750
10,000
132,000
26,000
20,900
21,000
77,800
2,000
2,850
765,800
139,400
15,429,000
1,100,000
825,000
990,000
385,000
10,000
4,590,000
206,600
2,758,300
50,000
30,000

360,000
7,680
43,800
2,400
15,000
9,000
78,000
4,200
330,000
1,440
7,200
72,000
2,400
3,000
300,000
360,000
600,000
420,000
540,000
57,600
72,000
250,800
132,000
118,800
9,240
11,700
12,000
158,400
31,200
25,080
25,200
93,360
2,400
3,420
918,960
167,280
18,514,800
1,320,000
990,000
1,188,000
462,000
12,000
5,508,000
247,920
3,309,960
60,000
36,000

432,000.00
9,216.00
52,560.00
2,880.00
18,000.00
10,800.00
93,600.00
5,040.00
396,000.00
1,728.00
8,640.00
86,400.00
2,880.00
3,600.00
360,000.00
432,000.00
720,000.00
504,000.00
648,000.00
69,120.00
86,400.00
300,960.00
158,400.00
142,560.00
11,088.00
14,040.00
14,400.00
190,080.00
37,440.00
30,096.00
30,240.00
112,032.00
2,880.00
4,104.00
1,102,752.00
200,736.00
22,217,760.00
1,584,000.00
1,188,000.00
1,425,600.00
554,400.00
14,400.00
6,609,600.00
297,504.00
3,971,952.00
72,000.00
43,200.00

4
4,500
4,500
2,500
6,500
2,500
20,000
40,000
80,000
120,000

*) Harga Tergantung Kepada Kebijakan Pemerintah


Kepala Dinas Kimpraswil
Kota Tasikmalaya

Ir. E. TJARLIA RACHMAT,MSc


NIP. 480 093 031

5
4,500
4,500
2,500
6,500
2,500
20,000
40,000
80,000
120,000

Harga 2010

kenaikan 20%

34,992.00
82,080.00
120,960.00
120,960.00
120,960.00
155,520.00
12,096.00
99,360.00
99,360.00
172,800.00
190,080.00
216,000.00
201,600.00
190,080.00
129,600.00
112,320.00
104,544.00
109,296.00
12,960.00
27,648.00
24,710.40
950.40
2,592.00
5,529.60
432.00
23,328.00
24,192.00
29,376.00
32,832.00
20,908.80
49,248.00
993.17
168,838.56
3,960.00
47,520.00
613,958.40
567,388.80
517,968.00
123,552.00
33,264.00
51,840.00
142,560.00
19,008.00

4,356.00
4,356.00
6,336.00
5,544.00
514,800.00
506,880.00
498,960.00
12,960.00
30,240.00
7,603.20
9,936.00
75,686.40
7,948.80
8,380.80
6,912.00
7,171.20
6,566.40
14,904.00
6,912.00
3,456.00
1,123.20
11,232.00
16,416.00
14,688.00
30,240.00
1,615,680.00
2,236,032.00
60,480.00
8,640.00

13,824.00
13,824.00
11,318.40
11,232.00
11,232.00

19,872.00
15,552.00
25,920.00
37,152.00
42,768.00
43,632.00
59,875.20
74,131.20
93,139.20
110,419.20
132,624.00
159,840.00
6,480.00
9,936.00
11,664.00
16,632.00
4,276.80
285,120.00
207,360.00
138,240.00
70,848.00
44,928.00
58,752.00
103,680.00
88,128.00
7,776.00
9,504.00
11,232.00
15,552.00
28,512.00
8,640.00
1,728.00
18,576.00
28,080.00
46,310.40
67,392.00
121,176.00
142,128.00
226,800.00
294,624.00
389,664.00
784,080.00
842,400.00
1,454,112.00
1,976,832.00
2,238,192.00
3,497,472.00
5,084,640.00
5,987,520.00
10,549,440.00
16,822,080.00
18,304,704.00
350,697,600.00
693,792,000.00
950,400,000.00
1,292,544,000.00
2,328,480,000.00
22,464.00
25,920.00
21,600.00
25,920.00
30,240.00
46,656.00
51,840.00
82,080.00

119,750.40
159,667.20
79,833.60
155,520.00
142,992.00
179,712.00

99,792.00
99,792.00
199,584.00
399,168.00
498,960.00
299,376.00
79,833.60
498,960.00

498,960.00
99,792.00
498,960.00
99,792.00
79,833.60
498,960.00
598,752.00
898,128.00
698,544.00
898,128.00
1,097,712.00
2,993,760.00
2,494,800.00
2,993,760.00
3,492,720.00
3,991,680.00
4,490,640.00
4,989,600.00
19,958,400.00
24,948,000.00
30,935,520.00
34,927,200.00

21,859.20
31,363.20
59,875.20
1,663,200.00
5,844,960.00
3,005,164.80
2,246,400.00
2,592,000.00
4,514,400.00
4,143,744.00
1,080,000.00
3,888,000.00
3,214,080.00
3,110,400.00
2,592.00
3,600,000.00
2,419,200.00
1,900.80
2,880,000.00
3,240,000.00
2,880,000.00
1,036.80
3,628,800.00
3,024,000.00
3,110,400.00
4,320.00
6,048,000.00
5,529,600.00
1,036,800.00
7,650,720.00
8,135,424.00
40,458,528.00
27,324,000.00
16,287,955.20
8,776,944.00
19,958.40
27,561.60
2,592.00
3,888.00
8,640.00
13,824.00
26,784.00
147,744.00
42,768.00
1,555.20
2,592.00
3,456.00
7,862.40

11,059.20
63,072.00
11,404.80
93,312.00
70,848.00
91,152.00

64,627.20

78,624.00
56,160.00
114,912.00
104,198.40
10,022.40
15,552.00
20,908.80
52,099.20
152,064.00
197,769.60
260,409.60
343,094.40
124,502.40
140,832.00
93,398.40
114,739.20
135,475.20
204,940.80
166,924.80
125,020.80

8,640.00
21,600.00
218,592.00
161,568.00
104,544.00
9,158.40
9,676.80
32,400.00
71,280.00
75,600.00
64,627.20
25,920.00
7,603.20
8,467.20
34,560.00
21,600.00
12,787.20
17,280.00
37,065.60
3,456.00
15,206.40
23,155.20
42,768.00
3,456.00
17,280.00
12,960.00
46,656.00
38,880.00
38,880.00
46,656.00
125,452.80
56,073.60
3,110.40
9,331.20
124,416.00
8,640.00

44,668.80
51,840.00
69,120.00
115,948.80
361,152.00
594,000.00
1,421,798.40
4,656,960.00
19,008.00
90,892.80

15,552.00
518.40
1,036.80
33,264.00
12,096.00
12,096.00
1,296.00
33,264.00
9,936.00
5,875.20
4,838.40

77,932.80
82,684.80
90,288.00
109,296.00
213,840.00
118,800.00
33,264.00
61,776.00
122,688.00
38,880.00
30,240.00
57,024.00
475,200.00
308,880.00
261,360.00
346,896.00
156,816.00
1,728,000.00
997,920.00
570,240.00
261,360.00
213,840.00
308,880.00
522,720.00
432,000.00

22,982.40
41,817.60
84,585.60
78,624.00
109,036.80
1,296.00
2,592.00
51,840.00
25,920.00
3,312.00
6,912.00
9,504.00
1,555.20
6,048.00
3,024.00
5,184.00
2,592.00
4,752.00
2,592.00
6,048.00
1,728.00
6,566.40
3,024.00
6,048.00
5,184.00
1,224.00
2,160.00
99,792.00
94,867.20
1,036.80
5,356.80
6,825.60
7,776.00
2,764.80
3,888.00

7,776.00
8,640.00
77,760.00
155,520.00
86,400.00
302,400.00
518,400.00
518,400.00
561,600.00
259,200.00
259,200.00
432,000.00
777,600.00
2,073,600.00
60,480.00
77,760.00

285,120.00
120,960.00
60,480.00
129,600.00
43,200.00
43,200.00
12,096.00
15,552.00
12,960.00
380,160.00
12,960.00
259,200.00
432,000.00
138,240.00
172,800.00
345,600.00
518,400.00
298,080.00
298,080.00
298,080.00
1,036,800.00
3,456,000.00
1,336,608.00
2,768,256.00
86,400.00
1,036,800.00
475,200.00
4,320,000.00

430,444.80
129,600.00
69,120.00
388,800.00
881,971.20
188,179.20
391,564.80
163,468.80
188,179.20
38,016.00
87,264.00
30,240.00
14,860.80
3,628.80
5,702.40
8,640.00
24,364.80
55,123.20
23,760.00
85,017.60
5,184.00
5,184.00
12,096.00
6,912.00
17,539.20
12,355.20
5,702.40
34,214.40
49,420.80

199,584.00
280,368.00
807,840.00
777,600.00
2,246,400.00
3,110,400.00
7,128,000.00
8,078,400.00
35,164,800.00
19,958,400.00
294,624,000.00
5,797,440.00
33,264.00
48,729.60
40,262.40
57,974.40
3,456.00
38,016.00

114,998.40
38,016.00
1,468.80
95,040.00
12,614.40
7,084.80
86,400.00
278,208.00
354,240.00
483,840.00
525,312.00
117,504.00
432,000.00
632,448.00
559,872.00
907,200.00
216,000.00
717,120.00
936,576.00
499,392.00
172,800.00
743,040.00
302,400.00
129,600.00
1,791,936.00
4,492,800.00
103,680.00
518,400.00
637,632.00
164,160.00
141,696.00
4,492,800.00
181,440.00
69,120.00
1,791,936.00
103,680.00
133,056.00
70,848.00
302,400.00
317,952.00
471,744.00
563,328.00
345,600.00
483,840.00
138,240.00
129,600.00
69,120.00
262,656.00
65,664.00
51,840.00
276,480.00

1,468.80
1,296.00
2,160.00
1,468.80
2,160.00
1,468.80
3,024.00
2,592.00
1,728.00
2,246.40
48,384.00
47,520.00
51,840.00
66,528.00
43,200.00
71,280.00
3,801.60
3,456.00
2,035,584.00
1,712,448.00
1,498,176.00
1,391,040.00
274,752.00

157,766.40
340,416.00
190,080.00
14,256.00
518,400.00
11,059.20
63,072.00
3,456.00
21,600.00
12,960.00
112,320.00
6,048.00
475,200.00
2,073.60
10,368.00
103,680.00
3,456.00
4,320.00
432,000.00
518,400.00
864,000.00
604,800.00
777,600.00
82,944.00
103,680.00
361,152.00
190,080.00
171,072.00
13,305.60
16,848.00
17,280.00
228,096.00
44,928.00
36,115.20
36,288.00
134,438.40
3,456.00
4,924.80
1,323,302.40
240,883.20
26,661,312.00
1,900,800.00
1,425,600.00
1,710,720.00
665,280.00
17,280.00
7,931,520.00
357,004.80
4,766,342.40
86,400.00
51,840.00

