You are on page 1of 34

Basic Objectives Reservoir

The purpose of storing water is to meet balancing requirements and planned shut-downs. The balancing volume is required to cater for peak outflows while a constant (or variable) inlet flow is being received. Water needs will usually vary between morning and evening. If clean water is unavailable, then the installation must be capable of supplying water processing a huge need, especially at peak time (peak hour demand reached 1.27 times the average daily requirement). For the possibility that water processing installation shall have a capacity of about 2 time of the average daily requirement, if not available reservoir. With a reservoir (reservoir) is adequate, then the water treated and distributed only by the amount of the distribution network in accordance with the needs of the daily average

Volume Reservoir A. Services Reservoir Volume reservoir services or services reservoir is determined by The maximum volume of water that must be accommodated at the minimum water usage plus the volume of water that must be provided during hours of peak flux fluctuations due to water consumption in its service area and the period of reservoir filling. The water supply for the city fire department in accordance with existing regulations for the local Fire Department. The need for special water, draining the reservoir, parks and special events. B. Balancing reservoir Effective reservoir volume balance or the balance is determined by the balance reservoir outflow and inflow of water in the reservoir during the use of the service area. System filling reservoir and pump system can be gravity. Water supply to consumers conducted by gravity. Effective reservoir volume calculation method: 1) The tabulation , By way of tabulation, effective volume is the largest positive gap amount (m3) and the biggest difference is negative (m3) between fluctuations in water use and supply water to the reservoir. The results of calculation of the cumulative value are created in table form. 2) Method of the curve Effective volume obtained from the largest percentage of the accumulated surplus plus the accumulated deficit of water use water use to the greatest accumulation of runoff water into the reservoir 1

(where the drainage of water into the reservoir for 24 hours). 3) The percentage of Effective volume was set at a percentage of the maximum water demand per day at least 15%. Determination in this way depends on the habits of the city is concerned, because it must be based on experience. The design of the reservoirs themselves for the design of covered service reservoirs for the storage of potable drinking water. Essentially both reservoirs are large concrete storage tanks. The common design features on both reservoirs which will site below ground level, can be summarized as follows: Concrete base, walls and fully enclosed roof; Internal dividing wall to allow for draining of half of each reservoir for future repair and/or inspection; Pipe links from the Inlet House to deliver newly treated water into the reservoirs; Pipe links to the Outfall House where water is distributed through the system to the customers.

PROPOSED WINONGAN RESERVOIR PLAN Location Off take District Nearest Existing Transmission Pipeline Distance to the Main pipe line Capacity design PDAM Specification: 1. Reservoir will be build underground and the location is 18 m above the see level. 2. Elevation for the Winongan Reservoir around the 19 m on top the sea 3. Distance from the Pump Station Umbulan to tapping point offtake is 3500 m with diameter pipe 1800 mm 4. Distance from the tapping point to the reservoir is 2970 m and the pipe diameter 300 mm : Desa Tenggilis Rejo : Kabupaten Pasuruan : Jl.Desa Menyarik : 2970 m : 125 l/sec : Kab Pasuruan

The building is generally placed near the reservoir distribution network at a height sufficient to drain the water properly and evenly to all areas of consumers.

Reservoir Calculation:
OFFTAKE WINONGAN 1 2 3 4 5 6 Not e 1 2 3 4 5 6 Water allocation has been determined by EJPG Flow rate , 125 x 3600 x 24 / 1000 take 20 % x Flow rate a day (2) alternative depth 4 m, 5m and 6 m add land using 50 % from reservoir area point (4) + (5) Allocation from Umbulan flow rate for a day Reservoir Capacity Calculation Area Reservoir With Depth 4 m is Add area for Facility around Reservoir Total Area / Land Requirement for Reservoir 125 10,800 2,160 540 270 810 m3 m3 m3 m2 m2 m2

50 % x (4) area reservoir

Alternative Dimension Reservoir


Alternative Dimension Winongan Reservoir Dept Are add Total Cap Reservoir h a 50% Area [m [m3] [m] 2] [m2] [m2] 4 540 270 810 2,160 5 432 216 648 6 360 180 540 Sequare Length [m] 28 25 23 Width [m] 28 25 23 Rectangular Length [m] 41 36 33 Width [m] 13 12 11

