Rockway Centre
Feasibility Study
and Business Case
www.kitchener.ca/rockwaystudy
Prepared by the RETHINK GROUP, Leisure Services Planning Management,
in association with AECOM Canada Architects Ltd. and C. Talbot & Associates
February 11, 2013
Research and
Consultation Inputs
The project team considered the following key
research in the development of the 8 options:
Community and seniors age profile at local,
provincial and national levels
Membership, program and facility use patterns,
with a focus on the Rockway Centre and Rockway
members
Recreation, social, leisure and other trends for
mid-age and older adults
Provincial study of older adult centres
The heritage assessment reports, Phase I and II
Five workshops including: Rockway participants
(2), community partners and stakeholders and
representatives of Rockway, Downtown and
Breithaupt Centre Advisory Councils,
representatives of the Mayors Advisory Council
for Kitchener Seniors, and municipal staff
City-wide survey of adults and older adults
focusing on their current and future leisure
interests and expectations (1046 surveys
completed)
A community forum attended by councillors and
community members
Input was also collected from the project team
and staff
Characteristics of
the Ideal Older Adult Centre
The following are the characteristics of the ideal
older adult centre in Kitchener:
o High quality
o Energy-efficient
o Flexible/adaptable
o Bright with natural light
o Single story facility
o Secure
o Welcoming, comfortable and homey
o Suitable colours and textures
o Accessible to transit and to major roads
Public Input
Included in this booklet are eight options for your
consideration and comment. The last page of this
booklet can be removed and returned to the nearest
community centre, or alternatively can be completed
on line at www.kitchener.ca/rockwaystudy.
Next Steps
Continue to gather community input on the options
from residents; displays and presentations at
various locations; information and comment cards
available at city community centres and city web
site: February to March 2013
Summarize input and incorporate key consultation
and research information into development of
report and recommendations
Project team selects the preferred option(s)
for councils consideration
Complete draft report for project team review and
comment
Present final report and recommended option(s)
to city council on May 27, 2013
Disadvantages
Features:
No additional space added, some space will be
lost due to larger washrooms.
Updated dcor.
Meets AODA accessibility requirements.
Site:
Advantages
Advantages
Features:
Several multi-purpose rooms of various sizes suitable for active and passive recreation;
gymnasium/auditorium; lobby & social spaces;
caf.
Food services located on main level.
Opportunity to address the below grade feel of
the lower level of the building.
Site:
Necessary to purchase lot at King and Preston
Streets (containing billboards).
Retains centre on current site.
Surface parking reduced from 112 to 101.
Outdoor amenities will be impacted.
Served by transit route #7.
Disadvantages
Interior heritage attributes are not retained, along
with the ancillary buildings.
Efforts to retain exterior heritage features will incur
additional costs.
The three floor design is retained, resulting in a
less efficient layout and increased capital cost and
operating costs.
All centre programs would have to be relocated
while the facility is under construction.
Capital is invested in 60+ year old building.
Need to acquire lot containing billboards.
Reduced parking on site with anticipated increase
in use.
Preliminary Construction
Cost Estimate: $10 million
Not including unknown site remedial work and cost
to purchase the lot containing the billboards.
Medium operating expenses per square foot and
good revenue potential (Score: 4/5).
Reasonable value for capital investment
(Score: 3/5).
Currently no capital budget allocation exists.
Disadvantages
Features:
Several multi-purpose rooms of various sizes,
suitable for active and passive recreation;
gymnasium/auditorium; lobby & social spaces;
caf.
Single storey design.
Site:
Necessary to purchase the lot containing
billboards.
Outdoor amenities will be reduced.
Parking at grade, although reduced
from 112 to 91.
Site regraded to optimize layout.
Served by transit route #7.
Advantages
Retains Rockway Centre on current site.
Purpose-built facility will achieve the highest level
of functionality and appeal.
Will meet the needs of current and future older
adults who desire a centre.
Energy efficient facility.
Do not have to purchase another site.
Preliminary Construction
Cost Estimate: $8.5 million
Not including unknown site remedial work and cost
to purchase the lot containing the billboards.
Lowest operating expenses per square foot and
good revenue potential (Score: 5/5).
Good value for capital investment (Score: 4/5).
Currently no capital budget allocation exists.
Advantages
Features:
Designed to provide full service older adult centre.