ANALISIS HARGA SATUAN PEKERJAAN


TAHUN ANGGARAN 2010
KOTA TASIKMALAYA

K
O
D
E

JENIS PEKERJAAN

S
A
T
U
A
N

K
O
E
F
I
S
I
E
N
d

HARGA SATUAN
Rp

a
b
c
e
A1 1 M2 PEK. PENGUKURAN KEMBALI (SITE)
- Tukang batu terampil
HOK
0.0100
57,600.00
- Pekerja
HOK
0.0200
36,000.00
- Peralatan
Lot
1.0000
5,000.00
Total
Total Harga
A2 1 M1 MENGERJAKAN PAS. BOUWPLANK
- Kayu
M3
0.0100
1,080,000.00
- Paku 5 - 7
Kg
0.0380
15,552.00
- Ongkos Pasang
Lot
0.1550
12,500.00
Total
Total Harga
A3 1 M2 PEK. KANTOR DIREKSI / LOS KERJA
- Kayu Gunung Klas Kuat III
M3
0.1000
390,000.00
- Paku 5 - 7
Kg
0.2500
7,200.00
- seng glb. " BJLS " 28 (80 x 180 cm )
Lbr
1.1000
42,000.00
- Triplek 3 mm
Lbr
0.5000
44,880.00
- PC ( 50 Kg )
zak
0.1000
34,200.00
- Peralatan
Lot
0.0250
151,221.00
- Ongkos pasang
Lot
0.1250
154,245.42
Total
Total Harga
A4 1 M3 MENGERJAKAN GALIAN TANAH BIASA TIDAK LEBIH DARI 1 M1
- Pekerja
HOK
0.400
36,000.00
- Mandor
HOK
0.040
57,600.00
- Alat bantu
Lot
0.050
16,704.00
Total
Total Harga
A5 1 M3 MENGERJAKAN GALIAN TANAH BIASA MAX. 2 M'
- Pekerja
HOK
0.526
36,000.00
- Mandor
HOK
0.052
57,600.00
- Alat bantu
Lot
0.050
21,931.20
Total
Total Harga
A6 1 M3 URUGAN KEMBALI PONDASI 1/4 DARI GALIAN
- Pekerja
HOK
0.1920
30,000.00
- Mandor
HOK
0.0190
37,500.00
- Alat bantu
Lot
0.1000
6,472.50
Total
Total Harga
B1 1 M3 URUGAN PASIR DIBAWAH LANTAI & PONDASI
- Pasir Urug
M3
1.200
50,000.00
- Pekerja
HOK
0.150
30,000.00
- Mandor
HOK
0.010
37,500.00
Total
Total Harga
B2 1 M2 PASANGAN RABAT BETON TUMBUK T = 5 cm
- Pekerja
HOK
0.5200
30,000.00
- Mandor
HOK
0.0360
37,500.00
- Kepala Tukang
HOK
0.0140
45,000.00
- Tukang Batu
HOK
0.1350
40,000.00
- Kerikil
M3
0.0500
80,400.00
- Pasir
M3
0.0350
60,000.00
- PC ( 50 Kg )
zak
0.2750
41,000.00
Total
Total Harga
B3 1 M' SALURAN GREVEL BETON 1/2 Q 20 cm + PASANG
- Galian tanah
M3
0.150
17,539.20
- Grevel beton 1/2 Q 20 cm
Bh
1.000
18,000.00
- Upah Kerja
Ls
0.350
23,384.53
Total

SUB TOTAL
UPAH KERJA
Rp

SUB TOTAL
BAHAN
Rp

JUMLAH HARGA
Rp

f=(dxe)

g=(dxe)

576.00
720.00
1,296.00

5,000.00
5,000.00
6,296.00
10,800.00
590.98

1,937.50
1,937.50

11,390.98
13,328.48
39,000.00
1,800.00
46,200.00
22,440.00
3,420.00
3,780.53

19,280.68
19,280.68

116,640.53
135,921.20

14,400.00
2,304.00
16,704.00

835.20
835.20
17,539.20

18,936.00
2,995.20
21,931.20

1,096.56
1,096.56
23,027.76

5,760.00
712.50
6,472.50

647.25
647.25
7,119.75
60,000.00

4,500.000
375.00
4,875.00

60,000.00
64,875.00

15,600.00
1,350.00
630.00
5,400.00

22,980.00

4,020.00
2,100.00
11,275.00
17,395.00
40,375.00

2,630.88
18,000.00
20,630.88

8,184.59
8,184.59

Total Harga
B4 1 M3 PASANGAN AANSTAMPING
- Batu belah
- Pasir Urug
- Pekerja
- Tukang Batu Setengah Terampil
- Kepala Tukang Batu
- Mandor
Total
Total Harga

28,815.47
M3
M3
HOK
HOK
HOK
HOK

B5 1 M3 PASANGAN PONDASI 1: 5
- Tukang batu setengah terampil
HOK
- Kepala tukang batu
HOK
- Pekerja
HOK
- Mandor
HOK
- Batu belah
M3
- PC ( 50 Kg )
zak
- Pasir pasang
M3
Total
Total Harga
B6 1 M3 URUGAN TANAH PENINGGIAN LANTAI
- Tanah Urug
M3
- Pekerja
HOK
- Peralatan
Lot
Total
Total Harga
C1 1 M3 PASANGAN PONDASI 1:3
- Kepala tukang batu
HOK
- Tukang batu setengah terampil
HOK
- Pekerja
HOK
- Mandor
HOK
- Batu belah
M3
- PC ( 50 Kg )
Zak
- Pasir pasang
M3
Total
Total Harga
C2 1 M2 PASANGAN DINDING 1:5
- Kepala Tukang batu
HOK
- tukang batu setengah terampil
HOK
- Pekerja setengah terampil
HOK
- Mandor
HOK
- Batu bata
Bh
- PC ( 50 Kg )
Zak
- Pasir pasang
M3
Total
Total Harga
C3 1 M3 PASANGAN DINDING 1:3
- Tukang batu setengah terampil
HOK
- Kepala tukang batu
HOK
- Pekerja setengah terampil
HOK
- Mandor
HOK
- batu bata
Bh
- PC ( 50 Kg )
Zak
- Pasir pasang
M3
Total
Total Harga
C5 1 M2 PLESTERAN 1:3 + ACIAN
- Tukang batu setengah terampil
HOK
- Kepala tukang batu
HOK
- Pekerja setengah terampil
HOK
- Mandor
HOK
- PC ( 50 Kg )
Zak
- Pasir pasang
M3
Total
Total Harga
D1 1 M2 PLESTERAN 1:5 + ACIAN
- Tukang Batu setengah terampil
HOK
- Kepala tukang batu
HOK
- Pekerja setengah terampil
HOK
- Mandor
HOK
- PC ( 50 Kg )
Zak
- Pasir pasang
M3
Total
Total Harga
D2 I UNIT BAK KONTROL GREVEL 40 X 40 CM
- Galian tanah
M3

1.2000
0.4000
1.1250
0.0563
0.0750
0.0560

54,000.00
30,000.00
18,000.00
22,000.00
25,000.00
26,000.00

64,800.00
12,000.00
20,250.00
1,238.60
1,875.00
1,456.00
24,819.60

76,800.00
101,619.60

1.1250
0.1125
2.2500
0.0169
1.2000
2.1600
0.4300

22,000.00
25,000.00
18,000.00
26,000.00
54,000.00
34,200.00
42,000.00

24,750.00
2,812.50
40,500.00
439.40

68,501.90

64,800.00
73,872.00
18,060.00
156,732.00
225,233.90

1.200
0.150
0.050

24,300.00
18,000.00
31,860.00

29,160.00
2,700.00
2,700.00

1,593.00
30,753.00
33,453.00

0.1125
1.1250
2.2500
0.0169
1.2000
3.2400
0.3480

25,000.00
22,000.00
18,000.00
26,000.00
54,000.00
34,200.00
42,000.00

2,812.50
24,750.00
40,500.00
439.40

68,501.90

64,800.00
110,808.00
14,616.00
190,224.00
258,725.90

0.0158
0.1805
0.3218
0.0083
70.0000
0.2592
0.0580

25,000.00
22,000.00
19,000.00
26,000.00
300.00
34,200.00
42,000.00

395.00
3,971.00
6,114.20
215.80

10,696.00

21,000.00
8,864.64
2,436.00
32,300.64
42,996.64

0.2140
0.0210
0.4290
0.0110
70.0000
0.5250
0.0540

22,500.00
25,000.00
19,000.00
26,000.00
300.00
34,200.00
42,000.00

4,815.00
525.00
8,151.00
286.00

13,777.00

21,000.00
17,955.00
2,268.00
41,223.00
55,000.00

0.2140
0.0210
0.2860
0.0200
0.1600
0.0190

22,000.00
25,000.00
19,000.00
26,000.00
34,200.00
42,000.00

4,708.00
525.00
5,434.00
520.00

11,187.00

5,472.00
798.00
6,270.00
17,457.00

0.2140
0.0210
0.2860
0.0200
0.1080
0.0190

22,000.00
25,000.00
19,000.00
26,000.00
34,200.00
42,000.00

4,708.00
525.00
5,434.00
520.00

11,187.00

3,693.60
798.00
4,491.60
15,678.60

0.175

17,539.20

3,069.36

- Urugan Pasir
- Pas. Bata 1:3
- Plesteran 1:3
Total
Total Harga
D3 1 KG BESI BETON TERPASANG U. 24
- Besi beton rata - rata
- Kawat beton
- Tukang besi setengah terampil
- Tukang Besi beton terampil
- Kepala tukang besi beton
- Mandor
- Peralatan, Spencer
Total
Total Harga

M3
M3
M2

0.039
0.085
1.850

64,875.00
55,000.00
17,457.00

2,530.13
4,675.00
32,295.45
42,569.94

42,569.94

Kg
Kg
HOK
HOK
HOK
HOK
Lot

1.0500
0.0100
0.0250
0.0150
0.0100
0.0050
0.0200

5,280.00
4,800.00
19,000.00
21,000.00
27,000.00
26,000.00
6,782.00

D4 1 M' SALURAN GORONG - GORONG BUIS BETON Q 30 cm + PASANGAN


- Galian tanah
M3
0.200
17,539.20
- Gorong - gorong Q 30 cm
Bh
1.000
21,000.00
- Pas. Bata + Plesteran 1:3
M3
1.000
72,457.00
- Upah Kerja
Ls
1.000
96,964.84
Total
Total Harga
E1 1 M3 COR BETON SITE MIX K 175
- PC ( 50 Kg )
Zak
6.8000
34,200.00
- Split pecah mesin 2/3
M3
0.8300
80,400.00
- Pasir beton
M3
0.5400
60,000.00
- Pekerja
HOK
3.0000
18,000.00
- Tukang batu setengah terampil
HOK
0.5000
22,000.00
- Kepala tukang batu
HOK
0.0500
25,000.00
- Mandor
HOK
0.0100
26,000.00
- Peralatan
Lot
0.0700
398,202.00
Total
Total Harga
E2 1 M2 BEKISTING DENGAN PAPAN
- Papan terentang (dihitung 2 x pakai )
M3
0.024
390,000.00
75 %
- Kaso 5/7 kayu terentang ( dihitung
M3
0.017
390,000.00
2 x pakai ) 50 %
- paku
Kg
0.400
7,200.00
- Pekerja
HOK
0.120
18,000.00
- Tukang kayu setengah terampil
HOK
0.150
23,000.00
- Kepala tukang kayu
HOK
0.150
27,000.00
- Mandor
HOK
0.050
26,000.00
- Tukang kayu 1/2 terampil ( bongkar
HOK
0.120
23,000.00
Cetakan Bekisting )
Total
Total Harga
E3 1 M2 PASANGAN STOOTWERK
- Kayu stoot ( Dinding 2x pakai ) 50%
btg
9.000
5,460.00
- Papan terentang
M3
0.016
390,000.00
- Paku
Kg
0.500
7,200.00
- Pekerja
HOK
0.150
18,000.00
- Tukang kayu terampil
HOK
0.200
24,000.00
- Kepala tukang kayu
HOK
0.200
27,000.00
- Mandor
HOK
0.017
26,000.00
Total
Total Harga
E4 1 M3 BETON 15/15 K 175
- Besi beton + kawat beton
Kg
229.3300
6,917.64
- Papan bekisting
M2
13.3300
26,935.00
- Campuran Beton K 175
M3
1.0000
426,076.14
Total
Total Harga
E5 1 M3 BETON 15/20 K 175
- Besi beton + kawat Beton
Kg
198.9500
6,917.64
- Papan Bekisting
M2
13.3300
26,935.00
- Campuran Beton K 175
M3
1.0000
426,076.14
Total
Total Harga
E6 1 M3 BETON 15/25 K 175
- Besi Beton + Kawat beton
Kg
219.220
6,917.64

