You are on page 1of 34

COMPANY PRESENTATION

www.pab-romania.com

Welcome word from PAB Romania


For PAB Romania "to build" represents in fact a partnership. Being a good partner means more than just to put concrete, steel and glass together. It means cooperating with the architects and beneficiaries in order to improve every aspect of their projects. It means to add value to this process of creation - to create buildings that last longer, that are more efficiently used and maintained, buildings that serve better those who live and work within. In what follows you will find various aspects of the way we understand to add value to your projects, as well as projects that had the benefits of the partnership with us.

PAB philosophy has remained unchanged from the beginnings of its activity: delivering quality products, on time and within the budget (regardless of the nature of goods or delivery method).

The basic principles of our societys activity are: - guiding the whole activity towards satisfying the clearly stated or inherent requirements of our customers by offering a diversified range of products and services at competitive prices - treating seriously each cooperation with interested parties in order to gain and maintain markets - to obtaining and maintain an excellent image that reflects professionalism, integrity, honesty and fairness as well as optimal communication relationships with suppliers and subcontractors, professional associations and customers.
(From the statement of the President Ion Sandu regarding quality policy)

ABOUT US
P.A.B. ROMANIA Ltd. ARAD Trading Company, located in Arad, no. 8 Iustin Marsieu Street, registered at the Chamber of Commerce under no. J02/35/93, fiscal code RO 3513698 is a Romanian company with a joint stock of 1.500.000.RON. The main field of activity of the society is manufacturing commercial, industrial, agricultural buildings, civil buildings of general interest, entertainment and sports places. Our delivery services cover the entire spectrum of activities from simple manufacturing (as a specialist entrepreneur) to the complete delivery of the project, along with the full range of services such as design, preconstruction and manufacturing to the expiration of the warranty of projects. During the 20 years working in construction, our experience can be summarized: 3,000,000 sqrm of built area, over 1,200 hectares of land surfaces arranged approximately 10,800,000 cubic meters of soil excavated and transported and about same amount of filling material over 1.5 million cubic meters of concrete and 14.400.000 kg of steel reinforcements more than 120.000 tones of metallic structure The society is concerned with designing, manufacturing and assembling metallic and concrete constructions, manufacturing closing perimeters and roofs with or without thermal and hydro insulation as well as floors and industrial platforms, preparing the land, draining, damming, land stabilization and pouring concrete, asphalt and any other processing of land. The constructive solutions adopted confer a vast range of advantages. They are modern solutions confirmed and implemented by our prior experience gained in time. Some of the advantages are: quick manufacture, long lasting, low maintenance expenses, thermal and acoustic insulation as well as a nice design of the building. The company disposes of 720 employees divided into different departments which form a very well organized unit. The company has collaboration agreements with the authorized testing laboratories in the surroundings of works in progress. The technical equipment park that our company has in endowment is various starting with mini-excavators, telescopic trucks, frontal cranes, excavators on wheels and caterpillar excavators, compacting cylinders, bulldozers, motor cranes, diesel motor and electric self-lifting platforms, equipments of low and high mechanization, means of travel for the stuff, motor trucks for transporting materials, the newest motor layouts which confer high productivity. The experience acquired in time in adopting modern qualitative solutions, as well as the performance of each department and high productivity of the motor park triggered about the steady increase of the social investment of the company. It reached 1.500.000. RON in 2007, having the following turnovers in the last 3 years: year 2006 = 34,68 mil Euro year 2007 = 51,37 mil Euro year 2008 = 51,33 mil Euro The materials used by our society in achieving the targets are from producers worldwide known for the quality they assure. The seriousness proven in dealing with foreign companies has led to a good collaboration and priority for the deliveries requested by our company. PAB experience stretches over a wide range of projects. We have never specialized in a certain market, simply because our work has been determined by the needs of our beneficiaries. This flexibility meant opportunities to build in any field, from very large commercial centers, or very small ones, exhibition centers or objectives of general interest, to sport centers and entertainment grounds, hospitals and complex industrial factories. When new projects make us work away from home, we take with us the values which consecrated our company. Succeeding in life and business its happen the most efficiently when your partners share your values. These values dont develop by themselves they have to be constantly cultivated. At PAB, we do this every day sustaining values that guide our steps. We believe in our values, and endeavor to translate these values into our behavior and daily actions

MANAGEMENT
president: Mr. Ion Sandu

general manager: eng. Vasile Moianu


- over 18 years experience in industrial and civil engineering - managing construction for more than 500.000 square meters of commercial and industrial buildings

Execution Department Organizing/controlling construction activities: civil eng. Lucian Dima


- 25 years of experience in management of construction activities - over 1.2 million square meters of built area in big and important civil, industrial and commercial buildings. Featured: Underground Electrical Plant in Caransebes, Romania Nuclear Power Plant in Cernavoda, Romania ALCOA Factory 14.000 square meters COFICAB Production facility 15.000 square meters for Coficab, Portugal LOTUS MARKET Mall 35.000 square meters built surface, 20.000 square meters exterior parking places, platforms and roads

Site manager: mech. eng. Dorin Borzan

- 30 years experience in industrial and commercial buildings, industrial structures and installations - over 700.000 square meters built surface for PAB in national and international sites Featured: ARMONIA CENTER Mall - 50.400 square meters built surface with 62.100 square meters exterior parking places, roads and platforms LOTUS MARKET Mall 35.000 square meters built surface, 20.000 square meters exterior parking places, platforms and roads Over 54.000 square meters supermarkets built surfaces in international sites: METRO I Beograd, Serbia, METRO II Beograd, Serbia, METRO Novisad, Serbia, METRO Nis, Serbia, METRO Kracuevac, Serbia

Site manager: mech. eng. Sida Marius

- 14 years experience in industrial and commercial buildings, industrial structures and installations - over 700.000 square meters built surface for PAB in national and international sites Featured: ARMONIA CENTER Mall - 50.400 square meters built surface with 62.100 square meters exterior parking places, roads and platforms LOTUS MARKET Mall 35.000 square meters built surface, 20.000 square meters exterior parking places, platforms and roads Over 36.000 square meters supermarkets built surfaces in international sites: METRO I Chisinau Moldova, METRO II Chisinau, Moldova, METRO Balti, Moldova

Site manager: mech. telecomm. eng. Dejan Trajkovic

- nationality: Serbian - works for PAB AT all sites in Serbia (more than 54.000 square meters); also in Romania for more than 120.000 square meters on commercial buildings - specialized in monitoring and coordinating installation works.

