You are on page 1of 8

ODORANT Production Unit 800 TPY

Data Sheet for


Allowable Nozzle Load

Iranian Gas Engineering & Development Co.

IGEDC Project No.


790637

Document .No.

Rev.

SP1-110-9850-00-PI-DT-137

SH
1

00

OF
8

Data Sheet for Allowable


Nozzle Load

00

09.Mar.2011

Rev.

Date

P.E

H.R.S

Prepared By

Checked By

N.GH

Issued For Review

Approved By

Description

This document is the property of IGEDC, Any unauthorized attempt to reproduce it, in any form, is strictly prohibited
over Code: PJ-FR-13 Rev.01

Date:89/11/18

B
Class

ODORANT Production Unit 800 TPY

Data Sheet for


Allowable Nozzle Load

Iranian Gas Engineering & Development Co.

IGEDC Project No.


790637

Document .No.

Rev.

SH
2

00

SP1-110-9850-00-PI-DT-137

OF
8

Table of Revised Pages


REVISION
PAGE

REVISION
5

REMARK

PAGE

36

37

38

39

40

41

42

43

44

10

45

11

46

12

47

13

48

14

49

15

50

16

51

17

52

18

53

19

54

20

55

21

56

22

57

23

58

24

59

25

60

26

61

27

62

28

63

29

64

30

65

31

66

32

67

33

68

34

69

35

70

This document is the property of IGEDC, Any unauthorized attempt to reproduce it, in any form, is strictly prohibited
over Code: PJ-FR-13 Rev.01

Date:89/11/18

REMARK

ODORANT Production Unit 800 TPY

Data Sheet for


Allowable Nozzle Load

Iranian Gas Engineering & Development Co.

IGEDC Project No.


790637

Document .No.

SP1-110-9850-00-PI-DT-137

Rev.

SH
3

00

OF
8

TABLE OF CONTENTS

1. Introduction.........................................................................................................................................4
2. Objective of the Project......................................................................................................................4
3. Terms and Definitions.........................................................................................................................4
4. 150 LB FLANGE RATING................................................................................................................5
5. 300 LB FLANGE RATING................................................................................................................6
6. 600 LB FLANGE RATING................................................................................................................7
7. NOTES:..............................................................................................................................................8

This document is the property of IGEDC, Any unauthorized attempt to reproduce it, in any form, is strictly prohibited
over Code: PJ-FR-13 Rev.01

Date:89/11/18

ODORANT Production Unit 800 TPY

Data Sheet for


Allowable Nozzle Load

Iranian Gas Engineering & Development Co.

IGEDC Project No.


790637

Document .No.

SP1-110-9850-00-PI-DT-137

Rev.

SH
4

00

OF
8

1. Introduction
This Data sheet covers the minimum requirements for the design, materials, fabrication,
installation, procurement, inspection and testing, and commissioning for Allowable Nozzle
Load for Odorant Production Unit.

2. Objective of the Project


This Project has been conceived for Engineering, Procurement and Construction of Odorant
Production Unit from stabilized gas condensate of South Pars field Phase 1 for Iranian Gas
Engineering and Development Company in Assaluyeh.
The License of this process is authorized by Research Institute of Petroleum Industry.

3. Terms and Definitions


In construing this specification following words and expressions shall have the meanings as
below:
COMPANY

Iranian Gas Engineering and Development Company (I.G.E.D.C).

OWNER

South Pars Gas Complex, Phase #1 (SPGC).

CONTRACTOR

JahanParsEngineeringandConstructionCompany.PertrogasJahan
EngineeringCompanyistheengineeringbodyofContractor.

Manufacturer/Supplie
r/Vendor

Organizationtowhichthepurchaseorderwillbeawarded.

Inspection Third Party


SHALL

OrganizationtowhichtheinspectionofprojectEquipmentwillbe
awarded.
Indicatesarequirement

SHOULD

Indicatesarecommendation

This document is the property of IGEDC, Any unauthorized attempt to reproduce it, in any form, is strictly prohibited
over Code: PJ-FR-13 Rev.01

Date:89/11/18

ODORANT Production Unit 800 TPY

Data Sheet for


Allowable Nozzle Load

Iranian Gas Engineering & Development Co.

IGEDC Project No.


790637

Document .No.

Rev.

SH
5

00

SP1-110-9850-00-PI-DT-137

OF
8

4. 150 LB FLANGE RATING

VESSEL, SHELL & TUBE HEAT EXCHANGER


TOWER, DRUM AND HEATER TIE-IN POINT
ALLOWABLE NOZZLE LOADS

NOZZLE
SIZE
(in)

150 LB FLANGE RATING


FORCES (KN)

MOMENTS (KNm)

FL

FA

FC

MC

MT

ML

2.40

2.40

1.80

0.24

0.36

0.31

3.60

3.60

2.70

0.54

0.81

0.70

4.80

4.80

3.60

0.96

1.44

1.25

7.20

7.20

5.40

2.16

3.24

2.81

9.60

9.60

7.20

3.84

5.76

4.99

10

12.00

12.00

9.00

6.00

9.00

7.80

12

14.40

14.40

10.80

8.64

12.96

11.23

14

16.80

16.80

12.60

11.76

17.64

15.29

16

19.20

19.20

14.40

15.36

23.04

19.97

18

21.60

21.60

16.20

19.44

29.16

25.27

20

24.00

24.00

18.00

24.00

36.00

31.20

22

26.40

26.40

19.80

29.04

43.56

37.75

24

28.80

28.80

21.60

34.56

51.84

44.93

This document is the property of IGEDC, Any unauthorized attempt to reproduce it, in any form, is strictly prohibited
over Code: PJ-FR-13 Rev.01

Date:89/11/18

ODORANT Production Unit 800 TPY

Data Sheet for


Allowable Nozzle Load

Iranian Gas Engineering & Development Co.

