Input Table for RCC Culverts as per IRC SP-13 Basic Design Parametres span 1.5 height 1.

5 No_of_spans 1 Road_width wearing_coat 6.00 0.075

Abut Ment Table

ab_b1 0.15

ab_b2 0.5

ab_b3 0.5

ab_b4 0

ab_Base1 1.45

ab_Base2 2.65

Slab Table

slab_bearing overall_slab_thic 300.00 300.00

Wing Wall Table

b_1 0.18

b_2 0.45

BASE_1 1.13

BASE_2 Length-Wing Wall 1.93 2.10

DETAILS OF MEASUREMENT OF ABUTMENT WALL & SLAB ( 1x3 m Span)


DESIGN PARAMETERS : SPAN HEIGHT LENGTH OF ABUTMENT No of Spans Sl No 1 (1x3.00 m Span) FOR ABOVE PARAMETERS 1.50 M 1.50 M 6.00 M 1 Nos Item of Work (As per IRC Special Publication no - 13) DEPTH OF SLAB DEPTH OF ABUTMENT CAP B1 = B2 = b3 = Length Breadth Height 0.300 M 0.15 M 1.45 M 2.65 M 0.50 M Quantity

Nos

Unit

Earth work in excavation in foundation trenches etc. not exceeding 30 meter depth including dressing of bottom and sides of trenches stacking the excavated soil lear from the edge of excavation and subsequent filling around home pipe/masonry in 15 cm layers with compection including disposal of all surplus soil as directed with in a lead of 30m.
2 6.60 2.65 1.50 52.47 Cum

Cement concrete 1:3:6 mix with stone aggregates 40mm nominal size mechanically mixed and vibrated in foundation upto a depth of 1.5 metres below ground level and 1.50 metres above Ground/Bed level.
Outer Step Inner Step Below flooring Foundation of Curtain Wall 2 2 1 2 6.00 6.00 5.20 5.30 2.65 2.25 5.30 0.60 0.20 0.20 0.10 0.15 6.36 5.40 2.76 0.95 15.47

First class brick in cement mortar 1:3 upto a depth of 1.50 below ground and above 1.50 metres from Bed/Ground level
Bottom Block Left Rectangle 2 Central Rectangle 2 Right Intermediate Rectangle 2 Right Most Upper Traingle 2 Right Most Bottom Rectangle 2 Intermediate Block upto top level Width Top Bottom 0.80 1.45 Deduct from above for the top notch For Curtain wall 2 2 1 5.30 5.30 5.20 (40+60)/2 0.50 5.30 1.00 1.00 0.12 5.30 3.31 47.01 Cum 6.00 0.40 0.40 1.92 6.00 0.40 0.40 0.96 6.00 0.00 0.80 0.00 6.00 1.45 0.80 13.92 6.00 0.00 0.80 0.00

2 2

6.00 6.00

1.13 0.50

1.80 0.45

24.30 -2.70

BOE Flooring (1:3 Brick work)

DETAILS OF MEASUREMENT OF ABUTMENT WALL & SLAB


Sl No 4 Item of Work Nos Length Breadth Height Quantity Unit

Reinforced cement concrete M20 (1:1.5:3) mix with stone aggregates 20mm nominal size mechanically mixed and vibrated for bed plates excluding steel reinforcement, but With 2% reinforcement , equally distributed at top & bottom in both directions Bed Block Reinforced cement concrete M20 (1:1.5:3) mix with stone aggregates 20mm nominal size mechanically mixed and vibrated for reinforced concrete work in slab excluding steel reinforcement, but including centering shuttering, laid in position. Width of Bearings = 0.30

6.00

0.53

.15

0.95

Cum

1 6

6.00

2.10

0.375

4.73

Cum

Steel reinforcement for R.C.C. works including bending and placing in position Mild steel bars conforming to IS 432/1966 GRADE I tested steel For slab For Bed Block per slab 2 6.00

0.53

.15

0.95

0.42 0.01 0.44

M.T.

