mcd Program
Reference:H:\References\Concrete\MathCad\Utilities.mcd(R)
A. INTRODUCTION A.1 FOR UNDERGROUND PIPES, AT LOCATIONS WHERE THE PIPE EXITS FROM OR ENTERS TO THE GROUND, CONCRETE ANCHOR BLOCKS SHALL BE PROVIDED IN ORDER O RESIT THER HORIZONTAL FORCE CAUSED BY THE PIPE. A.2 THE HORIZONTAL FORE CAUSED BY THE PIPE IS RESISTED BY THE FOLLOWING: - FRICTION FORCE BETWEEN THE CONCRETE BLOCK AND THE GROUND. - PASSIVE EARTH PRESSURE AGAINST THE CONCRETE BLOCK.
A.3 ANCHOR BLOCKS USUALLY HAVE A RECTANGULAR PLAN BUT FOR LARGE FORCES H-SHAPE PLANS MAY BE USED IN ORDER TO INCREASE THE PASSIVE EARTH PRESSURE. A.4 A.5 A.6 C. NO TENSION IS ALLOWED WHEN COMPUTING THE BEARING PRESSURE UNDER THE BLOCK. THE FACTOR OF SAFETY AGAINST SLIDING SHALL NOT BE LESS THAN 1.20 THE FACTOR OF SAFETY AGAINST OVERTURNING SHALL NOT BE LESS THAN 1.50
INPUT PARAMETERS MATERIAL PROPERTIES CONCRETE COMPRESSIVE STRENGTH UNIT WEIGHT OF CONCRETE TENSILE STRENGTH OF REINFORCING BARS MODULUS OF ELASTICITY CONCRETE COVER PIER DIMENSIONS PIER WIDTH PIER LENGTH PIER HEIGHT MATH/FOOTING THICKNESS CONCRETE STRENGTH REDUCTION FACTORS BENDING/TENSION COMPRESSION SHEAR BEARING MODIFICATION FACTOR t := 0.9 c := 0.65 s := 0.75 b := 0.65 := 1.0 NORMAL WEIGHT CONCRETE (ACI 318-05, Sec. 11.7.4.3) b x := 36in b y := 36in h pier := 4ft T := 8ft [ACI 318-05, Sec. 9.3] fc := 4ksi c := 0.15kcf fy := 60ksi E s := 29000ksi Cc := 1.5in kcf :=
kips 3 ft
B.
DESIGN LOADS MAX TENSION MAX COMPRESSION SHEAR ALONG X SHEAR ALONG Y Tu := 100kip P u := 1000kip Vux := 30kip Vuy := 30kip
RC Pier Design.mcd
LNT - Page 1 of 7
TOTAL SHEARS
Vu Total :=
2 2 Vux + Vuy
MOMENT, Mux MOMENT, Muy C. RECTANGULAR PIER ANALYSIS AND DESIGN FACTORED LOADS ACTING AT BOTTOM OF PIER MAX COMPRESSION
P ub := P u + LF c b x b y h pier
P ub = 4481.85 kN
CONSERVATIVELY USE A LOAD FACTOR LF 1.4 FOR PIER SELFWEIGHT IN STRENGTH DESIGN MOMENT ABOUT X MOMENT ABOUT Y MAX SHEAR LIMIT BY CROSS SECTION PROVIDED ASSUME TO USE A FACTOR 0.9 TO CALCULATE THE EFFECTIVE SECTION DEPTH. IT CAN BE RE-EVALUATED AFTER REBAR DESIGN IF NECESSARY d x := 0.9b x Vys.max := s 0.67 fc MPa d x b y d x = 0.823 m Vys.max = 446.431 kip Mux := Mux + Vuy h pier Muy := Muy + Vux h pier Mux = 176.26kN m Muy = 189.81kN m
Vys.max >=? Vuy = "YES!.. SATISFACTORY" d y := 0.9b y Vxs.max := s 0.67 fc MPa d y b x d y = 0.823 m Vxs.max = 446.431 kip
Vxs.max >=? Vux = "YES!.. SATISFACTORY" CHECK MINIMUM/MAXIMUM REINFORCEMENT REQUIREMENTS MINIMUM REINFORCEMENT RATIO MINIMUM REINFORCEMENT min := 0.005 As.min := min b x b y As.min = 6.48in MINIMUM REINFORCEMENT RATIO ALTHOUGH 0.08 IS ALLOWED BY THE CODE, PRACTICALLY 0.04 MAY BE USED. MAXIMUM REINFORCEMENT As.max := max b x b y As.max = 51.84 in 2 max := 0.04 2 [ACI 318-05, 10.9.1] [ACI 318-05, Sec. 10.8.4, 10.9.1 & 15.8.2.1]
RC Pier Design.mcd
LNT - Page 2 of 7
bar bar
tie tie
d tie.min :=
d tie.min = 0.375 in
tie
n 1 := 7 n 2 := 5
A1 := n 1 Ab bar A2 := n 2 Ab bar
A1 = 4.123 in A2 = 2.945 in
2 2
n := 2 n 1 + n 2
n = 24 As = 14.136in 2
As := n Ab bar
As >=? As.min = "YES!.. SATISFACTORY" As <=? As.max = "YES!.. SATISFACTORY" D. CHECK PIER FOR APPLIED LOADS DISTANCE TO CENTER OF TENSION REBARS DISTANCE TO CENTER OF TENSION REBAR FROM THE CONCRETE EDGE IN X-DIRECTION DISTANCE TO CENTER OF TENSION REBAR FROM THE CONCRETE EDGE IN X-DIRECTION PIER COMPRESSION CAPACITY 1 d x := b x Cc d b d b tie 2 bar 1 d y := b y Cc d b d b tie 2 bar d x = 33.594in