Site manager: civil eng. Radu Munteanu

- Specialized in monitoring and coordinating of finishing works

Site manager: mech. eng. Ciprian Tanase Site survey: eng. Pavel Teczesi
- coordinating of all surveying activities - over 30 years in site experience

Technical department Constructive and technological designing Technical manager: civil eng. Florian Vintila
- Civil designer, structural analyst - More than 26 important projects

Budget development and analysis compartment manager: eng. Delia Szepesi Production settling up & organizing production eng. Lorena Stana eng. Luminita Munteanu Economic department Department manager: Economist Gloria Cismas Economic management of sites: Economist Marinike Capacin Economist Marioara Popan Economist Alina Marcut Economist Eva Redai

IT Department Eng. Dan Tamas

Quality in Construction Department Quality Approval: eng. Danciu Stanoiu Quality Approval: mech. eng. Constantin Manea

Health & Safety Department HR Manager: Livia Bradean Health & safety environment: mech. eng. Ana Maria Gyorgyi Legal Department Legal adviser: Bogdan Puiu Legal adviser: Adrian Zahoi

The company has contracts with the authorized testing laboratories situated in the area of the site. The park for equipment is varied, beginning with miniexcavator, frontal loader, caterpillar shovel, wheel shovel, compactor, bulldozer, truck cranes, diesel and electric lifting platforms, minibuses to transport the workers, auto trucks to transport the materials, last generation auto equipment that have a major productivity.

2009 AUTO EQUIPMENT


Nr. Crt. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 212083 212084 212105 212078 212077 212076 212075 212074 STOCK LIST NUMBER 212056 212110 212111 212087 212086 212109 212088 212089 212085 212064 212070 212073 212071 212072 212069 212108 212068 212066 212164 212079 212090 212067 212107 212081 212054 212052 212106 212082 EQUIPMENT NAME MANUFACTURER MODEL YEAR obs./technical

TRUCK CRANE 12to TOUR CRANE TOUR CRANE AUTOBASCULE AUTOBASCULE AUTOBASCULE BULLDOZER BULLDOZER BULLDOZER BULLDOZER BULLDOEXCAVATOR BULLDOEXCAVATOR BULLDOEXCAVATOR BULLDOEXCAVATOR BULLDOEXCAVATOR BULLDOEXCAVATOR BULLDOEXCAVATOR BULLDOEXCAVATOR COMPACTOR COMPACTOR COMPACTOR COMPACTOR EXCAVATOR ON WHEELS EXCAVATOR ON WHEELS EXCAVATOR ON WHEELS EXCAVATOR ON WHEELS EXCAVATOR WITH CRAWLER EXCAVATOR WITH CRAWLER PRACTICE PIT BALLAST PRODUCTS INHERENT FRONT END LOADER FRONT END LOADER FRONT END LOADER LOADER WITH LEVER LOADER WITH LEVER LOADER WITH LEVER LOADER WITH LEVER LOADER WITH LEVER POTAIN CARLO RAIMONDI BARFORD 4.3to BARFORD 4.3to KOMATSU KOMATSU KOMATSU KOMATSU CATERPILAR JCB CATERPILAR JCB JCB CATERPILAR CASE FIAT HITACHI JCB BOMAG 21,5to PROTEC 20,5to HAMM 19,5to PUMA 8,7to KOMATSU KOMATSU AKERMAN O&K KOMATSU KOMATSU PC 240 LC- 8 /25to PC 240 NLC 3 PW 140-7K PW 140-7 EW 200 MDT98 MR 99 E SX6000 SX6000 HD 325-3 D-61EX 15EO 19.7to D-61EX 15EO 19.7to D-61EX 15EO 19.7to D6NXL 20.3to 3CX-4T 428 D 2CX-A 3CX-97T 428 C 580.SLE FT-800.2 3D BW219 PDH-3 AC 160 HD D-95643

1985 2006 2003 2008 2007 1992 2008 2008 2007 2003 2006 2005 2003 1999 1998 1997 1994 1992 1999 1998 1997 1987 2008 2007 1999 1977 2008 2007 2008 KOMATSU KOMATSU KOMATSU MERLO MERLO MERLO MANITOU MANITOU WA380-6 WA380-6 WA430-6 21.2to P26.6LPT P26.6SP ROTO 30.16K MVT1330S MVT1330SLC 2007 2007 2007 2005 2005 2003 2002 1999 MURES-BARZAVA 3.6mc 3.6mc 3.6mc arm length 18 m crampons smooth smooth smooth H-50m,L-55m/1.2to H-46.9m,L-60m/1.3to 1 mc 1 mc 16.7 mc 3.6mc/1.2to/1.6to+laser 3.6mc/1.2to/1.6to+laser 3.6mc/1.2to/1.6to+laser 3.6mc/1.2to/1.5to

38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55

212059 212060 212061 212104 212080 212091 212092 212094 212093 212095 212096 212097 212098 212099 212100 212101 212102 212103

LOADER WITH LEVER LOADER WITH LEVER MINIEXCAVATOR MINI FRONT ND LOADER MINI FRONT ND LOADER MINI COMPACTOR MOTOSTACKER WITH LEVER MOTOCOMPRESSOR MOTOCOMPRESSOR UNDERSTRUCTURE 8 m UNDERSTRUCTURE 8 m UNDERSTRUCTURE 10 m UNDERSTURCTURE 10 m UNDERSTRUCTURE 10 m UNDERSTRUCTURE 10 m UNDERSTRUCTURE 10 m UNDERSTRUCTURE 10 m UNDERSTRUCTURE 8 m