Off TAKE POHJENTREK Location Off take District Pasuruanan Nearest Existing Transmission Pipeline Distance to the Main pipe line Capacity design PDAM Specification: 1. Reservoir will be build elevated above ground 2. Elevation for the Pohjentrek offtake around the 18 m on top the sea 3. Distance from Tapping Winongan to tapping point offtake pohjentrek is 9416 m with diameter pipe 1800 mm 4. Distance from the tapping point to the reservoir pohjentrek is 1720 m and the pipe diameter 350 mm
OFFTAKE POHJENTREK 1 2 3 4 5 6 Not e 1 2 3 4 Water allocation has been determined by EJPG Flow rate , 75 x 3600 x 24 / 1000 take 20 % x Flow rate a day (2 alternatif depth 4 m, 5m and 6 m Allocation from Umbulan flow rate for a day Reservoir Capacity Calculation Area Reservoir With Depth 4 m is Add area for Facility around Reservoir Total Area / Land Requirement for Reservoir 75 6,480 1,296 324 162 486 m3 m3 m3 m2 m2 m2

: Desa Sungi Kulon : Kabupaten : Jl. Raya Plinggisan : 1720 m : 75 l/sec : Kab Pasuruan

5 6

add land using 50 % from reservoir area point (4) + (5)

50 % x (4) area reservoir

Alternative Dimention Winongan Reservoir Dept Are add Total Cap Reservoir h a 50% Area [m [m3] [m] 2] [m2] [m2] 4 324 162 486 1,296 5 259 130 389 6 216 108 324

Sequare Length [m] 22 20 18 Width [m] 22 20 18

Rectangular Length [m] 31 28 26 Width [m] 10 9 8

Offtake Pleret Location Off take District Nearest Existing Transmission Pipeline Distance to the Main pipe line Capacity design PDAM Capacity Reservoir Existing

: Desa Pleret : Kabupaten Pasuruan : Jl. Raya Warung dowo : 100 m : 110 l/sec : Kota Pasuruan : 500 m3

1. Reservoir will be build under ground 2. Elevation for the Pleret offtake around the 16 m on top the sea 3. Distance from Tapping pohjentrek to reservoir is 180 m with diameter pipe 250 mm

OFFTAKE PLERET 1 2 3 4 5 6 Not e 1 2 3 4 5 6 Water allocation has been determined by EJPG Flow rate , 110 x 3600 x 24 / 1000 take 20 % x Flow rate a day (2) alternatif depth 4 m, 5m and 6 m add land using 50 % from reservoir area point (4) + (5) Allocation from Umbulan flow rate for a day Reservoir Capacity Calculation Area Reservoir With Depth 4 m is Add area for Facility around Reservoir Total Area / Land Requirement for Reservoir 110 9,504 1,901 475 238 713 m3 m3 m3 m2 m2 m2

50 % x (4) area reservoir

Alternative Dimention Pleret Reservoir Dept Are add Total Cap Reservoir h a 50% Area [m [m3] [m] 2] [m2] [m2] 4 475 238 713 1,901 5 380 190 570 6 317 158 475

Sequare Length [m] 27 24 22 Width [m] 27 24 22

Rectangular Length [m] 38 34 31 Width [m] 13 11 10

Off take PIER Location Off take District Nearest Existing Transmission Pipeline Distance to the Main pipe line Capacity design PDAM

: Desa Pejangkungan : Kabupaten Pasuruan : Jl. Raya Kanigoro : 2500 m : 100 l/sec : Kota Pasuruan

1. Reservoir will be build elevated above ground 2. Elevation for the PIER offtake around the 16 m on top the sea 3. Distance from Tapping Pohjentrek to tapping point Pier offtake is 12000 m with diameter pipe 1700 mm 4. Distance from the tapping point to the reservoir pohjentrek is 2500 m and the pipe diameter 300 mm

