HOJA GENERADORA
LIMPIEZA DE TERRENO
CLAVE
CONCEPTO
LIM001
LIMPIEZA
DE
TERRENOS A MANO
INC:
CHAPEO
DE
MALEZA Y CORTE DE
ARBUSTOS DE MS
DE
EJE ENT
RE
EJE
ANC
HO
LAR
GO
13.0
0
2.60
ALTURA
OPERACIN
SUBTOTA
L
13.00 X 2.60 =
338.00
338.00
338 M2
1 .50 M DE ALTURA,
RECOLECCIN
DE
BASURA Y/ QUEMA
DEL PRODUCTO.
TOTAL:
CIMENTACION
CIM001
CIMIENTO Y
DESPLANTE DE
MAMPOSTERIA CON
PIEDRA DE LA
REGIN, DE 30 CM DE
ESPESOR,DEBIDAMEN
TE ACUADA,
PLOMEADA Y
ENTRAADA EN UNA
CARA, HASTA 1 .00 M
24
0.30
3.60
1.00
1.080
DE PROFUNDIDAD.
PROMEDIO
CIM001
45
0.30
3.60
1.00
1.080
CIM001
24
0.30
3.60
1.00
1.080
CIM001
2
2
0.30
1.35
1.00
0.405
CIM001
2
3
0.30
1.25
1.00
0.375
CIM001
45
0.30
3.60
1.00
1.080
CIM001
24
0.30
3.60
1.00
1.080
CIM001
45
0.30
3.60
1.00
1.080
CIM001
26
0.30
8.40
1.00
1.740
CIM001
F
G
0.30
2.35
1.00
0.705
CIM001
B
F
0.30
7.00
1.00
0.30 X
7.00 X 1.00=2.10
2.100
CIM001
B-E
0.30
0.85
1.00
0.255
CIM001
0.30
2.35
1.00
0.450
CIM001
B
G
0.30
12.7
6
1.00
3.108
CIM001
B
D
0.30
2.85
1.00
0.855
CIM001
D
E
0.30
1.50
1.00
0.450
CIM001
B
G
0.30
12.7
6
1.00
3.708
TOTAL: 26.556 M3
HOJA GENERADORA
EXCAVACION
CLAVE
CONCEPTO
EXC001
EXCAVACIN A MANO
CON PICO Y PALA EN
TIERRA
Y
PIEDRA
COMPACTADAS "MAT.
B", PARA ZANJAS DE
CIMENTACIN
EN
TERRENO
NATURAL,
HASTA 1 .OO M DE
PROFUNDIDAD
EJE ENT
RE
EJE
ANC
HO
LAR
GO
ALTURA
OPERACIN
SUBTOTA
L
24
0.50
3.95
1.00
1.975
EXC001
45
0.50
3.95
1.00
1.975
EXC001
24
0.50
3.95
1.00
1.975
EXC001
2
2
0.50
1.70
1.00
0.850
EXC001
2
3
0.50
1.60
1.00
0.800
EXC001
45
0.50
3.95
1.00
1.975
EXC001
24
0.50
3.95
1.00
1.975
EXC001
45
0.50
3.95
1.00
1.975
PROMEDIO
1.975
EXC001
26
0.50
8.75
1.00
EXC001
F
G
0.50
2.70
1.00
EXC001
B
F
0.50
7.35
1.00
EXC001
B-E
0.50
1.20
1.00
EXC001
F
G
0.50
2.70
1.00
0.925
EXC001
B
G
0.50
13.1
1
1.00
5.555
EXC001
B
D
0.50
3.20
1.00
1.600
EXC001
D
E
0.50
1.85
1.00
0.925
EXC001
B
G
0.50
13.1
1
1.00
6.555
TOTAL:
35.60 M3
2.900
HOJA GENERADORA
CADENA EN CIMENTACION DE 15 X 15 CM
CLAVE
CONCEPTO
CADC01
DALA DE 15X15 CM
DE
SECCIN
EN
CIMENTACIN,
EJE ENT
RE
EJE
B
24
ANC
HO
LAR
GO
3.75
ALTURA
1.00
OPERACIN
SUBTOTA
L
3.75
3.75
45
3.75
3.75
3.75
CADC01
24
3.75
3.75
3.75
CADC01
2
2
1.50
1.50
1.50
2
3
1.40
1.40
1.40
CADC01
45
3.75
3.75
3.75
CADC01
24
3.75
3.75
3.75
CADC01
45
3.75
3.75
3.75
CADC01
26
8.55
6.10
CADC01
F
G
2.50
2.50
2.50
CADC01
B
F
7.15
7.15
7.15
CADC01
B-E
1.00
1.00
1.00
2.50
CADC01
CADC01
2.50-0.85 = 1.65
1.65
G
CADC01
B
G
12.9
1
CADC01
B
D
3.00
3.00
3.00
CADC01
D
E
1.65
1.65
1.65
CADC01
B
G
12.9
1
12.91
12.91
TOTAL: 72.17 ML
12.91-2.10= 10.81
10.81
HOJA GENERADORA
IMPERMEABILIZACION EN CADENA DE CIMENTACION DE 15 X 15 CM
CLAVE
IMP01
CONCEPTO
IMPERMEABILIZACIO
N EN
CADENAS DE
CIMENTACION
DE
15X15-4
CON
IMPERMEABILIZANTE
FESTER
EJE ENT
RE
EJE
ANC
HO
LAR
GO
ALTURA
OPERACIN
SUBTOTA
L
24
0.45
3.75
0.45 x 3.75=1.6875
1.6875
IMP01
45
0.45
3.75
0.45 x 3.75=1.6875
1.6875
IMP01
24
0.45
3.75
0.45 x 3.75=1.6875
1.6875
IMP01
2
2
0.45
1.50
0.45 x 1.50=0.675
0.6750
2
3
0.45
1.40
0.45 x 1.40=0.630
0.6300
IMP01
45
0.45
3.75
0.45 x 3.75=1.6875
1.6875
IMP01
24
0.45
3.75
0.45 x 3.75=1.6875
1.6875
IMP01
45
0.45
3.75
0.45 x 3.75=1.6875
1.6875
IMP01
IMP01
26
0.45
8.55
2.7450
IMP01
F
G
0.45
2.50
0.45 x 2.50=1.125
1.1250
IMP01
B
F
0.45
7.15
0.45 x 7.15=3.2175
3.2175
IMP01
B-E
0.45
1.00
0.45 x 1.00=0.45
0.4500
F
G
0.45
2.50
2.50-0.85 = 1.65 x
0.45 =0.7425
0.7425
IMP01
B
G
0.45
12.9
1
12.91-2.10= 10.81 x0
.45 =4.8645
4.8645
IMP01
B
D
0.45
3.00
0.45 x 3.00=1.35
1.3500
IMP01
D
E
0.45
1.65
0.45 x 1.65=0.7425
0.7425
IMP01
B
G
0.45
12.9
1
0.45 x 12.91=5.8095
5.8095
IMP01
TOTAL: 32.4765 m2
HOJA GENERADORA
ZAPATA DE 60 X 60 X20 CM
CLAVE
CONCEPTO
ZAP01
ZAPATA DE
60X60X20 CM, INC:
CIMBRA,
HABILITADO Y
ARMADO DE ACERO,
COLADO Y DES
EJE ENT
RE
EJE
B
24
ANC
HO
LAR
GO
ALTURA
OPERACIN
SUBTOTA
L
1 +1= 2
CIMBRADO.
