WORLDWIDE CONSTRUCTION UPDATE

Leena Koottungal Survey Editor/News Writer Listed are major construction projects by processing and pipeline categories. Contractors, estimated completion date, and added capacity are provided when available. *Designates projects listed for the first time. Construction project abbreviations: Engr. Contr. Tech. Dsgn. Constr. PM CM EPC Engineer Contractor Technology Design Construction Project management Construction management Engineering procurement construction PE CS PD DD JV Lic. FEED Procurement engineering Construction supervision Process design Detailed design Joint venture License Front-end engineering and design

REfININg

Added capacity listed in barrels per day (b/d) unless otherwise specified.

Company and location ALGERIA Sonatracheast Algeria Algiers ANGOLA SonangolLobito

Project

Added capacity, b/d

Status

Expected completion

Contractor and contract type

Project notes

Refinery Refinery

Engineering Engineering

2012 2013

Samsung Engineering Co. TechnipEngr.

Renovation. $2 billion. Refurbish. $908.2 million.

Refinery

200,000 Engineering

2012

KBREngr./PE/CM

New. $2 billion. Technip (60%), Sonangol (40%).

ARGENTINA YPF SALa Plata refinery Delayed coker 28,000 b/sd Engineering Foster WheelerEngr./PE/ Constr. New

BANGLADESH Eastern Refinery Ltd. Chittagong Asphalt Crude distillation Hydrocracker Hydrotreater Hydrotreater Isomerization Reformer Vacuum distillation BELARUS JSC MozyrMozyr Novopolotsk JSC NaftanNovopolotsk Crude distillation Isomerization Vacuum distillation Delayed coker 43,800 Engineering 3,285 Engineering 14,600 Engineering 20,000 Engineering Koch-GlitschPD UOPPD Foster WheelerEngr./ Contr./PD/Lic. Expansion New Expansion New 2,500 Planning 70,000 Planning 15,000 Planning 20,000 Planning 250,000 Planning 8,200 Planning 11,000 Planning 26,000 Planning New New New New New New New New

BRAZIL Alberto Pasqualini RefineryCanoas, RS Hydrodesulfurization Hydrogen Duque de Caxias Refinery Hydrodesulfurization Rio de Janeiro Gabriel Passos Refinery Betim, MG Hydrodesulfurization Hydrodesulfurization Hydrogen Ladulpho Alves Refinery Hydrogen Sao Francisco do Conde, BA Hydrodesulfurization Hydrodesulfurization Paulinia RefineryPaulinia, SP Crude distillation Hydrodesulfurization Hydrodesulfurization 30,157 Planning 135,000 cu Planning m/d 30,157 Planning 19,084 Planning 24,126 Planning 300,000 cu Planning m/d 250,000 cu Planning m/d 18,094 Planning 30,157 Planning 34,983 Planning 24,126 Planning 24,126 Planning New New New New New New New New New New New New

Oil & Gas Journal / Apr. 4, 2011

REfININg CONT.
Company and location Project Hydrodesulfurization Reformer PetrobrasCanoas Ceara Maranhao Sao Jose dos Campos, SP Petrobras/PDVSA Pernambuco State Presidente Bernardes RefineryCubatao, SP Presidente Getulio Vargas RefineryAraucaria, Parana ULSD *Diesel hydrotreater *Refinery *Refinery Delayed coker Refinery Hydrodesulfurization Hydrodesulfurization Crude distillation Delayed coker Hydrodesulfurization Hydrodesulfurization Hydrotreater Reformer Refinaria do Nordeste Ipojuca BRUNEI PetroBru Sdn. Bhd.Pulau Muara Besar BULGARIA Burgasnefeproekt EOOD Bourgas Lukoil Neftochim Bourgas Bourgas *Hydrocracker Hydrocracker Hydrocracker 2.5 million Engineering tpy 47 ,000 Planning 37 ,000 Planning May 2013 2012 2012 TechnipFEED AxensDsgn./Lic. AxensDsgn./Lic. New New. H-Oil-RC ebullatedbed vacuum residue. New. HyK single-stage, high conversion. Refinery 200,000 Planning New. Expandable capacity to 500,000 b/d. ULSD Added capacity, b/d Status Expected completion 2014 2017 2014 2014 Contractor and contract type Haldor Topsoe A/SLic. UOPFEED Process Consulting Services UOPFEED Process Consulting Services Toyo EngineeringContr. ConocoPhillipsLic. SegenContr. Haldor Topsoe A/SLic. New New New. Premium II train. New. Premium I train. New New. $12 billion. Petrobras (60%), PDVSA (40%). New New New New New. Diesel. $77 million. New New New New Project notes New 36,189 Planning 15,079 Planning 37 ,620 Planning Planning 300,000 Engineering 300,000 Engineering 140,000 Under constr. 230,000 Under constr. 13,206 Under constr. 30,157 Planning 18,094 Planning 30,157 Planning 18,094 Planning 30,157 Planning 36,189 Planning 6,031 Planning 81,500 Planning

CANADA BA Energy Inc.Industrial Park near Edmonton, Alta. Upgrader Upgrader Canadian Natural ResourcesHorizon Upgrader, Alta. Ft. McMurray, Alta. North Atlantic Refining Ltd.Come By Chance, Newf. North West Upgrading Inc.Sturgeon Co., Alta. OPTI Canada Inc.Ft. McMurray, Alta. Upgrader Delayed coker *Refinery Hydrocracking Upgrader Crude distillation Hydrocracker Hydrogen Thermal cracker Vacuum distillation Petro-CanadaMontreal, Que. Shell CanadaFt. Saskatchewan Delayed coker Crude/vacuum distillation Hydrogen Resid hydrocracker 75,000 Under constr. 185,000 Planning 270,000 Under constr. 124,300 Under constr. Engineering 32,000 Planning 50,000 Engineering 70,000 Engineering Engineering Under constr. Engineering Engineering 25,000 Under constr. 150,000 Under constr. 135 MMcfd Under constr. 100,000 Under constr. 2011 2014 2012 2011 2011 2011 Jacobs EngineeringEngr. ABB Lummus GlobalPD/ Lic. Jacobs EngineeringContr. UOP LLCContr. Lurgi AGLic. Fluor Corp.Engr. Fluor Corp.Engr. Linde Engineering Engr. Fluor Corp.Engr. Fluor Corp.Engr. BantrelEngr. BechtelEngr./Contr./DD/ PE/CS/PM Shell-Lic. BechtelEngr./Contr./DD/ PE/CS/PM Uhde-Lic. UOP-Lic. BechtelEngr./Contr./ DD/PE/CS/PM Chevron Lummus-Lic. New. $1.5 billion. Heartland Upgrader Project. Expansion of Heartland Upgrader. New. $10 billion. New New. Turnaround and small capital work. New New New New New New New New. $1 billion. New. Scotford Upgrader. New. Scotford Upgrader. New. Scotford Upgrader.

Oil & Gas Journal / Apr. 4, 2011

REfININg CONT.
Company and location Suncor Energy Inc.Ft. McMurray, Alta. Valero Energy Corp.Levis, Que. CAMEROON SONARALimbe refinery Crude distillation Vacuum distillation Catalytic reformer CHAD China National Petroleum Corp.near NDjamena CHINA Chinas National Development and Reform CommissionJieyang, Guangdong province China National Petroleum Corp.Anning City Refinery 10 million Planning tpy 200,000 Under constr. 36,000 Engineering 10 million Under constr. tpy 300,000 Planning New Refinery 2.5 million Under constr. tpy 2011 New. CNPC 60%, Chads Ministry of Petroleum 40%. Engineering Engineering Engineering Foster WheelerEPC Foster WheelerEPC Foster WheelerEPC Revamp New New Project Delayed coker Upgrader Crude distillation Added capacity, b/d Status Expected completion 2012 Contractor and contract type ConocoPhillipsLic. Project notes New Expansion. $5.9 billion. Expansion 275,000 Planning 550,000 Planning 45,000 Under constr.

Refinery

2013 2011

Haldor Topsoe A/SEngr.

New New New. $1.6 billion. New. $9 billion. JV Kuwait Petroleum Corp.

Chinese Petroleum Corpora- ULSD hydrotreater tionKaohsiung, Taiwan PetroChina Co. Ltd. Qinzhou SinopecZhangjiang, Guangdong COLOMBIA Empresa Colombiana de PetroleosBarrancabermeja Hydrodesulfurization Hydrodesulfurization Hydrogen Llanos Basin area Refineria de Cartagena SACartagena Upgrader Refinery Refinery ECUADOR Ministry of Energy and MinesJaraminjo, Manabi GERMANY Total SALeuna Desulfurization Hydrotreater Refinery Refinery Refinery

19,000 Engineering 57 ,000 Engineering 19,000 Engineering Planning 85,000 Engineering 165,000 Engineering

2013 2012

Technip Engr./PE/CS/Dsgn. Upgrade AxensTech. Technip Engr./PE/CS/Dsgn. Upgrade AxensTech. Technip Engr./PE/CS/Dsgn. Upgrade CB&I/Foster Wheeler/Process ConsultantsEPC CB&IEPC New. JV of Ecopetrol and Ivanhoe Energy. Expansion New. $1.4 billion.

300,000 Planning

2013

New. $3.6 billion.

1 million tpy Under constr. 1.05 million Engineering tpy

Technip EPC

New. $168.9 million. New. $133.4 million.

