Pursuant to this agreement the Owner and the Construction Manager hereby execute
this Exhibit G1 and further agree as follows
1 The Construction
s Manager
GMP
entire Project has been established The Construction Manager GMP for the TEE s Center Project dated December 7 2010 attached hereto and incorporated herein
is accepted by the Owner
2 3
4
00 670 082 1
00 400 26 00 930 250 00 647 796 1 00 842 710 00 543 199 3 00 000 780
3 4
Lump Sum Fixed Management Fee for the Project including this Bid Package is The Guaranteed Maximum Price per attachment A Value Engineering for the Project is The Date of Substantial Completion shall be
00 000 900 27
24 months after
Notice to Proceed
Items 2 3 and 5 above were previously agreed to and included in the agreement
Owner
Construction Manager
W R Allen LLC
Augusta Georgia
By
e 0v
Signature
iv Ip
5
Seal
Gvv
Signature
5d
T
Seal
sic
Name
Wilk
oA
i
Name
Fi23 i o
Title
Titl
kil
Attest
s y b
Street Address
No PO Box
City
Cle
f7 7
19 100 400
g
mq C 4 Eot Signature 9
1 of 1
4 t 2 1
Date of Signature 9
1
1015 Broad Street
wow
Decernber 7 2009
A P
Ivir Jacques Ware Project Manager Heery IDED Augusta Richmond County
RWAllen
Augusta GA 30901
RE
It is our understanding that Augusta County would like to execute a Guaranteed Richmond Maximum Price GMP contract with R Allen LLC Based on our 75 pricing exercise we W produced a GMP number of 29 After a thorough estimate reconciliation meeting 00 109 471
with Heery we were able to reduce the GMP nunaber However we still exceeded the established GMP of 27 Therefore R W Allen has developed the attached list of 00 000 900
scope clarification savings and value engineering ongoing items in an effort to achieve the
desired GMP
R W Allen LLC will execute the GMP contract in the amount of 27 based on the 00 000 900
project cost reconciliation and the acceptance ofthe attached value engineering items which are
required to achieve the desired GMP
If you have any questions or concerns regarding the attached items please do not hesitate to
contact us
Construction Services
Attachment
5 C
k
1 21171 2010
Event Center
Potential Savings
10 17 11
109 71 29
479885
991 28
Scope Clarifications
Refine wood
decking
Scope
lam gu
beam scope
Scope
screen
Etiminate utility
Elimiaate roof Refine Refine
wall
area
screen
painting
scope
flooring scope
Value Engineering
Eliminato treatment for wood decking
Eflminate FSC
requirements for wood decking Eliminate treatment for glu beams 4am
Eliminate fSC requirements for gIuiam beams Provide schedue 10 fire sprinkler pipe in Iieu of schedule 40 Eliminate AVVI certified cabinet mariufacturer millwork
Reduce parapet @
000 4 000 8
000 18 000 21
TBD
Eliminate J toilets
x tile
acr
fianmin0
area
panels
Modify duct
insulation
stainless wrap
Reduce metal panel scope Eliminate duct cteaning Provide metal coping in tieu of caststone @ stucco parapets Install ACT in tieu of stucco drive thru ceillag
Provide stucco in Iieu of brick @ the west elevation
car wlth 46 bi doors for parting freight elev Provide holed hydrautic elevators in Iieu traction elevators
Total
Py