OFFTAKE PIER 1 2 3 4 5 6 Not e 1 2 3 4 5 6 Water allocation has been determined by EJPG Flow rate , 75 x 3600 x 24 / 1000 take 20 % x Flow rate a day (2) Allocation from Umbulan flow rate for a day Reservoir Capacity Calculation Area Reservoir With Depth 4 m is Add area for Facility around Reservoir Total Area / Land Requirement for Reservoir 100 8,640 1,728 432 216 648 m3 m3 m3 m2 m2 m2

alternatif depth 4 m, 5m and 6 m


add land using 50 % from reservoir area point (4) + (5) 50 % x (4) area reservoir

Alternative Dimention Pier Reservoir Dept Are add Total Cap Reservoir h a 50% Area [m [m3] [m] 2] [m2] [m2] 4 432 216 648 1,728 5 346 173 518 6 288 144 432

Sequare Length [m] 25 23 21 Width [m] 25 23 21

Rectangular Length [m] 36 32 30 Width [m] 12 11 10

10

Off take Beji Location Off take District Nearest Existing Transmission Pipeline Distance to the Main pipe line Capacity design PDAM

: Desa Gunung Sari : Kabupaten Pasuruan : Jl. Raya Sidowayah : 30 m : 100 l/sec : Kota Pasuruan

1. Reservoir will be build under ground 2. Elevation for the Beji offtake around the 17 m on top the sea 3. Distance from Tapping Pier to tapping point Beji offtake is 6500 m with diameter pipe 1700 mm 4. Distance from the tapping point to the reservoir Beji is 30 m and the pipe diameter 250 mm

OFFTAKE BEJI 1 2 3 4 5 6 Allocation from Umbulan flow rate for a day Reservoir Capacity Calculation Area Reservoir With Depth 4 m is Add area for Facility around Reservoir Total Area / Land Requirement for Reservoir 150 12,960 2,592 648 324 972 m3 m3 m3 m2 m2 m2

Not e 1 2 3 4 5 6 Water allocation has been determined by EJPG Flow rate , 150 x 3600 x 24 / 1000 take 20 % x Flow rate a day (2)

alternatif depth 4 m, 5m and 6 m


add land using 50 % from reservoir area point (4) + (5) 50 % x (4) area reservoir

11

Alternative Dimention Beji Reservoir Dept Are add Total Cap Reservoir h a 50% Area [m [m3] [m] 2] [m2] [m2] 4 648 324 972 2,592 5 518 259 778 6 432 216 648

Sequare Length [m] 31 28 25 Width [m] 31 28 25

Rectangular Length [m] 44 40 36 Width [m] 15 13 12

12

Off take Gempol Location Off take District Nearest Existing Transmission Pipeline Distance to the Main pipe line Capacity design PDAM

: Desa Winong : Kabupaten Pasuruan : Jl. Hasan Musadi : 1400 m : 70 l/sec : kab Pasuruan

1. Reservoir will be build under ground 2. Elevation for the Gempol offtake around the 9 m on top the sea 3. Distance from Tapping Beji to tapping point Gempol offtake is 7900 m with diameter pipe 1700 mm 4. Distance from the tapping point to the reservoir Gempol is 1400 m and the pipe diameter 250 mm
OFFTAKE GEMPOL 1 2 3 4 5 6 Not e 1 2 3 4 5 6 Water allocation has been determined by EJPG Flow rate , 70 x 3600 x 24 / 1000 take 20 % x Flow rate a day (2) alternatif depth 4 m, 5m and 6 m add land using 50 % from reservoir area point (4) + (5) Allocation from Umbulan flow rate for a day Reservoir Capacity Calculation Area Reservoir With Depth 4 m is Add area for Facility around Reservoir Total Area / Land Requirement for Reservoir 70 6,048 1,210 302 151 454 m3 m3 m3 m2 m2 m2

50 % x (4) area reservoir

13

Alternative Dimention Gempol Reservoir Dept Are add Total Cap Reservoir h a 50% Area [m [m3] [m] 2] [m2] [m2] 4 648 324 972 2,592 5 518 259 778 6 432 216 648

Sequare Length [m] 31 28 25 Width [m] 31 28 25

Rectangular Length [m] 44 40 36 Width [m] 15 13 12

14

Off take Jabon Location Off take District Nearest Existing Transmission Pipeline Distance to the Main pipe line Capacity design PDAM