GREECE Hellenic Petroleum SA Elefsina Refinery Flexicoking Hydrocracker Crude distillation Hydrorefining Engineering 20,000 Planning 40,000 Planning 30,000 Engineering Engineering 2011 2011 2011 WorleyParsonsContr. Upgrade

Exxonmobil Research & Eng. Upgrade Co.Tech. ExxonmobilEngr./PE/Tech. Kellogg-Engr./PE/Tech. ExxonmobilEngr./PD/Tech. Asprofos-DD Upgrade Expansion Upgrade

HUNGARY MOL Nyrt.Szazhalombatta Hydrocracker Engineering 2013 New

Oil & Gas Journal / Apr. 4, 2011

REfININg CONT.
Company and location INDIA Chennai Petroleum Corp. Ltd.Manali Refinery Refinery Essar EnergyVadinar Hindustan Petroleleum Corp. Ltd.Bhatinda, Punjab Maharashtra Andhra Pradesh Mumbai Refinery Refinery Refinery Diesel hydrotreater Diesel hydrotreater FCCU Indian Oil Corp. Ltd.Gujarat Haldia Delayed coker Refinery Coker gas oil hydrotreating Orissa Refinery Delayed coker IOT Infrastructure & Energy ServicesAssam Nagarjuna Fertilizers and Chemicals Ltd.Cuddalore Delayed coker Refinery 3.5 million Planning tpy 4 million tpy Planning 75,000 Under constr. 180,000 Under constr. 18 million Planning tpy 2.2 million Engineering tpy 2.2 million Under constr. tpy 1.4 million Under constr. tpy 3.7 million Engineering tpy 150,000 Planning 1.4 million tpy 15 million Under constr. tpy 4.1 million Engineering tpy Engineering 6 million tpy Under constr. 2012 2011 Foster WheelerEngr./ Contr./DD Jacobs EngineeringPM Jacobs EngineeringEngr. Uhde GmbH New. Feasibility study for Phase II naptha cracker. New. $350 million. New. $60 million. New. $1.1 billion. Nagarjuna (51%), Tata Sons (30%), Uhde, Cuddalore Port Development Co., and Tamil Nadu Industrial Development Corp. (19%). 2012 2012 2012-17 TechnipEPC Foster WheelerEngr./Lic. Expansion. $32 million. Refinery I. Expansion. $29 million. Refinery III. Expansion New. $3 billion. New New New New New Expansion Project Added capacity, b/d Status Expected completion Contractor and contract type Project notes

INDONESIA PT Petrogas Jatim Utama Situbondo PT PertaminaCilacap refinery IRAQ Iraqi Ministry of OilNassiriya US Army Corps of EngineersNorthern Iraq State Company Oil ProjectKarbala IRAN National Iranian Oil Refining & Distribution Co.Arak Atmospheric distillation Isomerization Under constr. Under constr. 2011 2011 UOP Axens, Technip , SEI, RIPI, Sazeh, ODCC UOP Axens, Technip , SEI, RIPI, Sazeh, ODCC Expansion Expansion Refinery Refinery Refinery 300,000 Feasibility study/ FEED 250,000 Engineering 140,000 Engineering Foster WheelerFEED WorleyParsonsEPC TechnipFEED New New. $800 million. JV of Iraq Oil Co. and WorleyParsons. New Refinery Catalytic cracking 150,000 Planning Planning 2012 New. $3 billion. Expandable capacity 300,000 b/d. JV Russian investors. New. $1.5 billion.

ISRAEL Oil Refineries Ltd.Haifa ITALY ENI Sannazzaro Refinery Sannazzaro, Pavia IVORY COAST PetrociVridi district of Abidjan Refinery 60,000 Under constr. New. Funded by Energy Allied International, WCW International. ROSE 15,000 Planning KBRLic. New Hydrocracker 25,000 Under constr. 2012 New. $670 million.

Oil & Gas Journal / Apr. 4, 2011

REfININg CONT. REfININg CONT.


Company and location JAPAN Idemitsu Kosan Co.Chiba refinery Nippon Petroleum Refining Co. Ltd.Kurashiki, Okayama Pref. JORDAN Jordan Petroleum Refinery Co. Ltd.Zarka KAZAKHSTAN KazakhstanWestern Mangistau LIBYA Zwara Oil Refinery Co. Mellita LITHUANIA JSC Mazeikiu Nafta Mazeikiai MALAYSIA PetronasMelaka Shell Refining Co.Port Dickson MEXICO Petroleos Mexicanos Minatitlan Guanajuato Tula PEMEX RefiningCadereyta Ciudad Madero Minatitlan Salina Cruz MOROCCO International Petroleum Vacuum distillation Investment Co.Jorf Lasfar MOZAMBIQUE Oilmoz LdaMaputo province NETHERLANDS Royal Dutch ShellPernis NEW ZEALAND New Zealand Refining CompanyMarsden Point, Northland NICARAGUA Petroleos de Venezuela Piedras Blancas Refinery 150,000 Under constr. 2012 New. $4 billion. Financed by Albanisa (PDV Caribe 55%, Petronic 45%). Crude distillation 35,000 Under constr. WorleyParsonsEngr. Expansion Hydrodesulfurization Planning 2011 New. $500 million. Refinery 350,000 Planning 2014 New 201,450 Planning 2015-16 New. $3 billion. Crude distillation Vacuum distillation Refinery Refinery Catalytic distillation Catalytic distillation Desulfurization Desulfurization 150,000 Under constr. 150,000 Under constr. Planning 300,000 Planning 42,500 Engineering 40,000 Engineering 25,000 Engineering 25,000 Engineering 2014 2015 2013 2013 Foster WheelerDD Foster WheelerDD ICA FluorEPC ICA FluorEPC ICA FluorEPC ICA FluorEPC New New Expansion. $3 billion. New. $9 billion. New New. 2 plants: 20,000 b/d/ plant New New Hydrogen Lube oil *Hydrodesulfurization Engineering 600 tpy Under constr. 6,000 tpy Engineering Lurgi AG Lurgi AGLic. Fluor Corp.EPC New New New. Hijau gas oil project. FCC 15,000 Under constr. Foster Wheeler Expansion Refinery 200,000 Planning 2014 Foster WheelerPD New. $4 billion. Refinery 1 million tpy Planning 2012 New Hydrocracker 1,300 Under constr. Expansion Catalytic cracking (fluid) Catalytic cracking (fluid) Planning 3,000 Under constr. Apr. 2011 Dec. 2011 Upgrade. $162 million. New Project Added capacity, b/d Status Expected completion Contractor and contract type Project notes

Oil & Gas Journal / Apr. 4, 2011

REfININg CONT. REfININg CONT.


Company and location NIGER China National Oil & Gas Development Exploration Corp.near Zinder NIGERIA Amakpe International Crude distillation Refineries Ltd.Eket, Akwa Ibom Hydrotreater Reformer OMAN Oman Refineries and Petrochemical Co.Sultanate of Oman PAKISTAN Bosicor Oil Pakistan Ltd. Hub, Balochistan Province Khalifa CoastalHub, Balochistan Province Trans-Asia Refinery Ltd. Port Qasim PERU Petroleos Del PeruTalara, Piura Fluid coking Crude distillation FCC Distillate upgrading Hydrogen Hydrogen Hydrotreating Naptha desulfurizing Straight run distillate Catalytic reforming Vacuum distillation POLAND Grupa Lotos SAGdansk Catalytic hydrocracking Crude/vacuum distillation unit Hydrorefining PKN Orlen SAPlock Hydrodesulfurization Hydrogen 4,000 Under constr. 90,000 Under constr. 50,000 Under constr. Engineering Engineering TechnipEngr./PE/Lic. TechnipEngr./PE/CS/ Constr. Expansion New New New New 20,000 Planning 28,000 Planning 19,000 Planning 20,000 Planning 55 MMcfd Planning 30 MMcfd Planning 41,000 Planning 11,000 Planning 25,000 Planning 11,000 Planning 29,000 Planning Jan. 2012 Jan. 2012 Jan. 2012 Jan. 2012 Jan. 2012 2015 2015 Jan. 2012 Jan. 2012 Jan. 2012 Jan. 2012 Haldor TopsoeEngr./Lic. Haldor TopsoeEngr./Lic. New. $1 billion total for all units. Expansion New New New New New New New New Expansion Refinery Refinery Refinery 115,000 Planning 250,000 Planning 100,000 Planning New New New *Refinery 27 ,000 Engineering CB&IFEED/PM Expansion. $40 million. 6,000 Under constr. 4,000 Under constr. 4,000 Under constr. Ventech Engineers InternationalEngr./Contr./PD/DD/ PE/CS/Tech./Constr. New New New Refinery 20,000 Under constr. 2012 New Project Added capacity, b/d Status Expected completion Contractor and contract type Project notes

PORTUGAL Petrogal SAPorto Catalytic hydrotreating Vacuum distillation Vacuum distillation Visbreaking Sines Distillate upgrading Hydrogen 2,500 Under constr. 39,100 Under constr. 5,300 Under constr. 14,600 Under constr. 43,000 Under constr. 80.5 Under constr. MMcfd 2011 2011 2011 2011 2011 2011 FluorCS FluorCS FluorCS FluorCS Tecnicas ReunidasCS Tecnicas ReunidasCS Expansion New Expansion New New New

QATAR Qatar Petroleum Messaieed Refinery Desulfurization RFCC Desulfurization 250,000 Engineering 51,000 Engineering 60,000 Engineering 30,000 Engineering 1QTR 2012 1QTR 2012 1QTR 2012 1QTR 2012 AxensEngr. AxensEngr. AxensEngr. AxensEngr. New. $60 million. Lump sum contract. New New New

Oil & Gas Journal / Apr. 4, 2011

REfININg CONT.
Company and location RUSSIA CJSC Nizhnekamsk RefineryTatarstan Refinery Delayed coker Mariisky NPZ Ltd.Mari-El Republic SAUDI ARABIA Aramco Services Co. Jubail Ras Tanura Jubail Refining and Petrochemical Co.Jubail Saudi AramcoYanbu Jazan Saudi Aramco Mobil Refinery Co.Yanbu Delayed coker Refinery Refinery Refinery *Refinery FCC, catalytic hydrotreating Planning 400,000 Engineering 400,000 Engineering 400,000 Engineering 400,000 Engineering Engineering Engineering 2012 2013 2014 2015 Foster WheelerPD Worley ParsonsEngr./ Contr./PD/DD/PE/CS KBRContr. KBRPM WorleyParsonsEngr./ Contr./PD/DD/PE/CS Chiyoda Corp./Samsung EngineeringEngr./PE/Constr. New. JV Total France. New. $8 billion. New. $12 billion. Saudi Aramco (62.5%), Total SA (37 .5%). New. $12 billion. New New. $3.3 billion. New Refinery 140,000 Engineering Engineering 63,000 Engineering 2011-12 2012 Foster Wheeler Engr./ Dsgn. Foster WheelerEngr./ Contr./PD/Constr. Foster WheelerFEED Upgrade. $3 billion. New Expansion Project Added capacity, b/d Status Expected completion Contractor and contract type Project notes

Saudi Aramco Total Refining Coker & Petrochemical Co.Jubail SERBIA NIS Petroleum Industry of SerbiaSerbia SOUTH AFRICA Petro SAPort Elizabeth SOUTH KOREA GS CaltexYeosu Hydrodesulfurization *Catalytic cracking *Hydrodesulfurization *Alkylation SK Corp.Inchon SOUTHERN SUDAN Government of Southern SudanAkon, Warap SPAIN Compania Espanol de Petro- Hydrogen leos SAHuelva Crude distillation Vacuum distillation Repsol YPF/Petronor Vizcaya Repsol YPF SACartagena Delayed coker Delayed coker Hydrodesulfurization Refinery Vacuum distillation La Coruna Murcia Puertollano Tarragona Hydrodesulfurization Hydrocracker Hydrodesulfurization Hydrodesulfurization Refinery Hydrocracker Refinery Hydrocracker/ hydrotreater

Engineering

CB&IEngr./PE/CS

Upgrade. $70 million.

