You are on page 1of 60

OWNER:

CONTRACTOR ID. CODE

PROJECT MATERIAL CRITICALITY ASSESSMENT PLAN


PMC:

3408-YZ-PC-0006
OWNER ID. CODE

3408-YZ-PC-0006
AL-WAHA PDH-PP PROJECT AL-JUBAIL K.S.A.

Sheet 2 of 10

Issue 03

LIST OF CONTENTS

1 2 3

SCOPE .................................................................................................................................3 REFERENCES.....................................................................................................................3 CRITICALITY RATE ASSESSMENT ................................................................................4 3.1 Criticality Impact (Table 1) .........................................................................................................4 3.2 Commodity Complexity (Table 2) ............................................................................................4 3.3 Criticality Rating (Table 3)..........................................................................................................6

INSPECTION LEVEL DEFINITION ...................................................................................7 4.1 4.2 4.3 4.4 Code CQ4 .....................................................................................................................................7 Code CQ3 .....................................................................................................................................7 Code CQ2 .....................................................................................................................................7 Code CQ1 .....................................................................................................................................8

OPERATING MODE ...........................................................................................................9 5.1 5.2 5.3 5.4 Items classified CQ4 .................................................................................................................9 Items classified CQ3 .................................................................................................................9 Items classified CQ2 .................................................................................................................9 Items classified CQ1 ...............................................................................................................10

ATTACHMENTS
Attachment 1 Criticality Rating Assessment (TCM) Attachment 2 Criticality Rating Assessment (DIC)

03

OWNER:

CONTRACTOR ID. CODE

PROJECT MATERIAL CRITICALITY ASSESSMENT PLAN


PMC:

3408-YZ-PC-0006
OWNER ID. CODE

3408-YZ-PC-0006
AL-WAHA PDH-PP PROJECT AL-JUBAIL K.S.A.

Sheet 3 of 10

Issue 03

SCOPE
Contractor proposes this Project Material Criticality Assessment Plan to define the minimum requirements of Supplier Surveillance to be carried out on the equipment and materials to be supplied by Contractor for the Project.

REFERENCES
Contractor shall carry out an adequate Supplier Surveillance activities according to the requirements included in the relevant Requisition and the level code due to the Quality Class (CQ) therein mentioned. The Quality Class of each material is considered equal to the Criticality Rating, which shall be calculated according to the indication of present Plan, after OWNER/IPMT approval. The Criticality Rating calculation results, for all items, shall be recorded by means of the forms attached in Attach. 1. The Commodity Criticality Rating (table 3) is achieved through the combination of the assessment of the Criticality Impact (table 1) and the evaluation of the Commodity Complexity (table 2). The evaluation is carried out in the course of a dedicated meeting, leaded by the Project Engineering Manager and with the participation of: Process Manager Technology Manager Safety Engineer Disciplines Engineer Welding Engineer Procurement Manager Inspection Manager

The Project Engineering Manager is nominated facilitator to timely call and conduct the meetings, to ensure the adoption of common criteria. Proposals issue are mainly from: Process Manager, for major process equipment indicated in the Equipment List Design Department, for the other components, whenever the assignment of a class other than the default class is deemed useful. The expected duration I 1 day for each typology of Plant. OWNER/IPMT will be informed of the date and venue of the meetings to have the possibility to attend the meetings.

OWNER:

CONTRACTOR ID. CODE

PROJECT MATERIAL CRITICALITY ASSESSMENT PLAN


PMC:

3408-YZ-PC-0006
OWNER ID. CODE

3408-YZ-PC-0006
AL-WAHA PDH-PP PROJECT AL-JUBAIL K.S.A.

Sheet 4 of 10

Issue 03

3
3.1

CRITICALITY RATE ASSESSMENT


Criticality Impact (Table 1) Each commodity (package, machinery, equipment and material) shall be assessed against the following table and the total score carried forward to the table 3 as indicated at point 3 .3.

