Power sector plays a very important role in transforming the economy into an industrially developed economy. The power sectors are required to function as autonomous corporate entities and to have independent, transparent and democratic regulations to guide and monitor their efficient, economical and competitive functions in commercial lines. The state of ODISHA is the unique distinction of being power pioneer in the country undertaking reform and restructuring in the power sector of the state. In 10 states of India, the private sector is operating to produce power to the extent of 1316.15MW.If we look at the region wise, northern region produces the highest hydro power in the private sector followed by western region (460.50MW) and southern region (55.45), but it is surprising to note that private sector is not operating to produce power in the private sector. In the Eastern region, Odisha tops the list of generation of power, out of 2496.53MW produced in the total eastern region of odisha alone produces 2062 MW of hydro power.Its is surprising to note that private sector are not allowed to produce power in this state. Odisha is the first state of the country to take up the power sector reforms to ensure stable & quality power at reasonable cost. The department of energy was created in 24 th April 1990 being separated from the Dept. of water resources..Presently three public sector undertakings viz: Grid Corporation of Odisha Limited (GRIDCO), Odisha Hydro Power Corporation Limited(OHPC), and Odisha Power Generation Corporation Limited(OPGC) are functioning under the administrative control of Dept. of energy, Govt. of Orissa. The Odisha Electricity Regulatory Commission (OREC) which is a quasi judicial independent body ensures transparent regulatory measures in the power sector of the state.Out of these three public undertakings, OHPC is selected for the purpose of the present study. Odisha Hydro Power Corporation Limited was formed in terms of Odisha Electricity Reforms Act 1995 and the hydro power generating stations of Govt. of Odisha as well as erstwhile OSEB were transferred to the control of OHPC as per the Odisha Electricity Reform (Tansfer of

Undertakings, Assets, Liabillities, Proceedings and Personnel) Scheme Rules 1996 and Amendment Rules 1997.It is a Govt. of Odisha Undertaking and was incorporated on 21 st April 1995. The efficient resource management by the process of automation has resulted in providing cheapest electricity to the people of Odisha. OHPC plays an important role in maintaining Grid discipline under the ABT regime for the Eastern regional Grid by supporting peak support.

INCORPORATION OF OHPC
As a result of Orissa Electricity Reforms Act 1995 and the Odisha Reforms OHPC, was registered under ICA on 21st April 1995, which became operational with effect from 1st April 1996 as per notification no.335 and 336.Initially all the assets, liabilities and proceedings acquired by State Government as well as those owned by it into generation, transmission and distribution undertakings. Those which could not be classified above were treated as residuary assets, liabilities and proceedings initiated. Being a newly set up corporation with employees from erstwhile OSEB, ex- employees of State Government and also employees directly recruited by OHPC, the HRD wing, faced various challenges to meet multifarious problems in interaction of such employees into a cohesive group to achieve organizational goals. In overall, There are seven hydro power projects viz: Hirakud-I, Burla, Hirakud-II (Chiplima), Balimela, Rengali, Upper Kolab, Upper Indravati, Machkund, which are under operation. Two units of Balimela Hydro Electric Project and Balimela Extension Project has been completed with a installed capacity of 2x75 MW.

Hydro Power Project Under OHPC

OBJECTIVES

To acquire, estabilish , operate, maintain, renovate , modernize in the state of Orissa and else while hydro electric generating stations, thermal and nuclear generating stations energy. and any other electric generating stations based on any non- conventional sources of

To carry the business of purchasing, selling, importing, exporting, producing, trading, manufacturing or otherwise dealing in hydro electric power, thermal and nuclear electric power based on any nonconventional source of energy.

To study, investigate, collect information and data, review operations, plan, research, design, prepare feasibility reports, diagonize operational difficulties and weakness and advise on the remedial measures to improve and modernize existing stations and facilitate to undertake for and behalf of others the setting up of hydro electric power plants based on any non-conventional source of energy.

VISION
To be a leading power utility in the energy sector through diversified energy portfolio with due care and concern to the environment.

MISSION
I.

To develop water resources in the State elsewhwere in the country while augmenting hydro power generating capacity by setting up new hydro power projects.

II. To adopt state of the art technology for upgradation of the existing

hydro power stations to achieve the highest level of efficiency.


III. To estabilish and operate thermal power plants through joint ventures

and also explore the opportunities to develop renewable energy resources viz: small hydro wind solar.
IV. To develop & operate coal mines allocated jointly in favour of HPC &

other public sector undertakings by the ministry of coal, Govt. of India.


V. To

improve

productivity

through

effective

planning

and

implementation of ERP system with development of robust & concurrent IT infrastructure.