400,000 Planning

2014

WorleyParsonsEngr.

New

70,000 Engineering 53,000 Planning 24,000 Planning Planning 40,000 Planning

2011

Haldor Topsoe A/SLic. GS E&C-Engr./Constr.

New New. $978.6 million. New New New

50,000 Planning

2012

New. $2 billion.

68,700 cu Engineering m/hr 90,000 Under constr. 30,500 Under constr. 40,000 Engineering 53,000 Under constr. 930,000 tpy Engineering 100,000 Engineering 90,000 Under constr. 860,000 tpy Engineering 50,000 Planning 1,440,000 Engineering tpy 950,000 tpy Engineering

2011 2011 2011 2011

TechnipEPC Foster WheelerEngr./ Contr./PD/DD/PE/CS Foster WheelerEngr./ Contr./PD/DD/PE/CS Foster WheelerEngr./ Contr./PD/DD/PE/CS/Lic. Foster WheelerEngr./ Contr./PE/CS/CM/Lic. Intecsa-UhdeEngr. UOP-Lic. FluorPM Foster WheelerEngr./ Contr./PD/PE/CS/Lic. Intecsa-UhdeEngr. UOP-Lic. AxensTech. Intecsa-UhdeEngr. UOP-Lic. Intecsa-UhdeEngr. UOP-Lic.

New. Lumpsum contract. New New New New Revamp Expansion. $4.8 billion. Final capacity: 200,000 b/d. New Revamp Expansion Revamp Revamp

Oil & Gas Journal / Apr. 4, 2011

REfININg CONT.
Company and location SRI LANKA Iranian govt.Sapugaskande SURINAME Staatsolie Maatschappij Refinery Suriname NVTout Lui Faut TAIWAN Chinese Petroleum Corp. Kaoshiung TRINIDAD & TOBAGO Petroleum Co. of Trinidad & TobagoPointe-a-Pierre Alkylation (sulfuric) Catalytic reforming FCC 10,000 Under constr. 28,000 Under constr. 9,000 Engineering/under constr. 2011 2011 2011 BechtelContr./PM DuPont Stratco-Lic. BechtelContr./PM UOP-Lic. BechtelContr./PM UOP-Lic. New New Revamp *Desulfurization Engineering 2013 Jacobs Engineering Group New 15,000 Engineering 2013 Aker SolutionsPM Lummus CB&I Expansion Refinery 100,000 Under constr. 2012 Upgrade. $1.2 billion. Project Added capacity, b/d Status Expected completion Contractor and contract type Project notes

TURKEY SOCAR & TURCAS Refinery ASIzmir, Aliaga Province Refinery Delayed coker Hydrocracker Hydrotreater Catalytic reformer UGANDA Ugandan government Uganda UNITED ARAB EMIRATES Abu Dhabi Oil Refining Co.Ruwais Refinery Aromatics Hydrodesulfurization Hydrocracker ConocoPhillipsFujairah Emirates National Oil Co. Jebel Ali, Dubai Refinery Reformer Hydrotreater 417 ,000 Planning Planning Engineering Engineering 500,000 Feasibility study 36,000 Under constr. 70,000 Under constr. 2014 2011 UOP LLCEngr./Tech. WorleyParsonsContr. WorleyParsonsPM WorleyParsonsPM Foster WheelerEngr./Lic./ Constr. AxensLic. Foster WheelerEngr./ Constr. AxensLic. Expansion New. $800 million. Expansion Expansion New. IPIC (51%), ConocoPhillips (49%). Upgrade Upgrade Refinery 150,000 Feasibility Foster Wheeler New 214,000 Engineering b/sd 40,000 b/sd Engineering 66,000 b/sd Engineering Engineering 28,000 b/sd 2012 Foster WheelerEngr. Fluor Foster WheelerEngr. Foster WheelerEngr. Foster WheelerEngr. New New New New

UNITED KINGDOM Chevron Corp.Pembroke, Wales ConocoPhillips Humberside, Grisby Total SAImmingham FCC Hydrotreater Hydrodesulfurization Steam methane reformer UNITED STATES BP PLCWhiting, Ind. BP-Husky Refining LLC Oregon, Ohio ConocoPhillipsRodeo, Calif. EnCana Corp./ConocoPhillipsWood River, Ill. Coker Hydrotreater Reformer Hydrocracker Coker 102,000 Under constr. 105,000 Engineering Planning 20,000 Under constr. 65,000 Under constr. 2012 2011 2012 2011 Foster WheelerEPC FluorPD/DD/PE/CS/PM New New Upgrade. $400 million. Replacing two catalytic reformers and hydrogen plant. Expansion Expansion Engineering 54,000 Engineering 1 million tpy Under constr. Under constr. AMEC PLCEPC Haldor Topsoe A/SEngr. Revamp Expansion New New

Oil & Gas Journal / Apr. 4, 2011

REfININg CONT.
Company and location Flint Hills Resources LP Corpus Christi, Tex. Marathon Petroleum Co. LLCDetroit, Mich. Project Delayed coker Refinery Delayed coker Distillate hydrotreater Motiva Enterprises LLC Port Arthur, Tex. Delayed coker Crude distillation Hydrocracker Hydrotreater (naphtha) Hydrotreater (cat feed) Isomerization Reformer Placid Refining Co. LLC Port Allen, La. Crude distillation Catalytic reforming (semiregenerative) Hydrotreater FCC Sinclair Oil Corp.Tulsa, Okla. Tesoro Corp.Mandan, ND Total SAPort Arthur, Tex. Refinery Delayed coker *Refinery Coker Desulfurization Vacuum distillation Valero Energy Corp.Port Arthur, Tex. Memphis, Tenn. Sunray, Tex. Refinery Coker Hydrogen Hydrogen *Refinery WRB Refining LLCRoxania, Ill. Coker Added capacity, b/d Status Expected completion 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2011 2011 2011 2011 2011 2011 2011 2014 Contractor and contract type Foster WheelerDD/PE FluorEPC FluorEPC FluorEPC Project notes Expansion Expansion. $1.6 billion. Expansion Expansion 2,000 Engineering 13,000 Under constr. 28,000 Under constr. 33,000 Under constr. 95,000 Under constr. 325,000 Under constr. 75,000 Under constr. 113,000 Under constr. 50,000 Under constr. 48,000 Under constr. 85,000 Under constr. 25,000 Engineering 5,500 Engineering 7 ,000 Engineering 6,000 Engineering 45,000 Engineering 30,000 Engineering 10,000 Planning 50,000 Planning Planning Planning 90,000 Under constr. 45,000 Under constr. 30 MMscfd Engineering 30 MMscfd Engineering 25,000 Planning Under constr.

BechtelEngr./Contr./DD/ New PE/CS/PM ConocoPhillipsLic. BechtelEngr./Contr./DD/ PE/CS/PM SGSLic. BechtelEngr./Contr./ DD/PE/CS/PM Chevron Lummus-Lic. BechtelEngr./Contr./DD/ PE/CS/PM UOP-Lic. BechtelEngr./Contr./DD/ PE/CS/PM SGS-Lic. BechtelEngr./Contr./DD/ PE/CS/PM UOP-Lic. BechtelEngr./Contr./DD/ PE/CS/PM UOP-Lic. Roddey Engineering ServicesPD Haldor Topsoe A/SEngr. WorleyParsonsEngr./ Contr./PD/DD/PE/CS Foster WheelerContr. FluorEPC FluorEPC FluorEPC TechnipEngr./PM TechnipEngr./PM FluorConstr. New New New New New New Expansion. $39.5 million. Project delayed. Expansion. $13.2 million. Project delayed. Expansion. $20.7 million. Project delayed. Expansion. $32 million. Project delayed. Expansion. Final capacity: 115,000 b/d. New Expansion New. $2.2 million total. New New Expansion. $2.4 billion. Final capacity: 415,000 b/d. New New New Expansion Expansion. Wood River refinery. JV ConocoPhillips, EnCana.

URUGUAY ANCAPMontevideo VENEZUELA Petroleos de Venezuela Barinas Cabruta Caripito Zulia VIETNAM PetroVietnamNghi Son Dung Quat Techno Star Management/ TelloilDong Hoa district Refinery Refinery Refinery 200,000 Engineering 52,000 Planning 4 million tpy Planning 2013 2012 New Expansion New. $1.7 billion. Refinery Refinery Refinery Refinery 100,000 Under constr. 400,000 Planning 50,000 Planning 200,000 Planning 2011-14 New. $1.2 billion. New. Crude upgrader. New New Hydrodesulfurization 18,000 Planning Haldor Topsoe A/SLic. New

Oil & Gas Journal / Apr. 4, 2011

Petrochemicals
Added capacity listed in tons per year (tpy) unless otherwise specified. Company and location ALGERIA Total/SonatrachArzew SonatrachArzew Polyethylene Ethylene HDPE LLDPE 800,000 1,100,000 350,000 450,000 Planning Engineering Engineering Engineering 2012 2012 2012 2012 Total SAConstr. Total SAConstr. Total SAConstr. New. 2 units. New New New Project Added capacity, tpy Status Expected completion Contractor and contract type Project notes

BELGIUM BP PLCGeel Terephthalic acid 350,000 Engineering TechnipEngr./PE/Constr. Expansion

BRAZIL Petroquimica Uniao SASanto Andre, Sao Paulo Ethylene 200,000 Planning ABB Lummus GlobalContr. Expansion. $175 million.