TACHEUKI CATERPILAR VOLVO KOMATSU KOMATSU RAMMAX 0.8to KOMATSU ATLAS MANNESMANN HAULOTTE HAULOTTE HAULOTTE HAULOTTE HAULOTTE HAULOTTE HAULOTTE HAULOTTE HAULOTTE

DM 15 301.5 EC 15 SK 815-5 SK 714-5 RW-1504 30-3,0to

2001 2001 2001 2008 2007 2007 2008 2000 crampons with sweep system

DEMAG COMPACT 10 COMPACT 10 COMPACT 12 COMPACT 12 COMPACT 12DX COMPACT 12DX COMPACT 12DX COMPACT 12DX STAR 10

1998 2007 2007 2007 2007 2007 2007 2007 2007 2007

PRODUCTS & SERVICES


One of the most valuable things we can do for our clients is to reduce uncertainty and the inherent risk implied by a major construction project. PAB has developed extensive resources dedicated to provide precise estimation, ideas for saving money, dates concerning the completion of trustworthy works and, in the end, a reliable building that functions as the beneficiary expected when inaugurated. These resources help control the project from start to delivery and also offer viable solutions and the safety of fulfilled task for our customers.

BUILDING SYSTEMS
Besides the very diversified services concerning constructions of all kinds, services that cover the entire possible spectrum, from designing to covering the warranties, PAB may be one of your suppliers of components or complete systems of buildings, executed on the basis of your projects or based on projects executed by our specialists. From light metal structures, which are economical, to structures able to cope with the most difficult situations of exploitation, from the prefabricated concrete structures to structures of composite materials (metal/concrete or other), executed by us together with our partners, we can design and deliver any type of structure for a modern building that complies with all current safety and quality standards. From simple metal closures suitable for industrial halls, composite panels to the most sophisticated systems of ventilated walls with thermal insulation and acoustic performance, we approach the delivery of complete packages of closings for constructions in all areas: commercial, industrial, civil buildings of general interest, sports and recreation, etc... Using materials that satisfy the highest demands of quality or proper for sophisticated and demanding aesthetic creations we offer our and our partners services that satisfy your most exquisite demands. Elements of the facade or interior joinery are all part of the packet of closings that you want. Whether simple doors and windows, curtain walls or complete systems for modern facades in combination with our plating systems, you can request the entire range of joinery items for your building. Together with our partners we provide our knowledge concerning design and delivery of complete electrical installation systems, ventilation and air handling, plumbing, sewage disposals for waste water and pluvial water, water treatment stations, fire protection and fire-fighting, and, in case, other systems that would complete the functionality of the building that you desire.

PROJECT SERVICES
DESIGNING Working with our own designers or cooperating with independent designers or employed by our beneficiaries, we have the experience of managing large projects and of high complexity. The works executed on the entire spectrum of the construction market have created in time an informational basis meant to provide real data for both an economically efficient design, but also in terms of energy consumption and comfort level of buildings, optimal depending on their destination. PRECONSTRUCTION SERVICES PAB offers a wide range of services in the preconstruction phase - as an important building company should do. The desire for continuous improvement has guided us in developing some processes and progressive and precise tools for evaluating the results of our future work. Although our services vary depending on the method we deliver the project, on the market demands as well as on each clients demands, there are stable aspects, and these are the results detailed, accurate and complete data that allow to make decisions with full knowledge of the facts and to have total control over costs and schedule of works from beginning to end. Budget estimation and development Value analysis Green consultancy (green materials, energy consumption, impact) Projects feasibility

CONSTRUCTION During the construction phase of a project, even if this is a new commercial space or a new factory PAB brings to the site experienced builders with solid knowledge, acting on the full interest of the recipient and interacting with the team of designers during the entire period of construction. The services offered by PAB during the construction phase can be grouped into several categories: Planning the phases of the project (being connected permanently with our partners) Purchasing the materials and equipments Accomplishing the plan independently Managing the subcontractors activity Planning and assuring quality, safety and health Putting into operation COMPLETING THE WORKS PAB can be proud of the swiftness in achieving their projects. The closing process begins the very first day when our teams of specialists identify the elements required by the final accomplishment of the works, continuing so that nothing remains incomplete. At the beginning we draw up a checklist of construction elements to be monitored using a computerized data basis drew up on the PAB experience of millions of built and arranged square meters in order to accomplish the project completely. We end the construction by closing the site and following the bearing of the project by the end of the warranty.

DELIVERY METHODS
Irrespective of the delivery method, the approach to each project is the same that of an undisputed leader in safety procedures, quality and project management, with the stated aim to surpass your expectations. Each beneficiary can choose a different method of delivery, which is best, suited for the planning, designing and the building he wants. We have the experience of a full scale of methods, ranging from simple auctions for construction contracts (in which case PAB has no involvement in the design phase) to the delivery of complete projects (when PAB plays a decisive role beginning with the early design process until the carrying out of the last guarantees). THE LUMP SUM CONTRACT PAB signs a lump sum contract for a global amount (flat-rate) in exchange for the construction services it offers, as a result of auctions based on the contract documents supplied by the customer. PROJECT MANAGEMENT PAB is committed to achieve the preconstruction and construction phase, without actually constructing with their own staff. Subcontracts are owned by the beneficiary. While carrying out the project, PAB is involved with the beneficiary, architects and consultants beginning with the design and construction until the investment is operational and taken hold off by the beneficiary. In time PAB services have diversified offering our customers a complete control over: costs, execution schedule, feasibility of projects, quality of executed works and guarantees. GENERAL ENTREPRENEUR PAB completes the works and services in the preconstruction and construction phase of the project, which are granted as a result of auctions and contract negotiations and executes on its own strength a big part of these works. PAB can make with its staff a great variety of civil works and structural ones, steel and concrete structures, all types of works of closing, as well as finishing and equipment assembly. By performing the most critical phases of the construction by its own, PAB exercises a maximum control over costs, program and execution quality issues. All subcontracts are held by PAB, so the execution schedule as well as the costs is guaranteed. PROJECT MANAGEMENT & GENERAL ENTREPRENEUR PAB performs a combination of the two methods described above - both the project management and the general contracting of the works performed. From the management of works in the preconstruction phase to the accomplishment with the own staff of the most important works during the construction phase PAB controls the project from the very beginning to its end. The guarantee concerning quality execution within the deadline and the budget is maximum.