ZAP01
45
ZAP01
24
1+1= 2
ZAP01
2
2
ZAP01
2
3
ZAP01
45
ZAP01
24
ZAP01
45
1+1= 2
ZAP01
26
1+ 1 +1 = 3
ZAP01
F
G
ZAP01
B
F
1+1+1=3
ZAP01
B-E
ZAP01
F
G
0
1
0
1
TOTAL: 16 PIEZAS
HOJA GENERADORA
CONCEPTO
ZAP01
EJE ENT
RE
EJE
ANC
HO
LAR
GO
ALTURA
OPERACIN
SUBTOTA
L
24
1 +1= 2
ZAP02
45
ZAP02
24
1+1= 2
ZAP02
2
2
ZAP02
2
3
ZAP02
45
ZAP02
24
ZAP02
45
1+1= 2
ZAP02
26
1+ 1 +1 = 3
ZAP02
F
G
ZAP02
B
F
1+1+1=3
ZAP02
B-E
ZAP02
F
G
0
1
TOTAL: 16 PIEZAS
0
1
HOJA GENERADORA
CASTILLO AHOGADO EN MURO DE BLOCK
CLAVE
CONCEPTO
CAST02
CASTILLO DE
CONCRETO AHOGADO
EN MURO DE BLOCK
DE 15X20X40 CM,
ARMADO CON UNA
VAR. DE 3/8 Y EST.
DE 1 /4 @ 20 CM, INC:
HABILITADO Y
COLOCADO DEL
ACERO Y COLADO
CAST02
EJE ENT
RE
EJE
ANC
HO
LAR
GO
ALTURA
OPERACIN
SUBTOTA
L
F
G
2.50
2 CASTILLOS
AHOGADOS X 2.50
ML
5.00
B
F
2.50
2 CASTILLOS
AHOGADOS X 2.50
ML
5.00
CAST02
B-E
2.50
2 CASTILLOS
AHOGADOS X 2.50
ML
5.00
CAST02
F
G
VARIOS
1 CASTILLO
AHOGADO DE 2.17
ML
4.67
1 CASTILLO
AHOGADO DE 2.50
ML
CAST02
B
G
VARIOS
2 CASTILLO
AHOGADO DE 2.20
ML(VENTANA)
9.40
2 CASTILLO
AHOGADO DE 2.50
ML
CAST02
B
D
VARIOS
1 CASTILLO
AHOGADO DE 2.17
ML(PUERTA)
9.37
2 CASTILLO
AHOGADO DE 2.50
ML
1 CASTILLO
AHOGADO DE 2.20
ML(VENTANA)
CAST02
D
E
2.50
1 CASTILLO
AHOGADO DE 2.50
ML
2.50
CAST02
B
G
VARIOS
1 CASTILLO
AHOGADO DE
2.20ML(VENTANA)
7.20
2 CASTILLO
AHOGADO DE 2.50
ML
CAST02
4
5
VARIOS
2 CASTILLO
AHOGADO DE 2.17
ML(PUERTA)
4.34
CAST02
2
2
2.50
1 CASTILLO
AHOGADO DE 2.50
ML
2.50
CAST02
23
1 CASTILLO
AHOGADO DE
2.20ML(VENTANA)
2.20
TOTAL: 57.48 ML
HOJA GENERADORA
CASTILLO ARMADO DE CONCRETO FC=150 KG/CM2
CLAVE
CONCEPTO
CAST01
CASTILLO
DE
CONCRETO F'C = 1
50 KG/CM2 DE
1
5X15
CM
DE
SECCIN,
ARMADO
CON
ARMEX
DE
15X15-4,
INC:
EJE ENT
RE
EJE
B
24
ANC
HO
LAR
GO
ALTURA
2.50
OPERACIN
SUBTOTA
L
16 CASTILLOS
ARMADOS
40 ML
2.50 MEDIDA DE
TODOS LOS
CASTILLOS
ARMADO,
CIMBRADO, COLADO
Y DESCIMBRADO.
16 X 2.50 = 40 ML
CAST01
45
2.50
CAST01
24
2.50
CAST01
2
2
2.50
CAST01
2
3
2.50
CAST01
45
2.50
CAST01
24
2.50
CAST01
45
2.50
CAST01
26
2.50
CAST01
F
G
2.50
CAST01
B
F
2.50
CAST01
B-E
2.50
CAST01
F
G
2.50
TOTAL: 40 ML
HOJA GENERADORA
CONCEPTO
MUR002
MURO DE BLOCK DE I
5X20X40 CM, A
PLOMO Y NIVEL, CON
MEZCLA RECORTADA
EN AMBAS CARAS
HASTA 2.50 M DE
ALTURA, ACABADO
COMN, NO INCLUYE
CLAROS.
MUR002
EJE ENT
RE
EJE
ANC
HO
LAR
GO
ALTURA
OPERACIN
SUBTOTA
L
24
3.45
2.50
8.625
45
3.45
2.50
4.719
23
2.45
2.50
6.125
MUR002
2
2
1.35
2.50
3.375
2
3
1.10
2.50
2.75
MUR002
5
5
0.60
2.50
1.50
MUR002
2
2
1.05
2.50
1.05 x 2.50
2.625
MUR002
MUR002
45
2.25
2.50
5.625
MUR002
26
8.25
2.50
11.404
Diferencia de la
suma del rea de la
entrada y ventana
6.125+3.096=9.221
HOJA GENERADORA
MURO DE BLOCK DE 15 X 20 X 40 (PLANTA BAJA)
CLAVE
CONCEPTO
EJE ENT
RE
EJE
ANC
HO
LAR
GO
ALTURA
OPERACIN
SUBTOTA
L
MUR002
F
G
2.20
2.50
5.500
MUR002
B
F
6.85
2.50
15.280
MUR002
B-E
0.90
2.50
2.250
MUR002
F
G
2.20
2.50
2.20 x 2.50=5.50
2.125= 3.375
3.375
MUR002
B
G
12.6
1
2.50
20.830
Ventanas de la
recamara 3
1.80
x 1.28 =
2.304
Divisor del comedor
con el pasillo 2.10
x2.50= 5.250
Ventanas de la sala
0.90x 1.20 =
1.080
Puerta de sala de
0.95 x 2.17=
2.061
Suma de reas =
10.695
MUR002
B
C
0.60
2.50
1.500
MUR002
1.5
2.50
3.750
D
MUR002
D
D
0.87
2.50
0.87 x 2.50=2.175
2.175
MUR002
D
E
1.75
2.50
1.75 x 2.50=
4.375
MUR002
B
G
12.6
1
2.50
12.61 x 2.50 =
31.525 2.3 =
29.225
Ventanas de la
recamara 3
0.90x1.20 = 1.08
Ventanas del bao
0.80 x 0.40 =
0.32
Puerta de bodega
0.75x 1.20=
0.90
Suma de
reas restantes =
2.30
TOTAL:
135.008 m2
29.225
HOJA GENERADORA
CASTILLO ARMADO DE CONCRETO FC=150 KG/CM2
CLAVE
CONCEPTO
CAST01
CASTILLO
DE
CONCRETO F'C = 1
50 KG/CM2 DE
1
5X15
CM
DE
SECCIN,
ARMADO
CON
ARMEX
DE
15X15-4,
INC:
EJE ENT
RE
EJE
B
24
ANC
HO
LAR
GO
ALTURA
OPERACIN
SUBTOTA
L
ARMADO,
CIMBRADO, COLADO
Y DESCIMBRADO.
45
24
2
2
2
3
45
24
45
26
F
G
B
F
B-E
F
G
B
G
B
D
D
E
B
G
TOTAL:
HOJA GENERADORA
CER01
CONCEPTO
CERRAMIENTO
PUERTAS
VENTANAS.,
CIMBRADO,
HABILITADO
EJE ENT
RE
EJE
EN
Y
ANC
HO
LAR
GO
ALTURA
OPERACIN
SUBTOTA
L
45
1.80
2.10
CER01
34
0.85
1.15
CER01
45
1.20
1.50
Y
ARMADO
DE
ACERO, COLADO Y
DES CIMBRADO.
