1.0 INTRODUCTION
Maintenance and Inspection work for the technical object may only be carried out when work safety measures have been implemented. These safety measures include lockout/tagout, fire protection, radiation protection etc. In lockout/tagout, for example, technical objects are isolated electrically or separated mechanically from other parts of the technical system while maintenance work or special tests are performed. Work on these technical objects can then be performed safely. Work Clearance Management (PM-WCM) component can be used to control and monitor the safety measures to ensure work safety of the employees. WCM component can replace the Permit to Work (PTW) system employed by almost all petrochemical and utilities industry.

2.0 WCM ARCHITECTURE


PM-WCM architecture defines relationship between WCM Objects and can be selected from following models:

2.1.

Standard Model
Standard Model is used when Lockout/Tagout is of primary importance.

2.2.

Enhanced Model
Enhanced Model is used when Safety Measures (radiation protection, safety in the workplace, and fire protection) are also required in addition to Lockout/Tagout.

Additional Applications

3.0 WCM OBJECTS


Objects that supports in Work Clearance Management process for assignment of administrative data, status, approvals, technical objects etc. and good for communication between departments.

PM-WCM

Following are the objects used for WCM with the responsible departments. WCM Object Work Approval Work Clearance Application Work Clearance Document Area of Responsibility Plant Maintenance, Production Plant Maintenance, Production Production

4.0 WCM ACTIVATION IN ORDER


The Maintenance Orders for which WCM is activated are marked as WCM-relevant orders. Activation of WCM for Maintenance Order can be performed by two ways: i. ii. Assigning Permits to the Order. Assigning control key WCM to operations in an order.

5.0 ORDER PROCESSING WITH WCM


Process flows for the WCM Orders defined in PM-WCM are classified as follows: i. ii. iii. Order Processing without Valuation Order Processing with Valuation Order Processing with WCM-Relevant Operations

5.1.

Order Processing without Valuation Standard Model

Following diagram shows the schematic of this process with status of Order and WCM Objects.

STATUS WOCO CLSD EXEC ETG EUG UNT TECO PREP VAL

DESCRIPTION Work Completed WCM object is Closed Order is Released for Execution The Operational WCD is Tagged The Operational WCD is Untagged The Operational WCD is Untaggable The order is Technically Completed The WCM object is Prepared The WCM-relevant order is Valuated

PM-WCM

5.2.

Order Processing with Valuation Enhanced Model

Following diagram shows the schematic of this process with status of Order and WCM Objects.

5.3.

Order Processing with WCM-Relevant Operations

Following diagram shows the schematic of this process with status of Order and WCM Objects.

6.0 EXAMPLE - ORDER PROCESSING WITHOUT VALUATION STANDARD MODEL 6.1. Scenario
For the WCM Order creation we have created equipment for which maintenance is required to be performed and child equipment for the parent equipment is created which is required to be locked-out and tagged-out for performance of maintenance activity safely. Note that it is not necessary to have a parent child relationship for the equipment(s) to be tagged out.

PM-WCM

6.2.

Procedure

Here MP denotes Maintenance Planner (i.e. Maintenance Engineer) and WP denotes Work Clearance
Planner (i.e. Safety Engineer) who will perform the respective steps as follows. MP Order Creation

Order creation is not necessary if you just want to use WCM for documentation of safety measures on the assets without planning or cost collection. 1. Type transaction code IW31 in Command Field on SAP Easy Access Screen.

PM-WCM

2.

Create Maintenance Order: Initial Screen

Field Order Type Equipment

Description PM01 Example: 10000089

3.

Create Maintenance Order: Header

PM-WCM

Field Order Mn.wk.ctr

Description Example: Maintenance of Compressor Example: Test0003

4.

Click Goto Assignments Funds management

Field Commitment Item Funds Center

Description Example: 1110103001 Example: F51431

PM-WCM

MP Work Clearance Application (Requisition for lockout/tagout)

Here Maintenance Planner will create requisition for lock-out/tag-out and will mark the order as WCM-relevant order. Activation of WC Application for an order can be accomplished by two methods as discussed in article 4. Here we will use second method i.e. by providing control key as WCM in operation. 5. Click Operations tab control .

Field Control key Operation short text

Description Example: WCM Example: Electrical isolation of Compressor Motor

6.

Click WC Application button

PM-WCM

7.

Click button

8.

Click button

PM-WCM

9.

Create WC Application Screen

Field Application Use of WCD


(marked in red box)

Description Example: Electrical Isolation of Compressor Motor Example: YU1 (Electric Work Ticket) Example: X

Cond.Tech.Syst.

10.

Click button

PM-WCM

10

11.

Approvals - WC Application

Field Permit

Description Example: YU_X11 (Electric permit)

12. 13.

Click button Click button

. on WC Application Screen

PM-WCM

11

14.

Click Yes button on Confirmation Prompt

15.

Click button

on Assignments - Display WC Applications

PM-WCM

12

16.

Click button screen

and then

on Create Maintenance order: Operation Overview

PM-WCM

13

WP Work Clearance Document (Specify objects to be lockout/tagout) In this step Work Clearance Planner will specify the objects required to be locked-out/tagged-out.

17. 18.