BRUNEI Brunei Darsussalam Methanol Project ConsortiumSungai Liang Industrial Zone Methanol 850,000 Planning New

CHINA BASF-YPC Co. Ltd.Nanjing Ethylene 750,000 Planning Expansion. Verbund site. $500 million. JV BASF & Sinopec. Expansion. Verbund site. JV BASF & Sinopec. Basell-Tech. New Expansion. Final capacity: 1.2 million tpy. New. Superflex technology. New. $10 billion. New. Ethylbenzene, styrene monomer. New New Expansion. Fujian Refining & Ethylene JV Project. Fujian Petrochemical, ExxonMobil, Saudi Aramco. Expansion. Fujian Refining & Ethylene JV Project. Fujian Petrochemical, ExxonMobil, Saudi Aramco. Expansion. Fujian Refining & Ethylene JV Project. Fujian Petrochemical, ExxonMobil, Saudi Aramco. New New New

Ethylene oxide

Planning

China Petrochemical Corp. Tianjin Daqing Petroleum & Chemical Co.Heilongjiang Province Jilin Chemical Group Corp. Jilin City PetroChinaNingbo PetroChina Jilin Petrochemical Co.Jilin PetroChina Sichuan Petrochemical Co. Ltd.Chengdu

Polypropylene Ethylene Propylene Ethylene EB/SM Benzene Paraxylene

450,000 600,000 200,000 1,200,000 320,000 350,000 600,000 700,000

Engineering Planning Engineering Planning Engineering Engineering Engineering Planning

2012 2011

UhdeEngr.

KBREngr./Dsgn. Lummus TechnologyPD/ Lic. UOP LLCEngr./Tech. UOP LLCEngr./Tech.

Quanzhou City

Paraxylene

Polyethylene

800,000

Planning

Polypropylene

400,000

Planning

Wuhan, Hebei Province

LDPE HDPE Polypropylene

300,000 300,000 400,000

Planning Planning Planning

EGYPT Carbon Holdings of EgyptAin Sokhna Polyethylene 1,350,000 Engineering 2015 Foster WheelerPM New

Oil & Gas Journal / Apr. 4, 2011

Petrochemicals cont.
Company and location Project Added capacity, tpy Status Expected completion Contractor and contract type Project notes

INDIA Brahmaputra Cracker and Polymer Ltd.Lepetkata, Assam Ethylene Polypropylene Essar Gujarat Petrochemicals Ltd.Vadinar, Gujarat GAIL India Ltd.Dibrugarh, Assam Ethylene Ethylene Propylene Indian Oil Corp. LtdOrissa Paraxylene Polypropylene Styrene Oil & Natural Gas Corp.Dahej ONGC Petro-additions Ltd. (OPAL)Dahej, Gujarat Ethylene Ethylene Propylene 220,000 60,000 1,300,000 220,000 60,000 1,200,000 700,000 600,000 1,100,000 1,100,000 340,000 Engineering Engineering Engineering Planning Planning Engineering Engineering Engineering Planning Engineering Engineering 2011 2011 2011 2012 3QTR 2012 2012 CB&IEngr./Lic. CB&IEngr./Lic. CB&IEngr./Lic. Foster WheelerContr./ FEED Foster WheelerContr./ FEED Foster WheelerContr./ FEED Foster WheelerContr. Linde EngineeringEngr. Linde EngineeringEngr. Samsung Engineering New New New New New New New New New. $1.05 billion. New. Turnkey lump sum. $1.43 billion. New. Turnkey lump sum. $1.43 billion.

IRAN Arvand Petrochemical Co. Bandar Imam Ethylene dichloride Polyvinyl chloride Polyvinyl chloride Vinyl chloride Kordestan Petrochemical Kermashah Lorestan Petrochemical Khoramabad Mahabad Petrochemical Mahabad LLDPE LLDPE LLDPE 267 ,300 300,000 40,000 343,200 300,000 300,000 307 ,000 Under constr. Under constr. Under constr. Under constr. Under constr. Under constr. Under constr. 2012-13 2012-13 2012-13 Uhde/SazehEngr./PE Uhde/SazehEngr./PE Uhde/SazehEngr./PE Uhde/SazehEngr./PE New New New New New New New

JAPAN Nippon Petroleum Refinery Co. Ltd.Sendai, Miyagi Pref. Xylene 300,000 Under constr. Mitsubishi Kakoki Kaisha Ltd.Contr. New

KAZAKHSTAN KazMunaiGazAtyrau refinery Paraxylene Benzene 496,000 133,000 Engineering Engineering 2012-13 2012-13 AxensTech. AxensTech. New New

NIGERIA Eurochem Tech Corp. Lagos Methanol 2,737 ,500 Engineering 2012 Haldor TopsoeLic. Snamprogetti New

POLAND PKN Orlen SAPlock Paraxylene 400,000 Engineering TechnipEngr./PE/Constr. UOP-Tech. New. $221.9 million.

QATAR Qatar Fertilizer Company Mesaieed Urea 3,850 Engineering 3QTR 2012 Saipem SPA Hyundai Engineering & Construction Co. Ltd. New. $610 million.

Oil & Gas Journal / Apr. 4, 2011

Petrochemicals cont.
Company and location Project Added capacity, tpy Status Expected completion Contractor and contract type Project notes

Qatar Petroleum/ExxonMobil Corp.Ras Laffan Industrial City Qatar Petroleum/Honam PetrochemMesaieed Qatar Petroleum/ShellRas Laffan Industrial City

Ethylene

1,600,000

Planning

2012

New

Ethylene * Monoethylene glycol

900,000 1,500,000

Planning Planning

New. $2.6 billion petrochemical complex. New. MOU.

RUSSIA KuibyshevTogliatti Ural Methanol GroupNizhny Tagil Polyamide * Methanol 21,500 657 ,000 Engineering Engineering 2014 Uhde Inventa-FischerEngr./ Tech. TechintEngr./PD New New

SAUDI ARABIA National Petrochemical Industrialization Co.Al-Jubail Ethylene Polyethylene Polyethylene Yanbu Saudi Arabian Oil Co.Rabigh Saudi Aramco Total Refining and Petrochemical Co.AlJubail Polypropylene Polyethylene HD Paraxylene 1,008,000 400,000 400,000 420,000 300,000 700,000 Engineering Engineering Engineering Engineering Engineering Engineering 2013 Fluor B.V.CS Fluor B.V.CS Fluor B.V.CS WorleyParsonsEngr./PE/ Constr. UhdeEngr. TechnipEPC Basell-Lic. New New New New. $700 million. New. JV Sumitomo. New

Benzene Propylene Saudi Basic Industries Corp. Al-Jubail Ethylene Ethylene glycol Polyethylene Polypropylene Yanbu HDPE Polyethylene Polypropylene Saudi Kayan Petrochemical Co.Al-Jubail Saudi PolymersAl-Jubail SipchemJubail Industrial City Tasnee PetrochemicalsAlJubail Olefins Ethylene * Ethylene vinyl acetate Ethylene

140,000 200,000 500,000 400,000 40,000 1,350,000 1,200,000 200,000 1,000,000

Engineering Engineering Under constr. Under constr. Under constr. Engineering Engineering Under constr. Under constr. Engineering Under constr. Engineering Engineering

2013 2013 2011 2013

TechnipEPC TechnipEPC Samsung Engineering Co. Ltd.Contr. Stone & WebsterContr. KBREngr./Dsgn. JGC Corp.Contr. GS Engineering and Construction Corp.EPC Linde EngineeringEngr./ CS/Lic. Samsung Engineering-Lic.

New New Expansion Expansion Expansion Expansion New New New New New New. $800 million. New

SINGAPORE ExxonMobil Chemical Corp. Jurong Island Benzene Ethylene Oxo-alcohol Polyethylene Polypropylene Jurong Aromatics Corp. Jurong Island Paraxylene 340,000 1,000,000 125,000 1,300,000 450,000 800,000 Under constr. Under constr. Under constr. Under constr. Under constr. Engineering 2011 2011 2011 2011 2011 2011 UOP Engr./Dsgn. SK Engineering & Construction New New New New. Two units: 650,000 tpy/unit. New New

Oil & Gas Journal / Apr. 4, 2011

Petrochemicals cont.
Company and location Project Orthoxylene Benzene Added capacity, tpy Status 200,000 450,000 Engineering Engineering Expected completion 2011 2011 Contractor, and contract type UOP Engr./Dsgn. SK Engineering & Construction UOP Engr./Dsgn. SK Engineering & Construction Project notes New New

SOUTH KOREA S-Oil Corp.Onsan Benzene Paraxylene 280,000 900,000 Engineering Engineering 2011 2011 AxensTech. AxensTech. New New

TAIWAN CPC Corp. TaiwanKaohsiung Linyuan Lin Yuan, Kaohsiung Ethylene Ethylene Propylene 1,000,000 600,000 432,000 Planning Planning Planning 2011 2013 2013 ABB Lummus GlobalTech. ABB Lummus GlobalTech. New. $1.25 billion. New New

THAILAND HMC PolymersMap Ta Phut PTT Polyethylene Co. Ltd. Map Ta Phut Propylene Ethylene 300,000 1,000,000 Under constr. Engineering 2011 BechtelContr./PM Lic. UOPNew New

Toyo Engineering Corp. Contr.

TRINIDAD & TOBAGO Westlake Chemical Corp. Ethylene 570,000 Planning New

UNITED ARAB EMIRATES Abu Dhabi Polymers Co. Ltd. (Borouge)Ruwais, Abu Dhabi ChemaWEyaat Al Taweelah, Abu Dhabi Ethylene Paraxylene, benzene, cumene, phenol, acetone, bisphenol A, propylene, polypropylene, HDPE, LLDPE, ammonia, urea, melamine, butadiene, carbon black 1,500,000 6,600,000 Engineering/ Under constr. Engineering 1QTR 2013 2013 Linde EngineeringEngr. WorleyParsonsEngr./PE New. Lump sum, turnkey. New

VENEZUELA PequivenJose, Anzoategui Ammonia Ethylene PolimericaJose PolinterEl Tablazo Ethylene Ethylene 657 ,000 1,050,000 1,300,000 1,000,000 Engineering Planning Engineering Under constr. 2012 2QTR 2011 June 2012 KBREngr. TechnipFEED Linde EngineeringContr. New. $510 million. New. $880 million. New. $3.2 billion. New

Oil & Gas Journal / Apr. 4, 2011

Gas processinG
Added capacity listed in millions of cubic feet per day (MMcfd) unless otherwise specified. Company and location Project Added capacity, MMcfd Status Expected completion Contractor and contract type Project notes

AFRICA Ghana National Petroleum Corp.Western region Gas plant 500,000 b/d Planning 2014 New

ALGERIA SonatrachCentral Algeria Sahara Desert LPG Gas processing complex 8 3.5 bcmy Engineering Engineering 2012 2012 Saipem SPAEngr./PE/ Constr. New. 3 production trains. New. $1.1 billion.