CER01
24
1.80
2.10
CER01
E
F
0.85
0.85 + 0.30=1.15
1.15
CER01
B
B
1.80
2.10
CER01
F
G
0.95
0.95 + 0.30=1.25
1.25
CER01
F
G
0.90
0.90 + 0.30=1.20
1.20
CER01
C
D
0.75
0.75 + 0.30=1.05
1.05
CER01
B
C
0.90
0.90 + 0.30=1.20
1.20
OPERACIN
SUBTOTA
L
3.75
3.75
CER01
TOTAL= 14.80 ML
HOJA GENERADORA
CADENA DE NIVELACION DE 15 X 15
CLAVE
CONCEPTO
CAST03
DALA
DE
NIVELACION
15X15
CM DE SECCIN EN
EJE ENT
RE
EJE
B
24
ANC
HO
LAR
GO
3.75
ALTURA
1.00
MURO
DE
BLOCK,
ARMADA CON ARMEX
DE
15X 15-4 CIMBRADO,
COLADO
Y
DESCIMBRADO.
.
CAST03
45
3.75
3.75
3.75
CAST03
24
3.75
3.75
3.75
CAST03
2
2
1.50
1.50
1.50
2
3
1.40
1.40
1.40
CAST03
45
3.75
3.75
3.75
CAST03
24
3.75
3.75
3.75
45
3.75
3.75
3.75
CAST03
26
8.55
6.10
CAST03
F
G
2.50
2.50
2.50
CAST03
B
F
7.15
7.15
7.15
CAST03
B--
1.00
1.00
1.00
CAST03
CAST03
E
CAST03
F
G
2.50
2.50-0.85 = 1.65
diferencia del ML de
una puerta
1.65
CAST03
B
G
12.9
1
12.91-2.10= 10.81
diferencia del ML de
una puerta
10.81
CAST03
B
D
3.00
3.00
3.00
D
E
1.65
1.65
1.65
B
G
12.9
1
12.91
12.91
CAST03
CAST03
TOTAL: 72.17 ML
HOJA GENERADORA
FIRME DE CONCRETO DE FC = 100 KG/CM2
CLAVE
CONCEPTO
EJE ENT
RE
EJE
ANC
HO
LAR
GO
FIRM02
FIRME DE CONCRETO
DE FC= 100KG/CM2
DE 5 A 8 CM DE
ESPESOR
BC
24
3.45
FIRM02
B- 45
F
FIRM02
CE
FIRM02
ALTURA
OPERACIN
SUBTOTA
L
4.26
3.45 X 4.26=14.697
14.697
3.45
6.85
3.45 X 6.85=23.6325
23.6325
24
3.45
3.57
3.45 X 3.57=12.3165
12.3165
24
3.45
4.55
3.45 X 4.55=15.6975
15.6975
INC: FINE Y
COMPACTACION DEL
TERRENO.
G
FIRM02
FG
4-6
4.65
2.15
4.65 X 2.15=9.9975
9.9975
BB
45
3.45
2.50
8.625
OPERACIN
SUBTOTA
L
FIRME DE LA TERRAZA
FIRM02
TOTAL: 84.996 M2
HOJA GENERADORA
PISO DE MOSAICO
CLAVE
CONCEPTO
EJE ENT
RE
EJE
ANC
HO
LAR
GO
ALTURA
24
3.45
4.26
3.45 X 4.26=14.697
14.697
B- 45
F
3.45
6.85
3.45 X 6.85=23.6325
23.6325
PISO02
CE
24
3.45
3.57
3.45 X 3.57=12.3165
12.3165
PISO02
E
G
24
3.45
4.55
3.45 X 4.55=15.6975
15.6975
FG
4-6
4.65
2.15
4.65 X 2.15=9.9975
9.9975
BB
45
3.45
2.50
8.625
PISO02
PISO DE MOSAICO DE
PASTA
ASENTADO
CON
MORTERO
Y
JUNTEADO
CON
CEMENTO
BLANCO,
INC!
CORTES,
REMATES Y LIMPIEZA
GENERAL
PISO02
PISO02
BC
TOTAL: 84.996 M2
HOJA GENERADORA
ZOCLO DE MOSAICO
CLAVE
CONCEPTO
PISO06
ZOCLO DE MOSAICO ,
ASENTADO CON
MORTERO Y
JUNTEADO CON
CEMENTO BLANCO,
INC: CORTES,
CHAFLANES Y
LIMPIEZA
EJE ENT
RE
EJE
ANC
HO
LAR
GO
ALTURA
OPERACIN
SUBTOTA
L
3.45
3.45
24
3.45
PISO06
45
3.45
3.45 X 2= 6.95
Ambas caras del
muro incluye zoclo
6.90
PISO06
23
2.60
2.60 x 2= 5.20
5.20
PISO06
2
2
1.35
PISO06
5
5
0.60
PISO06
23
2.45
PISO06
45
3.45
46
2.05
2.05
PISO06
F
G
2.20
2.20
solo el
muro interior incluye
zoclo
PISO06
B
F
6.85
6.85- 0.85
diferencia del ML de
la puerta
6.00
PISO06
B-E
0.90
0.90 x 2= 1.80
Ambas caras del
muro incluye zoclo
1.80
F
G
1.50
1.50 x 2= 3.00
Ambas caras del
muro incluye zoclo
3.00
B
D
5.20
PISO06
PISO06
PISO06
1.35
la cara del
muro de la bodega
no contiene zoclo
0.60 x 2 = 1.20
Ambas caras del
muro incluye zoclo
2.45
3.45 x 2 = 6.90
Ambas caras del
muro incluye zoclo
5.20 x 2= 10.40
Ambas caras del
muro incluye zoclo
1.35
1.20
2.45
6.90
2.05
10.40
ya esta restada ML
de la puerta
4
D
G
4.20
4.20 X 2 = 8.40
Ambas caras del
muro incluye zoclo
8.40
ya esta restada ML
de la puerta
PISO06
B
C
0.75
0.75 X 2= 1.50
Ambas caras del
muro incluye zoclo
1.50
C
D
1.60
1.60 X 2= 3.20
Ambas caras del
muro incluye zoclo
3.20
ya esta restada ML
de la puerta
PISO06
PISO06
EXTRAS
B
G
12.6
1
12.61 1.60
diferencia del ML del
bao (no lleva zoclo)
76.01 ML
11.01
1.20
HOJA GENERADORA
CONCEPTO
RECU003
RECUBRIMIENTO
EN
MUROS
CON
MOSAICO
VENECIANO,
ASENTADO
CON
PEGAZULEJO
Y
JUNTEADO
CON
CEMENTO
BLANCO,
INC: CORTES,
REMATES,
TIRATRIM
Y
EJE ENT
RE
EJE
C
23
ANC
HO
LAR
GO
2.45
ALTURA
2.50
OPERACIN
SUBTOTA
L
6.125
LIMPIEZA.
D
23
2.45
2.50
C
D
1.60
2.50
6.125
2.3725
(DIFERENCIA EN
AREA DE PUERTA)
2
C
D
1.60
2.50
3.968
(DIFERENCIA EN
AREA DE VENTANA)
REA DE
RECUBRIMIENTO DE
AZULEJO
DONDE SE UBICA EL
LAVABO =
1.10+0.60+0.60=
2.30 X 2.50=5.75 M2
TOTAL= 24.3405 M2
5.75
HOJA GENERADORA
APLANADO EN MURO DE BLOCK ABASE DE 3 CAPAS
CLAVE
CONCEPTO
EJE ENT
RE
EJE
APLA01
APLANADO
EN
MUROS DE BLOCK A
BASE DE RICHIADO,
EMPARCHE Y ESTUCO,
A
PLOMO
Y
REGLA,
INC.