ASSISTING DESIGN PAB provides an extensive team of specialists within different areas to help design teams in their efforts. Our focus is on connecting all subcontractors with designers to find the best solutions that satisfy all the needs of the beneficiary DESIGN & CONSTRUCTION PAB concludes a single contract, which includes all services for planning, design, construction and implementation of a project. From the draught to the actual functioning of the objective the responsibility and the guarantee are total. INTEGRATED PROJECTS PAB closes a settlement with the customer, design team and teams of builders, to have a cooperation that allows a share of benefits when the project objectives are achieved. Execution of such projects allows us to fully integrate our approach to works, our safety and quality programs to successfully attain the object for all team members.

PARTNERSHIPS
For PAB Romania "to build" represents in fact a partnership. Being a good partner means more than just to put concrete, steel and glass together. It means cooperating with the architects and beneficiaries in order to improve every aspect of their projects. It means to add value to this process of creation - to create buildings that last longer, that are more efficiently used and maintained, buildings that serve better those who live and work within. In order to achieve a solid development of the business and also for giving confidence and security to your clients, your partners must share this strength and basic values that guide their present actions and vision about how future should look like. In this context, the association between PAB Romania and Corus British Steel Nederland International BV Netherlands comes as a natural pursuit of the constant growth that our company has experienced. This increase in both quantity and quality concerning all fields of our activity has resulted in a new company - Corus Building Systems Romania - a joint venture within whose framework we feel both honored and obliged.

Having adhered to the core values of CORUS (one of the largest global manufacturers of metal and metal products) requires a total opening towards what is new and lasting in the field of constructions. Using materials produced by CORUS can be a guarantee of the quality and the sustainability of the executed works. These materials along with our system of quality assurance, safety and health, but also with the respect for the environment, are the guarantees of works that have a particular quality level but are also very "current" in terms of compliance with all the requirements of a modern, economic and efficient building.

Collaboration with CORUS unquestionably means "development", a quantitative development - considering the strength of CORUS as supplier of materials - making possible to tackle more projects at a larger scale, providing certainty and quality concerning their execution within the term. Development concerns also quality - the huge system of production performed by CORUS can provide a diverse range of materials, created due to the latest scientific research in the field, able to satisfy the most demanding aesthetic and sustainability claims. Our leadership, coordination and monitoring of activity in all its aspects is a developed and upgraded one, with the stated aim to be leaders in this field of activity. We are characterized by the wish to evolve and the constant desire for self-improvement, therefore we can say we have a performance oriented management system able to cope with the projects it undertakes and to keep their excellent performance over time. In this regard we are in the process of developing cooperation with Corus KALZIP specialized in manufacturing and supplying worldwide metal solutions of aluminum closures suitable for buildings (facades and roofs). Kalzip the world's leading aluminum standing seam roofing and wall cladding system is a precision engineered, multi component system with proven durability, high performance and low maintenance. A range of materials, finishes and shapes, virtually limitless design potential and advanced roll forming techniques have enabled Kalzip to combine functionality with stunning aesthetics on both small uncomplicated designs and world-famous, award winning projects. Truly sustainable features, such as solar solutions and Nature Roof provide the perfect finishing touches to the unique Kalzip range. The new and innovative Kalzip-FC facade system offers architects and designers a flexible and economical solution for coating walls both for new buildings and renovation projects. The innovative fixing and flexible bidirectional assembly system are the new features added by this system to the already known metal ventilated facades.

RESPONSIBILITY
We take our responsibilities seriously. Our objective is to be world class. For PAB Romania, responsibility involves the integration of our financial and strategic goals with: - a commitment to the health, safety and well-being of its employees and communities. - a focus on improving environmental performance and providing sustainable products. - conducting all aspects of its business with honesty and integrity.

ENERGY&ENVIRONEMENT Regulation Framework for environmental protection - from the statement of the President Protecting the environment in which we operate and where our employees and our community live is a fundamental deed for the ongoing success of our business. This set of environmental rules has been developed to maintain and improve our company's behavior by encouraging these ecological practices. The framework confirms the values that PAB has had and has always applied, and which must from now on become strategic targets in the development of the company. I am personally committed to ensuring that we have functional procedures and that the staff from our companys management provides the exceptionality of our projects in this regard. I expect all our actions to be directed to improve the environment by following these rules.
ION SANDU President PAB Romania

Our mission is to maintain and develop a large number of contracts and business development projects that will generate profit for investors and real values for customers. In this approach, the environmental protection is one of the essential values in the core virtues of our company.

PAB encourages and supports its staff to develop a strong and environmentally responsible culture. It also acts for developing ecological execution procedures to be followed by all those involved in the companys projects. The integration of environmental issues can only be achieved when all those responsible involved in the company's operations will contribute directly and side by side to achieve these objectives. PAB Romania will always coordinate its affairs in compliance with environmental protection as basic value for the company and its staff. Our approach is based on clear objectives. All participants to the company's activities are obliged to have regard for these procedures supporting their own environmental protection systems. PAB will strive to carry on its operations in a responsible and environmentally sustainable manner.

SAFETY IS OUR NUMBER ONE PRIORITY

Simply put, nothing we do is more important than ensuring that our employees and our team members return safely to their loved ones every night. And that's because we are a company where family is a key word and a society whose employees are regarded as our greatest and most valuable asset. But above all, we stress the safety issue in our work, simply because it is important. Everything we do within PAB to achieve a labor environment that has zero accident potential is not only a priority but a basic principle of our company. The company's total commitment to safety work rewards everyone involved. Our performance within labor safety has improved steadily. Our approach through preventing events led PAB to achieve a safety record the registering of an insignificant number of events. The results only motivate us to work even better. PAB safety philosophy is built around the idea that everyone must be equally involved in safety programs at work. This approach proves to be an effective tool to eliminate deceases, injuries, and professional diseases at work. Our formal and proactive security program is actively managed by trained and dedicated security professional staff and is best summarized in four words: communication, training, motivation and monitoring.

