HAZARDS IDENTIFICATION A

LANCO BABANDH POWER LTD Doc No: LBPL/Ele/ HIRA/SWYD/01 Department: Electrical OH & S Participation: Mukesh Behera Issue No: 1/ Date- 31.10.12

Activities

Hazards Identification

Risk Identification

N 1 Excavation N

Falling of person or vehicle into the excavated area

Minor/Major injury

Vehicle accident may cause major/fatal Fall down cause minor injury

Material Handling and Transportation

Vehicle movement at site for shifting of material. Collision vehicle to vehicle or to structure cause major/ fatal

1.Fall of tools and structure parts from height. 3 Structure(Shell) erection N 2.Rolling of Plate. 3.Lifting of plate from grond. Electrical construction power distribution:4.1 1.PSS Installation Above ground cable open termination,loose connection, improper earthing ,ingress protection overload.

Major injury / fatal Y Major injury / fatal Major injury / fatal Y

IPC(Y-Yes,N-NO)

LC (Y-Yes,N-NO)

Condition (N/AB/E)

Sl NO

4.2 2.Cable Laying

Above ground cable open termination,over load,loose termination,improper clipping,cable damage. Y Improper earthing,loose termination,ingress protection,improper clipping,improper housing of electrical equipment. Improper switching. 1.Electrocution, 2.Damage of materials 3.Job hamper. Y Y Y Y Y

4.3

3.Installation of Distribution board

N 4.4 5.Power Supply to the equipment

4.5 Testing of equipment-

5 Area Lighting N

Improper of lack of lighting

Injury to person, vehicle accident

HAZARDS IDENTIFICATION AND RISK ASSESMENT (HIRA)


Issue No: 1/ Date- 31.10.12 Rev. No: 0/ Date- 31.10.12 Area : FOPH AREA

Ref of Legal requirement

NO

3E

CP2

Barricading the excavated area

LBPL

NO

4M

CP2

NO

4L

CP1

Proper approach road need LBPL to be made using stone or stone dust , short cut approach not to be allowed , LBPL rain boot must be used during walk Vehicle moving to other site location are not allowed to enter into work area for taking any short cut way. Continuous supervision. LBPL

NO

4E

CP2

3H

Barricading the protected area where height work is going on, proper tieing of tools , use of PPE as mandatory.

LBPL

1.All armoured power cable tobe undergrounded, unarmourpower cable to be over headed or undergrounded in movement area Damaged cable should be removed from the work area. 2.Earthing should be provided to the elecrical DB and equipment. RCCB and earth pit to be tested at regular interval. 3. Sufficient no of standard

Any additional control proposed

BC(Y-Yes,N-NO)

Existing Control

E(Y-Yes,N-NO)

Risk control Plan

Risk Level

Ref OCP

Y Y

Y Y

3E

CP3

over headed or undergrounded in movement area Damaged cable should be removed from the work area. 2.Earthing should be provided to the elecrical DB and equipment. RCCB and earth pit to be tested at regular interval. 3. Sufficient no of standard measuring electrical tools to be used. 4.IP 55 protection of the equipment should be provided. 5.Proper cable termination with proper tightness of the joint. 6.Bare wire connection should be prohibited and LBPL proper plug top should be provided.

4M

CP2

Proper planning of night work and be it informed well before evening, Use of fluorescent dress at night. LBPL

.12

Proposed controls