: Desa Pangreh : Kabupaten Pasuruan : Jl. Raya Melikan : 3700 m : 100 l/sec : kab Pasuruan

1. Reservoir will be build under ground 2. Elevation for the Jabon offtake around the 9 m on top the sea 3. Distance from Tapping Gempol to tapping point Jabon offtake is 2962 m with diameter pipe 1700 mm 4. Distance from the tapping point to the reservoir Gempol is 3700 m and the pipe diameter 250 mm
OFFTAKE JABON 1 2 3 4 5 6 Allocation from Umbulan flow rate for a day Reservoir Capacity Calculation Area Reservoir With Depth 4 m is Add area for Facility around Reservoir Total Area / Land Requirement for Reservoir 100 8,640 1,728 432 216 648 m3 m3 m3 m2 m2 m2

Not e 1 2 3 4 5 6 Water allocation has been determined by EJPG Flow rate , 100 x 3600 x 24 / 1000 take 20 % x Flow rate a day (2) alternatif depth 4 m, 5m and 6 m add land using 50 % from reservoir area point (4) + (5)

50 % x (4) area reservoir

15

Alternative Dimention Jabon Reservoir Dept Are add Total Cap Reservoir h a 50% Area [m [m3] [m] 2] [m2] [m2] 4 432 216 648 1,728 5 346 173 518 6 288 144 432

Sequare Length [m] 25 23 21 Width [m] 25 23 21

Rectangular Length [m] 36 32 30 Width [m] 12 11 10

16

Off take Porong Location Off take District Nearest Existing Transmission Pipeline Distance to the Main pipe line Capacity design PDAM

: Desa Kebon Agung Porong : Kabupaten Pasuruan : Jl. Kedung Solo : 3600 m : 50 l/sec : kab Pasuruan

1. Reservoir will be build elevated 2. Elevation for the Porong offtake around the 8 m on top the sea 3. Distance from Tapping Jabon to tapping point Porong offtake is 5096 m with diameter pipe 1700 mm 4. Distance from the tapping point to the reservoir Porong is 3600 m and the pipe diameter 300 mm

OFFTAKE PORONG 1 2 3 4 5 6 Allocation from Umbulan flow rate for a day Reservoir Capacity Calculation Area Reservoir With Depth 4 m is Add area for Facility around Reservoir Total Area / Land Requirement for Reservoir 50 4,320 864 216 108 324 m3 m3 m3 m2 m2 m2

Not e 1 2 3 4 5 6 Water allocation has been determined by EJPG Flow rate , 50 x 3600 x 24 / 1000 take 20 % x Flow rate a day (2) alternatif depth 4 m, 5m and 6 m add land using 50 % from reservoir area point (4) + (5)

50 % x (4) area reservoir

17

Alternative Dimention Porong Reservoir Dept Are add Total Cap Reservoir h a 50% Area [m [m3] [m] 2] [m2] [m2] 4 216 108 324 864 5 173 86 259 6 144 72 216

Sequare Length [m] 18 16 15 Width [m] 18 16 15

Rectangular Length [m] 26 23 21 Width [m] 8 8 7

Off take Tanggulangin Location Off take District Nearest Existing Transmission Pipeline

: Desa Randengan : Kabupaten Pasuruan : Jl. Lapindo Brantas

18

Distance to the Main pipe line Capacity design PDAM

: 300 m : 150 l/sec : kab Sidoarjo

1. Reservoir will be build elevated 2. Elevation for the Tanggulangin offtake around the 6 m on top the sea 3. Distance from Tapping Porong to tapping point Tanggulangin offtake is 6300 m with diameter pipe 1700 mm 4. Distance from the tapping point to the reservoir Tanggulangin is 300 m and the pipe diameter 200 mm