COMMUNITY INVOLVEMENT PAB employees are as passionate about building better communities as we are about construction. Ours is a personal approach. We give of our time and talent for one simple reason. It's the right thing to do. More than donating money, it's about creating personal relationships, improving lives, helping those who need help most, making a real difference, together. PAB employees build more than buildings. We build relationships. At PAB we are proud of the difference we make in the communities where we live and work.

THE MAIN WORKS CARRIED OUT BY OUR COMPANY


CONSTRUCTION DIVISION
1. ARBEMA - ARAD DEPOSIT
Built surface 8.200 sqrm. Type of working sub-contractor Execution time 3 months Year of execution 1997

Enclosures:
-

Walls: sandwich pannels with polyuretanic core Roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

2. MONDIAL - LUGOJ production facility


Built surface 8.700 sqrm. Type of working sub-contractor Execution time 2 months Year of execution 1997

Enclosures:
-

Walls: sandwich pannels with polyuretanic core Roof: sandwich pannels with polyuretanic core

3.

METTERA - GIURGIU production facility for special steels in FREE ZONE OF GIURGIU
Built surface 32.000 sqrm. Type of working sub-contractor Execution time 4 months Year of execution 1998 1999

Enclosures:
-

Walls: sandwich pannels with polyuretanic core Roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

4.

SOLECTRON I - TIMISOARA
Built surface 12.000 sqrm. Type of working sub-contractor Execution time 3 months Year of execution 1999

Enclosures:
-

Walls: cassetes, mineral wool, anti-dew foil, metal sheet for faade, Roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

5.

CONPET S.A. - PLOIESTI pumping plants and distributors 10 Pieces


Built surface 8.200 sqrm. Type of working sub-contractor Execution time 8 months Year of execution 1999- 2000

Enclosures:
-

Walls: sandwich pannels with polyuretanic core Roof: : sandwich pannels with polyuretanic core

6.

EASTERN TECHNOLOGY - ARAD production facility


Built surface 5.500 sqrm. Way of execution: walls - cassettes, mineral wool, anti-dew foil, metal sheet for faade, roof Alkorplan, metallic structure made out of euro profiles Type of working general contractor Execution time 6 months Year of execution 1999- 2000

7.

STEROM - CAMPINA
Built surface 12.700 sqrm. Way of execution thermo insulating panels Type of working sub-contractor Execution time 2 months Year of execution 1999

8.

ALKATEL E.K.R. - SANTANA


Built surface 6.900 sqrm. Type of working sub-contractor Execution time 3 months Year of execution 2000

Enclosures:
-

Walls: thermo insulating panels Roof: thermo insulating panels

9.

SOLECTRON II - TIMISOARA
Built surface 12.000 sqrm. Type of working sub-contractor Execution time 3 months Year of execution 2000

Enclosures:
-

Walls: cassetes, mineral wool, anti-dew foil, metal sheet for faade Roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

10. METRO - CLUJ


Built surface 10.000 sqrm. Type of working sub-contractor Execution time 3 month Year of execution 2000

Enclosures:
-

Walls: cassetes, mineral wool, anti-dew foil, metal sheet for faade Roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

11. SARA LEE- ROSKO TEXTIL - CURTICI


Built surface 4.740 sqrm. Type of working general contractor Execution time 3 months Year of execution 2000 2001

Enclosures:
-

Walls: cassetes, mineral wool, anti-dew foil, metal sheet for faade Roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

12. KROMBERG & SCHUBERT - TIMISOARA


Built surface 8.400 sqrm. Type of working sub - contractor Execution time 2 months Year of execution 2000

Enclosures:
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

13. MOMO - RIBITA, BRAD


Built surface 2.400 sqrm. Type of working sub-contractor Execution time 2 months Year of execution 2000

Enclosures:
-

walls: sandwich panels with polyuretanic core roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

14 CASH&CARY XXL REWE BUCURESTI - PANTELIMON


Built surface 4.584 sqrm Type of working sub-contractor Execution time 1 month Year of execution 2001

Enclosures:
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

15. METRO VOLUNTARI, BUCURESTI


Built surface 12.700 sqrm Type of working sub-contractor Execution time 1,5 month Year of execution 2000

Enclosures:
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

16. METRO - BAIA MARE


Built surface 10.000 sqrm Type of working sub-contractor Execution time 1,5 month Year of execution 2001

Enclosures:
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

17. SELGROS BUCURESTI PANTELIMON


Built surface 14.000 sqrm Type of working sub-contractor Execution time 1,5 month Year of execution 2001

Enclosures:
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

18. METRO GALATI


Built surface 10.000 sqrm Type of working sub-contractor Execution time 1,5 month Year of execution 2001

Enclosures:
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

19. EXHIBITION PAVILION CCIA ARAD


Built surface 4.800 sqrm Type of working direct contract Execution time 1 month Year of execution 2001

Enclosures:
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

20. METRO - PLOIESTI


Built surface 10.000 sqrm Type of working sub-contractor Execution time 1,5 month Year of execution 2002

Enclosures:
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

21. METRO - ORADEA


Built surface 10.000 sqrm Type of working sub-contractor Execution time 1,5 month Year of execution 2002

Enclosures:
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

22. SELGROS BUCURESTI BANEASA


Built surface 14.000 sqrm Type of working sub-contractor Execution time 1,5 month Year of execution 2002

Enclosures:
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

23. METRO SIBIU


Built surface 10.000 sqrm Type of working sub-contractor Execution time 1,5 month Year of execution 2002

Enclosures:
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

24. SELGROS TARGU. MURES


Built surface 14.000 sqrm Type of working sub-contractor Execution time 1,5 month Year of execution 2002

Enclosures:
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

25. MAXSTILE FACTORY ARAD


Built surface 4.000 sqrm Type of working general-contractor Execution time 2 months Year of execution 2002