Several multi-purpose rooms of various sizes,
suitable for active and passive recreation;
gymnasium/auditorium; lobby & social spaces;
caf.
Existing facility has three multi-purpose rooms and
single gym.
Retains pre-school facility, although moved.
Site:
1700 Queens Blvd. near intersection of Queens
Blvd. and Fischer-Hallman Rd.
Adjacent to transit hub served by six different bus
routes and the iXpress route.
Parking expanded and accommodated at grade
(132 spaces).
On-site fire and ambulance services.
Adequate surface parking on site.
Adjacent amenities such as shopping mall.
Disadvantages
Will not retain the current site of the Rockway
Centre.
Disadvantages
Features:
Several multi-purpose rooms of various sizes,
suitable for active and passive recreation;
gymnasium / auditorium; lobby & social spaces;
caf.
Site:
Undetermined site and location.
Require 3-4 acres to accommodate the building,
parking and outdoor amenities
Key criteria for a site will include proximity to a
major roadway, access to public. transit, and a
location where the older adult population is more
concentrated.
142 parking spaces accommodated at grade
Advantages
Purpose-built facility will achieve the highest level
of functionality and appeal.
Will meet the needs of current and future older
adults who desire a centre.
No disruption to the current Rockway programs
while the facility is constructed.
Allows for alternate uses of the Rockway site.
Advantages
Features
Older adult component would include several multipurpose rooms of various sizes, suitable for active
and passive recreation; gymnasium / auditorium;
lobby & social spaces; caf.
Other uses to be determined.
Site:
Undetermined site size and location.
Key criteria for a site will include proximity to a
major roadway; access to public transit; and a
location where the older adult population is more
concentrated.
Disadvantages
Features:
Older adult component would include several
multi-purpose rooms of various sizes, suitable for
active and passive recreation; gymnasium /
auditorium; lobby & social spaces; caf.
Other uses to be determined.
Site:
Necessary to purchase the lot containing
billboards.
Will require underground parking.
Outdoor amenities will be impacted.
Served by transit route #7.
Advantages
Retains Rockway Centre on current site.
A purpose-built addition will achieve a high level of
functionality and appeal.
Disadvantages
Interior heritage attributes will be impacted.
Efforts to retain exterior heritage features will incur
additional costs.
A two or more storey design may be necessary
resulting in a less efficient layout and increased
capital cost and operating costs.
All centre programs would have to be relocated
while the facility is under construction.
Capital is invested in 60+ year old building.
Need to acquire the lot containing billboards.
Most parking will be underground, which is much
more costly and less appealing to an older adult
population.
Preliminary Construction
Cost Estimate: $10 million
(for the recreation component only) - not including
unknown site remedial work and the cost to purchase
the lot containing the billboards. Also, does not
include the cost of the other facilities.
Medium operating expenses per square foot and
good revenue potential (Score: 4/5).
Medium value for capital investment (Score: 3/5).
Currently no capital budget allocation exists.
Potential for some costs to be offset through
private public partnerships
Features:
Older adult component would include several multipurpose rooms of various sizes, suitable for active
and passive recreation; gymnasium / auditorium;
lobby & social spaces; caf.
Other uses to be determined.
Site:
Necessary to purchase the lot containing
billboards.
Will require underground parking.
Outdoor amenities will be impacted.
Served by Transit Route #7.
Advantages
Retains Rockway Centre on current site.
Purpose-built facility will achieve a high level of
functionality and appeal.
Disadvantages
External and internal heritage attributes of the
Rockway Centre will be impacted .
A two or more storey design may be necessary
resulting in a less efficient layout and increased
capital cost and operating costs.
All Rockway Centre programs would have to be
relocated while the facility is under construction.
Capital is invested in 60+ year old building.
Need to acquire the lot containing billboards.
Most parking will be underground, which is much
more costly and less appealing to an older adult
population.
Will incur demolition cost ($370,000).
Preliminary Construction
Cost Estimate: $8.5 million
(for the recreation component only) - not including
unknown site remedial work and the cost to purchase
the lot containing the billboards. Also, does not
include the cost of the other uses.
Lowest operating expenses per square foot and
excellent revenue potential (Score: 5/5).
Good value for capital investment (Score: 4/5).
Currently no capital budget allocation exists.
Potential for some costs to be offset through
private public partnerships
36-45
46-55
56-65
66-75
76-85
85+
Rockway Centre
Feasibility Study
and Business Case