AUSTRALIA Apache Energy/Santos Ltd.Pilbara region Chevron Australia Pty. Ltd.Ashburton North Gas plant Gas plant 202 Under construction Engineering 2011 Clough Ltd.Engr./PE/ Dsgn. Bechtel Oil & Gas ChemicalsFEED New. Devil Creek gas plant. New

CANADA AltaGas Ltd.Grande Prairie, Alta. EnCana Corp.Fort Nelson, BC Spectra EnergyFort Nelson, BC *Gas plant Gas plant Gas plant 120 400 250 Planning Planning Engineering 2012 2011 2012 WorleyParsons EPC New. Gordondale. $235 million. New Expansion

EGYPT Danagaz BahrainRas Shukheir NGL recovery 55 bcf/year Engineering New

INDIA ONGCUran Hazira LPG recovery Gas sweetening 5 5.6 Engineering Engineering Larsen and Toubro Ltd. Engr./Contr./PM/Constr. Larsen and Toubro Ltd. Engr./Contr./PM/Constr. New. $25 million. New. $25 million.

IRAN National Iranian Oil Co. Bandar Assaluyeh Gas plant 2,000 Under constr. Lurgi AGLic. New

IRAQ BGR Energy Systems Ltd.Akas gas field Al-Mansuria Crescent Petroleum Co. Khor Mor Field Gulfsands Petroleum PLCMisan Gas plant Gas plant LPG recovery NGL processing 110 110 150 46,600 b/d Engineering Engineering Under constr. Planning Mott MacDonald Group Ltd.Engr./PE Mott MacDonald Group Ltd.Engr./PE Ortloff Engineers Ltd.Lic. New. Engineering to be complete in 2011. New. Engineering to be complete in 2011. New. Cryogenic. New

KAZAKHSTAN Agip KCOAtyrau Gas plant 424 Engineering WorleyParsonsEngr./PD/ DD Fluor New

KUWAIT Kuwait National Petroleum Co.Mina Ahmadi NGL 1,140 Engineering Ortloff Engineers Ltd.Lic. New

Oil & Gas Journal / Apr. 4, 2011

Gas processinG cont.


Company and location MEXICO Petroleos Mexicanos Posa Rica gas complex, Northern Mexico Gas plant 200 Under constr. 2011 ICA Fluor/LindeEngr./PE/ Constr. Ortloff EngineersLic. New. $268 million. Project Added capacity, MMcfd Status Expected completion Contractor and contract type Project notes

NORWAY StatoilHydroKollsnes Karsto Gas plant Gas plant 183 Planning Engineering 2012 Linde EngineeringDsgn. MW KelloggContr. Expansion Upgrade

OMAN Petroleum Development OmanSaih Nihayda Gas plant 5 MMcm/d Engineering GS Engineering and Construction Expansion

QATAR ExxonMobil Middle East Gas Marketing Ltd.Ras Laffan QatarGas IIIRas Laffan LPG recovery 1,560 Under constr. Ortloff Engineers Ltd.Lic. New

Cryogenic LPG recovery Gas plant

1,450

Under constr.

Ortloff Engineers Ltd.Lic.

New. Qatar Petroleum, ConocoPhillips, Mitsui. New. Two trains: 1,700 MMcfd/train.

Qatar PetroleumRas Laffan

3,400

Engineering

Chiyoda Corp.FEED

RUSSIA GazpromVyborg Gas plant 6 bcfd Engineering 2011 Siirtec Nigi SPA Germanishcher Lloyd New

SAUDI ARABIA GascoRuwais Saudi Arabian Oil Co. Juaymah Khurais Wasit NGL processing NGL fractionation Gas plant Gas plant 270,000 b/d 535 1.8 bcfd Under constr. Engineering Engineering Planning 2013 Snamprogetti SPAContr. Technicas ReunidasContr. Foster WheelerEngr. Expansion Expansion New. Sour associated gas. New

SCOTLAND Total E&P UK Ltd.Sullom Voe Gas plant 500 Engineering 2014 PetrofacEngr./PE/Constr. New. Shetlands gas plant.

TANZANIA GlobeleqSongo Songo Island Gas plant 70 Engineering Expansion. Final capacity: 140 MMcfd.

THAILAND PTT PLCRayong NGL NGL recovery 675 Engineering Engineering Ortloff Engineers Ltd. Engr./Lic. UOP-Lic. Ortloff Engineers Ltd.Lic. UOP-Lic. New New

TURKMENISTAN TurkmengasYoloten Gas plant 10 bcm Engineering 3QTR 2012 Hyundai Engineering Co. Contr. New. $1.48 billion.

UNITED ARAB EMIRATES Abu Dhabi Gas Development Co. Ltd.Abu Dhabi Gas complex Engineering 2012 Samsung Engineering EPC New

Oil & Gas Journal / Apr. 4, 2011

Gas processinG cont.


Company and location Abu Dhabi Gas Industries Ltd.Asab Habshan Project NGL processing Added capacity, MMcfd 820 Status Engineering Expected completion Contractor and contract type Foster Wheeler Contr. BechtelEngr./PD OrtloffLic. WorleyParsons/Fluor Engr./PE JGC Corp.Contr. Petrofac/GS Engineering Project notes Expansion

Table 1

NGL *Gas plant

470 2.15 bscfd 1,200 8.9 million tpy

Engineering Under constr. Engineering Under constr. Engineering

2013 2013

Expansion. $400 million. New New. JV Tecnimont SpA. New New. Train 4.

Abu Dhabi Ruwais

NGL recovery NGL NGL

UNITED STATES Alaska Gas Pipeline North Slope, Alas. AnadarkoUintah Co., Utah Caiman Energyalong Texas Eastern pipeline Crestwood Midstream Partners LPGranite Wash play, Tex. Crosstex Energy LP Hood Co., Tex. DCP MidstreamEagle Ford shale, Tex. Devon EnergyCanadian Co., Okla. Dominion EnergyPleasants Co., W. Va. Lewis Co., W. Va. Natrium, W. Va. Wetzel Co., W. Va. Gulf Coast Fractionators Mt. Belvieu, Tex. Hiland Partners Woodford Shale, Okla. Magnum Hunter Resources Corp.W. Va. MarkWest Energy PartnersPike Co., Ky. Arapaho gas complex, Okla. OccidentalElk Hills oil and gas field, Calif. Oneok Partners LPMcKenzie Co., ND Western Williams Co., ND Targa Resources Partners LPMont Belvieu, Tex. Gas plant 5 bcfd Planning Fluor WorleyParsons Arctic Solutionspre-FEEDDsgn. CH2M Hill New

Gas plant Gas plant *Gas plant

250 200 60

Under constr. Under constr. Planning

2011 2011

Expansion. Chipeta plant. New New

Gas plant *Gas plant Gas plant Gas plant

200 200 200 10

Planning Planning Under constr. Planning

2012 Jan. 2011 4QTR 2012

New. Bear Creek plant. New New New. $253 million. Gathering Enhancement Project. New. Gathering Enhancement Project. New New. Gathering Enhancement Project. Expansion. $74 million. New. $23 million. New Expansion. Boldman plant. Cryogenic. New. Third plant.

Gas plant *Gas plant Extraction plant *Fractionator Gas plant *Gas plant Gas plant *Gas plant Gas plant Gas plant Gas plant NGL fractionator

40 300 60,000 gpd 43,000 b/d 40 200 60 60 200 100 100 215,000 b/d

Planning Engineering Planning Engineering Planning Planning Engineering Planning Engineering Planning Planning Planning

4QTR 2012 4QTR 2012 2QTR 2012 2011 2011 2011 2012 2011 2012 1QTR 2011

Black & VeatchEngr./ Contr./PE/Dsgn. EPC, Inc.Dsgn.

CB&IEPC

New. $280 million. New New. Stateline I. Expansion. Final capacity: 275,000 b/d.

Oil & Gas Journal / Apr. 4, 2011

LNG
Added capacity listed in millions of tons per year (million tpy) unless otherwise specified.

Company and location ALGERIA Sonatrach--Arzew Skikda

Project

Added capacity, million tpy Status

Expected completion

Contractor and contract type

Project notes

LNG LNG

4.7 4.5

Engineering Under constr.

2012 2012

Saipem SPA/Snamprogetti/ Chiyoda--Engr./PM/Constr. JGC/KBR/SNC-Lavalin/ Black & Veatch--Contr.

New. $4 billion. Lumpsum turnkey. New. $700 million. Replaces plant destroyed in 2004.

ANGOLA Angola LNG Ltd.--Soyo LNG 5.2 Under constr. 2012 Bechtel--Engr./Contr./PD/ DD/PE/CS/PM KBR/JGC/ Technip One train. $2 billion. Chevron Corp.(36.4%), Sonangol (22.8%), BP PLC (13.6%), Eni (13.6%), Total SA (13.6%). ConocoPhillipss proprietary natural gas liquefaction technology.

ARGENTINA YPF SA--Buenos Aires LNG 8 cu m Planning New. $150 million.

AUSTRALIA Chevron Australia Pty. Ltd-Ashburton North Gladstone LNG--Gladstone Gorgon LNG--Barrow Island LNG LNG LNG 8.6 7 .8 15 Engineering Planning Under constr. 2016 2014 2014 Bechtel Oil & Gas Chemicals Inc.--FEED KBR/JGC/Clough/Hatch New. Two trains: 4.3 million tpy/train. New. Two trains. New. Three trains: 5.0 million tpy/train. Chevron Corp. (50%), ExxonMobil Corp. (25%), Shell (25%). New. $550 million. 2 storage tanks: 180,000/tank. New. Ichthys plant. New. $12 billion. Train 1, 2, 3. Pluto LNG. New. 2 tanks: 120,000 cu m/tank.

LNG storage Inpex Australia/Total SA-Darwin Woodside Energy Ltd.-Burrup Peninsula LNG LNG LNG storage

360,000 8.4 12.9 240,000 cu m

Engineering Engineering Under constr. Under constr.

3QTR 2013 2015 2011-2014 2011

CB&I--Engr./PE/Constr. Chiyoda/JGC/KBR--FEED Foster Wheeler--Contr./EPC CB&I--Engr. Foster Wheeler/WorleyParsons JV-EPCM

BRAZIL Petrobras--Bay of All Saints *LNG terminal 14 MMcfd Planning 2013 New. $425 million.

CANADA Petro-Canada--Gros Cacouna,Que. LNG terminal 500 MMcfd Engineering Black & Veatch--Engr. New. $660 million. JV TransCanada Corp.