ANDAMIAJE
COMN
HASTA 2.50
M DE
ALTURA
ANC
HO
LAR
GO
ALTURA
OPERACIN
SUBTOTA
L
24
3.45
2.50
8.625
45
3.45
2.50
4.719
A) RICHIADO
B) EMPARCHE
REPELLADO
C) MASILLA
ESTUCO
APLA01
23
2.60
2.50
13.00
23
2.45
2.50
6.125
5
5
0.60
2.50
3.00
23
2.50
2.50
12.50
45
2.60
2.50
11.00
rea de la ventana
0.84 x 1.20= 1.008
APLA01
56
2.05
2.50
5.125
APLA01
24
3.45
2.50
5.529
rea de la ventana
CONCEPTO
EJE ENT
RE
EJE
APLA01
APLANADO
EN
MUROS DE BLOCK A
BASE DE RICHIADO,
EMPARCHE Y ESTUCO,
A
PLOMO
Y
REGLA,
INC.
ANDAMIAJE
COMN
HASTA 2.50
M DE
ALTURA
ANC
HO
LAR
GO
ALTURA
OPERACIN
SUBTOTA
L
F
G
2.35
2.50
5.875
B
F
6.85
2.50
15.2805
A) RICHIADO
B) EMPARCHE
REPELLADO
C) MASILLA
ESTUCO
APLA01
B-E
0.90
2.50
4.50
APLA01
APLA01
F
G
1.50
2.50
7.5
B
D
5.20
2.50
15.50
D
G
5.10
2.50
11.67
B
C
0.60
2.50
3.00
Muro intermedio
APLA01
C
D
2.30
2.50
8.245
D
E
2.00
2.50
APLA01
6.01
2.50
5.00
13.625
=15.025 1.4=
13.625
Diferencia del rea
de la ventana = 1.4
TOTAL: 159.8185 M2
HOJA GENERADORA
PINTURA VINILICA EN MUROS INTERIORES
CLAVE
CONCEPTO
PINT01
APLICACIN
DE
PINTURA VINILICA EN
MUROS INTERIORES,
INC. UNA MANO DE
SELLADOR
Y
3
MANOS DE PINTURA.
PINT01
EJE ENT
RE
EJE
ANC
HO
LAR
GO
ALTURA
OPERACIN
SUBTOTA
L
24
3.45
2.50
8.625
45
3.45
2.50
4.719
23
2.60
2.50
13.00
23
2.45
2.50
6.125
5
5
0.60
2.50
3.00
23
2.50
2.50
12.50
45
2.60
2.50
11.00
rea de la ventana
0.84 x 1.20= 1.008
PINT01
56
2.05
2.50
5.125
PINT01
24
3.45
2.50
5.529
rea de la ventana
1.80 x 1.72= 3.096
HOJA GENERADORA
PINTURA VINILICA EN MUROS INTERIORES
CLAVE
CONCEPTO
PINT01
APLICACIN DE
PINTURA VINILICA EN
MUROS INTERIORES,
INC. UNA MANO DE
SELLADOR Y 3
MANOS DE PINTURA.
PINT01
EJE ENT
RE
EJE
ANC
HO
LAR
GO
ALTURA
OPERACIN
SUBTOTA
L
F
G
2.35
2.50
5.875
B
F
6.85
2.50
15.2805
B-E
0.90
2.50
4.50
PINT01
F
G
1.50
2.50
7.5
B
D
5.20
2.50
15.50
PINT01
PINT01
D
G
5.10
2.50
11.67
B
C
0.60
2.50
3.00
Muro intermedio
PINT01
C
D
2.30
2.50
8.245
D
E
2.00
2.50
5.00
B
D
6.01
2.50
6.01 X 2.50
=15.025 1.4=
13.625
13.625
HOJA GENERADORA
PINTURA VINILICA EN INFERIOR DE TECHOS (PLAFON)
CLAVE
CONCEPTO
EJE ENT
RE
EJE
ANC
HO
LAR
GO
PINT02
APLICACIN
DE
PINTURA VINILICA EN
PLAFONES
CON
ACABADO FINO INC.
UNA
MANO
DE
SELLADOR
Y
3
MANOS DE PINTURA*
BC
24
3.45
PINT02
B- 45
F
PINT02
CE
PINT02
PINT02
ALTURA
OPERACIN
SUBTOTA
L
4.26
3.45 X 4.26=14.697
14.697
3.45
6.85
3.45 X 6.85=23.6325
23.6325
24
3.45
3.57
3.45 X 3.57=12.3165
12.3165
E
G
24
3.45
4.55
3.45 X 4.55=15.6975
15.6975
FG
4-6
4.65
2.15
4.65 X 2.15=9.9975
9.9975
2.50
8.625
BB
45
3.45
TOTAL: 84.996 M2
HOJA GENERADORA
ACABADO TIPO TIROL EN MUROS EXTERIORES
CLAVE
CONCEPTO
TIRO01
APLCACIN
DE
ACABADO TIPO TIROL
CON GRANO FINO EN
MUROS
NC:
LIMPIEZA
Y
PROTECCION
DE
ELEMENTOS.
EJE ENT
RE
EJE
ANC
HO
LAR
GO
ALTURA
OPERACIN
SUBTOTA
L
24
3.75
2.70
10.1250
45
3.60
2.70
5.8140
rea de la ventana=
5
6
2.35
2.70
6.3450
24
3.60
2.70
6.6240
rea de la ventana
1.80 x 1.72= 3.096
F
G
2.50
2.70
6.7500
B
F
7.15
2.70
17.4605
B
B
3.30
2.70
6.6060
B
G
12.9
1
2.70
12.91 X 2.70 =
34.857 -2.30= 32.557
rea de la ventana
recamara 3 _
0.90x1.20= 1.08
rea de la ventana
del bao
_ 0.80
32.5570
x0.40= 0.32
rea de la puerta de
la bodega
-0.75x1.20=0.90
2.30
2
D
G
6.44
2.70
16.4880
HOJA GENERADORA
APLANADO INFERIOR EN TECHOS (PLAFON)
CLAVE
CONCEPTO
APLA03
APLANADO INFERIOR
DE TECHOS (PLAFN)
A BASE DERICHIADO,
EMPARCHE
Y
ESTUCO A
REGLA,
INC: ANDAMIAJE
EJE ENT
RE
EJE
ANC
HO
LAR
GO
BC
3.45
4.26
24
ALTURA
OPERACIN
SUBTOTA
L
3.45 X 4.26=14.697
14.697
COMN HASTA
2.50 M DE ALTURA
APLA03
B- 45
F
3.45
6.85
3.45 X 6.85=23.6325
23.6325
APLA03
CE
24
3.45
3.57
3.45 X 3.57=12.3165
12.3165
APLA03
E
G
24
3.45
4.55
3.45 X 4.55=15.6975
15.6975
APLA03
FG
4-6
4.65
2.15
4.65 X 2.15=9.9975
9.9975
BB
45
3.45
2.50
8.625
PLAFON DE LA TERRAZA
APLA03
TOTAL: 84.996 M2
HOJA GENERADORA
PERFILADO DE ARISTAS
CLAVE
CONCEPTO
EJE ENT
RE
EJE
APLA06
EMBOQUILLADO Y
PERFILADO
DE
ARISTAS EN, CLAROS
DE
PUERTAS
Y
VENTANAS, ETC., INCI
ANDAMIAJE COMN Y
LIMPIEZA.