Enclosures:
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

26. SHOWROOM & SERVICE QUARK MOTORS - ARAD


Built surface 2.500 sqrm Type of working sub-contractor Year of execution 2003 in work

Enclosures:
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

27. CASH&CARY XXL Sibiu


Built surface 5.450 sqrm Type of working sub-contractor Execution time 3 weeks Year of execution 2002

Enclosures:
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

28. CASH&CARY XXL TARGOVISTE


Built surface 5.450 sqrm Type of working sub-contractor Execution time 1 month Year of execution 2003

Encasings
-

walls: sandwich panels with polyuretanic core roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

29. CASH&CARY XXL BUZAU


Built surface 5.450 sqrm Type of working sub-contractor Execution time 1 month Year of execution 2003

Encasings
-

walls: sandwich panels with polyurethane core roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

30. SELGROS - BUCURESTI BERCENI


Built surface 14.000 sqrm Type of working sub-contractor Execution time 1,5 month Year of execution 2003

Encasings
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

31. FUEL SUPPLY BASE ROMOIL - BUCURESTI


Built surface 1.800 sqrm Type of working direct contract Execution time 1 month Year of execution 2003

Encasings
-

walls: sandwich panels with polyuretanic core roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

32. METRO - SUCEAVA


Built surface 10.000 sqrm Type of working sub-contractor Execution time 1,5 month Year of execution 2003

33. SPACES FOR STORING FOOD PRODUCTS S.C. ASTRAL IMPEX S.R.L. - ARAD
Built surface 2.900 sqrm Type of working general contractor Execution time 4 months Year of execution 2003

Structure:
-

Encasings

insulated foundations, foundation beams Structure: columns made out of built-up concrete walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane exterior roads and platforms connection to the national road

Exterior furnishing

34. METRO - TG MURES


Built surface 10.000 sqrm Type of working sub-contractor Execution time 1,5 month Year of execution 2003

Encasings
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

35. METRO BUCURESTI IV, BERCENI


Built surface 10.000 sqrm Type of working sub-contractor Execution time 1,5 month Year of execution 2003

Encasings
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

36. METRO - PITESTI


Built surface 10.000 sqrm Type of working sub-contractor Execution time 1,5 month Year of execution 2003

Encasings
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

37. DRAEXLMAIER - HUNEDOARA


Built surface 15.000 sqrm Type of working general contractor Execution time 3,5 months Year of execution 2003

Structure
-

Encasings

insulated foundations, foundation beams structure made out of euro profiles walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane exterior roads and platforms connection to the national road

Exterior furnishing

38. SELGROS - CONSTANTA


Built surface 14.000 sqrm Type of working sub-contractor Execution time 1,5 month Year of execution 2003

Encasings
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

39. GAS STATION ROMPETROL


CONSTANTA 2 Stations TARGOVISTE ARAD Year of execution: 2003

Structure:
-

Encasings

insulated foundations under the columns, foundation beams metallic structure made out of euro profiles walls: sandwich panels with polyuretanic core roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

40. SHOW ROOM BMW


Encasings
CONSTANTA BUCURESTI

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

41. CONTITECH - TIMISOARA


Built surface 7.000 sqrm Type of working general-contractor Execution time 3 months Year of execution 2003

Structure
-

Encasings

insulated foundations under the columns, foundation beams structure made out of euro profiles walls: sandwich panels with mineral wool core roof: sandwich panels with mineral wool core exterior roads and platforms connection to the national road

Exterior furnishings

42. F U E L

SUPPLY BASE ROMOIL - CRAIOVA


Built surface 1.800 sqrm Type of working direct contract Execution time 1 month Year of execution 2004

Encasings
-

walls: sandwich panels with polyuretanic core roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

43. GAS STATION ROMPETROL


TIMISOARA ORADEA CLUJ SUCEAVA SLOBOZIA SIBIU ARAD DROBETA TURNU SEVERIN CRAIOVA

Structure:
-

Encasings

insulated foundations under the columns, foundation beams metallic structure made out of euro profiles walls: sandwich panels with polyuretanic core roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

44. SELGROS - TIMISOARA


Built surface 14.000 sqrm Type of working sub-contractor Execution time 3,5 months Year of execution 2004\

Encasings
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

45. BLUE ARCTIC GYM ARAD


Built surface 1.200 sqrm Type of working direct contract Execution time 2 weeks Year of execution 2004

Encasings
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

46. INDUSTRIAL COMPLEX ALCOA - CHISINEU CRIS


Built surface 12.000 sqrm Type of working general-contractor Execution time 5 months Year of execution 2004

Structure
-

Encasings

insulated foundations under the columns, ground beams technical channels metallic structure made out of europrofiles walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane exterior roads and platforms (36 000 sqrm) connection to the national road (12 000 sqrm)

Exterior furnishings

47. METRO BRASOV


Built surface 10.000 sqrm Type of working sub-contractor Execution time 1,5 month Year of execution 2004

Encasings
-

walls: cassettes, mineral wool, anti-dew foil, metal sheet for faade roof: trapezoidal sheet, anti-dew foil, mineral wool, heat sealable membrane

48. SELGROS ORADEA


Built surface 14.000 sqrm Construction solution lateral encasing: cassettes, terrace: ALKORPLAN Type of working sub-contractor Execution time 2 months Year of execution 2004

49. METRO CONSTANTA


Built surface 10.000 sqrm Construction solution lateral encasing: cassettes, terrace: ALKORPLAN Type of working sub-contractor Execution time 2 months Year of execution 2004

50. SHOW ROOM BANAT CAR TIMISOARA BMW


Built surface 3.000 sqrm Type of working sub-contractor Execution time 4 months Year of execution 2004

51. METRO CHISINAU REPUBLIC OF MOLDAVIA


Built surface 10.000 sqrm Construction solution lateral encasing: cassettes, terrace: ALKORPLAN Type of working sub-contractor Execution time 2 months Year of execution 2004

