Alberca

Medida 8 X 6 X 2 = 96 m3 Losa Cargas WD= (2400kg/m3)(.15 m)= 360 kg/m2 Wu = 1.4 WD +1.7 wL Wu = 1.4 (360) +1.7 (300) Wu =1014 kg/m2

Reacciones RA = RB =

Carga uniforme MB =MA=

DIAGRAMA DE MOMENTOS

Mmax

*REVISIN DEL PERALTE Pmax=0.016 para fc =210 kg/cm

d= 10.49 cm < 15 cm * se deja d=13 cm y rec= 2 cm.

REVISAMOS POR CORTANTE Vc = 0.53 (100)(13) Vc = 8986.10kg > 5408 kg *no requiere esfuerzos por cortante.

ACERO EN LOSA As = w b d

w= 0.85

w= 0.85 (

= 0.0425

w b d= (0.0425)(100)(13)= 55.25 *PARA EL AUMENTO NEGATIVO As= 55.25 As= 12.3958 cm en el apoyo central por el lecho superior. Pmin = = = 0.0033

As min= p b d = (0.0033)(100)(13) As min = 4.29 cm *PARA EL MOMENTO POSITIVO As = 55.25 As= 5.807 cm SE PROPONE VARILLA # 4 ab= 1. 27 cm = = 10.24 cm 10 cm. = 21.87 cm 21 cm

ACERO POR TEMPERATURA Ast= 0.0018 b t Ast= 0.0018(100)(15) Ast= 2.7 cm < As= 5.8 y As =12.39 PROPONER VARILLA DEL NO 3. = 26.29 CM 25 CM.

DISEO DE LA PANTALLA DE ALBERCA

P= P = 1700 P= 3400 kg

Pu= 1.3 P Pu= 1.3 (3400) Pu= 4420 kg MOMENTO FLEXIONANTE Mf= 0.666 Pu Mf= 0.666(3400) Mf=2944 kg- m

Mu= 2652 kg-m V= 4420 kg

REVISION DEL PERALTE NECESAIO d=

= 7.34 cm

PARA fc = 210 kg/ cm

Ku= 49.23}

d nec < d se deja d = 15 cm * REVISION DEL CORTANTE Vc= 0.85(b d 0.53 )

Vc= 0.85(100)(15) (0.53) Vc= 9792.54 kg > 4420kg resiste por cortante y no necesita calculo de estribo. CALCULO DEL ESFUERZO As = wbd w= 0.85 = = 0.0425

wbd=(0.425)(100)(13) = 55.25 As= 55.25 As= 5.68 cm SE PROPENE VARILLA # 4 ab= 1.27 Sep = Sep = 22.35 20 cm.

TITULO DE DISEO HIDRAULICO

VOL. ALBERCA 8 X 6 X 2 Q= = = 2.2 lts/s = 0.0022 m/s

DETERMINAR EL GASTO DE LA TUBERA DE DESCARGA D= 1.3 D= 1.3 ( D= 2.04 2

DETERMINAR PERDIDAS DE SUCCION Hsucc= carga esttica + perdidas de friccin en la tubera (tubera+ carga de velocidad y conexin) Carga esttica= 2.0 m + .50= 2.50 Coladera: * Codos = 4(2.15) =8.60 * cople unin = 1(.13)= .13 * Longitud de la tubera=2.50 +11= 13.50 m Desnatador: * Codos = 3(2.15)=6.45 *longitud dela tubera= 15.60m

Succin: * Codos = 2(2.15) = 4.30 * Longitud del a tubera = 10.15 m *codo= 2.15 * Tee= 2 = 3.05 Total = 63.93 m * CARGA DE VELOCIDAD V= Q/A Q= = = 2.22 lts / s= .0022 m/s

A=

= .0022m/s

v= Q/A=

= 1.1m/s = .55 m

CARGA DE VELOCIDAD =

Hsucc.= 2.50+ 63.93 + .55= 66.98 m

DETERMINAR LAS PERDIDAS POR DESCARGA PERDIDAS POR FRICCION CONEXIONES: Codos TEE 90 5(2.15) = 10.75 1(3.05)= 3.05

Cople unin 1( .13) = .13 Long. Tubera 19.05 m TEE recta 2(.60) = 1.20 TOTAL = 34.18

CARGA DE VELOCIDAD = .55 H DESC= 34.18+ .55= 34.73

PERDIDAS TOTALES Ht= Hdec+ Hsuc= 34.73+66.98= 101.71

DETERMINAR LA POTENCIA DE LA BOMBA

HP=

= 4.24

HP.

ACOMODO DE VARILLA DE LOSA.

VISTA PERFIL: Var #4 @10 cm. 2m

8m Var #4 @10 cm.

VISTA PLANTA:

6m

Var #4 @10 cm.

8m Var #4 @10 cm.

UNIVERSIDAD JUAREZ DEL ESTADO DE DURANGO. FACULTAD DE INGENIERIA, CIENCIA Y ARQUITECTURA.

DISEO DE ALBERCA.
MATERIA. INSTALACIONES HIDRAULICAS

ALUMNOS:
JUAN RENTERIA SOTO JESUS CASTRO GARCIA LUIS SILVA BARRAGAN JUAN JOSECHIMAL ELIZALDE RICARDO NEVAREZ MELERO CAROLINA RODRIGUEZMONTOYA GERARDO ANTONIO HERRERA ESQUIVEL

CATEDRATICO: ING. JORGE AGERO ING CIVIL 5 B GOMEZ PALACIO, DGO. A 23 DE NOVIEMBRE DE 2011