Type of Soil
4 25 8 198 22 53 30 197
3 78 -
13 114 90 361
2 22 -
5 42 10 32 14 143 34 180
5 15 4 32 0.5 7 3 26
0 19 5 35
0 14 --
3 14 16 39 5 23 2.1 19*
(6% Stabiliser)
Sample 1
Sample 2
Sample 3
Sample 4
Sample 5
Sample 1
Sample 2
Sample 3
Sample 4
Sample 5
UT T with RBI
Clay
16.6 3.2 5 0
20 4.3 16.6 0
33 13 0 0
Clay
UT
Silt
T with RBI
Silt
Construction time reduction by 30 40% Drastically increases the strength Treated soil is water resistant & prevents damage to the road foundation Reduces transport & earth-moving costs by about 60% Longer Durability
Reduces leaching and contamination of ground water Reduces use of bitumen. Reduces energy consumed in road construction Saves construction material like Aggregates, Good soil Saves non-renewables resources in
construction process Reduces the Carbon Emission resulting into carbon credits
Railway Embankments
Construction Equipments
1. JCB
4. Rotavator
2. Dozer
5. Water Sprinkler
Rise in CBR from 2% to 10 %, There is saving of DBM by 42 % Saving in aggregates for sub base & base will be 37 % More than 50% saving in aggregate as per IRC:37- 2001
Granular Sub Base and Base E2 (GSB + Base), MPa = E3 (Sub-Grade), MPa x 0.2 x (h,mm)0.45 Substitution of Layer E1H13/12(1 - 2) = E2H23/12(1- 2), for both granular layers = 0.40 E1H13 = E2H23
(13 BRTF)
150 100
Total Thickness
725
Total Thickness
425
4. Time Savings = 40 %
253 cum
Unit values
250 200 150 100 50 0 Quantity of Aggregate Quantity of Bitumen Truck trip Time
Sr. No
Layer
Date of Laying
Sub-Grade
18-10-08
24
43
48
51
Sub-Base
19-10-08
73
98
175
375
Base
20-10-08
94
135
375
Increment (%)
19.47 32.43
19.23 36.22
-1.26 10.47
E Value
168.84 281.27
166.76 314.15
-1.24 10.46
Performance Certificate
Construction Process
CLAY
SAND
Source: http://livefist.blogspot.com/2009/09/iaf-32-lands-at-nyoma-ladakh.html
Source: http://livefist.blogspot.com/2009/09/iaf-32-lands-at-nyoma-ladakh.html
Project Name : Parking Area for Mobile Rig Length Width Design : 27 m : 12 m : 100 mm Soil Stabilized with 4% RBI Grade 81
Soil Type : Clay Condition : Saturated Sub Grade : Moisture Content more than 50%
The Location
Dewatering
Pulverizing Soil
Initial Compaction
Final Compaction
COMMONWEALTH GAMES
60 M X 6 M STRETCH CONSTRUCTED USING RBI Grade-81
PARKING AT SIRIFORT
INITIAL CONDITION
FINISHED LOOK
Untreated Surface
SOR KARNATAKA
IRC ACCREDITED
Quarry Road
State : Karnataka Project Name : Quarry Road near Weigh Bridge Location : Kolar
Paved Road
State : Jammu & Kashmir Project Name : Durbal Hanjik Road, Badgam Location : Srinagar
Narhar (Pilani)
State : Rajasthan Location: Pilani Length : 220 m Width : 3.75 m
Desert Roads
State : Rajasthan Project Name : Kota Sawai Madhopur Road, SH-33 Location : KM 17, Kota
Village Roads
State : Orissa Project Name : Uttara Balakati Khurda Road Location : Barijanga
City Road
State : Delhi Project Name : Connecting Road Near Air force School & CSD Canteen, Officers Quarters Location : Delhi Cantt.
Forest Road
Forestry roads The benefits of using RBI 81 are particularly self-evident when building roads in a fragile natural environment. RBI 81 do not place an additional burden upon their precious natural resources
RBI 81 Road
Asphalt Road