OHPC AT A GLANCE
7

TABLE 1.1: TOTAL PERFORMANCE 1 2 3 4 5 6 7 8 9 Incorporated under companies Act Year of starting of commercial operation Date of transfer of hydro power 21.4.1995 1996-97 assets(excluding 1.4.1996 1.4.1997 1272MW 1912MW 6000MW 11OOOMW

Machkund) Transfer of Orissa share of Machkund (34.5 MW) Installed capacity at the time of transfer of assets Present installed capacity.(October 2006) Average Annual Generation Capabillity Peak capability Installed capacity of ongoing projects: Potteru Hydro Electric Projects Balimela Extension Project 6MW 150MW

PERFORMANCE HIGHLIGHTS
The hydro power generating stations were transferred to OHPC w.e.f 01.04.1996.A brief power generation result (upto May 2009) has been presented below:TABLE 1.2: OHPC HYDRO POWER CAPACITY Units Installed Design Generation(MW)

Capacity Energy (MW) (MU) 06-07 07-08 08-09 09-10 10-11 (UptoAu g) Hirakud HEP Chiplima HEP Balimela HEP Rengali HEP 275.5 72.00 510.0 250.0 684 490 1183 525 862 88 1621 670 888 93 1832 983 818 140 1076 882 574 130 786 549 297 100 590 178

Upper HEP Upper

Kolab 320.0 600.0 2027.5 34.5*

832 1962 5676 262.5

1026 3019 7198 342

1075 2979 7850 175

586 2301 5803 243

407 1474 3920 286

179 766 2110 123

Indravati Sub- Total Machkund (30% Orissa) Total 2062 5938.5 7625 8025 6046 4206 2233

Source: Published records of Orissa Hydro Power Corporation Ltd. Summary of performance of OHPC is indicated below:Design Energy for sale (MW) QLD UNITS UIHEP TOTAL = = = 3676.8 1932.38 5619.24

TABLE1.3: FINANCIAL RESULTS (Rs. In Crores) Particulars 06-07 Sale of Power Profit before Depriciation & Tax Less : Depriciation Net Profit/Loss before Tax 117.23 60.98 117.23 137.10 118.96 17.57 129.04 32.74 303.65 178.21 Financial Year 07-08 386.4 254.43 08-09 329.16 136.53 09-10 296.16 161.78

PERFORMANCE ACHIEVED

OHPC

has installed capacity of 2062MW, which is a distinct

improvement over 1272MW at the time incorporation. The capacity augmentation of 790MW is due to: Capacity addition of 600MW by commissioning 4x150MW Upper

Indravatti Project.
Capacity addition of 24MW during 1998 by Renovation Modernization

and Upper rating unit 1&2 of Burla power house.


Estabilishment of VSAT communication link from corporate office to

upper Indravatti, Rengali & Balimela project sites.


OHPC has been able to mobilize internal resources from its operation

to the extent of Rs 280 crores of the completed & on going projects & towards other capital expenditures.
Out of term loan of Rs 497.37 Crores availed for the Projects, it has

repaid Rs 263.15Crores to thelender PFC.

JOINT VENTURE PROJECTS i)Orissa Thermal Power Corporation Ltd. (OPTCL) OHPC & Odisha Minning Corporation Ltd. Have together floated a joint Venture Company namely OPTCL for setting up thermal power plant of 200MW capacity. OHPC is a 50% share holder of this JV company. Private Land acquisition is under progress. ii)Baitrani West Coal Company Ltd. (BWCCL) OHPC has been allotted a coal block (Baitrani West of 602MT) to be shared equally among the Kerela state Electricity Board & Gujurat Power Corporation Ltd. Through the Govt. Dispensation route vide GoI, Ministry of coal letter dt. 25th July, 2007.A JV company namely Baitrani West Coal Company Ltd. Between the three allocates, was incorporated on 22.04.2008 & certificate foo commencement of business was obtained on 05.05.2008.The development of the coal block as per the milestones stipulated by the Ministry of coal, Govt. of India is under progress.

Engagement of consultant for selection of MDO (Mines Developer Operators) has been finalized. Work order is to be issued shortly.

DIFFERENT WINGS OF OHPC


There are three wings under Odisha Hydro Power Corporation Limited, Bhubaneswar, Odisha. They are Technical , Financial & Human Resource Development wing.