5,544.00
48.00
475.00
315.00
270.00
130.00
1,190.00

135.64
5,727.64
6,917.64

3,507.84
21,000.00
72,457.00
96,964.84
96,964.84

96,964.84
193,929.68
232,560.00
66,732.00
32,400.00

54,000.00
11,000.00
1,250.00
260.00
66,510.00

27,874.14
359,566.14
426,076.14
7,020.00
3,315.00
2,880.00

2,160.00
3,450.00
4,050.00
1,300.00
2,760.00
13,720.00

13,215.00
26,935.00
49,140.00
6,240.00
3,600.00

2,700.00
4,800.00
5,400.00
442.00
13,342.00

58,980.00
72,322.00
1,586,422.38

359,043.55
426,076.14
785,119.69

1,586,422.38
2,371,542.07
1,376,264.48

359,043.55
426,076.14
785,119.69

1,376,264.48
2,161,384.17
1,516,485.04

- Papan Bekisting
- Campuran Beton K 175
Total
Total Harga
E7 1 M3 BETON 20/20 K 175
- Besi Beton + Kawat Beton
- Papan bekisting
- Campuran Beton K 175
Total
Total Harga
E8 1 M3 BETON 20/40 K 175
x - Besi Beton + kawat beton
- Papan Bekisting
- Campuran Beton K 175
Total
Total Harga
F1 1 M3 BETON 20/30 K 175
- Besi Beton + Kawat Beton
- Papan Bekisting
- Campuran Beton K 175
- Stootwerk
Total
Total Harga
F2 1 M3 BETON 12/12
- Besi Beton + Kawat Beton
- Papan Bekisting
- Campuran Beton K 175
Total
Total Harga

M2
M3

21.340
1.000

26,935.00
426,076.14

574,792.90
426,076.14
1,000,869.04

1,516,485.04
2,517,354.08

Kg
M2
M3

107.000
20.000
1.000

6,917.64
26,935.00
426,076.14

740,187.48
538,700.00
426,076.14
964,776.14

740,187.48
1,704,963.62

Kg
M2
M3

100.880
12.500
1.000

6,917.64
26,935.00
426,076.14

697,851.52
336,687.50
426,076.14
762,763.64

697,851.52
1,460,615.16

Kg
M2
M3
M2

244.020
20.000
1.000
2.080

6,917.64
26,935.00
426,076.14
72,322.00

1,688,042.51
538,700.00
426,076.14
150,429.76
1,115,205.90

1,688,042.51
2,803,248.41

Kg
M2
M3

229.330
20.000
1.000

6,917.64
26,935.00
426,076.14

F3 1 M3 PLAT MEJA BETON TEBAL 10 CM K 175


- Besi Beton + Kawat Beton
Kg
115.000
6,917.64
- Papan Bekisting
M2
10.000
26,935.00
- Campuran Beton K 175
M3
1.000
426,076.14
Total
Total Harga
F4 1 M3 KUDA-KUDA KAYU GUNUNG KLAS II KUAT
- Balok kayu
M3
1.1000
2,250,000.00
- Paku 8 s/d 12 mm
HOK
5.8000
7,200.00
- Pekerja setengah terampil
HOK
3.0000
19,000.00
- Tukang Kayu terampil
HOK
5.0000
24,000.00
- Kepala Tukang Kayu
HOK
2.0000
27,000.00
- Mandor
HOK
0.4000
26,000.00
Total
Total Harga
F5 1M2 PASANGAN RANGKA ATAP KAYU GUNUNG KLAS II KUAT
- Kaso 5/7 Kayu Gunung
M3
0.0168
1,320,000.00
- Reng 2/3 Kayu Gunung
M'
4.0000
720.00
- Paku
Kg
0.2500
7,200.00
- Pekerja Setengah Terampil
HOK
0.1500
19,000.00
- Tukang kayu terampil
HOK
0.1500
24,000.00
- Kepala Tukang kayu
HOK
0.0100
27,000.00
- Mandor
HOK
0.0050
26,000.00
Total
Total Harga
F6 1 M2 PASANGAN GENTENG PALENTONG
- Genteng Palentong
Bh
25.000
900.00
- Ongkos Pasang
Ls
1.000
2,500.00
Total
Total Harga
F6 A 1 M2 PASANGAN GENTENG BETON PRES
- Genteng beton Pres
Bh
9.000
1,920.00
- Pekerja
HOK
0.150
18,000.00
- Tukang Kayu 1/2 terampil
HOK
0.100
23,000.00
- KepalaTukang Kayu
HOK
0.010
27,000.00
Mandor
HOK
0.005
26,000.00
Total
.
Total Harga
F7 1 M' PAS. BUBUNGAN ATAP GENTENG EX JATIWANGI
- Genteng Bubungan
Bh
3.500
1,800.00
- PC ( 50 Kg )
Zak
0.130
34,200.00
- Pasir pasang
M3
0.210
42,000.00
- Pekerja setengah terampil
HOK
0.150
19,000.00
- Tukang batu terampil
HOK
0.200
22,000.00
- Kepala tukang batu
HOK
0.010
25,000.00
- Peralatan
Lot
0.065
31,821.71

1,586,422.38
538,700.00
426,076.14
964,776.14

1,586,422.38
2,551,198.52

795,528.60
269,350.00
426,076.14
695,426.14

795,528.60
1,490,954.74
2,475,000.00
41,760.00

57,000.00
120,000.00
54,000.00
10,400.00
241,400.00

2,516,760.00
2,758,160.00
22,176.00
2,880.00
1,800.00

2,850.00
3,600.00
270.00
130.00
6,850.00

26,856.00
33,706.00
22,500.00

2,500.00
2,500.00

22,500.00
25,000.00
17,280.00

2,700.00
2,300.00
270.00
130.00
5,400.00

17,280.00
22,680.00
6,300.00
4,446.00
8,820.00

2,850.00
4,400.00
250.00
2,068.41

Total
Total Harga
F7 A 1 M' PAS. BUBUNGAN ATAP GENTENG BETON
- Genteng Bubungan genteng Beton
Bh
3.000
2,700.00
- PC ( 50 Kg )
Zak
0.130
34,200.00
- Pasir pasang
M3
0.210
42,000.00
- Pekerja setengah terampil
HOK
0.150
19,000.00
- Tukang batu terampil
HOK
0.200
24,000.00
- Kepala tukang batu
HOK
0.010
25,000.00
- Mandor
HOK
0.005
26,000.00
- Peralatan
Lot
0.065
29,396.00
Total
Total Harga
F8 PEKERJAAN DAUN PINTU DOUBLE TRIPLEK
- Triplek 4 mm Uk. Pintu
Lbr
1.000
39,000.00
- Rangka kayu
M3
0.025
- Paku
Kg
0.055
7,200.00
- Pekerja Terampil
HOK
0.300
21,000.00
- Tukang kayu setengah terampil
HOK
1.500
23,000.00
- Kepala Tukang kayu
HOK
0.200
27,000.00
- Mandor
HOK
0.020
26,000.00
Total
Total Harga
G1 1 M3 PEK. SILANG GEMPA DAN ANGIN 6/12 KAYU GUNUNG KLAS II KUAT
- Balok 6/12 kayu
M3
1.0000
2,250,000.00
- Baut / Mur
Kg
13.2800
8,400.00
- Tukang kayu setengah terampil
HOK
0.1680
23,000.00
- Kepala Tukang kayu
HOK
0.1700
27,000.00
- Pekerja
HOK
0.5000
18,000.00
- Mandor
HOK
0.2500
26,000.00
Total
Total Harga

G2 1 M2 PEK. RANGKA PLAPOND KAYU GUNUNG KLAS II KUAT + ETERNIT


- Eternit 1 x 1 m
Bh
1.0000
7,680.00
- kaso 5/7 kayu gunung
M3
0.0140
1,320,000.00
- kaso 5/10 kayu gunung Klas II
M3
0.0070
1,320,000.00
- Paku
Kg
0.2200
7,200.00
- Pekerja setengah terampil
HOK
0.2800
19,000.00
- Tukang Kayu terampil
HOK
0.4000
24,000.00
- Kepala tukang kayu
HOK
0.0400
27,000.00
- Mandor
HOK
0.0140
26,000.00
Total
Total Harga
G3 1 M' PAS. LIST PLAPOND 1/4 KAYU GUNUNG
- Kayu 1/4
M3
0.001
1,320,000.00
- Paku
Kg
0.002
7,200.00
- Tukang kayu setengah terampil
HOK
0.035
23,000.00
- Kepala tukang kayu
HOK
0.022
27,000.00
Total
Total Harga
G4 1 M2 PEKERJAAN JALUSI ATAP KAYU GUNUNG KLAS II KUAT
- Kayu
M3
0.0100
1,320,000.00
- Paku
Kg
2.5000
7,200.00
- Lem Putih ( FOX )
HOK
0.3000
10,800.00
- Pekerja terampil
HOK
0.4500
21,000.00
- Tukang kayu setengah terampil
HOK
0.9500
23,000.00
- Kepala tukang kayu
HOK
0.1300
27,000.00
- Mandor
HOK
0.0150
26,000.00
Total
Total Harga
H1 1 M1 PEKERJAAN LISTPLANK 3/25 KAYU GUNUNG KLAS II KUAT
- Papan 3/25
M3
0.0080
1,320,000.00
- Paku
Kg
0.0010
7,200.00
- Pekerja terampil
HOK
0.0700
21,000.00
- Tukang kayu setengah terampil
HOK
0.2000
23,000.00
- Kepala tukang kayu
HOK
0.0200
27,000.00
- Mandor
HOK
0.0040
26,000.00

7,500.00

21,634.41
29,134.41
8,100.00
4,446.00
8,820.00

2,850.00
4,800.00
250.00
130.00
8,030.00

1,910.74
23,276.74
31,306.74

39,000.00
396.00
6,300.00
34,500.00
5,400.00
520.00
85,720.00

396.00
86,116.00
2,250,000.00
111,552.00

3,864.00
4,590.00
9,000.00
6,500.00
23,954.00

2,361,552.00
2,385,506.00

7,680.00
18,480.00
9,240.00
1,584.00
5,320.00
9,600.00
1,080.00
364.00
16,364.00

36,984.00
53,348.00
1,320.00
14.40

805.00
594.00
1,399.00

1,334.40
2,733.40
13,200.00
18,000.00
3,240.00

9,450.00
21,850.00
3,510.00
390.00
35,200.00

34,440.00
69,640.00
10,560.00

7.20
1,470.00
4,600.00
540.00
104.00

Total
Total Harga
H2 1 M3 PEKERJAAN KUSEN KAYU GUNUNG KLAS II KUAT
- Balok 6/15 kayu gunung
M3
1.100
- Paku
Kg
2.500
- Lem Putih ( FOX )
Kg
1.000
- Pekerja terampil
HOK
4.000
- Tukang Kayu terampil
HOK
15.000
- Kepala tukang kayu
HOK
2.700
- Mandor
HOK
0.500
Total
Total Harga
H3 1 M2 PEKERJAAN DAUN PINTU PANILKAYU GUNUNG I
- Rangka + Panil
M3
0.0500
- Lem putih
Kg
0.7500
- List Profil
M'
4.0000
- Pekerja terampil
HOK
0.6000
- Tukang kayu terampil
HOK
2.6000
- Kepala tukang kayu
HOK
0.2600
- Mandor
HOK
0.0260
Total
Total Harga
H4 1 M2 PAPAN JALUSI JENDELA KAYU GUNUNG
- Papan Jalusi
M3
0.020
- Lem Putih
Kg
0.200
- Pekerja setengah terampil
HOK
0.400
- Tukang kayu terampil
HOK
0.600
- Kepala tukang kayu
HOK
0.070
- Mandor
HOK
0.007
Total
Total Harga
I1 1 M2 DAUN JENDELA KACA KAYU GUNUNG ( TANPA KACA )
- Papan kayu
M3
0.017
- Lem Putih
Kg
0.300
- List kayu
M'
4.000
- Pekerja setengah terampil
HOK
0.300
- Tukang kayu terampil
HOK
1.200
- Kepala Tukang kayu
HOK
0.120
- Mandor
HOK
0.020
Total
Total Harga
I2 1 M3 PASANGAN PAPAN RUITER KAYU GUNUNG
x - Papan kayu 3/20
M3
1.1000
- paku
Kg
0.2000
- Pekerja
HOK
0.1000
- Tukang Kayu setengah terampil
HOK
0.0500
- Kepala tukang kayu
HOK
0.0070
Total
Total Harga