(puerta)
APLA06
(puerta)
34
0.85
2.17
5.19
APLA06
(ventana)
45
1.20
0.84
(1.20 X 2= 2.40) +
(0.84 X 2 = 1.68)=
4.08
1.08
APLA06
(ventana)
24
1.80
1.172
(1.80 X 2 = 3.60) +
(1.72 X 2= 3.44) =
7.04
7.04
45
ANC
HO
LAR
GO
1.80
ALTURA
2.17
OPERACIN
SUBTOTA
L
1.80 X 1=1.80
6.14
2.17 X2 =4.34
6.14
APLA06
(puerta)
E
F
0.85
2.17
(0.85 X 1= 0.85) +
(2.17 X 2 =4.34) =
5.19
5.19
APLA06
(ventana)
B
B
1.80
1.28
(1.80 X 2 = 3.60) +
(1.28 X 2 =2.56)
=6.16
6.16
APLA06
(ventana)
B
C
0.90
1.20
(0.90 X 2=1.80) +
( 1.20 X 2= 2.40)=
4.20
4.20
APLA06
(puerta)
F
G
0.95
2.17
(2.17 X 2= 4.34) +
( 0.95 X1=0.95)
=5.29
5.29
APLA06
(ventana)
F
G
0.90
1.20
(0.90X 2=1.80) +
(1.20X 2= 2.40) =
4.20
4.20
APLA06
(puerta)
C
D
0.75
2.17
(2.17X2=4.34) +
(0.75X 1=0.75 ) =
5.09
5.09
APLA06
(ventana)
C
D
0.80
0.40
(0.80X2= 1.60) +
(0.40X 2= 0.80)=
2.40
2.40
APLA06
(puerta)
D
D
0.75
1.20
(0.75 X 1=0.75) +
(1.20 X2= 2.40)=
3.15
3.15
APLA06
TOTAL= 60.755 ML
2.625
HOJA GENERADORA
CERRAMIENTO EN PUERTAS Y VENTANAS
CLAVE
CER01
CONCEPTO
CERRAMIENTO
PUERTAS
VENTANAS.,
CIMBRADO,
HABILITADO
EJE ENT
RE
EJE
EN
Y
45
ANC
HO
LAR
GO
1.80
ALTURA
OPERACIN
SUBTOTA
L
1.80 + 0.30=2.10
2.10
Y
ARMADO
DE
ACERO, COLADO Y
DES CIMBRADO.
CER01
(puerta)
34
0.85
0.85 + 0.30=1.15
1.15
CER01
(ventana)
45
1.20
1.50
(ventana)
24
1.80
1.80 + 0.30=2.10
2.10
CER01
+ 0.30=
CER01
(puerta)
E
F
0.85
0.85 + 0.30=1.15
1.15
CER01
(ventana)
B
B
1.80
1.80 + 0.30=2.10
2.10
CER01
(ventana)
B
C
0.90
0.90 + 0.30=1.20
1.20
CER01
(puerta)
F
G
0.95
0.95 + 0.30=1.25
1.25
CER01
(ventana)
F
G
0.90
0.90 + 0.30=1.20
1.20
CER01
(puerta)
C
D
0.75
0.75 + 0.30=1.05
1.05
CER01
(ventana)
C
D
0.80
0.80 + 0.30=1.10
1.10
CER01
(puerta)
D
D
0.75
0.75 + 0.30=1.05
1.05
TOTAL= 16.95 ML
HOJA GENERADORA
ESCALONES
CLA
VE
CONCEPTO
EJE
ENT
RE
EJE
ESC
A01
ESCALONES DE
CONCRETO
HASTA 20X30
CM
DE
SECCION INC:
CIMBRADO,
COLADO,
DESCIMBRADO
RESANES
Y
D-D
23
ANC
HO
LAR
GO
0.95
ALTU
RA
UN
ML
OPERACIN
SUBTO
TAL
5 PERALTES
DE 0.95= 5X
0.95=4.75
ML
7.35
2 PERALTES
PARA
DESCANSO
DE 1.30 =
LIMPIEZA.
1.30 X 2 =
2.60
4.75 +
2.60= 7.35
ESC
A01
D-E
23
0.95
ML
5
PERALTES
DE 0.95= 5X
0.95=4.75
ML
7.35
2 PERALTES
PARA
DESCANSO
DE 1.30 =
1.30 X 2 =
2.60
4.75 +
2.60= 7.35
TOTAL= 14.70 ML
FORJADO DE FREGADERO
FORJ FORJADO DE
002 FREGADERO
DE CONCRETO
ARMADO DE
60X1.10X6 CM
DE SECCIN
INTERIOR, INC:
ENLOSADO,
PERFORACIN
2
3
PZA
1 PZA
DE MURO,
CIMBRADO,
ARMADO,
COLADO,
TIRATRIM,
DESCIMBRADO
Y LIMPIEZAS.
FORJ
002
4
5
PZA
1 PZA
FORJ
002
45
PZA
1 PZA
5
5
ML
3 piezas de
0.60=
TOTAL= 3 PZA
FORJADO DE MESETA
FORJ FORJADO DE
001 MESETA DE
CONCRETO
ARMADO DE 1
M DE ANCHO
PROMEDIO
CON
RECUBRIMIENT
O DE LOSETAS
Y REMATE DE
ANTE PECHO ,
INC.
RANURACIN
DE MUROS,
CIMBRADO
,ARMADO,
0.60
3 x 0.60 =
1.80
1.80
COLADO,
DESCIMBRADO
, DETALLES Y
LIMPIEZA
FORJ
001
5
5
0.60
ML
3 piezas de
0.60= 3 x
0.60 = 1.80
1.80
FORJ
001
4
5
1.76
ML
1.76
1.76
FORJ
001
4
5
1.85
ML
1.85
1.85
TOTAL= 7.21 ML
INSE001
CONCEPTO
EJ
E
ENT
RE
EJE
ANC
HO
LARG
O
ALTURA
OPERACIN
SUBTOTA
L
20 SALIDAS
20
TOTAL = 20 SAL.
SALIDA ELECTRICA PARA LAMPARA DE ESCALERA
INSE002
1 SALIDA
14 SALIDAS
14
TOTAL = 1 SAL.
SALIDA ELCTRICA PARA CONTACTOS
INSE003
TOTAL
=14 SAL.
SALIDA ELCTRICA PARA VENTILADOR DE TECHO
INSE004
3 SALIDAS
CHALUPAS, REGISTROS,
CONTROL Y REBANES.
TOTAL= 3 SAL.
COLOCACION DE LMPARA DE PLAFON
INSE006
COLOCACION DE LMPARA
DE PLAFON TIPO SPOT, INC:
CONEXIONES Y PRUEBAS
2 PZA.
INC: CONEXIONES Y
PRUEBAS.
TOTAL= 2
PZA
HOJA GENERADORA
PREPARACIN DE ACOMETIDA BIFSICA
CLAVE
INSE007
CONCEPTO
PREPARACIN DE
ACOMETIDA BIFSICA EN
COLUMNA DE CONCRETO
EJ
E
ENT
RE
EJE
ANC
HO
LARG
O
ALTURA
OPERACIN
TOTAL
1 PZA
1 PZA
QO'-8
EMPOTRADO DE CENTRO DE
CARGA HASTA
1 PZA.
TENDIDO Y COLOCADO DE
CABLE CAL. 8 A 12
129.35 ML
129.35
INC. CONEXIONES Y
DESPERDICIOS.
TOTAL= 129.35 ML
REGISTRO
SANITARIO
DE
40X60X60
REGI001
REGISTRO SANITARIO
40X60X60 CM DE
SECCION INTERIOR,
DE
CM
3 PZAS.
3 PZAS
HOJA GENERADORA
SALIDA HIDRULICA Y SANITARIA PARA W.C.
CLAVE
INSH001
CONCEPTO
EJ
E
ENT
RE
EJE
SALIDA HIDRULICA Y
SANITARIA PARA W.C.INC:
RANURADO, EXCAVACIN,
TENDIDO, NIVELADO,
RESANES Y AMACIZADO DE
RAMALEOS.
ANC
HO
LARG
O
ALTURA
OPERACIN
TOTAL
1 SALIDA
1 SAL.
SALIDA HIDRULICA Y
SANITARIA PARA LAVABO,
INC: AGUA FRA Y CALIENTE,
1 SALIDA
1 SAL.
1 SALIDA
1 SAL.
SALIDA HIDRULICA Y
SANITARIA PARA REGADERA,
INC: AGUA FRA Y CLIENTE
INSH004
SALIDA HIDRULICA Y
SANITARIA PARA
FREGADERO, INC: AGUA FRA
Y CALIENTE.
2 SALIDAS
2 SAL.
COLOCACIN DE W.C
INSH006
1 PIEZA.
1 PZA
3 PIEZA.
3 PZAS
21.60ML
21.60 ML
INC: CONEXIONES Y
PRUEBAS.