Using transaction code IW32 initiate the Change Maintenance order for order created previously in this case 4000000929 Click WC Application button on Change Maintenance order: Header

19.

Click on

in Assignments - Change WC Applications window

PM-WCM

14

20.

Click Operational WCDs button

on Change WC Application screen

21.

Click button

on Assignments - Change Operational WCDs screen

PM-WCM

15

22.

Click button

on Data Transfer screen

23.

Create Operational WCD: Header

Field WCD Usage


(marked in red box)

Description Example: YU1 (Isolation permit for Electric Motor)

24. 25.

Click button . Approvals - Operational WCD

PM-WCM

16

Field Permit

Description Example: YU_X11 (Electric permit)

26. 27.

Click button Click button

. on Create Operational WCD: Header screen

28.

Create Operational WCD: Maintenance Screen

PM-WCM

17

At this level we will provide the details of equipment(s) to be tagged out. In the present case we will provide the equipment 10000090 (Electric Motor of Centrifugal Compressor) which required to be tagged OFF for carrying out the maintenance of equipment 10000089 safely.

Field Item Category


(marked in red box)

Description Example: E (Equipment) Example: 10000090

Equipment

29. 30. 31.

Press "Return". Press F4 key after selecting Tagging Condition field Select First item in Tagging Condition window and press .

Specifying the Tag condition OFF for the equipment with tagging type RBT (Red Danger Tag)

PM-WCM

18

32.

Select PF (Print Format) XXXX in present case for the Tag

33. 34.

Click button

. on Create Operational WCD: Header

Click Task button

PM-WCM

19

35.

Task - Operational WCD

Field Code group Code

Description Example: YU8101 (Electric Motor Isolation) Example: YU01 (Rackout for Electric Motor Switch Gear) YU02 (Close manual switch at site)

36.

Click button

PM-WCM

20

37.

Click button

on Create Operational WCD: Header screen

38.

Click Yes button on Confirmation Prompt

PM-WCM

21

WP Work Clearance Document (Approval for lockout/tagout) In this step Work Clearance Approver gives the approval for Lockout/tagout of the equipment defined in Operational WCD previously.

39.

Click

on Assignments - Change Operational WCDs

40.

Click button

on Change Operational WCD: Header screen

PM-WCM

22

41.

Approvals - Operational WCD

42. 43. 44.

Select the Permit YU_X11 row. Click Issue button Click button . .

PM-WCM

23

WP Work Clearance Document (Perform lockout/tagout) Here tags for the equipment(s) to be tagged are printed and are tagged physically on the location.

45.

Click button

on Change Operational WCD: Header screen

46.

Change Operational WCD: Switching Screen

47. 48. 49.

Click check box Click Tag button Click Tag button

. . .

PM-WCM

24

50.

Click Print button

on the Print window

51.

Change Operational WCD: Switching Screen

52. 53. 54.

Click Tagged button Click button Click button . .

PM-WCM

25

55.

Click button

on Assignments - Change Operational WCDs screen

PM-WCM

26

WP Work Clearance Application (Approval for lockout/tagout requisition) Work Clearance Approver now approves the WC Application for Order Execution.

56.

Change WC Application

57. 58.

Click button . Approvals - WC Application

PM-WCM

27

59. 60. 61. 62.

Select the Permit YU_X11 row. Click Issue button Click button Click button . on Change WC Application .

63.

Click button

on Assignments - Change WC Applications window

PM-WCM

28

MP Order (Releasing for execution) Maintenance planner now releases the order for execution.

64.

Change Maintenance order: Header

65.

Click Released for execution button

PM-WCM

29

MP Order (Conformance of Work Completion)

66.

Change Maintenance order: Header

67.

Click Work completed button

PM-WCM

30

WP Work Clearance Application (Approval for un-tagging) Here Work Clearance Planner closes the WC Application and consequently gives approval for un-tagging.

68. 69.

Click WC Application button Assignments - Change WC Applications

70. 71.

Click on Click Yes on Confirmation Prompt

PM-WCM

31

WP Work Clearance Document (Perform un-tagging) Now un-tagging can be performed at site and WC Document status is set at Untagged.

72.

Display WC Application

73. 74.

Click Operational WCDs button . Click on Assignments - Change Operational WCDs screen

PM-WCM

32

75.

Change Operational WCD: Header

76. 77.

Click button . Change Operational WCD: Switching Screen

78. 79. 80. 81.

Click check box

. . .

Click Untag button Click Untagged button Click button .

PM-WCM

33

82.

Click button

on Assignments - Change Operational WCDs window

83.

Click button

on Display WC Application screen

PM-WCM

34

84.

Click button

on Assignments - Change WC Applications window

85.

Click button

on Change Maintenance order: Header screen

PM-WCM

35

MP Technical & Overall Completion of Order

86. 87.

Type transaction code IW42 in Command Field on SAP Easy Access Screen. Overall Completion Confirmation

Field Order

Description Example: 4000000929

88. 89.
Field

Complete all checks (Final Conf., Clear Reservation, No Remain Work) for all operations Provide the Confirmation Text
Description Example: Maintenance of Compressor completed Example: Isolation & De-isolation performed

Confirmation text Confirmation text

90. 91. 92.

Click Tech.completion button Click button Click button . .