I3

I4

J1

1 M2 PENGECATAN KAYU BERIKUT MENI


- Meni Kayu
Kg
0.167
- Dempul kayu
Kg
0.083
- Cat kayu merk Seiv Dov
Kg
0.200
- Minyak cat
Ltr
0.150
- Ampelas kayu
Lbr
0.400
- Kwas 4"
Bh
0.050
- Pekerja setengah terampil
HOK
0.200
- Tukang cat terampil
HOK
0.300
- Kepala tukang cat
HOK
0.030
- Mandor
HOK
0.010
Total
Total Harga
1 M' PLASING SENG BJLS 30"
- Seng BJLS 30"
Lbr
0.5000
- Papan 2/10
M3
0.0200
- Ongkos pasang
Ls
0.0500
Total
Total Harga
1 M2 PENGECATAN DINDING DENGAN SANLEX ( 3 X )
- Cat tembok setara Sanlex
Kg
0.175
- Plamour Tembok
Kg
0.160
- Rol Cat
Bh
0.010
- Ampelas kayu
Lbr
0.500
- Pekerja setengah terampil
HOK
0.104

6,721.20

10,560.00
17,281.20

2,250,000.00
7,200.00
10,800.00
21,000.00
24,000.00
27,000.00
26,000.00

2,475,000.00
18,000.00
10,800.00
84,000.00
360,000.00
72,900.00
13,000.00
529,900.00

2,503,800.00
3,033,700.00

2,250,000.00
10,800.00
5,500.00
21,000.00
24,000.00
27,000.00
26,000.00

112,500.00
8,100.00
22,000.00
12,600.00
62,400.00
7,020.00
676.00
82,696.00

142,600.00
225,296.00

2,250,000.00
10,800.00
19,000.00
24,000.00
27,000.00
26,000.00

45,000.00
2,160.00
7,600.00
14,400.00
1,890.00
182.00
24,072.00

47,160.00
71,232.00

2,250,000.00
10,800.00
2,700.00
19,000.00
24,000.00
27,000.00
26,000.00

38,250.00
3,240.00
10,800.00
5,700.00
28,800.00
3,240.00
520.00
38,260.00

52,290.00
90,550.00

2,250,000.00
7,200.00
18,000.00
23,000.00
27,000.00

2,475,000.00
1,440.00
1,800.00
1,150.00
189.00
3,139.00

2,476,440.00
2,479,579.00

9,000.00
12,000.00
27,000.00
10,560.00
2,400.00
12,000.00
19,000.00
24,000.00
30,000.00
26,000.00

1,503.00
996.00
5,400.00
1,584.00
960.00
600.00
3,800.00
7,200.00
900.00
260.00
12,160.00

11,043.00
23,203.00

19,500.00
390,000.00
17,550.00

9,750.00
7,800.00
877.50
18,427.50
18,427.50

6,720.00
6,000.00
18,000.00
2,400.00
19,000.00

1,176.00
960.00
180.00
1,200.00
1,976.00

- Tukang cat setengah terampil


HOK
0.182
- Kepala tukang cat
HOK
0.0195
- Mandor
HOK
0.010
- Steger Werk
Lot
0.045
Total
Total Harga
J2 1 M2 PENGECATAN PLAPOND DENGAN SANLEX ( 3 X )
- Cat tembok setara Sanlex
Kg
0.200
- Plamour Tembok
Kg
0.160
- Rol Cat
Bh
0.010
- Ampelas kayu
Lbr
0.500
- Pekerja setengah terampil
HOK
0.104
- Tukang cat setengah terampil
HOK
0.182
- Kepala tukang cat
HOK
0.0195
- Mandor
HOK
0.010
- Steger Werk
Lot
0.043
Total
Total Harga
J3 1 M2 PENGECATAN GENTING
- Cat Genting
Kg
0.175
- Sikat kawat
Bh
0.050
- Kwas 4 Inc
Bh
0.050
- Pekerja setengah terampil
HOK
0.500
- Tukang cat setengah terampil
HOK
0.182
- Kepala tukang cat
HOK
0.0195
- Mandor
HOK
0.010
- Steger Werk
Lot
0.050
Total
Total Harga
J4 1 M2 PLITURAN DAUN PINTU
- Dempul plitur ( Dempul kasar )
Kg
0.030
- Wood Filer
Kg
0.200
- Oker Putih
Kg
0.020
- Oker Coklat warna
Kg
0.010
- Batu apung ( batu gosok )
Kg
0.100
- Sirlak Ex India
Kg
0.200
- Kwas 4 "
Bh
0.010
- Spirtus
Ltr
0.200
- Ampelas kayu
Lbr
0.100
- Pekerja setengah terampil
HOK
0.250
- Tukang pelitur setengah terampil
HOK
0.285
- Kepala tukang cat/pelitur
HOK
0.040
- Mandor
HOK
0.020
Total
Total Harga
J5 1 M2 CAT SOLIGNUM RANGKA ATAP
- Cat Solignum
Galon
0.012
- Kuas 4"
Bh
0.070
- Pekerja
HOK
0.030
- Tukang cat setengah terampil
HOK
0.015
- Kepala tukang cat
HOK
0.020
Total
Total Harga

22,500.00
30,000.00
26,000.00
10,432.00

4,095.00
585.00
260.00
6,916.00

469.44
3,985.44
10,901.44

6,720.00
6,000.00
18,000.00
2,400.00
19,000.00
22,500.00
30,000.00
26,000.00
10,600.00

1,344.00
960.00
180.00
1,200.00
1,976.00
4,095.00
585.00
260.00
6,916.00

455.80
4,139.80
11,055.80

14,500.00
6,000.00
12,000.00
19,000.00
22,500.00
30,000.00
26,000.00
17,877.50

2,537.50
300.00
600.00
9,500.00
4,095.00
585.00
260.00
14,440.00

893.88
4,331.38
18,771.38

12,000.00
25,740.00
2,160.00
6,480.00
8,400.00
86,400.00
12,000.00
6,000.00
2,400.00
19,000.00
22,500.00
30,000.00
26,000.00

360.00
5,148.00
43.20
64.80
840.00
17,280.00
120.00
1,200.00
240.00
4,750.00
6,412.50
1,200.00
520.00
12,882.50

25,296.00
38,178.50

24,000.00
12,000.00
18,000.00
22,500.00
30,000.00

K1 1 M3 PEKERJAAN GORDING DAN BALOK NON KAYU GUNUNG


- Balok 8/12 kayu
M3
1.000
2,250,000.00
- Paku
Kg
6.500
7,200.00
- Tukang kayu setengah terampil
HOK
0.168
23,000.00
- Kepala tukang kayu
HOK
0.170
27,000.00
- Pekerja
HOK
0.500
18,000.00
- Mandor
HOK
0.250
26,000.00
Total
Total Harga
K2 1 M2 PASANGAN LANTAI KERAMIK 30 X 30 DN PUTIH POLOS
- Keramik 30 x 30
M2
1.010
30,000.00
- PC ( 50 Kg )
Zak
0.160
34,200.00
- Pasir pasang
M3
0.030
42,000.00
- PC warna
Kg
0.013
2,750.00
- Pekerja terampil
HOK
0.190
21,000.00

288
840
540.00
337.50
600.00
1,477.50

1128
2,605.50

2250000
46,800.00
3,864.00
4,590.00
9,000.00
6,500.00
23,954.00

2,296,800.00
2,320,754.00
30,300.00
5,472.00
1,260.00
35.75

3,990.00

K3

K4

K5

L1

L2

L3

L4

- Tukang batu terampil


HOK
0.375
24,000.00
9,000.00
- Kepala tukang batu
HOK
0.075
25,000.00
1,875.00
- Mandor
HOK
0.020
26,000.00
520.00
Total
15,385.00
37,067.75
Total Harga
1 M2 PASANGAN LANTAI KERAMIK 30X30 KM/WC ANTI SLIP
- Keramik 30 x 30
M2
1.0100
49,500.00
49,995.00
- PC ( 50 Kg )
Zak
0.1600
34,200.00
5,472.00
- Pasir pasang
M3
0.0300
42,000.00
1,260.00
- PC warna
Kg
0.0130
2,750.00
35.75
- Pekerja terampil
HOK
0.2810
21,000.00
5,901.00
- Tukang batu terampil
HOK
0.5630
24,000.00
13,512.00
- Kepala tukang batu
HOK
0.1130
25,000.00
2,825.00
- Mandor
HOK
0.0280
26,000.00
728.00
Total
22,966.00
56,762.75
Total Harga
1 M2 PASANGAN DINDING KERAMIK 20X20 DN PUTIH POLOS
- Keramik 20 x 20
M2
1.0100
33,000.00
33,330.00
- PC ( 50 Kg )
Zak
0.1600
34,200.00
5,472.00
- Pasir pasang
M3
0.0300
42,000.00
1,260.00
- PC warna
Kg
0.0130
2,750.00
35.75
- Pekerja terampil
HOK
0.1875
21,000.00
3,937.50
- Tukang batu terampil
HOK
0.3750
24,000.00
9,000.00
- Kepala tukang batu
HOK
0.0750
25,000.00
1,875.00
- Mandor
HOK
0.0188
26,000.00
488.80
Total
15,301.30
40,097.75
Total Harga
1 M2 PEKERJAAN HAMPARAN BATU KERIKIL BULAT TEBAL 7.50 CM
- Batu kerikil bulat
M2
0.250
17,160.00
4,290.00
- Pekerja Terampil
HOK
0.110
21,000.00
2,310.00
- Peralatan
HOK
1.000
6,600.00
6,600.00
Total
2,310.00
10,890.00
Total Harga
1 M2 PASANGAN BATU TEMPEL HITAM
- Batu tempel
M2
1.100
75,900.00
83,490.00
- PC ( 50 Kg )
Kg
0.120
34,200.00
4,104.00
- Pasir pasang
M3
0.031
42,000.00
1,302.00
- Pekerja terampil
HOK
0.188
21,000.00
3,948.00
- Tukang batu terampil
HOK
0.225
24,000.00
5,400.00
- Kepala tukang batu
HOK
0.038
25,000.00
950.00
- Mandor
HOK
0.034
26,000.00
884.00
- Peralatan
Ls
1.000
100,078.00
100,078.00
Total
11,182.00
188,974.00
Total Harga
1 M2 PEKERJAAN DAUN PINTU PANIL KACA TANPA KACA + RANGKA KAYU GUNUNG
- Rangka kayu gunung Kl II
M3
0.020
2,250,000.00
45,000.00
- Lem Putih
Kg
0.600
10,800.00
6,480.00
- List Kayu kamper banjar
M'
4.000
1,800.00
7,200.00
- Pekerja Terampil
HOK
0.400
21,000.00
8,400.00
- Tukang kayu terampil
HOK
1.400
24,000.00
33,600.00
- Kepala tukang kayu
HOK
0.140
27,000.00
3,780.00
- Mandor
HOK
0.014
26,000.00
364.00
Total
46,144.00
58,680.00
Total Harga
1 M2 PEK. DAUN PINTU PANIL 4 MM BAGIAN DALAM LAPIS ALUMUNIUM + RANGKA KAYU GUNUNG
- Papan Kayu gunung
M3
0.025
2,250,000.00
56,250.00
- Alumunium Sheet 0.30 mm
Lbr
1.800
36,000.00
64,800.00
- Paku Triplek
Kg
0.200
7,200.00
1,440.00
- Lem Putih Fox
Kg
0.500
10,800.00
5,400.00
- Pekerja 1/2 terampil
HOK
0.300
19,000.00
5,700.00
- Tukang kayu terampil
HOK
1.300
24,000.00
31,200.00
- Kepala tukang kayu
HOK
0.130
27,000.00
3,510.00
- Mandor
HOK
0.130
26,000.00
3,380.00
Total
43,790.00
127,890.00
Total Harga
1 M3 PEKERJAAN STRIPING TANAH TEBAL = 0,20 M2
- Pekerja 1/2 terampil
HOK
0.050
19,000.00
950.00
- Mandor
HOK
0.005
26,000.00
130.00
- Alat bantu
Ls
1.000
1,080.00
1,080.00
Total
1,080.00
1,080.00
Total Harga