PARAMETER
Personnel Safety a) Failure would have no perceived risk to personnel. b) Failure would have moderate risk to personnel., mitigated by equipment system or procedures. c) Failure would cause high risk to personnel. Standby Availability a) Failure would be covered by standby unit or change out without difficulty b) Failure would cause some loss of production but not loss of integrity c) Failure would cause major loss of production and jeopardise plant integrity Environmental Impact a) Failure would have no significant impact, would be isolated and only affect operating personnel b) Failure would have moderate impact and could affect a small public population c) Failure would have high impact and affect a large public population Design Maturity a) A proven design, frequently used, very reliable Suppliers b) Minor modification to a proven design, Supplier reliability and good references c) New or innovative design or significant extrapolation of previous capacity, new Suppliers and/or no significant reference Manufacturing Process Complexity a) Simple, known process b) Numerous simple known processes or one complex process c) More than one complex process Engineering Interface Data a) Not significant for overall design b) Of some value, but not critical for overall design c) Essential for overall design Importance, Cost, Size a) Minor importance, low cost, small item b) Significant importance, moderate cost, moderate size item c) Vital importance, large, expansive item

SCORE

1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3

3.2

Commodity Complexity (Table 2) Each commodity (plant, machinery, equipment and material), shall be assessed against the following table and the grade carried forward to the table 3 as indicated at point 3.3

OWNER:

CONTRACTOR ID. CODE

PROJECT MATERIAL CRITICALITY ASSESSMENT PLAN


PMC:

3408-YZ-PC-0006
OWNER ID. CODE

3408-YZ-PC-0006
AL-WAHA PDH-PP PROJECT AL-JUBAIL K.S.A.

Sheet 5 of 10

Issue 03

Should any item not suitably be covered by this table, the relevant Grade shall be defined during the criticality assessment meeting and the rationale recorded in the minute of meeting.

ITEM
Main Rotating Equipment: Centrifugal pump in critical service (i.e. loop reactor pump), reciprocating compressor (high pressure and flow rate), large size extruder, turbo generator (>20 MW), special fire fighting pump package Main Package Units Process Heaters (i.e. Reformer, Cracking, Vis-breaking) Safety Critical Systems: Process Safeguarding, Fire and Gas, etc. Static Equipment: Main Pressure Equipment in critical service, special materials, severe design data (Vessels, Columns, Reactors) General Package Unit: Water tube boiler/Heat Recovery Boiler (large size and high pressure), catalytic oxidiser, cold box, air separation units, process gas purification unit, pneumatic conveying systems General Rotating Equipment: High power gas turbine and steam turbine, large centrifugal/reciprocating compressor, BFW pump, critical service agitator, process dryer and centrifuges, diesel generator set, sea/cooling water pump, process chiller General Static Equipment: Silos, tank to be assembled on Site, cryogenic storage tanks, spheres, special material pressure equipment, heat exchanger Major Instrumentation Systems: Engineered system such as DCS, SCADA, special equipment etc. Special Piping: Special grade, special thickness, exotic material Telecommunication Equipment: Engineered items, antenna, special equipment Large or Complex Valves > 300 mm diameter, Special or High Pressure valves, Safety Valves: ESD valves, manifolds Major Electrical Equipment: Converter, HV transformer, HV switchgear Std Static Equipment: Plate heat exchanger, desuperheater, low pressure vessel and exchanger Std Package Unit: Desalination unit, Water treatment plant, air drier, flare, cooling tower, small boiler and incinerators, loading arm, bagging line Std Rotating Equipment: Agitators, Air, nitrogen and gas normal compressor, normalized pump (i.e. ISO), large fan, diesel engine, water chiller Normal Electrical Equipment: Standard control panels, MCC, LV switchgear Special Safety Items: Fire dampers, gas bottles, pressurized components in fire extinguishing systems Minor Rotating Equipment: Scales, small pumps and fans, pneumatic pumps, belt conveyor, hoist, bridge crane, fork lift Minor Package Unit: Chemical dosing unit, minor units (completely standard Supplier)

GRADE
A

A A B

B B B B B B C C C C C D D

OWNER:

CONTRACTOR ID. CODE

PROJECT MATERIAL CRITICALITY ASSESSMENT PLAN


PMC:

3408-YZ-PC-0006
OWNER ID. CODE

3408-YZ-PC-0006
AL-WAHA PDH-PP PROJECT AL-JUBAIL K.S.A.

Sheet 6 of 10

Issue 03

ITEM
Minor Static Equipment: Hoppers, bins, atmospheric small drums, static mixers Valves: Std Valves < 300 mm diameter Electrical Bulks: Cables, light fittings Instrument Bulks Cables, standard field instruments Standard Piping: Normal grades of carbon steel and stainless steel, standard flanges and couplings Heating, Ventilating, Air Conditioning Equipment Normal Safety Items: Hydrants, hose reels, monitors

GRADE
D E E E E E E

3.3

Criticality Rating (Table 3) The following table allows to find the Criticality rating on the base of the Criticality Impact (see Table 3.1) and Commodity Complexity (Table 3.2).