52. METRO - BELGRAD REPUBLIC OF SERBIA


Built surface 10.000 sqrm Construction solution lateral encasing: cassettes, terrace: ALKORPLAN Type of working sub-contractor Execution time 2 months Year of execution 2004

53. GAS STATION ROMPETROL


TIMISOARA ARAD - SAVARSIN TURDA SIBIU

54. 54. INDUSTRIAL COMPLEX CARANSEBES


Built surface 1.200 sqrm Construction solution lateral encasing: cassettes, terrace: ALKORPLAN Type of working general-contractor Execution time 4 months Year of execution 2004

55. SELGROS - ARAD


Built surface 14.000 sqrm Type of the contract general contractor Execution time 4 months Year of execution 2005

Structure:
-

Encasings:

insulated foundations under the columns, ground beam structure made out of built -up concrete walls: :cassetes, mineral wool, anti dew foil, metal sheet for facade roof: trapezoidal sheet, anti dew foil, mineral wool, heat sealable membrane exterior roads and platforms (42 000 sqrm) docks connection to the national road (15 000 sqrm)

Exterior furnishings:

56. METRO - ARAD HALL


built surface 9.000 sqrm type of contract General Contractor time of execution 2 months year of execution 2005

Structure:
-

Encasings:

insulated foundations under the columns, ground beams structure made out of built up concrete walls: cassettes, mineral wool, anti dew foil, metal sheet for facade roof: trapezoidal sheet, anti dew foil, mineral wool, heat sealable membrane exterior roads and platforms (25 000 sqrm) docks connection to the national road (16 000 sqrm)

Exterior furnishings:

57. METRO - TIMISOARA 2 HALL


built surface 9.000 sqrm type of contract General Contractor execution time 2 months Year of execution 2005

Encasings:
-

walls: :cassettes, mineral wool, anti dew foil, metal sheet for facade roof: trapezoidal sheet, anti dew foil, mineral wool, heat sealable membrane

58. METRO - BELGRAD 2 SERBIA HALL


built surface 12.000 sqrm type of contract subcontractor time of execution 2 luni year of execution 2005

Encasings:
-

walls: cassettes, mineral wool, anti dew foil, metal sheet for facade roof: trapezoidal sheet, anti dew foil, mineral wool, heat sealable membrane

59. SELGROS - CRAIOVA HALL


built surface 14.000 sqrm type of contract subcontractor time of execution 2 months year of execution 2005

Encasings:
-

walls: cassettes, mineral wool, anti dew foil, metal sheet for facade roof: trapezoidal sheet, anti dew foil, mineral wool, heat sealable membrane

60. SELGROS - PLOIESTI HALL


built surface 14.000 sqrm type of contract subcontractor time of execution 2 months year of execution 2005

Encasings:
-

walls: cassettes, mineral wool, anti dew foil, metal sheet for facade roof: trapezoidal sheet, anti dew foil, mineral wool, heat sealable membrane

61. SIEMENS - SIBIU HALL


built surface 4.000 sqrm type of contract subcontractor time of execution 2 months year of execution 2005

Encasings
-

walls: cassettes, mineral wool, anti dew foil, metal sheet for facade roof: trapezoidal sheet, anti dew foil, mineral wool, heat sealable membrane

62. METRO - KRACUJEVAC SERBIA HALL


BUILT SURFACE 9.000 sqrm type of contract subcontractor time of execution 2 months year of execution 2005

Encasings:
-

walls: cassettes, mineral wool, anti dew foil, metal sheet for facade roof: trapezoidal sheet, anti dew foil, mineral wool, heat sealable membrane

63. COINDU CURTICI, ARAD


built surface 12.000 sqrm time of execution 3 months year of execution - 2005

Encasings:
-

walls: cassettes, mineral wool, anti dew foil, metal sheet for facade roof: trapezoidal sheet, anti dew foil, mineral wool, heat sealable membrane

64. COFICAB EASTERN EUROPE - ARAD


built surface 15.000 sqrm type of contract General Contractor time of execution 6 months year of execution - 2005

Structure:
-

Encasings

insulated foundations under the columns, ground beams technical channels euro profiles metallic structure walls: cassettes, mineral wool, anti dew foil, metal sheet for facade roof: trapezoidal sheet, anti dew foil, mineral wool, heat sealable membrane exterior roads and platforms (35 000 sqrm) docks

Exterior furnishings:

65. REAL - CONSTANTA


built surface - 14.500 sqrm type of contract subcontractor time of execution 2,5 months year of execution - 2006

66. REAL - CRAIOVA


built surface 15.000 sqrm type of contract subcontractor time of execution 2,5 months year of execution 2006

67. SELGROS - BACAU


built surface 14.500 sqrm type of contract subcontractor time of execution 3 months year of execution 2006

68. SELGROS - SUCEAVA


built surface 14.500 sqrm type of contract subcontractor time of execution 3,5 months year of execution 2006 -2007

69. SPAR - ARAD


built surface 1.100 sqrm type of contract General Contractor time of execution 1,5 months year of execution 2006

70. SPAR - RESITA


built surface 1.100 sqrm type of contract General Contractor time of execution 1,5 monhs year of execution 2006

71. KANDIA - BUCHAREST


built surface: - 4.572 sqrm type of contract General Contractor time of execution: 5 months year of execution - 2006

72. SELGROS - IASI


built surface 16.000 sqrm type of contract subcontractor time of execution 4,5 months year of execution 2007 2007

73. REAL - TARGU MURES


built surface 15.500 sqrm type of contract subcontractor time of execution 1,5 months year of execution 2006

74. REAL - BRASOV


built surface 12.500 sqrm type of contract subcontractor time of execution - 1,5 months year of execution 2006

75. HORNBACH - BUCHAREST


type of contract General Contractor built surface 16.773 sqrm time of execution: - 8 months year of execution 2006 2007

76. SELGROS - BRAILA


built surface 14.500 sqrm type of contract Subcontractor time of execution 3 months year of execution 2008

77. PRAKTIKER - IASI


built surface 10.000 sqrm type of contract General Contractor time of execution 3,5 months year of execution 2008