OFFTAKE TANGGULANGIN 1 2 3 4 5 6 Not e 1 2 3 4 5 6 Water allocation has been determined by EJPG Flow rate , 150 x 3600 x 24 / 1000 take 20 % x Flow rate a day (2) alternatif depth 4 m, 5m and 6 m add land using 50 % from reservoir area point (4) + (5) Allocation from Umbulan flow rate for a day Reservoir Capacity Calculation Area Reservoir With Depth 4 m is Add area for Facility around Reservoir Total Area / Land Requirement for Reservoir 150 12,960 2,592 648 324 972 m3 m3 m3 m2 m2 m2

50 % x (4) area reservoir

19

Alternative Dimention Tanggulangin Reservoir Dept Are add Total Cap Reservoir h a 50% Area [m [m3] [m] 2] [m2] [m2] 4 648 324 972 2,592 5 518 259 778 6 432 216 648

Sequare Length [m] 31 28 25 Width [m] 31 28 25

Rectangular Length [m] 44 40 36 Width [m] 15 13 12

Off take Candi Location Off take District

: Desa Randengan : Kabupaten Pasuruan 20

Nearest Existing Transmission Pipeline Distance to the Main pipe line Capacity design PDAM

: Jl. Desa Sudimoro : 2656 m : 270 l/sec : kab Sidoarjo

1. Reservoir will be build under Ground 2. Elevation for the Candi offtake around the 6 m on top the sea 3. Distance from Tapping Tanggulangin to tapping point Candi offtake is 5100 m with diameter pipe 1700 mm 4. Distance from the tapping point to the reservoir Candi is 2656 m and the pipe diameter 600 mm

OFFTAKE CANDI 1 2 3 4 5 6 Not e 1 2 3 4 5 6 Water allocation has been determined by EJPG Flow rate , 270 x 3600 x 24 / 1000 take 20 % x Flow rate a day (2) alternatif depth 4 m, 5m and 6 m add land using 50 % from reservoir area point (4) + (5) Allocation from Umbulan flow rate for a day Reservoir Capacity Calculation Area Reservoir With Depth 4 m is Add area for Facility around Reservoir Total Area / Land Requirement for Reservoir 270 23,328 4,666 1,166 583 1,750 m3 m3 m3 m2 m2 m2

50 % x (4) area reservoir

21

Alternative Dimention Candi Reservoir Cap Dept Are add Total Reservoir h a 50% Area [m2 [m3] [m] ] [m2] [m2] 1,16 4 6 583 1,750 4,666 5 933 467 1,400 6 778 389 1,166

Sequare Length [m] 42 37 34 Width [m] 42 37 34

Rectangular Length [m] 60 53 49 Width [m] 20 18 16

Off take Sidoarjo Location Off take

: Desa Jati 22

District Nearest Existing Transmission Pipeline Distance to the Main pipe line Capacity design PDAM

: Kabupaten Sidoarjo : Jl. Raya Suko : 3700 m : 300 l/sec : kab Sidoarjo

1. Reservoir will be build Elevated 2. Elevation for the Sidoarjo offtake around the 4 m on top the sea 3. Distance from Tapping Candi to tapping point Sidoarjo offtake is 2375 m with diameter pipe 1600 mm 4. Distance from the tapping point to the reservoir Sidoarjo is 3700 m and the pipe diameter 500 mm
OFFTAKE SIDOARJO 1 2 3 4 5 6 Not e 1 2 3 4 5 6 Water allocation has been determined by EJPG Flow rate ,300 x 3600 x 24 / 1000 take 20 % x Flow rate a day (2) alternatif depth 4 m, 5m and 6 m add land using 50 % from reservoir area point (4) + (5) Allocation from Umbulan flow rate for a day Reservoir Capacity Calculation Area Reservoir With Depth 4 m is Add area for Facility around Reservoir Total Area / Land Requirement for Reservoir 300 25,920 5,184 1,296 648 1,944 m3 m3 m3 m2 m2 m2

50 % x (4) area reservoir

Alternative Dimention Sidoarjo Reservoir Cap Dept Are add Total Reservoir h a 50% Area [m2 [m3] [m] ] [m2] [m2] 1,29 4 6 648 1,944 1,03 5,184 5 7 518 1,555 6 864 432 1,296

Se

Length [m] 44 39 36

23

Off take Buduran Location Off take District Nearest Existing Transmission Pipeline Distance to the Main pipe line Capacity design PDAM