CRITICALITY IMPACT Total Score 21


COMMODITY COMPLEXITY Grade

20

19

18

17

16

15

14

13

12

11

10

Criticality Rating = CQ1


B C D E

Criticality Rating = CQ2 Criticality Rating = CQ3 Criticality Rating = CQ4

OWNER:

CONTRACTOR ID. CODE

PROJECT MATERIAL CRITICALITY ASSESSMENT PLAN


PMC:

3408-YZ-PC-0006
OWNER ID. CODE

3408-YZ-PC-0006
AL-WAHA PDH-PP PROJECT AL-JUBAIL K.S.A.

Sheet 7 of 10

Issue 03

INSPECTION LEVEL DEFINITION


The Inspection Level of each item is determined on the basis of Criticality Rating, calculated by means of the tables in previous paragraph 3. The Inspection Level is described here below:

4.1

Code CQ4 This code denotes equipment and/or materials having low technological content or complexity. The Contractor Inspector does not normally witness tests at Suppliers shop. The material conformity is established through Suppliers certificate review. The Contractor's Inspectors follow the relevant operating mode described in paragraph 5. Desk expediting by phone, every 3 weeks. Expediting visit to be fixed if necessary. Inspection & Test Plan (ITP) and test procedures not required, Supplier standard documents applicable.

4.2

Code CQ3 This code denotes equipment and/or materials having medium technological content or complexity. The Contractors Inspector witnesses the functional and/or final test as per indicated requirements, following the relevant operating mode described in paragraph 5. Desk expediting are performed every 2 weeks while expediting visit are performed at least every 4 weeks. ITP required, test procedures not required, Supplier standard documents applicable.

4.3

Code CQ2 This code denotes equipment and/or materials having high technological content. The Contractors Inspector surveillance is scheduled on regular basis, at least every three weeks, the inspector witnesses intermediate, final test during fabrication phases, adopting the relevant operating mode described in paragraph 5. Surveillance inspection frequency could be increased only case by case, after analysis of the elements that could affect the correct supply of the item. Expediting visits to be performed at least every 2/3 weeks. Intermediate desk expediting to be performed if necessary. ITP to be approved during the pre inspection meeting by Contractor and OWNER/IPMT representative, Supplier procedures for fabrication and test required.

OWNER:

CONTRACTOR ID. CODE

PROJECT MATERIAL CRITICALITY ASSESSMENT PLAN


PMC:

3408-YZ-PC-0006
OWNER ID. CODE

3408-YZ-PC-0006
AL-WAHA PDH-PP PROJECT AL-JUBAIL K.S.A.

Sheet 8 of 10

Issue 03

4.4

Code CQ1 This code denotes items having high construction complexity, where any non-conformity may affect the objectives of the Project, and a relatively high technological content. The Contractors Inspector surveillance is scheduled on regular basis, at least every fortnight, the inspector witnesses the fabrication phases, intermediate and final tests, following the relevant operating mode described in paragraph 5. Surveillance inspection frequency could be increased to daily or weekly only case by case, after analysis of the elements that could affect the correct supply of the item. Expediting visits to be performed on regular basis every fortnight, frequency could be increased, depending on supply performance results. Intermediate desk expediting to be performed if necessary. ITP to be approved during the pre inspection meeting by Contractor and OWNER/IPMT representative, Supplier procedures for fabrication and test required.

OWNER:

CONTRACTOR ID. CODE

PROJECT MATERIAL CRITICALITY ASSESSMENT PLAN


PMC:

3408-YZ-PC-0006
OWNER ID. CODE

3408-YZ-PC-0006
AL-WAHA PDH-PP PROJECT AL-JUBAIL K.S.A.

Sheet 9 of 10

Issue 03

OPERATING MODE
Contractors Project organization, coordinated by the Inspection Team and with active cooperation of Quality Manager and of involved Lead Discipline Engineers, if any, will carry out the required Suppliers surveillance, adopting the operating mode here following described, related to the achieved quality class for each equipment and/or material which are part of his scope of supply. The surveillance criteria here highlighted are the guideline for inspection activities but they are not limited to the points here recalled. Details of the inspection phases for each item will be included in the ITPs of each supply, suitable graduating Contractor and OWNER/IPMT presence where required.