L5 1 M' TALANG SENG BJLS 30" + PAPAN


- Seng BJLS 30"
- Papan 2/20
- Ongkos Pasang
Total

Lbr
M'
Ls

1.000
1.000
1.000

19,500.00
2,280.00
21,780.00

19,500.00
2,280.00
21,780.00
43,560.00

52,452.75

79,728.75

55,399.05

13,200.00

200,156.00

104,824.00

171,680.00

2,160.00

Total Harga
M1 1 M3 PASANGAN PONDASI KIRMIR 1:4 PAKAI BATU MUKA + SIARAN
- Tukang batu setengah terampil
HOK
1.125
32,000.00
- Kepala tukang batu
HOK
0.113
40,000.00
- Pekerja terampil
HOK
1.250
30,000.00
- Mandor
HOK
0.017
37,500.00
- Batu Belah
M3
1.500
54,000.00
- PC ( 50 Kg )
Zak
1.250
34,200.00
- Pasir pasang
M3
0.348
42,000.00
Total
Total Harga
M2 1 M' PEKERJAAN PAGAR DEPAN BRC BERIKUT TIANG
- Bouplank
M'
1.000
13,328.48
- Galian tanah
M3
0.480
17,539.20
- Pas. Batu belah 1pc : 4 Psr
M3
0.360
225,233.90
- Plesteran & acian 1 PC : 4 Psr
M2
0.410
17,457.00
- Pas. Bata 1:3
M2
0.500
55,000.00
- Pagar BRC + Tiang
M'
1.010
172,800.00
- Pengecatan
M3
0.410
10,379.29
Total
Total Harga
M3 1 M2 PEKERJAAN PAGAR BELAKANG / SAMPING KAWAT DURI
- Galian tanah
M3
0.216
17,539.20
- Pas. Batu belah 1 pc : 4 Psr
M3
0.060
225,233.90
- Plesteran & Acian 1pc : 3 Psr
M2
0.250
17,457.00
- Besi Siku
Kg
2.000
4,200.00
- Besi Stoot Q 6 mm + Baut
Kg
0.550
4,200.00
- Kawat duri
M2
1.000
2,400.00
- Pengecatan
Ls
1.000
10,901.44
Total
Total Harga
M4 1 M' SALURAN GORONG - GORONG BUIS BETON Q 30 mm + PASANGAN
- Galian tanah
M3
0.400
17,539.20
- Gorong - gorong Q 30 cm
Bh
1.000
21,000.00
- Pas. Bata + Plesteran 1:3
M3
1.000
72,457.00
- Upah Kerja
Ls
1.000
100,472.68
Total
Total Harga
M5 1 M2 PASANGAN RABAT BETON TEBAL 7.50 cm
- Pekerja
HOK
0.750
18,000.00
- Mandor
HOK
0.086
26,000.00
- Kepala tukang
HOK
0.024
25,000.00
- Tukang batu terampil
HOK
0.135
24,000.00
- Kerikil
M3
0.050
80,400.00
- Pasir
M3
0.035
60,000.00
- PC ( 50 Kg )
Zak
0.461
34,200.00
Total
Total Harga
N1 1 UNIT SEPTICTANK 2 X 1,5 X 1,5 M + REMBESANNYA ( TYPE KECIL )
- Galian Tanah
M3
4.500
17,539.20
- Pasir urug
M3
0.214
64,875.00
- Lantai Kerja
M3
2.250
40,375.00
- Pas. Bata 1 Pc : 3 Ps + Plesteran
M2
15.000
72,457.00
- Plat penutup Beton
M3
0.300
1,490,954.74
- Pipa PVC 4" jenis AW + sambungan
M'
5.400
- Pipa GIV 1 1/2
M'
1.200
72,000.00
- Galian tanah untuk rembesan
M3
3.375
23,027.76
- Pas. Injuk
Kg
5.400
10,800.00
- Urugan kerikil 3,50 cm
M3
1.050
73,200.00
- Pipa PVC 4 " berlobang jenis AW
M'
5.000
(3,000.00)
- Urugan kembali / peralatan tanah
M3
1.125
7,119.75
- Tambahan upah
Ls
1.000
30,000.00
Total
Total Harga
N2 1 M2 PEKERJAAN LANTAI KERJA 1:3:5 TEBAL 5 cm
- PC ( 50 Kg )
Zak
3.965
34,200.00
- Pasir beton
M3
0.550
60,000.00
- Split pecah Mesin 2/3
M3
0.930
80,400.00
- Peralatan
Ls
1.000
3,000.00
- Pekerja
HOK
2.000
18,000.00
- Tukang batu 1/2 terampil
HOK
0.500
22,000.00
- Kepala tukang batu
HOK
0.050
25,000.00
- Mandor
HOK
0.010
26,000.00
Total
Total Harga

43,560.00
36,000.00
4,520.00
37,500.00
637.50

78,657.50

81,000.00
42,750.00
14,616.00
138,366.00
217,023.50
13,328.48
8,418.82
81,084.20
7,157.37
27,500.00
174,528.00
4,255.51
316,272.38
316,272.38
3,788.47
13,514.03
4,364.25
8,400.00
2,310.00
2,400.00
10,901.44
45,678.19
45,678.19
7,015.68
21,000.00
72,457.00
100,472.68
200,945.36
200,945.36

13,500.00
2,236.00
600.00
3,240.00

19,576.00

4,020.00
2,100.00
15,766.20
21,886.20
41,462.20

78,926.40
13,883.25
90,843.75
1,086,855.00
447,286.42
86,400.00
77,718.69
58,320.00
76,860.00
(15,000.00)
8,009.72
1,803,523.23

30,000.00
236,580.00
2,040,103.23
135,603.00
33,000.00
74,772.00
3,000.00
36,000.00

11,000.00
1,250.00
260.00
12,510.00

282,375.00
294,885.00

N3 1 M2 PEKERJAAN ONDERLAG BATU BELAH T = 20 cm


- Pasir pasang
M3
0.150
42,000.00
- Batu Belah
M3
0.250
54,000.00
- Pekerja terampil ( Gali+Urug+Ampar )
HOK
0.150
30,000.00
- Peralatan
Ls
1.000
24,300.00
Total
Total Harga
N4 1 UNIT SEPTICTANK BUIS BETON Q 100 CM + RESAPAN KEDALAMAN 2 M
- Galian tanah
M3
2.412
17,539.20
- Buis beton Q 100 cm
Bh
4.000
111,000.00
- Plat penutup beton ( t = 10 cm )
M3
0.077
1,490,954.74
- Urugan Pasir
M2
0.038
64,875.00
- Plesteran 1 PC : 3 Psr
M3
0.314
17,457.00
- Pipa GIV 1 1/2
M'
1.500
72,000.00
- Pas. Injuk
Kg
4.000
2,970.00
- Urugan Pasir
M3
0.353
64,875.00
- Tambahan Upah
Ls
0.600
12,000.00
Total
Total Harga
O1 1 M2 PASANGAN LANTAI UBIN ABU - ABU 20 X20
- Ubin 20 x 20
Bh
25.000
1,020.00
- PC ( 50 Kg )
Zak
0.160
34,200.00
- Pasir Pasang
M3
0.030
42,000.00
- Pekerja Terampil
HOK
0.250
21,000.00
- Tukang Batu terampil
HOK
0.400
24,000.00
- Kepala tukang batu
HOK
0.050
25,000.00
- Mandor
HOK
0.025
26,000.00
Total
Total Harga
O2 1 M2 WATER PROOFING PLAT BETON
- Water Proof beton / aqua proof
Kg
0.500
52,500.00
- Rol Cat
Bh
0.010
18,000.00
- Sikat Kawat
BH
0.010
6,000.00
- Pekerja setengah terampil
HOK
0.104
19,000.00
- Tukang cat setengah terampil
HOK
0.182
22,500.00
- Kepala tukang kayu
HOK
0.020
27,000.00
- Mandor
HOK
0.065
26,000.00
Total
Total Harga
O3 1 M2 PEK. RANGKA PLAPOND KAYU GUNUNG KLS II (Hanya rangka saja )
- Kaso 5/7 kayu borneo
M3
0.014
2,250,000.00
- Paku
Kg
0.220
7,200.00
- Pekerja setengah terampil
HOK
0.188
19,000.00
- Tukang kayu terampil
HOK
0.225
24,000.00
- Kepala tukang kayu
HOK
0.038
27,000.00
- Mandor
HOK
0.011
26,000.00
Total
Total Harga
O4 1 M2 PEK. BAHAN PLAPOND ETERNIT 4 MM
- Eternit 1 x 1 m
Lbr
1.000
7,680.00
- Paku
Kg
0.220
7,200.00
- Pekerja setengah terampil
HOK
0.048
19,000.00
- Tukang kayu terampil
HOK
0.113
24,000.00
- Kepala tukang kayu
HOK
0.010
27,000.00
- Mandor
HOK
0.003
26,000.00
Total
Total Harga
P1 1 M2 PEK. PAVING BLOCK T = 6 Cm NATURAL
- Paving block
M2
1.010
16,200.00
- Pasir beton
M3
0.100
60,000.00
- Pekerja setengah terampil
HOK
0.250
19,000.00
- Tukang batu setengah terampil
HOK
0.500
22,000.00
- Kepala tukang batu
HOK
0.025
25,000.00
- Mandor
HOK
0.003
26,000.00
- Peralatan
Ls
1.000
2,000.00
Total
Total Harga
P2 1 M2 PEK. PAVING BLOCK T = 8 Cm NATURAL
- Paving block
M2
1.010
20,400.00
- Pasir beton
M3
0.100
60,000.00
- Pekerja setengah terampil
HOK
0.250
19,000.00
- Tukang batu setengah terampil
HOK
0.500
22,000.00
- Kepala tukang batu
HOK
0.025
25,000.00

6,300.00
13,500.00
4,500.00
24,300.00
44,100.00
44,100.00
42,304.55
444,000.00
114,803.51
2,465.25
5,481.50
108,000.00
11,880.00
22,900.88
7,200.00
759,035.69
759,035.69
25,500.00
5,472.00
1,260.00
5,250.00
9,600.00
1,250.00
650.00
16,750.00

