You are on page 1of 1

ARCHITECTURAL DESIGN 7 (AR411S4) FINAL

Title:

MAJOR PLATE

A MODERN AVIATION TERMINAL


Design Problem: A private corporation has commissioned an architect to prepare the plans of a modern aviation terminal of international standard. This will be the master plan for the aviation program for year 2020 in keeping up with proposed full implementation of deregulation and privatisation of the national flag carrier to serve millions of tourist world wide and the export drive of type of government under and aura of new living rights expanded cabotage rights and competitive air fares shall be established at least 6 major points of the nation. The site development plan (SDP) is desired to relate the various structures and facilities which are, among others, the landing strips, taxi way turn paths, runway holding bay for modern aircrafts; passenger terminal; cargo terminal; administration building; commercial aircraft facilities such as hangers, maintenance and service; airport entrance road; perimeter paved service road; operational activities provided by airport management such as traffic control, communication and weather forecasting those provided by airport management such as 20 garage stalls, equipment bldgs. For fire and crash rescue; aircraft sales, storage, maintenance and flight training; the cargo and mail building, pavement areas for passenger loading apron, service apron, storage; hangar for two aircraft. There will be parking to serve the complex. Include personal accommodations such as lockers, locker rooms, multipurpose room (for employees lunch, etc.) Include a hotel complex for tourists passengers away from this site: The terminal, which must be designed based on a gate-lounge concept (consolidated) is the transfer point land and air, and shall provide deplaning and enplaning spatial facilities such as valet parking for 60 cars (20 short term and 40 long term): 150 cars, 20 buses; 20 baggage check-in counters; intraline passengers, flight info. Ticket counters for at least 10 airline companies; customs processing; gate lounges; baggage claim counters/conveyors system; tax-free gift shopper; boarding device, public corridor, security, operations, snack/coffee areas for passengers. PART 1: a. b. c. d. e. f. Drawing Requirements: FLOOR PLANS 30% SCALE 1:200 M. SECTIONS 5% SCALE 1:200 M. ELEVATIONS 5% SCALE 1:200 M. SITE DEVELOPMENT PLAN 20% SCALE 1:2000 M. DESIGN CONCEPT AND PHILOSOPY 10% AERIAL PERSPECTIVE of the SDP using any scale with terminal building at foreground. 10% ACS g. INTERIOR PERSPECTIVE 10% Showing main building lobby h. Mans eye view perspective of terminal building 10% ACS I. Material Board Concept PART 2: Final Presentation / Oral Presentation j. Various 3D and walk thru presentation. k. Scale Model 1: 300M / 1: 400M 50% of the total plate grade Note: USE 15 x 20 PAPER Full rendered (All perspective)

Due of submission: Presentation date Schedule will be posted per Group. Starting on the date of Final Examination week. * You will be notify encase there will be change of schedule.

You might also like