ab_b1 0.15
ab_b2 0.5
ab_b3 0.5
ab_b4 0
ab_Base1 1.45
ab_Base2 2.65
Slab Table
b_1 0.18
b_2 0.45
BASE_1 1.13
Nos
Unit
Earth work in excavation in foundation trenches etc. not exceeding 30 meter depth including dressing of bottom and sides of trenches stacking the excavated soil lear from the edge of excavation and subsequent filling around home pipe/masonry in 15 cm layers with compection including disposal of all surplus soil as directed with in a lead of 30m.
2 6.60 2.65 1.50 52.47 Cum
Cement concrete 1:3:6 mix with stone aggregates 40mm nominal size mechanically mixed and vibrated in foundation upto a depth of 1.5 metres below ground level and 1.50 metres above Ground/Bed level.
Outer Step Inner Step Below flooring Foundation of Curtain Wall 2 2 1 2 6.00 6.00 5.20 5.30 2.65 2.25 5.30 0.60 0.20 0.20 0.10 0.15 6.36 5.40 2.76 0.95 15.47
First class brick in cement mortar 1:3 upto a depth of 1.50 below ground and above 1.50 metres from Bed/Ground level
Bottom Block Left Rectangle 2 Central Rectangle 2 Right Intermediate Rectangle 2 Right Most Upper Traingle 2 Right Most Bottom Rectangle 2 Intermediate Block upto top level Width Top Bottom 0.80 1.45 Deduct from above for the top notch For Curtain wall 2 2 1 5.30 5.30 5.20 (40+60)/2 0.50 5.30 1.00 1.00 0.12 5.30 3.31 47.01 Cum 6.00 0.40 0.40 1.92 6.00 0.40 0.40 0.96 6.00 0.00 0.80 0.00 6.00 1.45 0.80 13.92 6.00 0.00 0.80 0.00
2 2
6.00 6.00
1.13 0.50
1.80 0.45
24.30 -2.70
Reinforced cement concrete M20 (1:1.5:3) mix with stone aggregates 20mm nominal size mechanically mixed and vibrated for bed plates excluding steel reinforcement, but With 2% reinforcement , equally distributed at top & bottom in both directions Bed Block Reinforced cement concrete M20 (1:1.5:3) mix with stone aggregates 20mm nominal size mechanically mixed and vibrated for reinforced concrete work in slab excluding steel reinforcement, but including centering shuttering, laid in position. Width of Bearings = 0.30
6.00
0.53
.15
0.95
Cum
1 6
6.00
2.10
0.375
4.73
Cum
Steel reinforcement for R.C.C. works including bending and placing in position Mild steel bars conforming to IS 432/1966 GRADE I tested steel For slab For Bed Block per slab 2 6.00
0.53
.15
0.95
M.T.
First class brick in cement mortar 1:3 upto a depth of 1.50 below ground and above 1.50 metres from Bed/Ground level
2 3.10 0.40 0.50 1.24 Cum
Cement pointing 1:2 deep variety (cut weather) on brick and tile work
Side Faces Long Faces 4 4 0.40 3.10 0.50 0.50 0.80 6.20 7.00 Sqm Nos
Providing and laying 11 mm dia PVC pipe to provide weep holes including supply of all material, labour T&P etc required for propoer completion of work
12
LENGTH
Earth work in excavation in foundation trenches etc. not exceeding 30 meter depth including dressing of bottom and sides of trenches stacking the excavated soil lear from the edge of excavation and subsequent filling around home pipe/masonry in 15 cm layers with compection including disposal of all surplus soil as directed with in a lead of 30m.