: Desa Anggas Wangi : Kabupaten Sidoarjo : Jl. Desa Kebon Agung : 1250 m : 100 l/sec : kab Sidoarjo

1. Reservoir will be build Under Ground

24

2. Elevation for the Buduran offtake around the 7 m on top the sea 3. Distance from Tapping Sidoarjo to Tapping point Buduran offtake is 3150 m with diameter pipe 1500 mm 4. Distance from the tapping point to the reservoir Buduran is 1250 m and the pipe diameter 400 mm
OFFTAKE BUDURAN 1 2 3 4 5 6 Allocation from Umbulan flow rate for a day Reservoir Capacity Calculation Area Reservoir With Depth 4 m is Add area for Facility around Reservoir Total Area / Land Requirement for Reservoir 100 8,640 1,728 432 216 648 m3 m3 m3 m2 m2 m2

Not e 1 2 3 4 5 6 Water allocation has been determined by EJPG Flow rate , 100 x 3600 x 24 / 1000 take 20 % x Flow rate a day (2) alternatif depth 4 m, 5m and 6 m add land using 50 % from reservoir area point (4) + (5)

50 % x (4) area reservoir

Alternative Dimention Buduran Reservoir Dept Are add Total Cap Reservoir h a 50% Area [m [m3] [m] 2] [m2] [m2] 4 432 216 648 1,728 5 346 173 518 6 288 144 432

Sequare Length [m] 25 23 21 Width [m] 25 23 21

Rectangular Length [m] 36 32 30 Width [m] 12 11 10

25

Off take Gedangan Location Off take District Nearest Existing Transmission Pipeline Distance to the Main pipe line Capacity design PDAM

: Desa Klopo Sepuluh : Kabupaten Sidoarjo : Jl. SD Klopo Sepuluh : 1375 m : 200 l/sec : kab Sidoarjo

26

1. Reservoir will be build Under Ground 2. Elevation for the Gedangan offtake around the 7 m on top the sea 3. Distance from Tapping Buduran to Tapping point Gedangan offtake is 2950 m with diameter pipe 1500 mm 4. Distance from the tapping point to the reservoir Gedangan is 1375 m and the pipe diameter 450 mm

OFFTAKE GEDANGAN 1 2 3 4 5 6 Allocation from Umbulan flow rate for a day Reservoir Capacity Calculation Area Reservoir With Depth 4 m is Add area for Facility around Reservoir Total Area / Land Requirement for Reservoir 200 17,280 3,456 864 432 1,296 m3 m3 m3 m2 m2 m2

Not e 1 2 3 4 5 6 Water allocation has been determined by EJPG Flow rate , 200 x 3600 x 24 / 1000 take 20 % x Flow rate a day (2) alternatif depth 4 m, 5m and 6 m add land using 50 % from reservoir area point (4) + (5)

50 % x (4) area reservoir

Alternative Dimention Gedangan Reservoir Cap Reservoir Dept Are add Total

Sequare Length Width

Rectangular Length Width

27

h [m3] 3,456 [m] 4 5 6

a [m 2] 864 691 576

50% [m2] 432 346 288

Area [m2] 1,296 1,037 864 [m] 36 32 29 [m] 36 32 29 [m] 51 46 42 [m] 17 15 14

Off take Waru Location Off take District Nearest Existing Transmission Pipeline Distance to the Main pipe line Capacity design

: Desa Pepelegi : Kab Sidoarjo : Jalan pepelegi : 3100 m : 200 l/sec

28

PDAM

: PDAM Kab Sidoarjo

1. Reservoir will be build Under Ground 2. Elevation for the Waru offtake around the 7 m on top the sea 3. Distance from Tapping Gedangan to Tapping point Waru offtake is 4550 m with diameter pipe 1400 mm 4. Distance from the tapping point to the reservoir Waru is 3100 m and the pipe diameter 400 mm
OFFTAKE WARU 1 2 3 4 5 6 Allocation from Umbulan flow rate for a day Reservoir Capacity Calculation Area Reservoir With Depth 4 m is Add area for Facility around Reservoir Total Area / Land Requirement for Reservoir 200 17,280 3,456 864 432 1,296 m3 m3 m3 m2 m2 m2

