You are on page 1of 4

KEMBARA SK BANDAR TUN HUSSEIN ONN

GROUPWORK

ACTIVITY INSTRUCTION

: KAMPUNG BOY. : Facilitator explains how to make a campfire. 1. Finding leaf / fiber / cotton as combustible materials. 2. Finding and collecting twigs. 3. Finding and collecting twigs with larger size. 4.Finding and collecting dry branches. : * Each group should make a medium campfire. *The bonfire was lit earlier then need to be able to burn a wood chopstick placed horizontally on top. * The first team to successfully burn the chopstick will be considered as winner. * Activity ends when the third winner is identified. : ~ Short wooden poles = 2. ( 2 x 15 groups = 30 ) ~ Wooden chopstick = 2. ( 2 x 15 groups = 30 ) ~ Matches = 1 box. ( 1 x 15 groups = 15 ) ~ Hammer to help fixing the wooden poles. = 3 Wooden poles

ESTIMATED TIME : 1 Hour

REGULATION

EQUIPMENT

Wooden chopstick

ACTIVITY INSTRUCTION REGULATION

: BIL AIR TERTUNGGAK'. : Facilitator explains how the activities will be carried out.

ESTIMATED TIME : 1 Hour

: * Group members will line up in a long line from Point A (The water source) to Point B. *Each group will be given two pieces of PVC pipe with holes in both end. * Each group is asked to transfer the water from the water source to fill up the pail. thus extracting a ball that is in a bucket without using hands. * Use their own creativity, each group has to figure out a way to avoid water from spilling when moving from point A (The source) to Point B. * The first team to successfully released the ball from the bucket to be a winner. *Activity ends when the third winner is identified. : ~ Small pail = 1. ( 1 x 15 Groups = 15 ) ~ Ping-pong ball = 1. ( 1 x 15 groups = 15 ) ~ PVC pipe = 2. ( 2 x 15 groups = 30 ) Pipe length 30 cm.

EQUIPMENT

PVC pipe

Point A ( Water source )

Point B Pail with ball

KEMBARA SK BANDAR TUN HUSSEIN ONN


GROUPWORK

ACTIVITY INSTRUCTION REGULATION

: TITIAN KASIH' : Facilitator explains how the activities will be carried out.

ESTIMATED TIME : 1 Hour

: * These activities require each participant in each group move from location A to B without stepping on the ground. *Each team will be supplied with 4 wooden bridge measuring 1 m. in length. * Hanya 3 kumpulan akan menjalankan aktiviti ini pada setiap sesi. * All three groups time will be taken by the facilitator. *If any of the band members fell from the bridge, then the entire group has to turn back to Location A again. *The group managed to get the fastest time will win the event. : ~ Wooden bridge = 4 ( 4 x 3 groups = 12 ) Wooden bridge length - 1 m. ~ Stopwatch = 3 Wooden bridge Point A

EQUIPMENT

Point B

ACTIVITY INSTRUCTION REGULATION

: TALIAN HAYAT' : Facilitator explains how the activities will be carried out.

ESTIMATED TIME : 1 Hour

: * Each team will be given five strings which measures 3 m. in length each. * Without making any bond each group asked to remove a bucket from Location A to Location B. * Not a single member of the group is allowed to hold the bucket by hand. * Group that committed the offense turned back to location A. * Only three groups will conduct activities at each session. * All three groups time will be recorded by the facilitator's. *The group managed to get the fastest time will win the event. : ~ Rope = 5 ( 5 x 3 = 15 utas ) Rope length 3 m. each. ~ Pail = 3. ~ Stopwatch = 3. Point B

EQUIPMENT

Point A

KEMBARA SK BANDAR TUN HUSSEIN ONN


GROUPWORK

ACTIVITY INSTRUCTION REGULATION

: MENARA IMPIAN'. : Facilitator explains how the activities will be carried out. : * Each group is given a packet of straws & a roll of tape. * By using materials that are given above, each group must build a high tower in a timely manner. * The tower must be able to withstand the load of a soap loaf. * Successful teams which build the highest tower, and can accommodate loads mentioned above will be the winner. : ~ Straws = 15 packets. ~ Tape = 15 roles. Soap

ESTIMATED TIME : 1 hour 15 m

EQUIPMENT

Tower

ACTIVITY INSTRUCTION REGULATION

: BAHTERA MERDEKA'. : Facilitator explains how the activities will be carried out.

ESTIMATED TIME : 1 Hour

: * Each group will be given a piece of polystyrene, double sided tape, 5 skewers & 5 rubber. * By using materials that are given above, each group must build ship / boat / boat capable of fast moving on the water surface. * Design / creation of each group will then be contested in a race. * The race will start at location A and ends at location B. * Design / creation which reach the finish line first will wins. : ~ Polystyrene = 15 pieces. ~ Skewers = ( 5 x 15 groups = 75 sticks. ~ Rubber band = ( 5 x 15 groups = 75 ) ~ Double sided tape = 15 gulung. ~ Boundry tape = 1 role ( for the starting and finishing line ) ENDS

EQUIPMENT

STARTING

KEMBARA SK BANDAR TUN HUSSEIN ONN


GROUPWORK

ACTIVITY INSTRUCTION REGULATION

: PENYU BERTELUR'. : Facilitator explains how the activities will be carried out. : * 5 people from the group will be given a PVC pipe that was splitinto half. * Each group will be given a ball ping-pong. * By balancing a ping-pong ball placed in the PVC pipes, each group must move the ping-pong ball from Location A to Location B. * If the ball is dropped, the group must return to location A. * Only three groups will conduct activities at each session. * All three groups time will be recorded by the facilitator's. *The group managed to get the fastest time will win the event. : ~ PVC pipe split in 2. ( 5 x 4 groups = 20 ) pipe length = 50 cm. ~ Ping-pong balls = 6 x 4 groups = 24. ~ Stopwatch = 4.

ESTIMATED TIME : 1 Hour

EQUIPMENT

Point A

PVC pipe

Ping-pong ball

Point B

You might also like