COLOCACIN DE LAVABO
INSH007
COLOCACIN DE TUBO DE
PVC SANITARIO DE 2" A 4"
PARA RAMALEOS
SANITARIOS
INSH011
COLOCACIN DE TUBO DE
COBRE DE 1 /2" A 1",
INC: RANLIRADO,
CONEXIONES, RESANES Y
PRUEBAS.
32.2 ML
32.2 ML
HOJA GENERADORA
VENTANAS Y PURTAS DE LA PLANTA ALTA
CLAVE
CONCEPTO
V1
VENTANAS Y PURTAS
DE LA PLANTA ALTA=
REA
Y
CLAROS
V2
ML
EJE ENT
RE
EJE
B
5
5
ANC
HO
LAR
GO
0.90
ALTURA
OPERACIN
1.20
DE
Ventana 2
REA=0.90X1.20:1.0
8 M2
PERFILADO=
(0.90X2=1.80)
+(1.20X2=2.40)=4.2
0 ML
45
0.85
1.20
REA=0.85X1.20:1.0
2 M2
PERFILADO=
(0.85X2=1.70)
+(1.20X
2=2.40)=4.10 ML
SUBTOTA
L
P1
puerta 1
5
6
1.80
2.175
REA=1.80X2.175:3.
915 M2
PERFILADO=
(1.80X1=1.80)
+(2.175X2=4.35)=6.
15 ML
P2
puerta 2
24
0.85
2.17
REA=0.85X2.17:1.8
445 M2
PERFILADO=
(0.85X1=0.85)
+(2.17X2=4.34)=5.1
9 ML
V3
ventana 3
24
1.80
1.20
REA=1.80X 1.20:
2.16 M2
PERFILADO=
(1.80X2=3.60)
+(1.20X2=2.40)=6.0
0 ML
P3
D
E
0.85
2.17
REA=
0.85X2.17:1.8445 M2
PERFILADO=
(0.85X1=0.85)
+(2.17X2=4.34)=5.1
9 ML
P4
C
D
0.75
2.17
REA= 0.75X2.17=
1.6275 M2
PERFILADO=
(0.75X1=
0.75)+(2.17X 2=
4.34)= 5.09 ML
V4
C
D
0.80
0.40
REA=
0.80X0.40=0.32 M2
PERFILADO=
(0.80X2=1.60)
+(0.40X2=0.80)=2.4
0ML
V5
D
E
0.80
2.20
REA= 0.80X2.20=
1.76 M2
PERFILADO=
(0.80X2= 1.60 )+
( 2.20X2= 4.40)
=6.00 ML
V6
E
G
0.90
1.20
REA=
0.90X1.20=1.08 M2
PERFILADO=(0.90X2
= 1.80)+
(1.20X2=2.40)=
4.20ML
TOTAL=
HOJA GENERADORA
MURO DE BLOCK DE 15 X 20 X 40 (PLANTA ALTA)
CLAVE
CONCEPTO
MUR002
MURO DE BLOCK DE I
5X20X40 CM, A
PLOMO Y NIVEL, CON
MEZCLA RECORTADA
EN AMBAS CARAS
HASTA 2.50 M DE
ALTURA, ACABADO
COMN, NO INCLUYE
CLAROS.
EJE ENT
RE
EJE
B
45
ANC
HO
LAR
GO
3.45
ALTURA
2.50
OPERACIN
SUBTOTA
L
7.5450
-1.08
7.545
Diferencia del rea
de la V1
MUR002
34
0.85
2.50
1.1050
MUR002
23
2.45
2.50
6.1250
MUR002
23
2.60
2.50
2.60X2.50= 6.5
6.5000
24
3.45
2.50
3.45X 2.50=8.6251.8445=6.7805
6.7805
MUR002
de la P2)
MUR002
45
3.45
2.50
4.7100
45
3.45
0.90
3.45X 0.90=3.105
3.1050
MUR002
5
6
2.10
0.90
2.10X0.90= 1.89
1.8900
MUR002
5
6
2.10
0.90
2.10X0.90= 1.89
1.8900
24
3.45
2.50
3.45X 2.50=8.62502.160=6.465
6.4650
HOJA GENERADORA
MURO DE BLOCK DE 15 X 20 X 40 (PLANTA ALTA)
CLAVE
CONCEPTO
MUR002
MURO DE BLOCK DE I
5X20X40 CM, A
PLOMO Y NIVEL, CON
MEZCLA RECORTADA
EN AMBAS CARAS
HASTA 2.50 M DE
ALTURA, ACABADO
COMN, NO INCLUYE
CLAROS.
EJE ENT
RE
EJE
ANC
HO
LAR
GO
ALTURA
OPERACIN
SUBTOTA
L
2.35X0.90= 2.115
2.115
F
G
2.35
0.90
MUR002
B
F
7.00
2.50
MUR002
BE
0.60
2.50
0.60X2.50=1.50
1.500
MUR002
1.30
0.90
1.170
7.00X2.50= 17.50
17.500
G
MUR002
B-G
9.20
2.50
21.1555
C
D
1.60
2.50
2.3725
E
G
0.60
2.50
1.500
MUR002
C
G
8.20
2.50
17.340
V4= 0.32
V5= 1.76
V6= 1.08
3.16 ( Suma de
reas de ventanas)
TOTAL= 110.7685 M2
HOJA GENERADORA
CONCEPTO
EJE ENT
RE
EJE
APLA01
APLANADO
EN
MUROS DE BLOCK A
BASE DE RICHIADO,
EMPARCHE Y ESTUCO,
A
PLOMO
Y
REGLA,
INC.
ANDAMIAJE
COMN
HASTA 2.50
M DE
ALTURA
45
ANC
HO
LAR
GO
3.45
ALTURA
2.50
OPERACIN
SUBTOTA
L
7.5450
-1.08
7.545
Diferencia del rea
de la V1
A) RICHIADO
B) EMPARCHE
REPELLADO
C) MASILLA
ESTUCO
APLA01
23
2.45
2.50
2.45X2.50= 6.125
6.125
APLA01
34
0.85
2.50
1.105
APLA01
23
2.60
2.50
2.60X2.50= 6.5X 2
(BLOCK INTERMEDIO)
13.00
24
3.45
2.50
3.45X 2.50=8.6251.8445=6.7805
APLA01
6.7805
45
3.45
2.50
9.4200
45
3.45
0.90
3.45X 0.90=3.105 X
2=6.21
6.2100
APLA01
5
6
2.10
0.90
2.10X0.90= 1.89 X
2= 3.78
3.78
APLA01
5
6
2.10
0.90
2.10X0.90= 1.89
1.8900
APLA01
24
3.45
2.50
3.45X 2.50=8.62502.160=6.465
6.4650
HOJA GENERADORA
MURO DE BLOCK DE 15 X 20 X 40 (PLANTA ALTA)
CLAVE
CONCEPTO
MUR002
MURO DE BLOCK DE I
5X20X40 CM, A
EJE ENT
RE
EJE
6
ANC
HO
LAR
GO
2.35
ALTURA
0.90
OPERACIN
SUBTOTA
L
2.35X0.90= 2.115
2.115
MUR002
B
F
7.00
2.50
MUR002
BE
0.60
2.50
0.60X2.50=1.50 X 2
= 3.00 (BLOCK
INTERMEDIO)
3.00
MUR002
F
G
1.30
0.90
1.170
B-G
9.20
2.50
MUR002
7.00X2.50= 17.50
17.500
42.311
C
D
1.60
2.50
4.745
E
G
0.60
2.50
3.00
MUR002
C
G
8.20
2.50
8.20X2.50= 20.50-
17.340
3.16= 17.34
V4= 0.32
V5= 1.76
V6= 1.08
3.16 ( Suma de
reas de ventanas)
TOTAL= 163.4115 M2
HOJA GENERADORA
PINTURA VINILICA EN MUROS INTERIORES(PLANTA ALTA)
CLAVE
CONCEPT
O
PINT01
APLICACI
N
DE
PINTURA
VINILICA
EN
MUROS
INTERIOR
ES,
INC.
