Engineering Department of Sibu Island Resort Mersing, Johor Prepared by Mohd Nazim / Khairul Asra
No. 1 2010
No.2 2006
No.3 2005
No.4 2008
without fail to run in the events. Another one unit to be run for the load above and/or nearly 85% an another unit standby for any emergency said, i.e. failure to operated under extreme conditions. There are four majors players in power distribution system consumed where air conditioning is the highest power consumable of 566 amps while load is running 66%, continue with water heater of total 618.68 amps, RO treatment plant pumps and others pump consumed about 628.32 amp; and lighting alone 110.48 amps.
0.00
SDI
28/6/2011
0.00
SDI
Turbo charger and manifold turning to red when generate power more than 200 KW. 09-06-11 ( 1unit injector no 4 worn out ) SDI change new unit, under warranty. 26/9/2011 26/9/2011 Battery not charging voltage present 17vdc (normal 27vdc). Screw tensioning belt missing. Fix back function good. Flexible piping crack and tear off. SDI come and change new unit. Under warranty.
0.00
SDI
5 6
0.00 0.00
SDI SDI
9 10
Certified value of work 97.55% by BK Teo on generator set. Base on Original Contract of 02-09-10 Supply, Repair, Overhaul and Trade-in of Diesel Generators. 16/4/2010 Supply, install and repair radiator top reseviour tank, radiator water hose, genset running smooth, however founded another leaks near to flywheel oil sump (this will f/up with another quot). 18/5/2010 Founded alternator malfunction (Code 51-P), Raise PR2501 28/11/2010 Raise PR2447: To supply new high pressure prime power radiator. 01-05-11 Engine Inspection report, engine fail to crank. Recorded
319,330.00 0.00
HATAN HATAN
11 12 13
0.00 3,650.00
RECORD K.TINGGI
0.00
RECORD
0.00
RECORD
1,690.00
PANSAR
Deutz Generator 500kva single running carry out 260 kilowatt power usage at 6.45pm, after 18/4/2009 check and rectify the earth leakage by Pan Sarawak the Generator still trip after 2 hour running. The problem Still cant be solved 25/4/2009 Deutz Generator 500 kva earth fault trip carrying Load 300kw. At 9.26am 0.00
PANSAR
RECORD
Pansar replace new protection CTs,move neutral wire From gen-set no 4 to gen-set no 3 after CT position. After that check the leakage 05-01-09 current fall to zero and Test run for 1hour,found the gen-set running in good Operating condition. 26/11/2009 Major Service been carried? Top Overhaul Radiator / Fuel Injector & Head / 15/12/2009 Fuel Injector Pump 109,000.00 48,300.00
PANSAR
9 10
PANSAR PANSAR
11 12 13 14 15
Labour & parts to service radiator coil, mounting & fuel pump Founded exhaust manifold & exhaust charger getting red while load is running Radiator head cap blow off ehile running PANSAR came to verify the engine. Repaired forced draft fan, narrow v-belt, filler cap
16
Pansar came continue repair as previous record, genertor canbot be start, however still 08-06-10 fail, reason of fuel pump need to claibrate and service Install fuel injector pump after overhaul, drive 09-09-10 shaft, completed with started the engine, running ok. 28/11/2010 01-10-11 21/1/2011 31/1/2011 02-02-11 24/3/2011 19/4/2011 23/6/2011 19/7/2011 RPM tacho meter malfunction (Raise PR2448 record) Record of genset continuously having oil leaks from the top of engine. Raise PR0691: High pressure injector pipe for cylinder A1. Inspection and repair high pressure injector pipe for cylinder A1 and B4. Continued repair leaking on high pressure pipe line Repair High Pressure pipe line, high temp pressure O-ring/seal & testing & comissioning Computer analysis and inspections been carried Change head valve cover seal, battery alternator, V belt & L type radiator hose. Battery alternator malfunction: Quot received by Nylink Recorded
0.00
PANSAR
17 18 19 20 21 22 23 24 25 26
565.00
NYLINK
199,812.00
No 1 2 3 4 5 6 7 8 9 10 11 12 13
Date Description Supply new generator set c/w accessories 15/12/2008 Inv:43018152 RM437800 18/4/2009 Setting ECU engine data 400kVA Deutz. Founded exhaust manifold & exhaust charger 28/4/2010 getting red while load is running 28/4/2010 IDMT setting not stable Cylinder head gasket leaks, oils drip into 05-01-10 exhaust manifold Repaired head gasket leaks, top cover, lower 05-05-10 gasket, exhaust manifold gasket, inlet manifold gasket 05-06-10 05-08-10 17/5/2010 07-08-10 19/4/2011 25/6/2011 19/7/2011 Repair alternator main stator coil & synchronizing panel wiring Carried load test after servicing been done PANSAR came to verify the engine. And do top overhaul Labour & parts to perform top overhaul Computer analysis and inspections been carried UVR 6 card short, Change 1 unit UVR card. AVR Card & T18 rotating diode not functioning - Received quot from NYLink. Recorded
Amounted 437,800.00
By PANSAR
0.00 2,500.00
RECORD NYLINK
21,250.00
Other records.
No 1 2 3
Description Supply 1 no. T18 rotating diode RM3350 14/4/2009 (Inv:43018757) Repair Perkins 400kVa genset & supply diesel 02-11-09 fuel tank Supply, install & calibration of oil dashpot 05-06-10 MCCB Recorded
Date
35,650.00
- End of Report -