CHINA CNOOC--Zuhai City, Guangdong LNG terminal LNG terminal CNPC--Dalian, Liaoning province Fujian LNG--Fujian Xiuyu, Fujian province Jiangsu Rudong LNG-Rudong LNG terminal LNG terminal LNG storage LNG terminal 3.5 3.5 3 2.6 320,000 cu m 3.5 Under constr. Planning Under constr. Planning Planning Under constr. 2012 2011 2012 2012 2011 New New New. $1.4 billion. New Expansion. 2 storage tanks. 160,000 cu m/tank. New. $952 million. CNPC (55%), Pacific Oil & Gas, Jiangsu Guoxin Invest. Group. New. Lumpsum. Two trains: 400,000 tpy/train.

Ningxia Hanas Natural Gas Co. Ltd.--Yinchuan

LNG

800,000 tpy

Engineering

2011

Technip--Constr.

Oil & Gas Journal / Apr. 4, 2011

LNG coNt.
Company and location PetroChina--Shenzhen city, Guangdong Shandong Qingdao LNG-Shandong Zhejiang Ningbo LNG-Ningbo City Project LNG terminal LNG terminal Added capacity, million tpy Status 2.5 3 Planning Under constr. Expected completion 2014 2014 Contractor and contract type Project notes New New. $654.7 million. Sinopec, China Huaneng Group. New. $625 million. CNOOC (51%), Zhejiang Energy Group Co. (29%), Ningbo Power Development Co. (20%). New. 3 storage tanks. 160,000 cu m/tank.

LNG terminal

3.5

Under constr.

2012

LNG storage

480,000 cu m

Under constr.

2012

EQUATORIAL GUINEA Marathon Oil--Bioko Island LNG 4.4 Engineering 2011 Bechtel--Engr./Dsgn. Expansion. Train 2. FID. Marathon (35%), Sonagas (30%), Mitsui (8.5%), Marubeni (6.5%), EON (5%), Union Fenosa (5%).

FRANCE GDF Suez--Montoir de Bretagne LNG terminal LNG terminal Le Havre Port Authority-Antifer LNG terminal 1.8 2.9 6.5 Under constr. Planning Planning INDIA Petronet LNG Ltd.--Kochi, Kerala Ratnagiri Gas and Power-Dabhol LNG terminal LNG terminal 2.5 5.5 Engineering Under constr. 2012 2011 CTCI/Afcons Infrastructure-EPC New. $440 million. New. $280 million. Fully operational in 2011. 2011 2014 2015 Poweo--Contr. Expansion Expansion New

INDONESIA Inpex Holdings--Abadi field PT Pertamina--Sulawesi LNG LNG 4.5 2.0-2.5 Planning Planning 2016 2013 New New. PT Medco Energi, Mitsubishi Corp.

IRAN Iran LNG--Assulayeh LNG 10.8 Under constr. ITALY Mercato/Endesa/OLT Energy Toscana/Golar LNG-Offshore Port of Livorno LNG terminal 2.7-3.4 Under constr. 2011 New 2012-2014 Linde--Lic. New. Two trains: 5.4 million tpy/train.

JAPAN Hibiki --Kita Kyushu City Inpex--Joetsu Tokyo Gas--Ohgishima Hitachi, Ibaraki Tokyo Gas/TEPCO--Sodegaura LNG terminal LNG terminal LNG terminal LNG terminal LNG terminal 1 MEXICO Pemex--Manzanillo LNG terminal 4.4 Under constr. 2011 Samsung New Planning Under constr. Planning Planning Planning 2014 2014 2011 2017 New New New New New

Oil & Gas Journal / Apr. 4, 2011

LNG coNt.
Company and location NETHERLANDS Royal Vopak/NV Nederlandse Gasunie--Rotterdam LNG terminal 8 Under constr. 2011 Sener Ingenieria y Sistemas SA/Techint--Engr./ Constr. Entrepose Contracting/ Vinci Construction--Dsgn. New. $1.2 billion. Dong Energy, Essent, OMV. New. 3 storage tanks: 180,000 cu m/tank. Project Added capacity, million tpy Status Expected completion Contractor and contract type Project notes

Storage

540,000 cu m

Planning

2012

NIGERIA Brass LNG Ltd.--Bayelsa State LNG 10 Engineering 2016 Bechtel--Engr./Contr./PD/ DD/PE/CS/PM New. Two trains: 5 million tpy/train. $3 billion. NNPC (49%), ConocoPhillips (17%), ENI (17%), Total SA (17%). Expansion. Train 7 . SevenPlus project. Expansion. Train 8. SevenPlus project. New. Four trains. NNPC (49.5%), Chevron Corp. (18.5%), Shell (18.5%), BG (13.5%).

Nigeria LNG Ltd. --Bonny Island

LNG LNG

8.5 8.5 20

Engineering Engineering Planning

2011-12 2012 2011

KBR/Foster Wheeler/Chiyoda Corp.--FEED KBR/Foster Wheeler/Chiyoda Corp.--FEED KBR--Contr.

Olokola LNG--West Niger Delta

LNG

PAKISTAN Mashal LNG--Port Qasim LNG terminal 3.5 Planning 2012 New

PAPUA NEW GUINEA ExxonMobil Corp.--Port Moresby LNG 6.6 Engineering 2014 Clough Curtain/Chiyoda Corp./ JGC Corp. New. $15 billion. 2 trains. ExxonMobil (33.2%), Oil Search (29%), Independent Public Business Corp. (PNG govt., 16.6%), Santos Ltd. (13.5%), Nippon Oil (4.7%), Mineral Resources Development Co. (PNG landowners, 2.8%), and Petromin PNG Holdings Ltd. (.2%). New. Trains 1 and 2.

InterOil Corp.--Napa Napa

LNG

Planning

2015

POLAND PGNiG--Swinousjcie LNG 1 Engineering RUSSIA Shtokman LNG--Bay of Orlovka LNG 7 .5 Planning 2017 New. Gazprom (51%), Total (25%), StatoilHydro (24%). 2014 Saipem/PBG New

SINGAPORE Singapore LNG--Jurong Island LNG terminal LNG terminal 3.5 376,000 cu m Under constr. Engineering 2013 2013 Samsung--EPC/Foster Wheeler Samsung--EPC/Foster Wheeler New. $703 million. New. 2 tanks: 188,000/ tank.

S. KOREA Korea Gas Corp.-Samcheok LNG terminal 18.35 Planning 2013 New

SPAIN Enagas--El Musel, Gijon LNG terminal 5.1 Under constr. 2013 New

SWEDEN AGA Gas AB--Nynashamn LNG terminal 250,000 Planning 2011 NCC New

Oil & Gas Journal / Apr. 4, 2011

LNG coNt.
Company and location THAILAND PTT PLC--Rayong UNITED KINGDOM Port Meridan Energy (Hoegh LNG)--Walney Island, offshore LNG 5.8 Planning 2013 New LNG terminal 5 Under constr. 2011 GS Engineering & Construction Corp. New. $700 million. Project Added capacity, million tpy Status Expected completion Contractor and contract type Project notes

UNITED STATES Gulf LNG Energy LLC-Pascagoula,Miss. LNG terminal 5 Under constr. 2011 Technip--Contr. New. $1.1 billion. El Paso (50%), Crest Group (30%), Sonangol USA (20%). Expansion

Southern LNG--Elba Island, Savannah, Ga.

LNG storage

200,000 cu m

Planning

2012

CB&I--Constr.

URUGUAY ANCAP--Montevideo LNG terminal Engineering Foster Wheeler--Engr./EPC New

VENEZUELA PDVSA--Jose, Anzoategui LNG 2.1 Planning New. $600 million.

Oil & Gas Journal / Apr. 4, 2011

Gas-to-liquids and other Gas


Added capacity listed in barrels per day (b/d) unless otherwise specified. Added Company and location Project capacity, b/d Status Expected completion Contractor and contract type Project notes

CANADA OPTI Canada Inc.Ft. McMurray, Alta. Syngas 340 Engineering Fluor New

FRANCE StorengyParis *Gas storage 385 cu m Engineering GE Oil & Gas Expansion. Beynes gas storage.

GERMANY EnBW Energie Baden-WurttembergEtzel Siemens Power Generation GroupSpreetal StatoilHydro Northern Germany Gas storage Coal gasification Gas storage 1,000 Mw 500 million cu m Engineering Planning Planning Technip-EPC New. Crystal gas plant project. New Expansion. Final capacity: 1 billion cu m.

INDIA Jindal Steel and PowerJindal Coal gasification Engineering Lurgi AG-Lic. New

JAPAN Japan Oil, Gas and Metals Natl. Corp.Namikata, Ehime-Pref. Gas storage 300,000 tonnes propane; 150,000 tonnes butane Under constr. Chiyoda Corp.-Engr./DD/ PE/CS New. LPG Underground water sealed mined storage cavern.

NETHERLANDS NuonGroningen TAQA Energy BVNorth Holland Coal gasification Gas storage 1,200 Mw Planning Engineering 2011 2013 Fluor Corp.-EPC New New. Bergermeer Gas Storage.

NIGERIA Chevron Nigeria\Nigerian National Petroleum Corp.Escravos GTL plant 34,000 Engineering Haldor Topsoe/Chevron/ Sasol-Lic. Snamprogetti/ JGC/KBR-Engr./Constr. New. 2 units: 17 ,000 b/d each.

PAPUA NEW GUINEA Syntroleum Corp.Port Moresby GTL plant 50,000 Planning New. JV Kufpec.

QATAR ExxonMobil/Qatar Petroleum GTL Ltd.Ras Laffan Royal Dutch Shell/Qatar Petroleum Pearl GTLRas Laffan GTL plant GTL plant 154,000 140,000 Planning Under constr. 2011 2011 JGC/KBR New New. $18 billion. Two trains: 70,000 b/d per train.

SOUTH KOREA Korean governmentSouth Korea Coal gasification Engineering 2014 Foster Wheeler-FEED, Doosan Heavy Industries & Construction Co., Ltd.-EPC New

Oil & Gas Journal / Apr. 4, 2011

Gas-to-liquids and other Gas


Added capacity listed in barrels per day (b/d) unless otherwise specified. Added Company and location Project capacity, b/d UNITED ARAB EMIRATES Abu Dhabi Gas Industries Ltd. Ruwais Gas storage Engineering Bechtel New. 8 tanks. Integrated Gas Development project. New Status Expected completion Contractor and contract type Project notes

Gas storage

Engineering

CB&I

UNITED KINGDOM Storengy UK Ltd.Stublach Gas storage 400 million c um Engineering 2013 Jacobs Engineering GroupEPC New. $500 million.