UNA
MANO DE
SELLADO
EJE
B
ENTRE EJE
45
ANCHO
LARGO
3.
4
5
2.50
ALTURA
UN
M2
OPERACI
N
SUBTOTA
L
3.45 X
2.50=
8.625
7.5450
-1.08
7.545
Diferenci
a del rea
R
Y
3
MANOS
DE
PINTURA.
de la V1
PINT01
23
2.
4
5
2.50
M2
2.45X2.50
= 6.125
6.125
PINT01
34
0.
8
5
2.50
M2
0.85 X
2.50=
2.1251.02=1.1
05
Diferenci
a del rea
de V2
1.105
PINT01
23
2.
6
0
2.50
M2
2.60X2.50
= 6.5X 2
(BLOCK
INTERME
DIO)
13.00
24
3.
4
5
2.50
M2
3.45X
2.50=8.6
251.8445=6
.7805
6.7805
PINT01
( Diferenc
ia del
rea de la
P2)
PINT01
45
3.
4
5
2.50
M2
3.45X2.50
= 8.6253.9150=
4.71 X
2=9.42
9.4200
( Diferenc
ia del
rea de la
P2)
(BLOCK
INTERME
DIO)
PINT01
45
3.
4
5
0.90
M2
3.45X
0.90=3.1
05 X
2=6.21
6.2100
PINT01
56
2.
1
0
0.90
M2
2.10X0.90
= 1.89 X
2= 3.78
3.78
PINT01
56
2.
1
0
0.90
M2
2.10X0.90
= 1.89
1.8900
PINT01
24
3.
4
5
2.50
M2
3.45X
2.50=8.6
2502.160=6.
465
6.4650
( Diferenc
ia del
rea de la
V3)
HOJA GENERADORA
PINTURA VINILICA EN MUROS INTERIORES(PLANTA ALTA)
CLAVE
CONCEPTO
PINT01
APLICACIN
DE
PINTURA VINILICA EN
MUROS INTERIORES,
INC. UNA MANO DE
SELLADOR
Y
3
MANOS DE PINTURA.
EJE ENT
RE
EJE
ANC
HO
LAR
GO
ALTURA
OPERACIN
SUBTOTA
L
2.35X0.90= 2.115
2.115
F
G
2.35
0.90
PINT01
B
F
7.00
2.50
PINT01
BE
0.60
2.50
0.60X2.50=1.50 X 2
= 3.00 (BLOCK
INTERMEDIO)
3.00
PINT01
F
G
1.30
0.90
1.170
B-G
9.20
2.50
PINT01
7.00X2.50= 17.50
17.500
42.311
C
D
1.60
2.50
4.745
E
G
0.60
2.50
3.00
PINT01
C
G
8.20
2.50
17.340
V4= 0.32
V5= 1.76
V6= 1.08
3.16 ( Suma de
reas de ventanas)
TOTAL= 163.4115 M2
CONCEPTO
EJE ENT
RE
ANC
LAR
ALTURA
OPERACIN
SUBTOTA
EJE
TIRO01
APLCACIN
DE
ACABADO TIPO TIROL
CON GRANO FINO EN
MUROS
NC:
LIMPIEZA
Y
PROTECCION
DE
ELEMENTOS.
45
HO
GO
3.60
L
2.90
9.3600
-1.08
(Diferencia del rea
de la V1)
9.36
TIRO01
24
3.60
2.90
TIRO01
45
3.60
2.90
8.5955
TIRO01
5
6
2.40
0.90
2.1600
24
3.75
2.90
TIRO01
9.4200
10.0750
F
G
2.50
0.90
2.2500
TIRO01
B
F
7.15
2.90
20.7350
TIRO01
E
G
4.40
2.90
12.7600
TIRO01
C
G
8.50
2.90
21.4800
V4= 0.32
V5= 1.76
V6= 1.08
3.16 ( Suma de
reas de ventanas)
TOTAL= 96.8355
CONCEPTO
FIRM02
FIRME DE CONCRETO
DE FC= 100KG/CM2
DE 5 A 8 CM DE
ESPESOR
EJE ENT
RE
EJE
ANC
HO
LAR
GO
BE
3.45
4.80
4
5
ALTURA
OPERACIN
SUBTOTA
L
16.56
CD
2
4
3.50
1.60
5.60
DE
2
4
3.45
2.00
6.90
EG
2
4
3.45
4.40
15.18
TOTAL = 44.24 M2
HOJA GENERADORA
INSTALACION ELECTRICA
TENDIDO Y COLOCADO DE CABLE CAL. 8 A 12
CLAVE
INSE011
CONCEPTO
EJ
E
ENT
RE
EJE
ANC
HO
LARG
O
TENDIDO Y COLOCADO DE
CABLE CAL. 8 A 12
ALTURA
OPERACIN
45 ML
INC. CONEXIONES Y
DESPERDICIOS.
TOTAL= 45 ML
TOTAL
45 ML
HOJA GENERADORA
PISO DE MOSAICO
CLAVE
PISO02
CONCEPTO
PISO DE MOSAICO DE
PASTA
ASENTADO
CON
MORTERO
Y
EJE ENT
RE
EJE
ANC
HO
LAR
GO
BE
3.45
4.80
4
5
ALTURA
OPERACIN
SUBTOTA
L
16.56
JUNTEADO
CON
CEMENTO
BLANCO,
INC.
CORTES,
REMATES Y LIMPIEZA
GENERAL
CD
2
4
3.50
1.60
5.60
DE
2
4
3.45
2.00
6.90
EG
2
4
3.45
4.40
15.18
TOTAL = 44.24 M2
ZOCLO DE MOSAICO
PISO06
ZOCLO DE MOSAICO ,
ASENTADO CON
MORTERO Y
JUNTEADO CON
CEMENTO BLANCO,
INC: CORTES,
CHAFLANES Y
LIMPIEZA
4
5
3.45
3.45
PISO06
2
4
3.45
PISO06
2
3
2.60
2.60
2.60
PISO06
2
3
2.60
2.60 X 2 = 5.20
5.20
(ESTA INCLUIDO EL
MURO DONDE SE
UBICA LA V2)
3.45
3.45
PISO06
4
5
3.45
3.45-1.80(PUERTA)
1.65
PISO06
2
4
3.45
3.45-1.80(PUERTA)
1.65
PISO06
BE
4.80
4.80
4.80
PISO06
BE
0.60
0.60X 2= 1.20
1.20
PISO06
BE
4.80
9.00
PISO06
EG
4.40
4.40
4.40
PISO06
C
D
1.60
1.60
1.60
PISO06
E
G
0.75
0.75 X 2= 1.50
1.50
PISO06
D
E
2.00
2.00
2.00
PISO06
E
G
4.40
4.40
4.40
TOTAL= 46.90 M2
HOJA GENERADORA
CONCEPTO
RECU003
RECUBRIMIENTO
EN
MUROS
CON
MOSAICO
VENECIANO,
ASENTADO
CON
PEGAZULEJO
Y
JUNTEADO
CON
CEMENTO
BLANCO,
INC: CORTES,
REMATES,
TIRATRIM
Y
LIMPIEZA.
EJE ENT
RE
EJE
C
23
ANC
HO
LAR
GO
2.45
ALTURA
2.50
OPERACIN
SUBTOTA
L
6.125
23
2.45
2.50
C
D
1.60
2.50
6.125
2.3725
(DIFERENCIA EN
AREA DE P4)
2
C
D
1.60
2.50
3.968
(DIFERENCIA EN
AREA DE V4)
TOTAL= 18.5905 M2
CONCEPTO
CAST01
CASTILLO
DE
CONCRETO F'C = 1
50 KG/CM2 DE
1
5X15
CM
DE
SECCIN,
ARMADO
CON
ARMEX
DE
15X15-4,
INC:
ARMADO,
CIMBRADO, COLADO
Y DESCIMBRADO.