IGEDC Project No.


790637

Document .No.

Rev.

SH
6

00

SP1-110-9850-00-PI-DT-137

OF
8

5. 300 LB FLANGE RATING

VESSEL, SHELL & TUBE HEAT EXCHANGER


TOWER, DRUM AND HEATER TIE-IN POINT
ALLOWABLE NOZZLE LOADS

NOZZLE
SIZE
(in)

300 LB FLANGE RATING


FORCES (KN)

FL

FA

FC

MC

MT

ML

2.80

2.80

2.10

0.28

0.42

0.36

4.20

4.20

3.15

0.63

0.95

0.82

5.60

5.60

4.20

1.12

1.68

1.46

8.40

8.40

6.30

2.52

3.78

3.28

11.20

11.20

8.40

4.48

6.72

5.82

10

14.00

14.00

10.50

7.00

10.50

9.10

12

16.80

16.80

12.60

10.08

15.12

13.10

14

19.60

19.60

14.70

13.72

20.58

17.84

16

22.40

22.40

16.80

17.92

26.88

23.30

18

25.20

25.20

18.90

22.68

34.02

29.48

20

28.00

28.00

21.00

28.00

42.00

36.40

22

30.80

30.80

23.10

33.88

50.82

44.04

24

33.60

33.60

25.20

40.32

60.48

52.42

MOMENTS (KNm)

This document is the property of IGEDC, Any unauthorized attempt to reproduce it, in any form, is strictly prohibited
over Code: PJ-FR-13 Rev.01

Date:89/11/18

ODORANT Production Unit 800 TPY

Data Sheet for


Allowable Nozzle Load

Iranian Gas Engineering & Development Co.

IGEDC Project No.


790637

Document .No.

Rev.

SH
7

00

SP1-110-9850-00-PI-DT-137

OF
8

6. 600 LB FLANGE RATING

VESSEL, SHELL & TUBE HEAT EXCHANGER


TOWER, DRUM AND HEATER TIE-IN POINT
ALLOWABLE NOZZLE LOADS

NOZZLE
SIZE
(in)

600 LB FLANGE RATING


FORCES (KN)

MOMENTS (KNm)

FL

FA

FC

MC

MT

ML

3.20

3.20

2.40

0.32

0.48

0.42

4.80

4.80

3.60

0.72

1.08

0.94

6.40

6.40

4.80

1.28

1.92

1.66

9.60

9.60

7.20

2.88

4.32

3.74

12.80

12.80

9.60

5.12

7.68

6.66

10

16.00

16.00

12.00

8.00

12.00

10.40

12

19.20

19.20

14.40

11.52

17.28

14.98

14

22.40

22.40

16.80

15.68

23.52

20.38

16

25.60

25.60

19.20

20.48

30.72

26.62

18

28.80

28.80

21.60

25.92

38.88

33.70

20

32.00

32.00

24.00

32.00

48.00

41.60

22

35.20

35.20

26.40

38.72

58.08

50.34

24

38.40

38.40

28.80

46.08

69.12

59.90

This document is the property of IGEDC, Any unauthorized attempt to reproduce it, in any form, is strictly prohibited
over Code: PJ-FR-13 Rev.01

Date:89/11/18

ODORANT Production Unit 800 TPY

Data Sheet for


Allowable Nozzle Load

Iranian Gas Engineering & Development Co.

IGEDC Project No.


790637

Document .No.

Rev.

SP1-110-9850-00-PI-DT-137

SH
8

00

OF
8

7. NOTES:
1. All forces and moments act on the intersection of the nozzle (including hillside type)
center line axis with the mid thickness plane of the shell or head plates.
2. The above nozzle loads are not applicable for double pipe heat
exchanger, air cooler and heater (fired and electrical) nozzle.
3. All forces and moments in the above table shall be considered as a base for
piping and equipment calculation as an external load on nozzles.
4. All forces and moments in the above table are positive and
sign notation is as per WRC bulletin 107. If other solution methods are used, loads
shall be converted into the applicable sign notation.
5. For Heater Tie-in point and nozzle on dish:
FC(Heater Tie-in point or nozzle on dish)=FL(same as Heater Tie-in point or nozzle on shell)
MC(Heater Tie-in point or nozzle on dish)=ML(same as Heater Tie-in point or nozzle on shell)
6. Loading nomenclature:
FC=Circumferential Force
MC=Circumferential Moment

FL=Longitudinal Force
ML=Longitudinal Moment

FA=Axial Force
MT=Torsional Moment

This document is the property of IGEDC, Any unauthorized attempt to reproduce it, in any form, is strictly prohibited
over Code: PJ-FR-13 Rev.01

Date:89/11/18

You might also like