32,232.00
48,982.00
26,250.00
180.00
60.00
1,976.00
4,095.00

540.00
1,690.00
2,230.00

32,561.00
34,791.00
31,500.00
1,584.00

3,572.00
5,400.00
1,026.00
286.00
10,284.00

33,084.00
43,368.00
7,680.00
1,584.00

912.00
2,712.00
270.00
78.00
3,972.00

9,264.00
13,236.00
16,362.00
6,000.00

4,750.00
11,000.00
625.00
78.00
16,453.00

2,000.00
24,362.00
40,815.00
20,604.00
6,000.00

4,750.00
11,000.00
625.00

- Mandor
- Peralatan
Total
Total Harga

HOK
Ls

0.003
1.000

P3 1 M2 PERHITUNGAN DINDING PARTISI TEAXWOOD


X - Teaxwood
M2
1.000
- Kaso 5/7 kayu gunung
M3
0.014
- Paku
Kg
0.220
- Kayu Balok 6/12
Btg
1.000
- Pekerja setengah terampil
HOK
0.280
- Tukang kayu terampil
HOK
0.400
- Kepala tukang kayu
HOK
0.080
- Mandor
HOK
0.014
Total
Total Harga
P4 1 M2 PEKERJAAN DAUN PINTU DOUBLE TAEKWOOD
- Rangka kayu
M3
0.025
- Paku
Kg
0.055
- Pekerja Terampil
HOK
0.300
- Tukang kayu setengah terampil
HOK
1.500
- Kepala Tukang kayu
HOK
0.200
- Mandor
HOK
0.020
- Taexwood
M2
1.000
Total
Total Harga
P5 1M2 PEK. RANGKA PLAFOND KAYU GUNUNG + TRIPLEK
- Triplek 4 mm
Lbr
1.000
- Kaso 5/7 kayu gunung
M3
0.014
- Paku
Kg
0.220
- pekerjaan 1/2 terampil
HOK
0.280
- Tukang kayu terampil
HOK
0.400
- Kepala tukang kayu
HOK
0.080
- Mandor
HOK
0.014
Total
Total Harga
P6 1M2 PEK. DINDING PARTISI DOUBLE TEXWOD
- Texwod double 3 mm x 1 x 1 m
Lbr
1.000
- Kaso 5/7 kayu gunung
M3
0.014
- Paku
Kg
0.220
- Kayu Balk 6/12
Btg
1.000
- pekerjaan 1/2 terampil
HOK
0.280
- Tukang kayu terampil
HOK
0.400
- Kepala tukang kayu
HOK
0.080
- Mandor
HOK
0.014
Total
Total Harga
P9 PAS. LANTAI MULTIPLEK RANGKA KAYU GUNUNG
- Multiplek
M2
1.000
- Kaso 5/7 kayu gunung
M3
0.014
- Paku
Kg
0.220
- Kayu 6/12
Btg
1.000
- Pekerjaan setengah terampil
HOK
0.280
- Tukang Kayu Terampil
HOK
0.400
- Kepala Tukang Kayu
HOK
0.080
- Mandor
HOK
0.014
Total
Total Harga
P10 PAS. DINDING PARTISI DOUBLE TRIPLEK
Sama dengan P5 Rp. 92.028,00 + Harga Triplek Rp. 44.880,00
P11 1 M2 PASANGAN GENTENG LAMA
- Pekerja
HOK
0.1500
- Tukang Kayu setengah terampil
HOK
0.1000
- Kepala Tukang Kayu
HOK
0.0100
- Mandor
HOK
0.0050
Total
Total Harga
P12 1 M2 BONGKARAN LANTAI

26,000.00
2,000.00

78.00
16,453.00

2,000.00
28,604.00
45,057.00

86,460.00
1,320,000.00
7,200.00
34,560.00
19,000.00
24,000.00
27,000.00
26,000.00

86,460.00
18,480.00
1,584.00
34,560.00
5,320.00
9,600.00
2,160.00
364.00
17,444.00

141,084.00
158,528.00

2,250,000.00
7,200.00
21,000.00
23,000.00
27,000.00
26,000.00
86,460.00

56,250.00
396.00
6,300.00
34,500.00
5,400.00
520.00
46,720.00

86,460.00
143,106.00
189,826.00

54,600.00
1,320,000.00
7,200.00
19,000.00
24,000.00
27,000.00
26,000.00

54,600.00
18,480.00
1,584.00
5,320.00
9,600.00
2,160.00
364.00
17,444.00

74,664.00
92,108.00

86,460.00
1,320,000.00
7,200.00
34,560.00
19,000.00
24,000.00
27,000.00
26,000.00

86,460.00
18,480.00
1,584.00
34,560.00
5,320.00
9,600.00
2,160.00
364.00
17,444.00

141,084.00
158,528.00

105,600.00
1,320,000.00
7,200.00
34,560.00
19,000.00
24,000.00
27,000.00
26,000.00

105,600.00
18,480.00
1,584.00
34,560.00
5,320.00
9,600.00
2,160.00
364.00
17,444.00

160,224.00
177,668.00
136,988.00

18,000.00
23,000.00
27,000.00
26,000.00

2,700.00
2,300.00
270.00
130.00
5,400.00

5,400.00

- Pekerja
HOK
0.0500
18,000.00
- Mandor
HOK
0.0050
26,000.00
- Alat bantu
Lot
0.0250
1,030.00
Total
Total Harga
P13 1 M2 BONGKARAN RANGKA ATAP DAN GENTING ( Bongk. Tidak Dipakai )
- Pekerja setengah terampil
HOK
0.1000
19,000.00
- Tukang Kayu setengah terampil
HOK
0.0250
23,000.00
- Kepala Tukang Kayu
HOK
0.0025
27,000.00
- Mandor
HOK
0.0050
26,000.00
Total
Total Harga
P14 1 M3 MEMBONGKAR KUDA - KUDA, GORDING / BALOK ( Bongk. Tidak Dipakai )
- Pekerja
HOK
4.0000
18,000.00
- Tukang Kayu setengah terampil
HOK
3.0000
23,000.00
- Mandor
HOK
0.2000
26,000.00
Total
Total Harga
P15 1 M3 MEMBONGKAR PLAPOND ( Bekas Bongk. Tidak Dipakai )
- Pekerja
HOK
0.1250
18,000.00
- Mandor
HOK
0.0050
26,000.00
Total
Total Harga

P16 1 M3 MEMBONGKAR DINDING BATA ( Bekas Bongk. Tidak Dipakai )


- Pekerja setengah terampil
HOK
1.0000
19,000.00
- Mandor
HOK
0.0900
26,000.00
Total
Total Harga
K3 1 M2 PASANGAN LANTAI KERAMIK Esenza 40X40
- Keramik 40 x 40
M2
1.0100
190,800.00
- PC ( 50 Kg )
Zak
0.1600
34,200.00
- Pasir pasang
M3
0.0300
42,000.00
- PC warna
Kg
0.0130
2,750.00
- Pekerja terampil
HOK
0.2810
21,000.00
- Tukang batu terampil
HOK
0.5630
24,000.00
- Kepala tukang batu
HOK
0.1130
25,000.00
- Mandor
HOK
0.0280
26,000.00
Total
Total Harga
P17 1 M2 PENGECATAN DINDING ULANG DENGAN SANLEX ( 2 X )
- Cat tembok Sanlex
Kg
0.1050
6,720.00
- Plamour Tembok
Kg
0.0960
6,000.00
- Rol Cat
Bh
0.0060
18,000.00
- Ampelas kayu
Lbr
0.3000
2,400.00
- Pekerja setengah terampil
HOK
0.0624
19,000.00
- Tukang cat setengah terampil
HOK
0.1092
22,500.00
- Kepala tukang cat
HOK
0.0117
30,000.00
- Mandor
HOK
0.0060
26,000.00
- Steger Werk
Lot
0.0450
6,259.20
Total
Total Harga
P18 1 M2 PENGECATAN PLAPOND ULANG DENGAN SANLEX ( 2 X )
- Cat tembok Sanlex
Kg
0.1300
6,720.00
- Plamour Tembok
Kg
0.1040
6,000.00
- Rol Cat
Bh
0.0065
18,000.00
- Ampelas kayu
Lbr
0.3250
2,400.00
- Pekerja setengah terampil
HOK
0.0624
19,000.00
- Tukang cat setengah terampil
HOK
0.1092
22,500.00
- Kepala tukang cat
HOK
0.0117
30,000.00
- Mandor
HOK
0.0060
26,000.00
- Steger Werk
Lot
0.0425
6,544.20
Total
Total Harga
P19 1 M2 MEMBONGKAR KUSEN PINTU DAN JENDELA ( Bongk. Tidak Dipakai )
- Pekerja
HOK
0.1000
18,000.00
- Tukang Kayu setengah terampil
HOK
0.2000
23,000.00
- Mandor
HOK
0.0100
26,000.00
Total
Total Harga
P20 1 M2 KUPASAN PLESTERAN
- Pekerja setengah terampil
HOK
0.1400
19,000.00
- Mandor
HOK
0.0140
26,000.00
- Alat bantu
Lot
0.0050
3,024.00
Total
Total Harga
P21 1 UNIT PASANGAN BAK KONTROL 80 X 80 DARI BATA

900.00
130.00
25.75
1,055.75

1,055.75

1,900.00
575.00
67.50
130.00
2,672.50

2,672.50

72,000.00
69,000.00
5,200.00
146,200.00

146,200.00

2,250.00
130.00
2,380.00

2,380.00

19,000.00
2,340.00
21,340.00

21,340.00
192,708.00
5,472.00
1,260.00
35.75

5,901.00
13,512.00
2,825.00
728.00
22,966.00

199,475.75
222,441.75
705.60
576.00
108.00
720.00

1,185.60
2,457.00
351.00
156.00
4,149.60

281.664
2,391.26
6,540.86
873.60
624.00
117.00
780.00

1,185.60
2,457.00
351.00
156.00
4,149.60

278.1285
2,672.73
6,822.33

1,800.00
4,600.00
260.00
6,660.00

6,660.00
2,660.00
364.00

15.12
15.12

3,024.00
3,039.12

- Galian
M3
0.2304
- Pasangan Bata 1:3
M2
1.1520
- Plesteran 1:3
M2
2.3040
Total
Total Harga
P22 1 UNIT PASANGAN BAK KONTROL 40 X 40 DARI BATA
- Galian
M3
0.1536
- Pasangan Bata 1:3
M2
0.7680
- Plesteran 1:3
M2
1.5360
Total
Total Harga
P23 1 M2 PASANGAN RANGKA ATAP MENGGUNAKAN KAYU LAMA
- Paku
Kg
0.2500
- Pekerja setengah terampil
HOK
0.1500
- tukang kayu terampil
HOK
0.1500
- Kepala tukang kayu
HOK
0.0100
- Mandor
HOK
0.0050
Total
Total Harga
P24 1 M2 PEK. RANGKA PLAPOND KAYU LAMA + ETERNIT BARU
- Eternit 1 x 1 m
M2
1.0000
- Paku
Kg
0.2200
- Pekerja setengah terampil
HOK
0.2800
- tukang kayu terampil
HOK
0.4000
- Kepala tukang kayu
HOK
0.0400
- Mandor
HOK
0.0140
Total
Total Harga