5.1

Items classified CQ4 The Contractor, as a minimum, shall: Verify the Purchase Order (PO), Material requisition (MR) and project engineering documents, if applicable; Ensure Supplier timely submission & updating of a SDI (Supplier Document Index) against POs requirements; Review the Suppliers resolution actions of the recorded non-conformances, if any; Obtain the shipping documents in compliance with the project requirements; Review quality certificates and final documentation.

5.2

Items classified CQ3 The Contractor, as a minimum, shall perform the actions as per items classified CQ4 and in addition shall: Check with the Supplier, during the expediting visits, the completeness and updating of Supplier's specifications and take action as necessary to comply with technical requirements and timely submission; Ensure the respect of Supplier fabrication schedule if any; Ensure Supplier timely submission & updating of a SDI (Supplier Document Index) against POs requirements; Review the Suppliers resolution actions of the recorded non-conformances; Witness Functional, Final Test & Inspection.

5.3

Items classified CQ2 The Contractor, as a minimum, shall perform the actions as per items classified CQ3 and in addition shall: Hold a pre-inspection meeting with the Supplier and OWNER/IPMT representative, before the start of fabrication; Analyse with Supplier the MR/PO attachments to achieve full comprehension of all technical aspects, with the support of the project specialists to obtain clarification; Check with the Supplier the completeness and the updating of Supplier's specifications and take action as necessary to comply with project requirements; Discuss the implementation of the inspection requirements to be included in the ITP;

OWNER:

CONTRACTOR ID. CODE

PROJECT MATERIAL CRITICALITY ASSESSMENT PLAN


PMC:

3408-YZ-PC-0006
OWNER ID. CODE

3408-YZ-PC-0006
AL-WAHA PDH-PP PROJECT AL-JUBAIL K.S.A.

Sheet 10 of 10

Issue 03

5.4

Check that the supply plan includes the critical paths of fabrication and the duration of the inspection is consistent with POs requirements; Require to the supplier a detailed fabrication schedule and verify the progress timely; Monitor the compliance of Supplier and his Sub-Suppliers with POs requirements; Ensure that all agreed Hold and Witness, as per OWNER/IPMT Quality Surveillance procedures and (ITR) Inspection & Tests Requirements, if any, are included in Suppliers ITP; Ensure Supplier timely submission & updating of a SDI (Supplier Document Index) against POs requirements; Ensure Supplier timely submission & updating of a SPIR (Spare Part Interchangeability Record) against POs requirements; Ensure that Supplier includes in the status report the Sub-Suppliers progress status; Review and/or Witness the Suppliers resolution actions of the recorded nonconformances; Review the Procedures and Work Instructions to ensure they include all specified requirements; Ensure all supporting Documents, Standards, Codes and Specifications are available at the Supplier's Work Site; Carry-out surveillance, inspection and witness points, following the phases reported in ITP, sufficient to ensure specified requirements are met; Ensure the QC staff are suitably qualified as specified; Ensure proper test & inspection equipment is used, calibrated and certified.

Items classified CQ1 The Contractor, as a minimum, shall perform the actions as per items classified CQ2 and in addition shall: Audit the Suppliers Quality Management System during execution of the PO; Agree Suppliers and their Sub-Suppliers QC; Witness Intermediate, functional and Final Test & Inspection and endorse Quality Records Books and As-Built drawings and data sheets.

CRITICALITY RATING ASSESSMENT

ITEM_NUMBER

DESCR

Personnel Safety

Stand-by Environmental Availability Impact

Design Maturity

Manufacturing Process Complexity 1 1 1 1 1

Engineering Interface Data 2 2 1 2 1

Importance, Cost, Size

Total Commodity QUALITY Score Complexity _CODE

A2120A/B A2130 A2131 A2140A/B A2551

DILUENT / DONOR BLENDING MIXERS GREASE MIXER OIL MIXER CATALYST MIXERS D2551 MIXER

1 1 1 1 1

1 1 1 1 1

1 1 1 1 1

2 1 1 2 1

2 1 1 2 1

10 8 7 10 7

C C C C C

CQ3 CQ3 CQ4 CQ3 CQ4

A2650 A2840 C2501 C2520 C2620 C2818 C4601A/B D2110 D2112 D2120A/B D2130

OIL TREATING MIXER D2840 MIXER STEAMER CYCLONE ACTIVATOR DRYER BLOWER INSTRUMENT AIR BOOSTER COMPRESSOR F2818 VENT FAN AIR COMPRESSOR TEAL METERING DRUM TEAL SEAL OIL POT DONOR STORAGE DRUMS GREASE DRUM