2.530
1.500
3.80
2.25
1.5
3.38
3.59
2.1
30.11 CUM
Cement concrete 1:3:6 mix with stone aggregates 40mm nominal size mechanically mixed and vibrated in foundation upto a depth of 1.5 metres below ground level and 1.50 metres above 1.93 X 0.4 = 0.77 1.65 X 0.4 = 0.66 0.72 2.1 6.01 CUM
First class brick in cement mortar 1:3 upto a depth of 1.50 below ground and above 1.50 metres from Bed/Ground level
A1 A2
1.530 1.530
X + 2 + 2
0.400 1.130
0.40
= =
0.61 0.53
1.25 1.25
X + 2 + 2
0.4 0.85
0.4
= =
0.5 0.42
0.56 0.48
2.1 2.1
4.67 4.00
A3
1.130
0.500
1.875
1.53
0.85
0.5
0.68
1.1
2.1
Cement pointing 1:2 deep variety (cut weather) on brick and tile work
1.575
+ 2
0.700
2.10
2.39 Sqm
Sl No 1
Item of Work
Nos
Unit
Earthwork in excavation in foundation trenches in all types of soil other than hard rocks as per MOST Specification Clause No. 404
0 8.10 2.75 1.50 0.00 Cum
Concrete with 4 cm gauge nominal stone ballast fine sand and cement in proportion of 1:3:6 (Cement, Sand, and 40 mm nominal stone ballast) in foundation, under floors including supply of all materials labour, T&P required for proper completion of work as per Specification No 280
Outer Step 0 Inner Step 0 7.70 2.35 0.20 0.00 0.00 Cum 8.10 2.75 0.20 0.00
First class brick in cement mortar 1:3 upto a depth of 1.50 below ground and above 1.50 metres from Bed/Ground level
Bottom Step Straight Portion Traingular Portion Intermediate Step Straight Portion Traingular Portion Top Step Straight Portion Traingular Portion 0 0 0 0 0 0 5.35 1.95 5.72 1.15 5.72 0.84 1.95 0.98 1.15 0.58 0.84 0.42 0.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Where
0.40
1.80
Cum
Concrete with 20 mm gauge nominal stone grit fine sand and cement in proportion of 1:2:4 (Cement, Sand, and 20 mm nominal stone ballast) in pier cap including supply of all materials labour, T&P required for proper completion of work
0 5.72 0.84 0.15 0.00 Cum
Pointing on brick masonry work in cement mortar 1:3 complete as per relevant Clause of MOST Specification No. 1300
Bottom Step Straight Portion Traingular Portion Intermediate Step Straight Portion Traingular Portion Top Step Straight Portion Traingular Portion 0 0 0 0 0 0 5.35 1.38 5.72 0.82 5.72 0.60 0.40 0.40 0.40 0.40 1.80 1.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sqm
Steel reinforcement for R.C.C. works including bending and placing in position Mild steel bars conforming to IS 432/1966 GRADE I tested steel For slab For Bed Block per slab 1 5.72
0.84
0.150
BILL OF QUANTITY
(1x3.00 m Span) Sl No Item of Work Abutment/Slab 1 Quantity Wing Wall Pier Unit Total Rate Amount
Earth work in excavation in foundation trenches etc. not exceeding 30 meter depth including dressing of bottom and sides of trenches stacking the excavated soil lear from the edge of excavation and subsequent filling around home pipe/masonry in 15 cm Cement concrete 1:3:6 mix with stone aggregates 40mm nominal size mechanically mixed and vibrated in foundation upto a depth of 1.5 metres below ground level and 1.50 metres above
52.47
30.11
0.00
82.58
Cum
51.00
4211.78
15.47 3
6.01
0.00
21.48
Cum
1508.70
32413.51
First class brick in cement mortar 1:3 upto a depth of 1.50 below ground and above 1.50 metres from Bed/Ground level
47.01 17.92 0.00 64.93 Cum 1465.60 95160.13
Reinforced cement concrete M20 (1:1.5:3) mix with stone aggregates 20mm nominal size mechanically mixed and vibrated for bed plates excluding steel reinforcement, but including centering shuttering, laid in position.
0.95 0.00 0.95 Cum 2618.00 2474.01
Reinforced cement concrete M20 (1:1.5:3) mix with stone aggregates 20mm nominal size mechanically mixed and vibrated for reinforced concrete work in slab excluding steel reinforcement, but including centering shuttering, laid in position.
4.73 6
4.73
Cum
2789.10
13178.50
Steel reinforcement for R.C.C. works including bending and placing in position
0.44 0.00 0.44 M.T. 21506.00 9437.62
First class brick in cement mortar 1:3 upto a depth of 1.50 below ground and above 1.50 metres from Bed/Ground level
1.24 1.24 Cum 1465.60 1817.34
Cement pointing 1:2 deep variety (cut weather) on brick and tile work
7.00 2.39 0.00 6 9.39 18 Cum No 30.70 100.00 288.23 1800.00
Providing and laying 11 mm dia PVC pipe to provide weep holes including supply of all material, labour T&P etc required for propoer completion of work
12
Section at Abutment
(1x3.00 m Span) 0.30 0.53
0.30
.15 0.50 b3
1.5
LOWEST BED LEVEL 0.00 b4 0.50 b2 0.30 0.50 b3 0.15 b1 0.40 0.40 0.20 0.20 0.20 0.20 2.65 B2 0.00 b4 0.30
0.40 1.5
1.45 B1
SECTION OF WINGWALL
0.5
0.50
H+Slabthickness+wearing coat
1.0 Ground level 0.30 0.45 b2 1.13 B1 0.40 0.40 0.20 0.20 0.2 0.2 0.4 0.50 0.18 b1 0.40 0.25 0.5 0.85 0.10 0.4 GL 0.3
0.40
0.4
1.93 B2
0.84
PIER CAP
0.15
1.50
GROUND LEVEL
0.30 0.40
1.15
GROUND LEVEL
0.20 0.20
1.95
FOUNDATION CONCRETE
1.15 2.75
8.10
5.35
5.72
6.56
7.30
7.7
2.75