78. WAREHOUSE PENNY MARKET - TURDA


built surface 30.000 sqrm type of contract General Contractor time of execution - 6 months year of execution 2008

79. COMERCIAL COMPLEX ARMONIA - ARAD


built surface 51.090,8 sqrm roads and platforms surface 64.200 sqrm road connection type of Contract General Contractor year of execution 2008

80. Comercial Complex LOTUS MARKET ORADEA


built surface 35.000 sqrm roads and platforms surface 20.000 sqrm type of contract Subcontractor time of execution 4 months year of execution 2008

81. Comercial Complex ARMONIA SATU-MARE


Built surface 51.100 sqrm parking, roads, platforms 112.000 sqrm type of contract General Contractor time of execution in work

82. Comercial Complex ROUA BRASOV


built surface 40.500 sqrm parking, roads, platforms 86.000 sqrm type of contract General Contractor time of execution in work

83. WAREHOUSE TRADE TRANS TERMINAL CURTICI, ARAD


built surface 5.400 sqrm roads and platforms surface 10.500 sqrm type of contract General Contractor time of execution - 3 months year of execution 2008

84. INTERMODAL CURTICI, ARAD


RAILPORT

TERMINAL

built surface 36.600 sqrm railway 2.500 m type of contract General Contractor time of execution - 4 months year of execution 2008

85. Office building TRADE TRANS LOG CURTICI, ARAD


built surface 2.000 sqrm roads and platforms surface 2.400 sqrm type of contract General Contractor time of execution 2.5 months year of execution 2009

86. KAUFLAND RESITA


built surface 5.500 sqrm roads and platforms surface 15.000 sqrm type of contract Subcontractor time of execution 3 months year of execution 2009

87. DEDEMAN II STORE - BUCURESTI


built surface 13.400 sqrm roads and platforms surface 6.200 sqrm type of Contract General Contractor time of execution 3.5 months year of execution 2009

88. SELGROS MILITARI, BUCURESTI


built surface 11.700 sqrm roads and platforms surface 13.000 sqrm type of contract Subcontractor time of execution 4 months year of execution 2009

89. DEDEMAN STORE - BRASOV


built surface 14.500 sqrm roads and platforms surface 18.200 sqrm type of Contract General Contractor time of execution 4 months year of execution 2010

90. DEDEMAN STORE - CRAIOVA


built surface 13.100 sqrm roads and platforms surface 18.000 sqrm type of Contract General Contractor time of execution 4 months year of execution 2010

91. DEDEMAN STORE - ARAD


built surface 13.100 sqrm roads and platforms surface 18.400 sqrm type of Contract General Contractor time of execution in work start of execution december 2009

92. DEDEMAN STORE - TIMISOARA


built surface 15.400 sqrm roads and platforms surface 18.400 sqrm type of Contract General Contractor time of execution in work start of execution march 2010

ROAD DIVISION
HUMAN RESOURCES
The road division has 483 employees, 50 with high degree in road construction specialists and other personnel construction and restoring roads.

EXPERTISE
Construction, maintenance and mending of highways, roads, airdromes, sports grounds Construction demount, embankments and building site management Lease of construction and demount equipment with service personnel

SERVICES
On site stabilizing and recycling of road layers with an addition of frothy bitumen, cement or other binders Summer and winter road maintenance Mending of road systems Maintenance and mending of art works Paving, reinforcing and modernizing roads Support walls and parapetes Asphalt carpets Preparation and delivering of asphalt mixture

COMPLETED PROJECTS
o o o o

o o o o

Primary mending works on the DN 68-57 km national road (16.7 mil euro); Asphalt mending works on Highway A1; Modernization of county and communal roads; Mending and compensation works for the wear of the road coating caused by Road reinforcement works, maintenance works for roads, embankments, art works, execution of support walls, rigid parapets, asphalt drillings on DN57B and DN57; Stabilizing works; On site recycling works of the road coating; On site consolidation by recycling with frothy bitumen and cement and two layers of DC39 mixture Snandrei cityhall Mending works with mixture on large and isolated surfaces 28,669,117 lei

EQUIPMENTS
Equipment for production of asphalt mixture, total capacity of 500 tones/h: OKIPP asphalt mixing plant - 240t/h = 1 piece BENINGHOVEN asphalt mixing plant -160 t/h = 1 piece KDM asphalt mixing plant -100 t/h = 1 piece Laying aspahlt mixture tools ABG road paver finisher = 3 pieces MARINI road paver finisher = 1 piece VGELE road paver finisher = 3 pieces HAMM mixt cilindric vibrocompactor = 6 pieces HAMM wheels cilindric vibrocompactor = 6 pieces Bituminos emulsion plant Aspahlt distributing truck Emulsion distributing equipment TEREX Crushing and Screening equipment = 1 piece On site milling machines WIRTGEN 2500 cold milling machine = 1 piece WIRTGEN 2100 cold milling machine = 1 piece Road construction and maintenance machines CAT dreger 3 pieces CAT 428 Bulldreger = 15 pieces CAT bulldozer = 2 pieces Motor graders = 7 pieces UMBARBER green road widener= 1 piece HAMM cilindric vibrocompactor = 9 pieces BOMAG cilindric vibrocompactor = 14 pieces 500 W asphalt driller = 5 pieces CAT frontal loader 3.5 mc = 4 pieces Vibratory plate compactors = 6 pieces Themocontainer = 10 pieces Means of transportation MERCEDES BENZ ACTROS dump truck= 15 pieces ROMAN dump track 20 pieces Carcrane = 2 pieces MERCEDES Transporter = 17 pieces LEA Transporter = 30 pieces Transport trailer equipment = 15 pieces Semitrailer = 2 pieces Equipment for snow removal and spreading of non-skidding materials = 52 pieces

o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o

Since November 2000 S.C. P.A.B. ROMANIA S.R.L. is certified by the ROMANIAN SOCIETY FOR QUALITY ASSURANCE as being the owner of a quality assurance system, according to the ISO 9001 standard. The quality of execution and complying with the contracted terms are two major objectives of our company and are certified by the owners.

PRESIDENT ION SANDU

You might also like