TECHNICAL WING:
On Introduction of availability based tariff with effect from April 2003 & application of electricity Act 2003 it has become important on the part of generators to maintain high level of machine availability and plant load factor. Hydro Power generation has special place in the load management under the ABT regime. The followings are the main functions of the Technical Wing: Monitoring the functioning of power plants. Preparation of data base. Monitoring of Renovation and Modernization programs. Planning for future R&M Programs and new projects. Inventory & procurement monitoring. Generation and Maintenance Planning and Monitoring. Tariff and PFA including coordination with GRIDCO and OERC. Computerization and online communication

FINANCE WING:
After formation of OHPC under the reform Act a separate Finance wing with experienced & qualified executives has been created to manage the corporate finance. The following are the main function of the Finance wing:-

Resource Management. Budget & Allocation. Banking. 11

Loan & Investment. Accounts & Audits. Taxation. Personal Entitlement. Provident Fund, Pension & Gratuity Fund. Human Resource Development

In recent times, HRD has become a very important wing of any organization. Consequent to formation of OHPC, Professionals were included in the organization. The Organization structure of OHPC is annexed being a newly set up Corporation with employees from erstwhile OSEB, exemployees of state Government and also employees recruited directly by OHPC. HRD wing is being faced with various challenges and is constantly striving to bring improvement in employee performance, motivation and work culture.

FUNCTIONS OF HR DEPARTMENT:I.PERSONAL FUNCTIONS


Implementation of Personal Projects and Rules. Manpower Planning including Recruitment and Selection. Retirement and Superannuation. Salary and Benefits. Personal Records.

II.INDUSTRIAL RELATIONS & WELFARE


Industrial Relations. Contract Labour Management. Welfare Activities.

III.OTHER FUNCTIONS

General Administration. Estate Management. Legal Case Management. Public Relation. Training & Development. Security (except Power House & Switchyard)

Out of these wings Human Resource Development (HRD) wing is most important for the growth and development of the any organization. This organization has also taken necessary steps in guiding the institution. This wing is clear in its functions. This wing is divided inti three branches i.e. The Personal Branch, The Welfare Branch, and other functions which are general in nature. But looking after the very important functions of the organization, one of the important function is Training & Development, which is an integral part of Human Resource Development. The HRD wing of the organization as a part of its proactive & progressive HR philosophy. This wing has initiated several innovative measures and implemented them in the system to attain the rate of growth.

Absorption of employees working in the Government of Odisha (GoO) and Odisha State Electricity Board (OSEB) Consequent to the formulation of the Odisha Electricity Reforms Act, 1995 and the Odisha Electricity (Transfer of Undertakings, Assets, Liabillities, Proceedings and Personnel), Scheme Rules , 1996, the absorption process was completed in respect of the following employees.

Executives Govt. of Orissa 288

Non-Executives 2936

Total 3224

13

OSEB TOTAL

23 311

1556 4492

1579 4803

EXECUTIVES-Disciplines
Technical Discipline includes:

Electrical (EI) Civil (Civ) Instrumentation & Control (I & C) Information Technology (IT) Mechanical (Mech)

EXECUTIVE CADRE
TABLE 1.4 EXECUTIVE CADRE GRADE E-1 E-2 E-3 E-4 E-5 E-6 E-7 TITLE Management Trainee Junior Manager Assistant Manager Deputy Manager Manager Assistant General Manager Deputy General Manager General Manager Senior General Manager APPOINTING AUTHORITY Functional HR Functional Director/Director HR Functional Director/Director HR Functional Director/Director HR CMD CMD CMD CMD Committee of the Board Director/ Director

E-8 E-9

E-10

Chief General Manager

Committee of the Board

CADRE OF ADMINISTRATIVE NON-EXECUTIVES


TABLE 1.5 SI.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 SO( SG) SO GR. I.ASST. GR.II ASST. LD. ASST. HEAD ASST SR. ASST SR. CLERK PS PA STENO-CUM-CA. GR. I STENO-CUM-CA. GR. II STENO-CUM-CA. GR. III TYPIST-CUM-CA. GR. I TYPIST-CUM-CA. GR. II TYPIST-CUM-CA. GR. III COMPUTER ASST. GR. I COMPUTER ASST. GR. II COMPUTER ASST. GR. III HEAD DRAFTSMEN SR. DRAFTSMEN HEAD DRAFTSMEN-A HEAD DRAFTSMEN-B Designation Grade E-3 E-2 NE-8 NE-7 NE-5 NE-9 NE-8 NE-6 E-3 E-2 NE-8 NE-7 NE-6 NE-8 NE-7 NE-5 NE-8 NE-7 NE-5 NE-9 NE-8 NE-7 NE-6

15

24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52

CARETAKER RECPTIONIST STORE-KEEPER-C PHOTOCOPIER ZAMADAR BANK ATTENDANT PEON DIARIST-CUM-DESPATCH JR.CLERK DAFATARY CASHIER D.MAN- B DRIVER- B RECORD SUPPLIER HELPER (OFFICE) WATCHMEN / CHOWKIDAR SWEEPER OFFICE ATTEND (KHALASI) WATCMAN-CUM-SWEEPER NIGHT WATCHMEN HEAD MASTER ASST. TEACHER (TGT) TEACHER (JACT) TEACHER (MATRICCT) CLASSICAL TEACHER HINDI TEACHER PET ( TRAINED) JR. LAB BATCH PHARMASIST