Not e 1 2 3 4 5 6 Water allocation has been determined by EJPG Flow rate ,200 x 3600 x 24 / 1000 take 20 % x Flow rate a day (2) alternatif depth 4 m, 5m and 6 m add land using 50 % from reservoir area point (4) + (5)

50 % x (4) area reservoir

Alternative Dimention Waru Reservoir Cap Reservoir Dept Are add Total h a 50% Area [m [m3] [m] 2] [m2] [m2] 4 864 432 1,296 3,456 5 691 346 1,037 6 576 288 864

Sequare Length [m] 36 32 29 Width [m] 36 32 29

Rectangular Length [m] 51 46 42 Width [m]

29

17 15 14

Off take Alas Malang Location Off take District Nearest Existing Transmission Pipeline Distance to the Main pipe line Capacity design PDAM : Alas Malang : Kota Surabaya : Jalan : 3100 m : 1000 l/sec : PDAM Kota Surabaya

1. Reservoir will be build Under Ground 2. Elevation for the Alas Malang offtake around the 12 m on top the sea 3. Distance from Tapping Waru to Tapping point Alas Malang offtake is 23100 m with diameter pipe 1000 mm 30

4. Distance from the tapping point to the reservoir Alasmalang is 3100 m and the pipe diameter 400 mm

OFFTAKE ALAS MALANG 1 2 3 4 5 6 Allocation from Umbulan flow rate for a day Reservoir Capacity Calculation Area Reservoir With Depth 4 m is Add area for Facility around Reservoir Total Area / Land Requirement for Reservoir 1,000 86,400 17,280 4,320 2,160 6,480 m3 m3 m3 m2 m2 m2

Not e 1 2 3 4 5 6 Water allocation has been determined by EJPG Flow rate ,1000 x 3600 x 24 / 1000 take 20 % x Flow rate a day (2) alternative depth 4 m, 5m and 6 m add land using 50 % from reservoir area point (4) + (5)

31

Alternative Dimension Alas Cap Dept Are Reservoir h a [m2 [m3] [m] ] 4,32 4 0 3,45 17,280 5 6 2,88 6 0

Malang Reservoir add Total 50% Area [m2] 2,160 1,728 1,440 [m2] 6,480 5,184 4,320

Sequare Length [m] 80 72 66 Width [m] 80 72 66

Rectangular Length [m] 115 103 94 Width [m] 38 34 31

32

Off take Giri Location Off take District Nearest Existing Transmission Pipeline Distance to the Main pipe line Capacity design PDAM : Desa Giri : Kab Gresik : Jl.Sunan Giri : 50 m : 1000 l/sec : PDAM Kab Gresik

1. Reservoir will be build Under Ground 2. Elevation for the Giri offtake around the 91 m on top the sea 3. Distance from Tapping Alas Malang to Tapping point Giri offtake is m with diameter pipe 1000 mm 4. Distance from the tapping point to the reservoir Giri is 50 m and the pipe diameter 300 mm
OFFTAKE GIRI 1 2 3 4 5 6 Allocation from Umbulan flow rate for a day Reservoir Capacity Calculation Area Reservoir With Depth 4 m is Add area for Facility around Reservoir Total Area / Land Requirement for Reservoir 1,000 86,400 17,280 4,320 2,160 6,480 m3 m3 m3 m2 m2 m2

Not e 1 2 3 4 5 6 Water allocation has been determined by EJPG Flow rate , 1000 x 3600 x 24 / 1000 take 20 % x Flow rate a day (2) alternative depth 4 m, 5m and 6 m add land using 50 % from reservoir area point (4) + (5)

50 % x (4) area reservoir

33

Alternative Dimention Giri Reservoir Cap Dept Are add Total Reservoir h a 50% Area [m2 [m3] [m] ] [m2] [m2] 4,32 4 0 2,160 6,480 3,45 17,280 5 6 1,728 5,184 2,88 6 0 1,440 4,320

Sequare Length [m] 80 72 66 Width [m] 80 72 66

Rectangular Length [m] 115 103 94 Width [m] 38 34 31

34