EJE ENT
RE
EJE
ANC
HO
LAR
GO
ALTURA
2.50
OPERACIN
SUBTOTA
L
10 CASTILLOS
ARMADOS UBICADOS
EN LA PLANTA ALTA
25
TOTAL=25 ML
CASTILLO
AHOGAD
O EN
MURO DE
BLOCK
CAST02
CASTILLO DE
CONCRETO AHOGADO
EN MURO DE BLOCK
DE 15X20X40 CM,
ARMADO CON UNA
VARILLA DE 3/8 Y
EST. DE 1 /4 @ 20 CM,
INC: HABILITADO Y
COLOCADO DEL
ACERO Y COLADO
2.20
13 CASTILLOS
AHOGADOS
2.20 ALRTURA
PROMEDIO
13 X 2.20 = 28.60 ML
TOTAL= 28.60 ML
28.60
HOJA GENERADORA
CERRAMIENTO EN PUERTAS Y VENTANAS
CLAVE
CER01
CONCEPTO
CERRAMIENTO
PUERTAS
VENTANAS.,
CIMBRADO,
HABILITADO
EJE ENT
RE
EJE
EN
Y
ANC
HO
LAR
GO
5
5
0.90
34
0.85
ALTURA
OPERACIN
0.90 + 0.30=1.20
SUBTOTA
L
1.20
Y
ARMADO
DE
ACERO, COLADO Y
DESCIMBRADO.
CER01
0.85 +
0.30=1.15
1.15
CER01
4
5
1.80
1.80+ 0.30=2.10
2.10
CER01
34
0.85
1.15
24
1.80
1.80 + 0.30=2.10
2.10
CER01
D
E
0.85
0.85 + 0.30=1.15
1.15
CER01
C
D
0.75
0.75+ 0.30=1.05
1.05
CER01
C
D
0.85
0.85+ 0.30=1.15
1.15
CER01
D
E
0.80
0.80+ 0.30=1.10
1.10
CER01
E
G
0.90
0.90+ 0.30=1.20
1.20
OPERACIN
SUBTOTA
L
CER01
CER01
TOTAL= 13.35 ML
HOJA GENERADORA
LOSA DE CONCRETO
CLAVE
CONCEPTO
EJE
ENT
RE
EJE
ANC
HO
LAR
GO
LOSA03
LOSA DE CONCRETO
ALIGERADA A BASE
DE VIGUETA Y
BOVEDILLA HASTA
DE 20 CM DE
PERALTE, INC. SUM.
DE CIMBRA Y
OPERADOR DE
REVOLVEDORA
LOSA03
BE
45
3.60
5.10
C
G
24
3.60
8.50
3.60 X
8.50 = 30.60
18.36
30.60
TOTAL= 48.96
M2
CALCRETO
AZOT01
CALCRETO EN LOSAS
DE AZOTEA, INC.
DERRETIDO DE
CEMENTO, CALCRETO
DE 6 CM DE ESPESOR
PROMEDIO Y
ACABADO FINAL
PULIDO (MASILLA).
AZOT01
BE
45
3.60
5.10
C
G
24
3.60
8.50
3.60 X
8.50 = 30.60
18.36
30.60
TOTAL= 48.96 M2
PRETIL O CABALLETE EN AZOTEA(PLANTA= BAJA Y ALTA )
AZOT02
PRETIL O CABALLETE
EN AZOTEA CON UNA
24
3.75
3.75
3.75
45
3.75
3.75
3.75
AZOT02
24
3.75
3.75
3.75
AZOT02
45
3.75
3.75
3.75
AZOT02
24
3.75
3.75
3.75
AZOT02
B
E
5.10
5.10
5.10
AZOT02
B
C
1.15
1.15
1.15
AZOT02
E
G
4.70
4.70
4.70
AZOT02
CG
8.50
8.50
8.50
AZOT02
TOTAL= 38.20 ML
RECU001
CONCEPTO
TEJA DE CAA
DE BARRO,
EJE
ENT
RE
EJE
ANC
HO
LAR
GO
F
G
4
5
1.25
2.45
ALTURA
OPERACIN
SUBTOTA
L
3.0625
3.0625
CLAVADA Y
JUNTEADA CON
MORTERO SOBRE
SUPERFICIES LISAS,
INC. CORTES,
REMATES,
ANDAMIAJE COMN,
DERRETIDO Y
LIMPIEZA
TOTAL = 3.0625 M2
LOSA DE CONCRETO DEL VOLADO DE 10 CM DE ESPESOR
LOSA01
LOSA DE
CONCRETO ARMADO
DE 10 CM DE
ESPESOR, INC.
CIMBRADO,
HABILITADO Y
ARMADO DEL
F
G
4
5
1.25
2.45
ACERO DE
REFUERZO,
ELABORACIN Y
ACOMODO DEL
CONCRETO,
CURADO Y
DESCIMBRADO.
TOTAL = 3.0625 M2
LOSA DE CONCRETO DE 20 CM DE ESPESOR
LOSA02
LOSA DE CONCRETO
ARMADO DE 20 CM
DE ESPESOR, INC.
CIMBRADO,
HABILITADO Y
ARMADO DEL
ACERO DE
REFUERZO,
ELABORACIN Y
ACOMODO DEL
CONCRETO,
CURADO Y
DESCIMBRADO
TOTAL = 2.695 M2
F
G
4
5
1.10
2.45
2.695
INSE001
CONCEPTO
EJ
E
ENT
RE
EJE
ANC
HO
LARG
O
ALTURA
OPERACIN
SUBTOTA
L
7 SALIDAS
1 SALIDA
TOTAL = 7 SAL.
SALIDA ELECTRICA PARA LAMPARA DE ESCALERA
INSE002
PLACAS Y RESANES.
TOTAL = 1 SAL.
SALIDA ELCTRICA PARA CONTACTOS
INSE003
7 SALIDAS
TOTAL
= 7 SAL.
SALIDA ELCTRICA PARA UNIDAD INDIVIDUAL DE AIRE ACONDICIONADO.
INSE005
1 PZA.
TOTAL= 1 PZA
COLOCACION DE LMPARA DE PLAFON
INSE006
COLOCACION DE LMPARA
DE PLAFON TIPO SPOT, INC:
CONEXIONES Y PRUEBAS
2 PZA.
INC: CONEXIONES Y
PRUEBAS.
TOTAL= 2
PZA
HOJA GENERADORA
SALIDA HIDRULICA Y SANITARIA PARA W.C.
CLAVE
INSH001
CONCEPTO
EJ
E
ENT
RE
EJE
SALIDA HIDRULICA Y
SANITARIA PARA W.C.INC:
RANURADO, EXCAVACIN,
TENDIDO, NIVELADO,
RESANES Y AMACIZADO DE
RAMALEOS.
ANC
HO
LARG
O
ALTURA
OPERACIN
TOTAL
1 SALIDA
1 SAL.
SALIDA HIDRULICA Y
SANITARIA PARA LAVABO,
INC: AGUA FRA Y CALIENTE,
1 SALIDA
1 SAL.
SALIDA HIDRULICA Y
SANITARIA PARA REGADERA,
INC: AGUA FRA Y CLIENTE
1 SALIDA
1 SAL.
1 SALIDA
1 SAL.
1 PIEZA.
1 PZA
1 PIEZA.
1 PZA
COLOCACIN DE W.C
INSH006
COLOCACIN DE LAVABO
INSH007
INSH010
COLOCACIN DE TUBO DE
PVC SANITARIO DE 2" A 4"
PARA RAMALEOS
SANITARIOS
3 ML
3 ML
COLOCACIN DE TUBO DE
COBRE DE 1 /2" A 1",
INC: RANLIRADO,
CONEXIONES, RESANES Y
PRUEBAS.
24 ML
24 ML