First class brick in cement mortar 1:3 upto a depth of 1.50 below ground and above 1.50 metres from Bed/Ground level
2 3.10 0.40 0.50 1.24 Cum

Cement pointing 1:2 deep variety (cut weather) on brick and tile work
Side Faces Long Faces 4 4 0.40 3.10 0.50 0.50 0.80 6.20 7.00 Sqm Nos

Providing and laying 11 mm dia PVC pipe to provide weep holes including supply of all material, labour T&P etc required for propoer completion of work

12

DETAILS OF MEASUREMENT OF WINGWALLS ( 1x3 m Span)


(1x3.00 m Span) SPAN LENGTH HEIGHT , H = LENGTH OF WINGWALL = SL NO. ITEM 1.50 M 1.50 M 2.10 M X-SECTIONAL AREA AT ABUT. END X-SECTIONAL AREA AT FAR END AVERAGE AREA SLAB THICKNESS WEARING COAT 0.300 M = = 0.075 M

LENGTH

VOLUME FOR 4 WALLS

Earth work in excavation in foundation trenches etc. not exceeding 30 meter depth including dressing of bottom and sides of trenches stacking the excavated soil lear from the edge of excavation and subsequent filling around home pipe/masonry in 15 cm layers with compection including disposal of all surplus soil as directed with in a lead of 30m.

2.530

1.500

3.80

2.25

1.5

3.38

3.59

2.1

30.11 CUM

Cement concrete 1:3:6 mix with stone aggregates 40mm nominal size mechanically mixed and vibrated in foundation upto a depth of 1.5 metres below ground level and 1.50 metres above 1.93 X 0.4 = 0.77 1.65 X 0.4 = 0.66 0.72 2.1 6.01 CUM

First class brick in cement mortar 1:3 upto a depth of 1.50 below ground and above 1.50 metres from Bed/Ground level

A1 A2

1.530 1.530

X + 2 + 2

0.400 1.130

0.40

= =

0.61 0.53

1.25 1.25

X + 2 + 2

0.4 0.85

0.4

= =

0.5 0.42

0.56 0.48

2.1 2.1

4.67 4.00

A3

1.130

0.500

1.875

1.53

0.85

0.5

0.68

1.1

2.1

9.25 17.92 CUM

Cement pointing 1:2 deep variety (cut weather) on brick and tile work

1.575

+ 2

0.700

2.10

2.39 Sqm

DETAILS OF MEASUREMENT OF PIER WALL ( 2x6 m Span)


DESIGN PARAMETERS : SPAN HEIGHT LENGTH OF PIER WALL No of Piers FOR ABOVE PARAMETERS 1.50 1.50 6.00 0 M M M Nos (As per IRC Special publication No 13) TOP WIDTH OF PIER EXPANSION JOINT GAP DEPTH OF SLAB DEPTH OF PIER CAP B1 = B2 = b3 = Length Breadth Height 0.84 M 0.04 M 0.30 M 0.15 M 1.15 M 2.75 M 0.40 M Quantity

Sl No 1

Item of Work

Nos

Unit

Earthwork in excavation in foundation trenches in all types of soil other than hard rocks as per MOST Specification Clause No. 404
0 8.10 2.75 1.50 0.00 Cum

Concrete with 4 cm gauge nominal stone ballast fine sand and cement in proportion of 1:3:6 (Cement, Sand, and 40 mm nominal stone ballast) in foundation, under floors including supply of all materials labour, T&P required for proper completion of work as per Specification No 280
Outer Step 0 Inner Step 0 7.70 2.35 0.20 0.00 0.00 Cum 8.10 2.75 0.20 0.00

First class brick in cement mortar 1:3 upto a depth of 1.50 below ground and above 1.50 metres from Bed/Ground level
Bottom Step Straight Portion Traingular Portion Intermediate Step Straight Portion Traingular Portion Top Step Straight Portion Traingular Portion 0 0 0 0 0 0 5.35 1.95 5.72 1.15 5.72 0.84 1.95 0.98 1.15 0.58 0.84 0.42 0.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Where

0.40

1.80

Cum

Concrete with 20 mm gauge nominal stone grit fine sand and cement in proportion of 1:2:4 (Cement, Sand, and 20 mm nominal stone ballast) in pier cap including supply of all materials labour, T&P required for proper completion of work
0 5.72 0.84 0.15 0.00 Cum