2 1 1 1 1 1 1 3 3 2 1

1 1 2 3 1 2 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1

1 1 2 2 1 1 1 1 1 1 2

1 1 1 1 2 1 2 1 1 1 1

1 2 1 2 2 1 2 1 1 1 1

1 1 1 2 1 1 2 1 1 1 1

8 8 9 12 9 8 10 9 9 8 8

B B B B B C B C C C C

CQ3 CQ3 CQ2 CQ2 CQ2 CQ3 CQ2 CQ3 CQ3 CQ3 CQ3

Attachment 1 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 1 of 18

CRITICALITY RATING ASSESSMENT

ITEM_NUMBER

DESCR

Personnel Safety

Stand-by Environmental Availability Impact

Design Maturity

Manufacturing Process Complexity 1 1 2 1 1 1 1 1 1 1 1 1 2 1 1 1 1

Engineering Interface Data 1 1 2 1 1 1 1 1 1 1 1 1 2 1 1 1 1

Importance, Cost, Size

Total Commodity QUALITY Score Complexity _CODE

D2131 D2140A/B D2141A/B D2151 D2160 D2161 D2162 D2230 D2310 D2320 D2340 D2350 D2501 D2502 D2511 D2512 D2513

OIL DRUM CATALYST DISPERSION DRUMS CATALYST LOADING SYRINGES HYDRAULIC OIL SURGE DRUM ATMER SURGE DRUM ATMER METERING POT OIL SEAL DRUM F2230 BLOWBACK GAS DRUM F2310 BLOW BACK GAS DRUM C2320 K.O. DRUM F2340 BLOW BACK GAS DRUM COMPRESSOR KNOCK-OUT DRUM STEAMER WATER / HYDROCARBONS DRUM WASTE OIL COLLECTING DRUM HYDROCARBONS SEPARATOR WATER COLLECTOR

1 1 1 1 2 2 1 3 3 3 3 3 2 2 2 2 2

1 1 1 1 1 1 1 2 2 2 2 2 3 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2 2 2 1 1 1 1 2 2 2 2 2 2 1 1 1 1

1 1 2 1 1 1 1 1 1 1 1 1 3 1 1 1 1

8 8 11 7 8 8 7 11 11 11 11 11 15 8 8 8 8

C C B C C C C B B B C C B C C C C

CQ3 CQ3 CQ2 CQ4 CQ3 CQ3 CQ4 CQ2 CQ2 CQ2 CQ3 CQ3 CQ2 CQ3 CQ3 CQ3 CQ3

Attachment 1 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 2 of 18

CRITICALITY RATING ASSESSMENT

ITEM_NUMBER

DESCR

Personnel Safety

Stand-by Environmental Availability Impact

Design Maturity

Manufacturing Process Complexity 1 2 1 1 2 2 1 1 1 1 1 1 1 1 2 2 2 2

Engineering Interface Data 1 2 1 1 2 2 1 1 1 1 1 1 1 2 2 1 1 1

Importance, Cost, Size

Total Commodity QUALITY Score Complexity _CODE

D2514 D2520 D2551 D2552 D2601 D2602 D2610 D2611 D2620 D2630 D2640 D2650 D2660 D2802 D2816 D2840 D2841 D2860

CONDENSATE DRAIN POT DRYER NaBZ PREPARATION DRUM NaBZ METERING DRUM HIGH PRESSURE BLOW DOWN VESSEL LOW PRESSURE BLOW DOWN VESSEL CHILLED WATER DRUM CHILLED WATER SURGE DRUM INSTRUMENT AIR BUFFER DRUM STEAM CONDENSATE DRUM COOLING WATER EXPANSION DRUM OIL TREATING DRUM OIL STORAGE DRUM INTERMEDIATE SURGE SILO TALC SILO ADDITIVE MELTING DRUM MELTED ADDITIVE METERING DRUM PEROXIDE DRUM