d y = 33.594in
Fac := min
As , 1.0 2 As.min
Fac = 1
Fac REDUCES THE AREA OF CONCRETE WHE Pmin IS LESS THAN 0.01
[ACI 318-05 Sec 10.8.4 & 10.9.1] [ACI 318-05 Eqn 10-2]
P n = 2266.34 kip
RC Pier Design.mcd
LNT - Page 3 of 7
PIER BEARING CAPACITY (AT BASE OF PIER) PER ACI 318-05 Sec 10.17.1 P brg := b 0.85fc b x b y P ub <=? P brg = "YES!.. SATISFACTORY" PIER TENSION CAPACITY (USE REINFORCING BARS AS DOWELS TO RESIST TENSION) Tn := t As fy Tn = 763.35kip P brg = 2864.16 kip [ACI 318-05 Eqn 10-2]
Tub <=? Tn = "YES!.. SATISFACTORY" AREA OF STEEL REQUIRED TO RESIST TENSION max Tub , 0kips Tn
Ast := As
Ast = 1.762 in
REINFORCEMENT REQUIRED TO TRANSFER HORIZONTAL FORCE TO FOOTING (ACI 318-05 Sec 11.7.4)
:= 1.0
Avf :=
Avf = 0.943 in
Ax.net := 1
Ast + Avf As 2
A1
Ay.net := 1
Ast + Avf As 2
A2
ax :=
ax = 1.634 in
ay :=
ay = 1.167 in
ax 2
Mny = 355.17kip ft
Muy <=? Mny = "YES!.. SATISFACTORY" BENDING CAPACITY ABOUT X-AXIS Mnx := b Ay.net fy d y
ay 2
Mnx = 255.50kip ft
RC Pier Design.mcd
LNT - Page 4 of 7
HORIZONTAL TIES
PROVIDE THE TIE BAR DIAMETER TIE SIZE TIE DIAMETER TIE BAR AREA Se := 0 min( 16 d b , 48 d b , b x , b y) bar tie S max := min( b x , b y) , 12in min8d b bar , 24 d b tie , 2 S max = 14 in [ACI 318-05 Sec 7.10.5] [ACI 318-05 Sec 21.12.5.2] tie = 4 db Ab = 0.472 in = 0.175 in 2
tie tie
Se
PROVIDE THE TIE VERTICAL SPACING Spacingtie := 12in Spacingtie <=? S max = "YES!.. SATISFACTORY" Se PIER SHEAR CAPACITY
Vnc1 := s 0.17
fc MPa 1 +
Vnc2 := s 0.17
Vnc2 = 99.249kip
Vnc = 99.249kip
1 2
kcs := if
kcs = 0
Ab
tie
= 0.175 in
RC Pier Design.mcd
LNT - Page 5 of 7
NUMBER OF LEGS
NoLeg := 3 2
Av := NoLeg Ab tie
Av = 0.525 in
Av.min = 0.36in
Av >=? Av.min = "YES!.. SATISFACTORY" d p := min b x , b y Cc d b tie SHEAR BY TIES PROVIDED kcs s Av fy d p Spacingtie
1 db 2 bar
d p = 33.594in
Vsprov :=
Vsprov = 0kip
b x 2Cc ( 2 + n 2) 1 S p := b y 2Cc (n ) 1 1
t := 1 e := 1 d := 1 c b := minCc + d b
Sp =
5.5 in 5.5
(FOR VERTICAL DOWELS) (FOR UNCOATED REBARS) (FOR NORMAL WEIGHT OF CONCRETE)
+ tie)
db
bar min S p , 2 2
( )
c b = 2.406 in
Ktr := 0in
AS A DESIGN SIMPLIPICATION, IT IS CONSERVATIVE TO ASSUME Ktr=0, EVEN IF TRANSVERSE REINFORCEMENT IS PRESENT (PER ACI 318-05 SECTION 12.2.3)
DEVELOPMENT LENGTH OF STRAIGHT BAR 3 e t 0.80 12 40 d fy db if bar 6 bar cb + Ktr , 2.5 fc MPa min d b bar d fy db if bar 7 bar c b + Ktr fc MPa min , 2.5 d b bar
Ld :=
3 e t 1.0 12 40
RC Pier Design.mcd
LNT - Page 6 of 7
Ld = 24.562in DEVELOPMENT LENGTH OF BAR WITH STANDARD HOOK Ldh := max 0.24 e
d fy fc MPa
db
bar
, 150mm , 8 d b
bar
Ldh = 16.375in
CHECK THE DEVELOPMENT LENGTH OF THE STRAIGHT BAR INTO THE PIER REDUCTION FACTOR PER ACI 318-05 SECTION 12.2.5 & 12.5.3.D IR := max
Tub Tn
IR = 0.509
IR <=? 1.0 = "YES!.. SATISFACTORY" max Ldh IR , 12in <=? h pier 2in = "YES!.. SATISFACTORY" CHECK THE DEVELOPMENT LENGTH OF THE HOOKED BAR INTO THE BASE MAT max Ldh IR , 6in , 8 d b <=? ( T 3in) = "YES!.. SATISFACTORY" bar
1 = 12.048 0.083
F.
PIER DESIGN SUMMARY PIER WIDTH PIER LENGTH VERTICAL BAR SIZE NUMBER OF VERTICAL BARS BAR ARRANGEMENT NUMBER OF BARS IN A1 NUMBER OF BARS IN A2 TIE BAR SIZE (2 LEGS) TIE SPACING n1 = 7 n2 = 5 tie = 4 Spacingtie = 12 in b x = 36 in b y = 36 in bar = 7 n = 24
12 0.02 = 0.24
RC Pier Design.mcd
LNT - Page 7 of 7