UNITED STATES American Electric PowerMeigs Co., Ohio Mason Co., WV Cardinal Gas Storage Partners Delhi, La. Excelsior EnergyTaconite, Minn. Golden TriangleBeaumont, Tex. Coal gasification Coal gasification Gas storage Coal gasification Gas storage 600 Mw 630 Mw 15 Bcf 531 Mw 12 Bcf Engineering Engineering Under constr. Planning Under constr. June 2012 2011 2011-2013 GE Energy/Bechtel GE Energy/Bechtel New. $23.7 million. New New. Perryville Gas Storage. New. $1 billion. New. 2 caverns. Expandable capacity 28 Bcf. New. South Heart project. Expansion New. $3.5 billion.

Great Northern Power Development/Allied Syngas Corp. Southwestern ND Southern Star Central gas pipelineIndependence, Kan. Tenaska Energy Inc.Taylorville, Ill.

Coal gasification

100 MMcfd

Planning

Envirotherm/AdvanticaPD/ Tech./Lic. Siemens Energy

Gas storage Coal gasification

2,600 MMcf 2,000 Mw

Under constr. Planning

2011 2014

UZBEKISTAN Uzbekistan GTLQarshi GTL plant 1.3 MMtpy Feasibility study Technip New. $2.5 billion. JV Petronas and Uzbekneftegaz.

Oil & Gas Journal / Apr. 4, 2011

Sulfur
Added capacity listed in tons per day, (tpd) unless otherwise specified. Company and location ARGENTINA Shell CAPSABuenos Aires Sulfur unit 15 Planning Black & VeatchLic. New. Project on hold. Added capacity, tpd Status Expected completion Contractor and contract type Project Project notes

BANGLADESH Eastern Refinery Ltd. Chittagong Sulfur unit 25 Planning New

BELARUS JSC Naftan RefineryNovopolotsk Sulfur unit Claus 180 136 Engineering Planning Haldor TopsoePD New New

BRAZIL Petrobras REDUC Rio de Janeiro Petrobras REPARAraucaria Petrobras RPBCCubatao Claus Claus Claus 145 65 35 Engineering Planning/ engineering Planning/ engineering 2015 2013 2014 WorleyParsonsPD WorleyParsonsPD WorleyParsonsPD New New New

CANADA Irving OilNew Brunswick MEG EnergyNorth Alberta Newfoundland Labrador Refining Corp.Newfoundland Petro-CanadaFort Hills Petro-Canada/Fort Hills North Alberta Statoil North American North Alberta Claus Claus Claus/tail gas treating Sulfur unit/tail gas treating Claus Claus 750 7 1,500 930 1,400 390 Engineering Planning/ engineering Planning Engineering Engineering Engineering 2015 2013 2012 2013 2014 WorleyParsonsPD WorleyParsonsPD Black & VeatchFEED/ Lic. WorleyParsonsPD/ Lic. WorleyParsonsPD WorleyParsonsPD New New New. Project on hold. New New. 2 units: 700 tpd/unit. New

CHINA PetrochinaLuojiazhai Sulfur unit 900 Engineering Black & Veatch/CPE EngineeringEngr. New. Two units: 450 tpd each.

COLOMBIA Empresa Colombiana de PetroleosBarrancabermeja Sulfur unit Tail gas treating 55 110 Engineering Engineering TechnipEngr./DD/ PE/CS TechnipEngr./DD/ PE/CS Upgrade Upgrade

INDIA Indian Oil Corp.Panipat Claus/tail gas treating Sulfur unit Paradip, Orissa Sulfur unit Tail gas treating Tail gas treating 450 225 1,575 2,100 1,050 Engineering Engineering Under constr. Engineering Engineering 2011 2011 2011 2011 2011 Black & VeatchLic. Black & VeatchLic. Black & VeatchLic. Black & VeatchFEED/ Lic. Black & VeatchEngr./ Lic. New New New. 3 units: 525 tpd each. New. 2 units: 1,050 tpd each. New

Oil & Gas Journal / Apr. 4, 2011

Sulfur cont.
Added capacity listed in tons per day, (tpd) unless otherwise specified. Company and location IRAN PetroparsSouth Pars Claus/tail gas treating 750 Engineering WorleyParsonsPD/ Lic. New Project Added capacity, tpd Status Expected completion Contractor and contract type Project notes

ITALY ENIGela Claus 160 Under constr. Siirtec Nigi SPAEngr./ Contr./PD/DD/PE/CS/ Lic. New. 375 tpd HCR. Project on hold.

KAZAKHSTAN Agip KCOKashagan Claus 3,800 Under constr. 2013 Black & VeatchEngr. Petrofac/B&VEngr. WorleyParsons-PD/Lic. Sirtec Nigi-Engr. FluorPD/DD/PE/CS New. Two trains: 1,900 tpd each.

TengizChevroilTengiz

Tail gas treating

2,600

Under constr.

New

KUWAIT DOW ChemicalShuaiba Kuwait National Petroleum Co.Al-Zour Sulfur unit Sulfur unit/tail gas treating 60 4,000 Engineering Engineering WorleyParsonsEngr./ PD/Lic. FluorPD/PM New New

NORWAY StatoilHydroMongstad Claus 80 Engineering WorleyParsonsPD/ Lic. New

PORTUGAL Petrogal SASines Porto Claus/tail gas treating Claus/tail gas treating 135 27 Under constr. Under constr. 2011 2011 Tecnicas ReunidasCS FluorCS New New

QATAR Qatar Gas Common Sulfur ProjectRas Laffan Qatar PetroleumAl Shaheen Messaieed Sulfur unit Claus/tail gas treating 12,000 1,300 Under construction Engineering 2011 Black & VeatchLic. New. $360 million. New. 2 units: 650 tpd each. Project on hold. Expansion

Claus/tail gas treating

308

Engineering

2011

WorleyParsonsLic.

RUSSIA CSSC NizhnekamskNizhnekamsk Claus 880 Engineering Worley ParsonsPD/ Lic. New

SAUDI ARABIA Aramco ConocoPhillips Yanbu Ltd.Yanbu Saudi Arabian Oil CompanyKhursaniyah Saudi Arabian Oil CompanyMoneefa Claus Sulfur unit Sulfur unit 1,890 900 4,800 Engineering Engineering Engineering 2014 WorleyParsonsPD Jacobs Engineering GroupDsgn. Jacobs Engineering GroupEngr. New. 3 units: 630 tpd/unit. New New. 4 units: 1,200 tpd/unit.

Oil & Gas Journal / Apr. 4, 2011

Sulfur cont.
Added capacity listed in tons per day, (tpd) unless otherwise specified. Company and location TURKMENISTAN TurkmengasYoloten Sulfur unit Engineering 2012 Jacobs Engineering Group/Hyundai Engineering Co. Ltd. Dsgn./Lic. New. Superclaus technology. Added capacity, tpd Status Expected completion Contractor and contract type Project Project notes

UKRAINE Kherson Refinery Sulfur unit/tail gas treating 110 Engineering WorleyParsons/ABB Lummus Global Contr. New

UNITED ARAB EMIRATES GascoAbu Dhabi Sulfur unit/tail gas treating Sulfur unit/tail gas treating Sulfur unit Habshan Sulfur unit/tail gas treating Tail gas treating 25,000 6,000 5,000 1,600 Engineering Engineering Engineering Engineering FluorPD FluorPD JGC Corp.Contr. Foster WheelerContr. FluorPD/DD/PE/CS WorleyParsonsPD/ Lic. New New New. $4.7 million. JV Tecnimont SpA. Expansion. Two 800 tpd SUPERCLAUS units. New

Ruwais

30

Engineering

UNITED STATES BP PLCCarson, Calif. Cherry Point, Wash. ChevronRichmond, Calif. El Segundo, Calif. CITGOLemont, Ill. Marathon Oil Corp.Detroit, Mich. Motiva EnterprisesPort Arthur, Tex. TesoroMartinez, Calif. Valero Energy Corp.Benecia, Calif. Sulfur/tail gas treating Sulfur unit/tail gas treating Claus Claus Claus Sulfur unit Claus Sulfur unit Claus 250 125 235 352 280 1,575 200 400 Planning Engineering Under constr. Under constr. Planning/ engineering Planning Under constr. Engineering Planning/ engineering 2013 2013 2014 2011 2013 FluorTech./Lic. FluorDD/PE/CS/Lic. WorleyParsonsPD WorleyParsonsPD WorleyParsonsPD Black & VeatchEngr./ Lic. FluorPD/Tech. WorleyParsonsPD New New Expansion New New. 2 units: 176 tpd/unit. Expansion New Expansion New. 2 units: 200 tpd/unit.

VIRGIN ISLANDS Hovensa LLCSt. Croix Sulfur unit Tail gas treating 500 300 Planning Planning 2014 2014 Black & VeatchEngr./ Lic. Black & VeatchEngr./ Lic. Revamp New

Oil & Gas Journal / Apr. 4, 2011

PiPelines
Diameter of pipe is listed in inches. *Designates projects listed for the first time. C G P CN Project, miles Diam. Status Crude Gas Products Condensate COMP PUMP STOR JV Compressor station Pumping station Gas storage Joint venture Project notes

Company and location ALGERIA SonatrachNK-1 pipeline Souguer to Hadjret En Nouss

Type

Expected completion

Contractor

C G

PUMP 169

Engineering Under constr.

ABB Group Stroitransgaz

New. $215 million. New

AUSTRALIA DBP GroupDampier to Bunbury G 354 Engineering Saipem New

BAHRAIN Saudi AramcoBahrain to Saudi Arabia C 71 Planning 2011 Expansion and replacement.

BOLIVIA Yacimientos Petroliferos Fiscales BolivianosCarrasco to Cochabamba Repsol YPFCochabamba province to La Paz G 155 16 Under constr. New. $170 million.

249

Planning

New. $150 million.

BRAZIL Petroleos Brasileiro SAGoias to Paulinia P 606 Under constr. New. $226 million.

BULGARIA TNK-BPBurgas, Bulgaria to Alexandroupolis, Greece C 177 Planning New. $700 million. Trans-Balkan oil pipeline. 15 MMtpy.

CANADA Husky EnergyLloydminster, Alta. to Hardisty, Alta. Imperial OilMackenzie River Delta to Alberta Kinder Morgan CanadaFort McMurray, Alta. to Scotford upgrader, Edmonton, Alta. TransCanada Corp.Hardisty, Alta. to Wood River, Ill. Keystone Pipeline route WilliamsFort McMurray to Redwater processing facility C G C 50 750 42 Planning Planning Planning WorleyParsons Expansion New. $16.2 billion. Mackenzie Valley pipeline. New

C C P

2,150 PUMP 261

30/34/36

Engineering Planning Planning

2011 2012

Bechtel

New. 591,000 b/d. New New. $283 million. 43,000 b/d. Expandable to 125, 000 b/d.

