Purpose
RespondtoCouncil Motion CF100221S1 (Rosendahl Reyes) Addressissuesraisesby Channel2CBSNews Updateonoptimization atMarVistaProject
PropOhasExtensiveOversight
AdministrativeOversight Committee(AOC) Meetsmonthly CitizenOversight AdvisoryCommittee (COAC) MeetsMonthly
MarVistaParkStormwaterBMP LocatedNearSawtelleBlvd.andPalmsBlvd.
ProjectPurposeandBenefits
Complywithwaterquality standards. Reducestormwatertrashand bacteriapollutionentering BallonaCreekandSantaMonica Bay. Reusewaterwherefeasible.
MarVistaProjectDescription
Newinnovativeproject in needofextensiveoptimization. 270acrewatershedtributary areaconsistingofhighdensity residentialandcommercial corridor. TreatmentTrain:
Trashcollection,hydrodynamic separator,retentionchamber,and disinfectionfacility.
Storagetankof260,000gallons.
6
STORMWATERFLOWANDTREATMENT
MarVistaProjectBudgetandSavings
ProjectSavingsof$1.15millionby leveragingotherfundingresources
TOTALBUDGET $4.46M MultipleSourcesofFunding: FederalARRA $1.78M StateWaterResources $0.30M CityLAPropO $1.23M TOTALCOST $3.31M TOTALSAVINGS $1.15M
MarVistaProjectIssues
Facilitywasshutdown duetosafetyconcerns Singlesampleshowed highbacterialevels Noreuseofwater Eligibilityfor reimbursementfrom State
Disinfection Building.
Optimization&CorrectiveActions
Disinfection Building.
10
Optimization&CorrectiveActions
Installedstoragefor chlorinetablesoutside thebuildingtominimize exposuretochlorine fumes.Projectusessolid chlorinetabletsfor disinfection.
Tablets stored in tubs and in locked blue container outside the building.
11
Optimization&CorrectiveActions
Installedaportable eyewash.Portable eyewashhasfreshwater toflusheyesifexposed tochlorine. Permanentsystemis beinginstalled.
Portable eyewash
12
Optimization&CorrectiveActions
New fan
13
Optimization&CorrectiveActions
Improvedaccessto buildingtoeliminate obstructionsandtrip hazards.
HighBacteriaLevel
SinglesampleisMarch 2012showedhigh bacterialevels. Thisisexpectedsince disinfectionsystemwas offlineduetothesafety issues. Projectsprimarygoalis toaddressbacteriain runoff.
15
MarVistaProjectWaterUse
Reusewasnotincluded ininitialprojectdueto lackofreuseguidelines. Withnewguidelinesin place,asecondphaseis beingdesignedtouse cleanwaterwillbeuse forparkirrigationbyJuly 2013.
16
EligibilityofReimbursementfromState
CostwasfrontedfromCitys PropOfunds. Stateconductedfinal inspectionandacceptedthe projectinSeptember2011. Stateprovidedcloseoutletter ThatCityfulfilledallgrant requirementsinJuly2012. Stateprovidedfinal reimbursementinSeptember 2012. Correctionunderwayarepart ofanynormalconstruction project.
17
PenmarStormwaterProject
18
PenmarStormwaterProjectStatus
March2007:ConceptReportpreparedbyBureauofSanitation November2008: PredesignReportpreparedbyBrownand CaldwellandBureauofEngineering July2010: Constructionbegan October2012:FormedStartupteam January2013: CompleteConstruction July2013: Scheduleofpostconstructiontocomplete January2012 September2015: PhaseIIworktoprovide disinfectionsystemfor beneficialusesatpark.
19
WestchesterStormwaterProject
20
WestchesterStormwaterProjectStatus
March2007:ConceptReportpreparedbyBureauof Sanitation July2008: PredesignReportpreparedbyGeosyntecand BureauofEngineering Currently: LAWAworkingonagreementtotransferlandto BureauofSanitation.
21