E2A 1 M2 BEKISTING DENGAN MULTIPLEK


-Multiplek
Lbr
0.347
- Kaso 5/7 kayu terentang ( dihitung
M3
0.017
2 x pakai ) 50 %
- paku
Kg
0.400
- Pekerja
HOK
0.120
- Tukang kayu setengah terampil
HOK
0.150
- Kepala tukang kayu
HOK
0.150
- Mandor
HOK
0.050
- Tukang kayu 1/2 terampil ( bongkar
HOK
0.120
Cetakan Bekisting )
Total
Total Harga
An A 1 Kg Erection Konstruksi Kuda - Kuda Baja
Pekerja Terampil
HOK
0.0010
Tukang besi Profil Terampil
HOK
0.0010
Kepala Tukang Besi Terampil
HOK
0.0002
Mandor
HOK
0.0001
Operator Alat Besar
HOK
0.0002
Pembantu Opeartor
HOK
0.0200
Sewa Alat
Ls
0.0002
Bahan Bakar Solar
Ltr
0.0100
Pelumas
Ltr
0.0010
Alat Bantu
Ls
0.0200
Total
Total Harga
An B 1 Kg Pekerjaan Baja IWF DN / Profil
- Besi IWF Ex DN SII
HOK
1.0500
- Pekerja Terampil
HOK
0.0600
- Tukang Besi Profil Terampil
HOK
0.0040
- Kepala Tukang Besi Terampil
HOK
0.0010
Mandor
HOK
0.0002
Peralatan (Oksigen, Solar, Elpiji, Kawat Las Dll) Ls
0.1250
Total
Total Harga
An C 1 TTK MELOBANGI KONSTRUKSI BESI DENGAN BOR
- Pekerja Terampil
HOK
0.0500
- Tukang Besi Profil Terampil
HOK
0.0200
- Kepala Tukang besi Profil
HOK
0.0030
- Mandor
HOK
0.0010
- Alat Bantu
Ls
0.2500
Total
Total Harga

17,539.20
55,000.00
17,457.00
-

4,041.03
63,360.00
40,220.93
107,621.96
107,621.96

17,539.20
55,000.00
17,457.00
-

2,694.02
42,240.00
26,813.95
71,747.97
71,747.97

7,200.00
19,000.00
24,000.00
27,000.00
26,000.00

1,800.00
2,850.00
3,600.00
270.00
130.00
6,850.00

1,800.00
8,650.00

7,680.00
7,200.00
19,000.00
24,000.00
27,000.00
26,000.00

7,680.00
1,584.00
5,320.00
9,600.00
1,080.00
364.00
16,364.00

9,264.00
25,628.00

79,800.00
390,000.00
7,200.00
18,000.00
23,000.00
27,000.00
26,000.00
22,500.00

20,767.95
3,315.00
2,880.00
2,160.00
3,450.00
4,050.00
1,300.00
2,700.00
13,660.00

26,962.95
40,622.95

21,000.00
27,000.00
30,000.00
26,000.00
33,000.00
29,000.00
388,800.00
1,650.00
6,000.00
743.46

21.00
27.00
6.00
2.60
6.60
580.00

643.20

77.76
16.50
6.00
14.87
115.13
758.33

4,700.00
21,000.00
27,000.00
30,000.00
26,000.00
6,338.20

4,935.00
1,260.00
108.00
30.00
5.20
6,338.20

792.28
792.28
7,130.48

21,000.00
27,000.00
30,000.00
26,000.00
1,706.00

1,050.00
540.00
90.00
26.00
1,706.00

426.50
426.50
2,132.50

1 Kg Kolom Baja Wf
(A+B)
Total Harga
An E 1 CM PEKERJAAN LAS LISTRIK TEBAL ( = TEBAL KAWAT 4 MM )
- Kawat Las Listrik
Kg
0.0400
8,000.00
- Solar
Ltr
0.0300
1,650.00
- Pelumas
Ltr
0.0040
6,000.00
- Pekerja Terampil
HOK
0.0040
21,000.00
- Tukang Besi Profil Terampil
HOK
0.0020
27,000.00
- Kepala Tukang besi Profil
HOK
0.0020
30,000.00
- Mandor
HOK
0.0010
26,000.00
- Alat Bantu
Ls
0.2500
617.50
Total
Total Harga
An F 1 BATANG PEKERJAAN ANCHOR BOLT
- Anchor Bolt
Btg
1.0000
27,500.00
- Tukang Besi Setengah Terampil
HOK
0.0250
19,000.00
- Tukang Besi Terampil
HOK
0.0150
21,000.00
- Kepala Tukang Besi
HOK
0.0100
27,000.00
- Pengelasan
Cm
3.0000
1,117.50
- Mandor
HOK
0.0050
26,000.00
- Alat Bantu
Ls
0.0200
32,042.50

An D

7,888.80
320.00
49.50
24.00
84.00
54.00
60.00
26.00
224.00

154.38
547.88
771.88
27,500.00

475.00
315.00
270.00
3,352.50
130.00
1,190.00

640.85
31,493.35
32,683.35

An G

1 KG PEKERJAAN BAJA PLAT


- Besi Plat
- Pekerja Terampil
- Tukang Besi Profil Terampil
- Kepala Tukang besi Profil
- Mandor
- Peralatan

Kg
HOK
HOK
HOK
HOK
Ls

1.0500
0.0600
0.0040
0.0010
0.0002
0.0125

7,500.00
21,000.00
27,000.00
30,000.00
26,000.00
9,278.20

7,875.00
1,260.00
108.00
30.00
5.20
1,403.20

115.98
7,990.98
9,394.18

An H

1 M2 ATAP SENG ALUMUNIUM ( l = 0,80 M' )


- Zink Allum
M2
- Paku sumbat ( Fisher )
Bh
- Tukang Besi Terampil
HOK
- Kepala Tukang Besi
HOK
- Pekerja Terampil
HOK
- Alat Bantu
Ls

1.000
4.000
0.020
0.010
0.150
0.025

32,000.00
1,500.00
27,000.00
27,000.00
21,000.00
41,960.00

32,000.00
6,000.00
540.00
270.00
3,150.00
3,960.00

1,049.00
39,049.00
43,009.00

E1A 1 M3 COR BETON SITE MIX K 225


- PC ( 50 Kg )
Zak
7.8960
- Split pecah mesin 2/3
M3
0.8100
- Pasir beton
M3
0.4900
- Pekerja
HOK
1.5000
- Tukang batu setengah terampil
HOK
0.5000
- Kepala tukang batu
HOK
0.0500
- Mandor
HOK
0.0100
- Peralatan
Lot
0.0700
Total
Total Harga
H2 1 M3 PEKERJAAN KUSEN KAYU GUNUNG KLAS II KUAT
- Balok 6/15 kayu gunung
M3
1.100
- Paku
Kg
2.500
- Lem Putih ( FOX )
Kg
1.000
- Pekerja terampil
HOK
4.000
- Tukang Kayu terampil
HOK
15.000
- Kepala tukang kayu
HOK
2.700
- Mandor
HOK
0.500
Total
Total Harga
I3 A 1 M2 PENGECATAN KAYU BERIKUT MENI 2X
- Meni Kayu
Kg
0.111
- Dempul kayu
Kg
0.055
- Cat kayu merk Seiv Dov
Kg
0.133
- Minyak cat
Ltr
0.100
- Ampelas kayu
Lbr
0.267
- Kwas 4"
Bh
0.033
- Pekerja setengah terampil
HOK
0.133
- Tukang cat terampil
HOK
0.200
- Kepala tukang cat
HOK
0.020
- Mandor
HOK
0.007
Total

41,000.00
80,400.00
60,000.00
30,000.00
25,000.00
35,000.00
37,500.00
376,072.00

323,736.00
65,124.00
29,400.00
45,000.00
12,500.00
1,750.00
375.00
59,625.00

26,325.04
444,585.04
504,210.04

2,250,000.00
7,200.00
10,800.00
21,000.00
24,000.00
27,000.00
26,000.00

2,475,000.00
18,000.00
10,800.00
84,000.00
360,000.00
72,900.00
13,000.00
529,900.00

2,503,800.00
3,033,700.00

9,000.00
12,000.00
27,000.00
10,560.00
2,400.00
12,000.00
19,000.00
27,500.00
30,000.00
26,000.00

1,002.00
664.00
3,600.00
1,056.00
640.00
400.00
2,533.33
5,500.00
600.00
173.33
8,806.67

7,362.00

Total Harga

16,168.67

639,766.85

1,259,200.00

KODE

LUAS TANAH
200

JENIS PEKERJAAN

3gb1

sd tgl 19 ags 09

1985520
900000
2885520

SATUAN

KOEFISIEN

HARGA SATUAN
Rp

SUB TOTAL
UPAH KERJA
Rp

SUB TOTAL
BAHAN
Rp

JUMLAH
HARGA
Rp

f = d*e

g = d*e

DAFTAR RENCANA ANGGARAN BIAYA


PEMBANGUNAN RUMAH TINGGAL TIDAK BERTINGKAT
TYPE 70
KOTA TASIKMALAYA
NO
1

URAIAN PEKERJAAN

1
2
3

2
I. PEK. PERSIAPAN
Pas. Bouwplank
Biaya Administrasi / IMB
Biaya Gambar dan Perencanaan

1
2
3
4

II. PEK. PELAKSANAAN


a. Pek. Tanah
Galian tanah Pondasi
Urugan tanah 1/4 galian
Urugan Peninggian Lantai
Pas. Pasir bawah lantai

1
2
3
4
5
6
7
8
9
10
11
12
13
14

b. Pek. Tembok Beton


Pas. Pondasi batu kali
Pas. Aanstamping Batu Kosong
Pas. Sloof 15/20
Pas. Ring Balk 15/15
Pas.Kolom Praktis 12/12
Plat Meja Beton T 8 cm
Pas. Bata merah
Pas. Plesteran
Pas. Lantai Keramik 30 x 30 cm
Pas. Lantai Keramik Km/Wc 20 x 20 cm
Pas. Dinding Keramik 20 x 20
Pas. Genteng palentong
Pas. Genteng Bubung
Pas. Keramik Plin 10 x 20

1
2
3
4
5
6
7
8

c. Pek. Kayu
Pas. Kusen kayu
Pas Silang Gempa , Angin & Gapit
Pas. Daun Pintu Double Triplek
Pas. Daun Jendela
Pas. Listplank
Pas. Plapond Eternit + Rangka
Pas. Rangka atap
Pas. Kuda - kuda

1
2
3
4
5
6
7
8

d. Pek. Besi + Kaca


Pas. Kaca bening
Pas. Kunci tanam
Pas. Kunci tanam KM/WC
Pas. Engsel Pintu
Pas. Engsel jendela
Pas. Hak Angin
Pas. Slot Pintu
Pas. Grendel

e. Pek. Sanitair
1 Pas. Bak Fiber
2 Pas. Kloset Jongkok
3 Pas. Floor Drain / Saringan
4 Pas. Plat Seng BJLS
5 Pas. Kran Bebek
6 Pas. Septitank Uk. Kecil
7 Pas. Instalasi air bersih
8 Pas. Instalasi air kotor
9 Pas Pompa Listrik SANYO 100 Watt
10 Pas. Kitchen Zink Stainless

1
2
3
4
5
6

f. Pek. Electrical
instalasi Titik Cahaya
Pas. Stop Kontak
Pas. Saklar Tunggal
Pas. Saklar Ganda
Biaya Pemasangan Baru
Pas. Lampu Pijar

ANALIS
PEK
3
A2
Ls
Ls

A4
A6
B6
B1

B5
B4
E5
E4
F2
F3
C3
C5
K2
K2
K4
F6
F7
B3

H2
G1
F8
I1
H1
G2
F5
F4

Dihitung
Dihitung
Dihitung
Dihitung
Dihitung
Dihitung
Dihitung
Dihitung

Dihitung
Dihitung
Dihitung
L5
Dihitung
N1
Ls
Ls
Ls
Dihitung

Dihitung
Dihitung
Dihitung
Dihitung
Ls
Dihitung

VOLUME
PEKERJAAN
4
400.00
-

96.51
23.93
3.23
35.98

44.79
14.36
3.77
1.65
1.70
0.12
286.22
419.45
72.00
6.00
18.90
135.55
12.00
6.48

0.91
5.00
9.20
11.20
37.00
147.50
270.00
1.74

5.53
4.00
2.00
18.00
32.00
32.00
6.00
16.00

1.00
1.00
2.00
9.00
3.00
1.00
1.00
1.00

M'