CHAD China National Petroleum Corp. Koudalwa field to Djarmaya refinery C 186 Under constr. 2013 New

CHINA China National Petroleum Corp. Kyaukryu port, Myanmar Kyaukryu port, Myanmar Xinjiang to Guangdong Xinjiang to Fujian province C G G G 1,553 1,553 4,038 5,650 Under constr. Under constr. Planning Under constr. 2013 2013 2011 2011 New. 440,000 b/d. New. 12 billion cu m New. 30 billion cu m/year. New

Oil & Gas Journal / Apr. 4, 2011

PiPelines cont.
Company and location COLUMBIA Ecopetrol SAAraguaney to Banadia Ecopetrol SABanadia to Ayacucho Ecopetrol SAAyacucho to Covenas C C C Under constr. Under constr. Under constr. 2012 2012 2012 New. Phase I. Total project: 596 miles, 450,000 b/d. New. Phase II. New. Phase III. Type Project, miles Diam. Status Expected completion Contractor Project notes

GERMANY E. ON Ruhrgas AGLauterbach to Rimpar Verband Chemischer Industrie Munchsmunster to Ludwigshafen G P 66 40/28 10 Planning Planning ILF Consulting Engineers Expansion New

GREECE DesfaCrossing Greece to Italy to Turkey G 360 42 Engineering 2015 Penspen Ltd./C&M Engineering SA New

INDIA British Gas Exploration & Production India Ltd.Mid Tapti field Gas Authority of IndiaBangalore to Chennai Dabhol to Bangalore India to Myanmar Kakinada to Chennai Kakinada to Kolkata Kakinada to Panvel Kochi to Bangalore Kochi to Kayamkulam Kolkata to Jagdishpur Karanpur to Kashipur Kashipur to Rudrapur-Pant Nagar Hindustan Oil Exploration Co. Ltd. South of Chennai to PY-1 gas field Cauvery basin G G G G G G G G G G G G G 50 186 528 497 360 621 643 534 62 530 62 36 35 20 12 12 14 Engineering Planning Planning Planning Planning Planning Planning Planning Planning Planning Under constr. Under constr. Planning 2011 2012 Global Industries Horizon Offshore Inc. New New New New New. Capacity 10 MMcmd. New. Capacity 10 MMcmd. New New. Capacity 11 MMcfd. New. Offshore capacity of 1.4 MMcmd. New. Capacity 10 MMcmd. New. Phase I. Total capacity 2.5 MMscfd. New. Phase II. New

INDONESIA BPH MigasEast Kalimantan to Central Java PetronasKepodang gas block to Tambak Lorok electric power plant G G 756 124 Planning Planning 2011 2013 New. $1.2 billion. New. 120-200 MMcfd.

IRAN National Iranian Gas Co.South Pars to Parsian gas plant South Pars Parchin to Sangbast Miami to Jajarm Miami to Jajarm COMP station at Saveh to Bijar Bijar to Miandoab Bijar G G G G G G G G 651 COMP 490 68 COMP 174 119 COMP 56 48 40 48 40 Under constr. Planning Planning Planning Planning Planning Planning Planning 2011 Expansion. IGAT VIII. Expansion. IGAT VIII. 10 units. 1.8 million HP total. New New New. 4 units. South Pars gas delivered through IGAT VIII. New New New. 4 units.

Oil & Gas Journal / Apr. 4, 2011

PiPelines cont.
Company and location ITALY Edison SPAOtranto to Stavrolimenas G 132 Planning 2012 New. $496 million. JV DEPA. Type Project, miles Diam. Status Expected completion Contractor Project notes

KUWAIT Kuwait Oil Co.Mina Al Ahmadi Mina Al Ahmadi to Subiyah Power Station KOCs Booster station 131 to Mina Al-Ahmadi refinery LPG plant C P G STOR 106 141 20 Planning Engineering Engineering 2011 Hyundai WorleyParsons Petrofac Expansion. $1.25 billion. New New. $543 million lump-sum contract.

MALAYSIA TranspenKedah state to Kelantan state C 199 Engineering 2014 Ranhill Engineers & Constructors Sdn. Bhd. New

MEXICO TransCanadaManzanillo to Guadalajara G 193 30 Planning 2011 New. Guadalajara Pipeline. $320 million.

MYANMAR

China National Petroleum Corp. Kyaukpyu to Yunnan

470

Planning

2013

New. Myanmar-to-China pipeline. 12 MMtpy.

NIGERIA Shell Petroleum Development Co. of NigeriaGbaran fields to central processing facility C, G 211 Engineering Saipem New. $420 million.

NORWAY Gassco ASKarsto to Grenland Grenland to Sweden G G 287 167 24 18 Planning Planning 2012 2012 New. 3 bcmy. New

PAKISTAN Attock RefinerySheikhupura to Peshawar P 294 12/16 Engineering Expansion

PHILIPPINES Philippine National Oil Co.Batangas to Manila G 84 Planning New. $100 million. Batman I.

RUSSIA GazpromSakhalin Island to Khabarovsk and Vladivostok North European Gas Pipeline Co.Vyborg, Russia to Greifswald, Germany TransneftSkovorodino to Kozmino Bay G G 839 744 56 Under constr. Under constr. 3QTR 2011 2011 New New. $4.8 billion.

1,300

Planning

20142015

New. $10 billion.

UNITED ARAB EMIRATES Abu Dhabi Oil Refining Co. Umm Al-Nar refinery to Ruwais refinery C 593 10-28 Engineering GS Engineering & Construction Corp. New. $623 million.

Oil & Gas Journal / Apr. 4, 2011

PiPelines cont.
Company and location UNITED KINGDOM Shell OilOffshore Corrib gas project to onshore processing plant G 50 Planning New. $368 million. Type Project, miles Diam. Status Expected completion Contractor Project notes

UNITED STATES Amberjack Pipeline Co. LLC Walker Ridge Block 718 to Green Canyone Block 19 *C 136 24 Engineering 2013 JP Kenny/Saipem New. Jack St. Malo.

*P Crosstex Energy LP/Crosstex Energy Inc.Tarrant County Dominion EnergyHarrison, Doddridge, Lewis, Gilmer, and Kanawha Counties to United States Dominion ResourcesW.Va. to Delmont Eagle Ford Gathering LLCLaSalle, Dimmit, and Webb Counties to Freer compression station, Duval Co., Tex. El Paso Corp.link Colorado Interstate, Wyoming Interstate, and Cheyenne Plains to Tennessee Gas, and Southern Natural Gas Opal, Wyo. to Malin, Ore. Trinidad, Colo. to Oklahoma Trinidad, Colo. to Oklahoma Enbridge Inc.Chicago, Ill. to Clearbrook, Minn. Energy Transfer PartnersHaynesville to Carthage hub, interconnects to 7 interstate pipelines serving the eastern US Haynesville to Carthage hub, interconnects to 7 interstate pipelines serving the eastern US Enterprise Products Partners LP/ Duncan Energy Partners LPAcadian Gas La. Pipeline to northwest La. Harvest Pipeline Co.Lasalle Co. to Fowlerton, Tex. Holly Corp.Salt Lake City, Utah to Las Vegas, Nev. Kern RiverWasatch Mountains Beaver Co., Utah Utah Co., Utah Clark Co., Nev. Uinta Co., Wyo. Millard Co., Utah Kinder Morgan Energy Partners LPsouthern Pennsylvania to Riga, Mich. Northwest Pipeline GPRio Blanco Co. to Lincoln Co. Wyo. Plains All American Pipeline LP Shafter LPG facility to Oxys Elk Hills gas plant Plains All American Pipeline LP Trenton, ND to Wascana system G G

83 15 COMP

12

Planning Planning Planning/ under constr. Planning Planning

2011 2011 4QTR 2012 2012 2011

New. Liberty Pipeline. 75,000 b/d. New. $25 million. New. $253 million. Gathering Enhancement Project. 7 ,000 hp. New. $600 million. New

G G

110 85

24/30

1,000

42

Engineering

New

G G G P G

680 5 10 674 175

42 20 24 20 42

Under constr. Engineering Engineering Engineering Under constr.

2011 2011

AMEC PLC

New. Ruby Pipeline. Expansion Expansion Expansion. $920 million total. Southern Lights. New. Tiger Pipeline.

Planning

2011

Expansion. 400 MMcfd.

249

30/36

Under constr.

2011

Expansion. Haynesville Extension. Expansion of Arrowhead Pipeline. New. JV Sinclair Transportation Co. UNEV pipeline. Expansion. Apex Expansion Project. Expansion. Apex Expansion Project. Expansion. Apex Expansion Project. Expansion. Apex Expansion Project. Expansion. Apex Expansion Project. Replacement. Apex Expansion Project. New. 75,000 b/d.

*C P G G G G G G P

25 406 29 COMP COMP COMP COMP COMP 250

12 36

Under constr. Under constr. Engineering Engineering Engineering Engineering Engineering Engineering Planning

2011 2011 2011 2011 2011 2011 2011 2011

Gulf Interstate Engineering Co. Gulf Interstate Engineering Co. Gulf Interstate Engineering Co. Gulf Interstate Engineering Co. Gulf Interstate Engineering Co.

G P

15.5

30

Planning Planning

2012

New Expansion. $30 million.

*C

103

12

Planning

2012

New. Bakken North. $160-200 million.

Oil & Gas Journal / Apr. 4, 2011

PiPelines cont.
Company and location Rocky Mountain Pipeline System Evanston, Wyo. to Salt Lake City, Utah Williams Northwest Pipeline Jordan Cove LNG terminal to Roseburg, Ore. Williams Partners LPMobile Co., Ala. to Jackson Co., Miss. Type C Project, miles 91 Diam. 16 Status Under constr. Expected completion Contractor Project notes Expansion. $77 million.

250

Planning

Dec. 2011

New. Pacific Connector Gas Pipeline. Expansion. Pascagoula project. Constr. to begin April 2011.

16

26

Planning

VIETNAM PetroVietnamSouthern Vietnam to Mekhong Delta G 247 Planning New. $1 billion. Chevron, Mitsui Oil, PTTEP .

Oil & Gas Journal / Apr. 4, 2011