Adopted at the International User Group meeting in Abu Dhabi 30-31 March 2011
Contact information: International IDM Coordinator Jan Karlshj, jan.karlshoej@gravicon.dk, +45 2463 7721
Copenhagen: 10-12-2011
Layout methodology
Roadmap as a Matrix Stages; Pre-lifecycle, Pre-Construction, Construction, Post-construction Services There has been identified individual IDMs for each stage/phase. First and second level of top prioritized IDMs have been identified and in which areas development already has started (Parties are not included yet)
OmniCLass Table 31 Inception Pre-lifecycle stages 31 10 11 00 Needs Identification Phase Portfolio requirements
31 10 45 00 Preliminary Design Phase Outline feasibility 31 10 45 00 Budgeting Phase 31 20 10 00 Preliminary Project Description Phase 31 20 20 00 Design Development Phase 31 25 00 00 Construction Documents Stage 31 40 00 00 Execution Stage Substantive feasibility Design Outline conceptual design Full conceptual design
Construction stages
31 40 00 00 Execution Stage
Maintenance
31 50 00 00 Utilization Stage
Post-construction stages
Demolition
31 60 00 00 Closure Stage
Brief
Pre-Construction stages
Construction
Disposal
OmniClass
32-41 21 00 Design Services, Programming 32-41 81 00 Design Services, Validating 32-57 81 13 Implementation Services, Assuring, Inspecting 32-81 61 00 Governmental Service, Regulating 32-57 71 15 Implementation Services, Postconstructing, Commissioning 32-49 11 00 Modeling
Regulatory Modeling
Performance Analysis
Cost Construction Operate Documentation Coordination Presentation
International User Group
Services
IDM
IDM
IDM IDM IDM
IDM
Substantive feasibility
Make quantity take-off Perform cost analysis Perform consistency control Visualize Solution
Perform security analysis Make quantity take-off Perform cost analysis Make quantity take-off Perform cost analysis BIM handover to contractor Make FM documentation Perform Consistency control Visualize Solution
Coordination Presentation
Primary
Secondary
Substantive feasibility
Perform energy analysis Perform HVAC control analysis Perform Structural analysis Perform Elec analysis
Make quantity take-off Perform cost analysis Perform consistency control Visualize Solution
Primary
Secondary
Regulatory Modelling
Do code compliance checking Make Archi. BIM model Make Elect. BIM model
Do code compliance checking Make Archi. BIM model Make Elect. BIM model Make Archi. BIM model Make Elect. BIM model
Primary
Secondary
Perform security analysis Make quantity take-off Perform cost analysis Make quantity take-off Perform cost analysis BIM handover to contractor Make FM documentation Perform Consistency control Visualize Solution Perform Consistency control Visualize Solution
Primary
Secondary
Control machinery Handle construction logistics Documentation BIM handover to subcontractor Make production doc. Make FM documentation
International User Group
Coordination Presentation
IDM Roadmap:
Content table for Primary prioritised Information Delivery Manual (IDM)
IDM Perform energy analysis Make Archi. BIM model Stage Outline feasibility Outline conceptual design Full conceptual design Coordinated design(and procurement) Service Performance Analysis Modeling
Modeling
Modeling
Modeling
IDM Roadmap:
Content table for Secondary prioritised Information Delivery Manual (IDM)
IDM Design brief to design Perform LCC analysis Do code compliance checking Perform procurement Make FM documentation Stage Conception of need Outline feasibility Full conceptual design Production Information Construction Service Client's needs Performance Analysis Regulatory Construction Documentation
IDMs initiated
Substantive feasibility
Client's needs
Regulatory Modelling
IDMs initiated
Substantive feasibility
Perform energy analysis Perform HVAC control analysis Perform Structural analysis Perform Elec analysis
Make quantity take-off Perform cost analysis Perform consistency control Visualize Solution
IDMs initiated
Regulatory Modelling
Do code compliance checking Make Archi. BIM model Make Elect. BIM model
Do code compliance checking Make Archi. BIM model Make Elect. BIM model Make Archi. BIM model Make Elect. BIM model
IDMs initiated
Perform Egress analysis Perform LCC analysis Enhance element with Fire requirements Perform security analysis
Perform security analysis Make quantity take-off Perform cost analysis Make quantity take-off Perform cost analysis BIM handover to contractor Make FM documentation
IDMs initiated
Regulatory
Cost
Control machinery Handle construction logistics Documentation BIM handover to subcontractor Make production doc. Make FM documentation Coordination International User Group Presentation Perform consistency control Visualize Solution Visualize Solution
IDMs initiated
Operation
Documentation
Manage spaces
Schedule maintenance Make FM documentation Make FM docu. from non BIM Create opera. doc. from BIM