Pointing on brick masonry work in cement mortar 1:3 complete as per relevant Clause of MOST Specification No. 1300
Bottom Step Straight Portion Traingular Portion Intermediate Step Straight Portion Traingular Portion Top Step Straight Portion Traingular Portion 0 0 0 0 0 0 5.35 1.38 5.72 0.82 5.72 0.60 0.40 0.40 0.40 0.40 1.80 1.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Sqm

Steel reinforcement for R.C.C. works including bending and placing in position Mild steel bars conforming to IS 432/1966 GRADE I tested steel For slab For Bed Block per slab 1 5.72

0.84

0.150

0.72 0.00 M.T.

BILL OF QUANTITY
(1x3.00 m Span) Sl No Item of Work Abutment/Slab 1 Quantity Wing Wall Pier Unit Total Rate Amount

Earth work in excavation in foundation trenches etc. not exceeding 30 meter depth including dressing of bottom and sides of trenches stacking the excavated soil lear from the edge of excavation and subsequent filling around home pipe/masonry in 15 cm Cement concrete 1:3:6 mix with stone aggregates 40mm nominal size mechanically mixed and vibrated in foundation upto a depth of 1.5 metres below ground level and 1.50 metres above

52.47

30.11

0.00

82.58

Cum

51.00

4211.78

15.47 3

6.01

0.00

21.48

Cum

1508.70

32413.51

First class brick in cement mortar 1:3 upto a depth of 1.50 below ground and above 1.50 metres from Bed/Ground level
47.01 17.92 0.00 64.93 Cum 1465.60 95160.13

Reinforced cement concrete M20 (1:1.5:3) mix with stone aggregates 20mm nominal size mechanically mixed and vibrated for bed plates excluding steel reinforcement, but including centering shuttering, laid in position.
0.95 0.00 0.95 Cum 2618.00 2474.01

Reinforced cement concrete M20 (1:1.5:3) mix with stone aggregates 20mm nominal size mechanically mixed and vibrated for reinforced concrete work in slab excluding steel reinforcement, but including centering shuttering, laid in position.

4.73 6

4.73

Cum

2789.10

13178.50

Steel reinforcement for R.C.C. works including bending and placing in position
0.44 0.00 0.44 M.T. 21506.00 9437.62

First class brick in cement mortar 1:3 upto a depth of 1.50 below ground and above 1.50 metres from Bed/Ground level
1.24 1.24 Cum 1465.60 1817.34

Cement pointing 1:2 deep variety (cut weather) on brick and tile work
7.00 2.39 0.00 6 9.39 18 Cum No 30.70 100.00 288.23 1800.00

Providing and laying 11 mm dia PVC pipe to provide weep holes including supply of all material, labour T&P etc required for propoer completion of work

12

Total Cost Say

160781.13 160800.00 Lacs

Section at Abutment
(1x3.00 m Span) 0.30 0.53

( not to the scale )

0.30

.15 0.50 b3

1.5

LOWEST BED LEVEL 0.00 b4 0.50 b2 0.30 0.50 b3 0.15 b1 0.40 0.40 0.20 0.20 0.20 0.20 2.65 B2 0.00 b4 0.30

0.40 1.5

1.45 B1

SECTION OF WINGWALL
0.5

0.50

H+Slabthickness+wearing coat = 3.550

H+Slabthickness+wearing coat

1.0 Ground level 0.30 0.45 b2 1.13 B1 0.40 0.40 0.20 0.20 0.2 0.2 0.4 0.50 0.18 b1 0.40 0.25 0.5 0.85 0.10 0.4 GL 0.3

0.40

0.4

1.93 B2

WING WALL SECTION AT HIGH END

WING WALL SECTION AT LOW END

#REF! DRAWING OF PIER

0.84

PIER CAP

0.15

1.50

GROUND LEVEL
0.30 0.40
1.15

GROUND LEVEL

0.40 BRICK MASONRY

0.40 0.20 0.20

0.20 0.20

1.95

FOUNDATION CONCRETE

1.15 2.75

8.10

5.35

5.72

6.56

7.30

7.7

2.75