NE-5 NE-4 NE-4 NE-3 NE-2 NE-3 NE-1 NE-3 NE-5 NE-2 NE-6 NE-5 NE-5 NE-3 NE-1 NE-1 NE-1 NE-1 NE-1 NE-1 NE-9 NE-8 NE-7 NE-5 NE-7 NE-7 NE-5 NE-6 NE-6

MEN IN POSITON(excluding contract Labour)


The empolyees position as on 01.01.2011 including regular executives and non-executives. NMR and Contingent Khalasis but excluding 368employees on deputation mostly from DOWR posted at UIHEP, (Khathiguda & Mukhiguda) is as under:-

TABLE 1.6A: Total men in position


Units Installed Capacit y (MW) Corporate office _ 48 58 0 0 0 106 106 Exe. Non-Exe ANE TNE NMR CK TOTAL Number of Employees (Ass on 01.01.2011)

Project under operation Hirakud HEP Chiplima HEP Balimela HEP Rengali HEP Upper Kolab HEP 510 369 66 68 216 0 0 350 72 61 81 364 2 1 509 509 275.5 69 62 229 0 0 360 360 320 25 19 123 0 0 167 167 250 48 45 263 0 0 356 356

17

Machkund HEP &Potteru Upper Indravatti HEP Machkund (30% Orissa Share) 2062 34.5 600

11

19

59

100

344

25

85

613

613

38

38

38

387

441

1577

27

86

2518

2480

TABLE 1.7B: Non-Executives On Deputation


SI.No Unit ANE 1. 2. 3. 4. UIHEP (Kathiguda) UIHEP (Mukhiguda) UKHEP (Bariniput Machakund Total 25 148 1 4 178 0 151 0 0 151 Non- Executives TNE 25 Total

299 1 4 329

TABLE1.8C: Executives on Deputation


SI.NO Unit Executives

1. 2. 3. 4. 5. 6.

UIHEP (Kathiguda) UIHEP (Mukhiguda) HHEP CHEP UKHEP (Bariniput) Machakund

33 2 1 2 1 2

7.

Corporate Office

Total

43

Grand Total (A+B+C)=2518+43+329=2890

As on date there are in total


2518 regular employees (including executives & non-executives) 372 employees on deputation (executives & non-executives) from other organization/ departments.

86 Contingent Khalasis (CK) and 27 Nominal Muster Rolls (NMR) 2890 employees in total including regular and employees on deputation.

INDUSTRIAL RELATIONS

19

There are 80 nos. Employees Coordination Committees, 20 nos.

Trade

Unions and 02 nos. of Officers Associations (OHPC Engineers Service Association and OHPC Officers Association). In total there are 05 nos recognized Trade Unions operating in OHPC Limited. The Industrial Relations In OHPC has been cordial and harmonious in the recent years.

TRAINING AND DEVELOPMENT


The Management provides continious emphasis on manpower training and develop activities. A well-furnished Training Centre has been constructed at Chandaka Industrial Complex with the financial assistance of DFID. OHPC has provided training in areas of specific skills, human relations, managerial and supervisory skills through both on-the-job & off-the-job methods. This is based on training-needs analysis done through the open potential appraisal system of OHPC. Refresher training to executives and non-executives of the power plants is being imparted at the OHPC training centre, an Institute recognized by the CEA. Employees are also sponsered for training conducted by reputed outside agencies.

PERFORMANCE MANAGEMENT
Existing system of appraisal in OHPC includes:

Confidential Character Roll (CCR) involving rating on a five point scale for non-executives.

Performance Appraisal Review for Executives- subjective and point rating method.

VOLUNTARY RETIREMENT SCHEMES


There is a Voluntary Retirement Scheme enacted in the year 2009 in operation. So far 40 (fourty) employees have been separated by means of VRS.

RENOVATION & MODERNISATION


Renovation & Modernization of unit-I, RHEP, Rengali has been started

since 25th March 2009.


The renovation process of BHEP, Balimela has been initiated in

consultation with CEA.


DPR for the R&M of unit-V, HHEP,Burla prepared in-house is under

final stage of completion.

ORGANIZATIONAL CHANGE
Rationalization of pay scales and unification of cadre of employees

have been implemented.


Unification of cadres is complete for the administrative and the

technical non-executive employees.


Reorganization Reorganization of divisons under OHPC has been effected. Restructuring & re-deployment of the units has been completed and

OHPC has already created 3 (three) clear cutwings (HRD, FINANCE & TECHNICAL) in all the units.
A Human Resource Information System (HRIS) for maintenance of

database of Human Resources is maintained.