2 x 600T-12.0M Wire Rope Upper Link 1 x 2000 - 9M Spreader Bar Lower Link 2 x 600T-6.0M Wire Rope
9 10 12 14 16
4388
CRANE CONFIGURATION Superstructure Counter Weight Crawler Side Frame Crawler Track Width Superlift Mast Length : 130 T : 10.5 M x 1.524 M : : : 8m 30 M 13 M
CRANE CONFIGURATION Superstructure Counter Weight Crawler Side Frame Crawler Track Width Superlift Mast Length Superlift Mast Radius Superlift Counter Weight Radius : : : : : : 180 T 14.9 M x 2 M 13.00 M 42 M 22 M 22 M
26000 26000
Scale : 1:600
Weight of Equipment Crane Hook Block Weight Rigging Accessories Weight Total Weight Crane Capacity Safety Factor Utilization Rate (%)
= = = = = = =
SAFETY FACTOR CALCULATION Weight of Equipment Crane Hook Block Weight Rigging Accessories Weight Total Weight Crane Capacity@20M Safety Factor Utilization Rate (%) = = = = = = = 497.00 T 24.40 T 32.25 T 553.65 T 649.00 T 649/553 = 1.17 85 %
10000
2 x 200T Shackles
Ground Bearing Pressure under crawler pads (ton/sq-m) Ground Bearing Pressure under steel plates (ton/sq-m)
AVERAGE GROUND BEARING PRESSURE Ground Bearing Pressure under crawler pads (ton/sq-m) Ground Bearing Pressure under crane mats (ton/sq-m) = 55.30 Ton/sq-M = 17.97 Ton/sq-M
Scale : 1:600
R18000
924
72000
18000
20835
18000
3000
1000
R18000
14900
26000
Scale : 1:800
Scale : 1:650
LIFTING PROCEDURE :
Lifting supervisor shall conduct tool box prior to lifting. Ground at the parking location shall be compacted and leveled, lay the crane mats and steel plat as shown in the lifting drawing. Main crane & tailing crane will be positioned as shown in the drawing. Equipment will be transported using cometto/trailer to the site at the designated location. Attache required lifting tackles into equipment using boom lift or ladders. Lifting weights will be checked before proceeding with the lift. Equipment will be lift by both cranes and the transporter would be instructed to move out. Equipment shall be lift up slowly horizontal position to vertical position by both cranes. Main crane radius to be 18m. Once in vertical position, Tailing crane's rigging tackles will be released from equipment and main crane will be same 18m. After swing main crane march back 3m.Once equipment comes centerline to the foundation, crane will march with 18m radius untill foundation. Equipment will be installed to its foundation in the correct orientation and position. Once equipment firmly seated and secured with anchor bolt/nuts, crane operator will be instructed to lower down the block for removal of lifting tackles.
1500
2000
15000
12000 11660
1500
9900
12000
1524
14000
9524
6000
1070 1500
9180
1250
1250
17000
R7
01
0 R8
00
12000 10500
7070
01 04-02-12
CR
JR JR Checked
GM GM Approved
Drawing Title: LIFTING PLAN FOR 31-RR-400 Drawing Number Scale Sheet Size OIL-DPC-L01/A 1/1 A3 VARY