thousand cubic metre from creek to sea from existing levels to specified
equipments, men, materials etc., complete with all lead and lift including conveyance charges to a minimum of 1.5 km distance away from the work site and as directed by the departmental officers.
Sl. No. 2
Qty 8500 m
Unit
Amount
(Eight thousand five harbour open area as shown by the departmental hundred cubic metre officers including excavating the earth in the borrow only) area conveying through tipper to a distance of 12km including loading and unloading at the site to be reclaimed spreading the gravel watering, consolidating by power roller to achieve the required practor density including all labour charges and the hire charges of all machinery and tools and plants etc., complete complying with standard specification and as directed by the departmental officers. 3 100 m metre only) Earthwork excavation for foundation to full depth as disintegrated rock not requiring blasting and hard rock requiring blasting and bailing out water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc., complete complying with standard specification as per the directed by the departmental officers. 1m
3
1m
(One hundred cubic per designed in all soils and sub soils except soft
Sl. No. 4
Qty 15 m only)
Description of work Plain Cement concrete 1:4:8 (one cement, four sand HBG of size 40mm gauge for foundation and basement including de-watering if found necessary and laid in layers of not more than 15 cm thick etc., complete complying with standard specification and as directed by the departmental officers.
TNBP No.
Unit
Amount
(Fifteen cubic metre and eight broken machine crushed stone jelly) using 1m
3
Plain cement concrete 1:1:3 (one cement one and half sand and three aggregates) using HBG Machine crushed stone jelly of size 20mm gauge for foundation and basement including de-watering if found necessary and laid in layers of not more than 15cms thick etc., complete complying with standard specification and as directed by the departmental officers. 1m
3
Sl. No. 6
Qty 390 m
Description of work Providing form work for centering, shuttering etc., for
TNBP No.
Unit
Amount
(Three hundred and all RCC works inclding strutting up to 3.29m in all ninety square metre floors using mild steel sheets of size 90x60cm of B.G. only) 10 stiffened with mild steel angles of size 1m
3
25x25x3mm laid over silver oak (country wood) joist of size 10x6.5cm spaced at about 90cm c/c supported by casurina props of 10 to 13 cm dia (spaced at 75cm center) complying with standard specification and as directed by the departmental officers and removing the same after specified period with out damaging the concrete etc., complete. 7 142 m (One hundred and only) 8 142 m (One hundred and only) Supply and laying packing the Gravel for revetment 15cm thick to the required slope including watering, departmental officers. Rough stone dry packing revetment for side of the boat basin including cost of rough stone labour by the departmental officers. 1m
3
forty two cubic metre consolidation etc., complete and as directed by the
1m
forty two cubic metre charges for sectioning etc., complete and as directed
Sl. No. 9
Description of work Providing Ring Bund using casurina piles and casurina bullies on two sides and dumping the sand bags in earth etc., complete ring bund of size 1.5 metre width and 2 metre height. Casurina poles of size 8cm to 10cm of length 3 metre of which 1 metre of casurina poles are to be driven below the ground level and the casurina poles are to be driven with 0.5 metre interval on both sides and casurina bullies of size 4cm to 5cm tied or fixed horizontally at 0.25m interval Diaphragm wall area complying with standard specification and as directed by the departmental officers.
TNBP No.
Unit
Amount
thirty running metre between the casurina piles and filling the gap with
1 Rm