M3
M3
M3
M3

M3
M3
M3
M3
M3
M3
M2
M2
M2
M2
M2
M2
M'
M2

M3
M2
M2
M2
M2
M2
M2
M3

M2
Bh
Bh
Bh
Bh
Bh
Bh
Bh

Bh
Bh
Bh
M'
Bh
Unit

Unit
Unit

11.00
6.00
5.00
3.00

Ttk
Bh
Bh
Bh

11.00

Bh

HARGA SATUAN
Rp.
5

JUMLAH HARGA
Rp.
6

13,328.48
650,000.00
1,500,000.00

5,331,390.40
650,000.00
1,500,000.00
7,481,390.40

7,481,390.40

1,692,708.19
170,375.62
108,053.19
2,334,202.50
4,305,339.50

4,305,339.50

10,088,226.38
1,459,257.46
8,148,418.32
3,913,044.42
4,337,037.49
306,143.82
12,306,498.30
6,576,388.77
3,776,598.00
332,394.30
1,047,042.05
3,388,750.00
349,612.93
186,724.22
56,216,136.45

56,216,136.45

2,760,667.00
11,927,530.00
792,267.20
1,014,160.00
639,404.40
7,868,830.00
9,100,620.00
4,799,198.40
38,902,677.00

38,902,677.00

199,080.00
360,000.00
96,000.00
151,200.00
153,600.00
192,000.00
21,600.00
57,600.00
1,231,080.00

1,231,080.00

78,000.00
108,900.00
90,000.00
378,000.00
63,000.00
2,040,103.23
1,250,000.00
1,250,000.00
540,000.00
5,798,003.23
11,596,006.46

11,596,006.46

660,000.00
54,000.00
42,000.00
10,800.00
1,000,000.00
66,000.00
1,832,800.00

1,832,800.00

17,539.20
7,119.75
33,453.00
64,875.00

225,233.90
101,619.60
2,161,384.17
2,371,542.07
2,551,198.52
2,551,198.52
42,996.64
15,678.60
52,452.75
55,399.05
55,399.05
25,000.00
29,134.41
28,815.47

3,033,700.00
2,385,506.00
86,116.00
90,550.00
17,281.20
53,348.00
33,706.00
2,758,160.00

36,000.00
90,000.00
48,000.00
8,400.00
4,800.00
6,000.00
3,600.00
3,600.00

78,000.00
108,900.00
45,000.00
42,000.00
21,000.00
2,040,103.23
1,250,000.00
1,250,000.00
540,000.00
148,500.00

60,000.00
9,000.00
8,400.00
10,800.00
1,000,000.00
6,000.00

JUMLAH BIAYA
Rp.
7

1
2
3
4

g. Pek. Pengecatan
Pengecatan tembok
Pengecatan kayu
Pengecatan plapond
Pengecatan Genting

III. BIAYA PELENGKAP


Pemberesan

J1
I3
J2
J3

Ls

479.97
504.32
146.50
135.55

M2
M2
M2
M2

10,901.44
23,203.00
11,055.80
18,771.38

1,000,000.00

5,232,364.16
11,701,736.96
1,619,674.70
2,544,459.88
21,098,235.70

21,098,235.70

1,000,000.00
1,000,000.00

1,000,000.00

Jumlah .
Dibulatkan ..

Terbilang : ( rupiah )

Tasikmalaya, 1 April 2004


Penyusun

DEDE ANIS YUNUS

143,663,665.51
143,664,000.00

140201225
140202000

REKAPITULASI
PEMBANGUNAN RUMAH TINGGAL TIDAK BERTINGKAT
TYPE 70
KOTA TASIKMALAYA
NO
1

URAIAN PEKERJAAN

1
2
3

2
I. PEK. PERSIAPAN
Pas. Bouwplank
Biaya Administrasi / IMB
Biaya Gambar dan Perencanaan

1
2
3
4

II. PEK. PELAKSANAAN


a. Pek. Tanah
Galian tanah Pondasi
Urugan tanah 1/4 galian
Urugan Peninggian Lantai
Pas. Pasir bawah lantai

1
2
3
4
5
6
7
8
9
10
11
12
13
14

b. Pek. Tembok Beton


Pas. Pondasi batu kali
Pas. Aanstamping Batu Kosong
Pas. Sloof 15/20
Pas. Ring Balk 15/15
Pas.Kolom Praktis 12/12
Plat Meja Beton T 8 cm
Pas. Bata merah
Pas. Plesteran
Pas. Lantai Keramik 30 x 30 cm
Pas. Lantai Keramik Km/Wc 20 x 20 cm
Pas. Dinding Keramik 20 x 20
Pas. Genteng palentong
Pas. Genteng Bubung
Pas. Keramik Plin 10 x 20

1
2
3
4
5
6
7
8

c. Pek. Kayu
Pas. Kusen kayu
Pas Silang Gempa , Angin & Gapit
Pas. Daun Pintu Double Triplek
Pas. Daun Jendela
Pas. Listplank
Pas. Plapond Eternit + Rangka
Pas. Rangka atap
Pas. Kuda - kuda

1
2
3
4
5
6
7
8

d. Pek. Besi + Kaca


Pas. Kaca bening
Pas. Kunci tanam
Pas. Kunci tanam KM/WC
Pas. Engsel Pintu
Pas. Engsel jendela
Pas. Hak Angin
Pas. Slot Pintu
Pas. Grendel

e. Pek. Sanitair
1 Pas. Bak Fiber
2 Pas. Kloset Jongkok
3 Pas. Floor Drain / Saringan
4 Pas. Plat Seng BJLS
5 Pas. Kran Bebek
6 Pas. Septitank Uk. Kecil
7 Pas. Instalasi air bersih
8 Pas. Instalasi air kotor
9 Pas Pompa Listrik SANYO 100 Watt
10 Pas. Kitchen Zink Stainless

1
2
3
4
5
6

f. Pek. Electrical
instalasi Titik Cahaya
Pas. Stop Kontak
Pas. Saklar Tunggal
Pas. Saklar Ganda
Biaya Pemasangan Baru
Pas. Lampu Pijar

ANALIS
PEK
3
A2
Ls
Ls

A4
A6
B6
B1

B5
B4
E5
E4
F2
F3
C3
C5
K2
K2
K4
F6
F7
B3

H2
G1
F8
I1
H1
G2
F5
F4

Dihitung
Dihitung
Dihitung
Dihitung
Dihitung
Dihitung
Dihitung
Dihitung

Dihitung
Dihitung
Dihitung
L5
Dihitung
N1
Ls
Ls
Ls
Dihitung

Dihitung
Dihitung
Dihitung
Dihitung
Ls
Dihitung

VOLUME
PEKERJAAN
4
48.00
-

96.51
23.93
3.23
35.98

44.79
14.36
3.77
1.65
1.70
0.12
286.22
419.45
72.00
6.00
18.90
135.55
12.00
6.48

0.91
5.00
9.20
11.20
37.00
147.50
270.00
1.74

5.53
4.00
2.00
18.00
32.00
32.00
6.00
16.00

1.00
1.00
2.00
9.00
3.00
1.00
1.00
1.00

M'

M3
M3
M3
M3

M3
M3
M3
M3
M3
M3
M2
M2
M2
M2
M2
M2
M'
M2

M3
M2
M2
M2
M2
M2
M2
M3

M2
Bh
Bh
Bh
Bh
Bh
Bh
Bh

Bh
Bh
Bh
M'
Bh
Unit

Unit
Unit

11.00
6.00
5.00
3.00

Ttk
Bh
Bh
Bh

11.00

Bh

HARGA SATUAN
Rp.
5

JUMLAH HARGA
Rp.
6

13,328.48
650,000.00
1,500,000.00

639,766.85
650,000.00
1,500,000.00
2,789,766.85

2,789,766.85

1,692,708.19
170,375.62
108,053.19
2,334,202.50
4,305,339.50

4,305,339.50

10,088,226.38
1,459,257.46
8,148,418.32
3,913,044.42
4,337,037.49
306,143.82
12,306,498.30
6,576,388.77
3,776,598.00
332,394.30
1,047,042.05
3,388,750.00
349,612.93
186,724.22
56,216,136.45

56,216,136.45

2,760,667.00
11,927,530.00
792,267.20
1,014,160.00
639,404.40
7,868,830.00
9,100,620.00
4,799,198.40
38,902,677.00

38,902,677.00

199,080.00
360,000.00
96,000.00
151,200.00
153,600.00
192,000.00
21,600.00
57,600.00
1,231,080.00

1,231,080.00

78,000.00
108,900.00
90,000.00
378,000.00
63,000.00
2,040,103.23
1,250,000.00
1,250,000.00
540,000.00
5,798,003.23
11,596,006.46

11,596,006.46

660,000.00
54,000.00
42,000.00
10,800.00
1,000,000.00
66,000.00
1,832,800.00

1,832,800.00

17,539.20
7,119.75
33,453.00
64,875.00

225,233.90
101,619.60
2,161,384.17
2,371,542.07
2,551,198.52
2,551,198.52
42,996.64
15,678.60
52,452.75
55,399.05
55,399.05
25,000.00
29,134.41
28,815.47

3,033,700.00
2,385,506.00
86,116.00
90,550.00
17,281.20
53,348.00
33,706.00
2,758,160.00

36,000.00
90,000.00
48,000.00
8,400.00
4,800.00
6,000.00
3,600.00
3,600.00

78,000.00
108,900.00
45,000.00
42,000.00
21,000.00
2,040,103.23
1,250,000.00
1,250,000.00
540,000.00
148,500.00

60,000.00
9,000.00
8,400.00
10,800.00
1,000,000.00
6,000.00

JUMLAH BIAYA
Rp.
7

1
2
3
4

g. Pek. Pengecatan
Pengecatan tembok
Pengecatan kayu
Pengecatan plapond
Pengecatan Genting

III. BIAYA PELENGKAP


Pemberesan

J1
I3
J2
J3

Ls

479.97
504.32
146.50
135.55

M2
M2
M2
M2

10,901.44
23,203.00
11,055.80
18,771.38

1,000,000.00

5,232,364.16
11,701,736.96
1,619,674.70
2,544,459.88
21,098,235.70

21,098,235.70

1,000,000.00
1,000,000.00

1,000,000.00

Jumlah .
Dibulatkan ..

Terbilang : ( rupiah )

Tasikmalaya, 1 April 2004


Penyusun

DEDE ANIS YUNUS

138,972,041.96
138,973,000.00

REKAPITULASI HARGA
I. PEK. PERSIAPAN

Rp

2,789,766.85

a. Pekerjaan Tanah

Rp

4,305,339.50

b. Pekerjaan Tembok & Beton

Rp

56,216,136.45

c. Pekerjaan Kayu

Rp

38,902,677.00

d. Pekerjaan Besi dan Kaca

Rp

1,231,080.00

e. Pekerjaan Sanitair

Rp

11,596,006.46

f. Pekerjaan Electrical

Rp

1,832,800.00

g. Pekerjaan Pengecatan

Rp

21,098,235.70

III. BIAYA PELENGKAP

Rp

1,000,000.00

TOTAL BIAYA
PEMBULATAN

Rp
Rp

136,182,275.11
136,183,000.00

II. PEK. PELAKSANAAN

Terbilang: (Seratus tiga puluh enam juta seratus delapan puluh tiga ribu rupiah),-

140201225
###