2 2 1 1 3 3 1 1 2 2 1 3 1 2 1 1 1 2

1 3 1 1 2 2 3 3 1 2 1 1 1 3 2 2 2 2

1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1

1 2 2 2 2 2 2 2 1 2 1 2 1 1 2 1 1 1

1 3 1 1 2 2 2 2 2 2 1 1 1 2 1 1 1 1

8 15 8 8 15 15 11 11 9 11 7 10 7 12 11 9 9 10

C B C C B C B B B C C C C C C C C C

CQ3 CQ2 CQ3 CQ3 CQ2 CQ2 CQ2 CQ2 CQ2 CQ3 CQ4 CQ3 CQ4 CQ3 CQ3 CQ3 CQ3 CQ3

Attachment 1 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 3 of 18

CRITICALITY RATING ASSESSMENT

ITEM_NUMBER

DESCR

Personnel Safety

Stand-by Environmental Availability Impact

Design Maturity

Manufacturing Process Complexity 2 1 1 1 1

Engineering Interface Data 2 2 1 1 1

Importance, Cost, Size

Total Commodity QUALITY Score Complexity _CODE

D3101A/B/C/D D3102 D3201A/B/C/D/E/F D3202A/B/C/D/E/F D3203A/B/C/D/E/F

PP PELLETS BLENDING SILOS WASHING WATER TANK PELLETS STORAGE SILOS PELLETS STORAGE SILOS PELLETS STORAGE SILOS PROCESS WATER STORAGE TANK

1 1 1 1 1

1 1 1 1 1

1 1 1 1 1

2 1 1 1 1

2 1 2 2 2

11 8 8 8 8

C C C C C

CQ3 CQ3 CQ3 CQ3 CQ3

D4101

CQ4

D4102

DEMINERALIZED WATER STORAGE TANK DRINKING WATER PRESSURE VESSEL 98% H2SO4 STORAGE TANK 4550% CAUSTIC SODA STORAGE TANK

CQ4

D4104

CQ4

D4105

10

CQ2

D4106

10

CQ2

D4151 D4601 D4602 D4901

SAFETY SHOWER BUFFER TANK COMPRESSED AIR BUFFER TANK INSTRUMENT AIR BUFFER TANK WASTE WATER COLLECTION TANK

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 2 1

1 1 1 1

1 1 1 1

7 7 8 7

C C C C

CQ4 CQ4 CQ3 CQ4

Attachment 1 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 4 of 18

CRITICALITY RATING ASSESSMENT

ITEM_NUMBER

DESCR

Personnel Safety

Stand-by Environmental Availability Impact

Design Maturity

Manufacturing Process Complexity 2 1 1 1 1 2 2 1 2 1 1 1 1 2 1 1 1

Engineering Interface Data 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Importance, Cost, Size

Total Commodity QUALITY Score Complexity _CODE

D4910 D4921 D4922 D4923 D4961 E2130 E2140 A/B E2210 E2230 E2240 E2241 E2242 E2243 E2244 E2320 E2340 E2350

SPENT SULFIDIC CAUSTIC TANK N.G. KO DRUM NATURAL GAS CYCLONE NITROGEN KO DRUM FIRE WATER STORAGE TANK GREASE MELTER CATALYST DISPERSION HEATERS PROPYLENE FEED COOLER R2230 GAS COOLER T2240 CONDENSER T2241 CONDENSER T2240 REBOILER T2240 BOTTOM COOLER T2241 POST-CONDENSER PK2320 SUCTION COOLER CO2 HEATER T2350 COOLER

3 2 2 1 1 1 1 2 2 2 2 2 2 2 2 2 1

1 2 2 2 3 1 1 2 3 2 2 2 2 2 1 1 2

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 1 1

1 1 1 1 2 1 1 2 2 2 2 1 1 2 1 1 1

10 9 9 8 10 8 8 10 13 11 11 10 10 12 9 8 8

B B B C C C B B B B B B B B B B B

CQ2 CQ2 CQ2 CQ3 CQ3 CQ3 CQ3 CQ2 CQ2 CQ2 CQ2 CQ2 CQ2 CQ2 CQ2 CQ3 CQ3

Attachment 1 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 5 of 18

CRITICALITY RATING ASSESSMENT

ITEM_NUMBER

DESCR

Personnel Safety

Stand-by Environmental Availability Impact

Design Maturity

Manufacturing Process Complexity 2 1 1 1 1 1 1 1 2 1 1 1 1 2 1 1 1 1

Engineering Interface Data 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 2 2 2

Importance, Cost, Size

Total Commodity QUALITY Score Complexity _CODE

E2401 E2402 E2431 E2432 E2433 E2501 E2511 E2520 E2521 E2630 E2710 E2711 E2712 E4301A-N E4901 F2110 F2120A/B F2121

R2401 GAS COOLER R2230 & R2401 START-UP HEATER T2430 FEED COOLER T2430 CONDENSER T2430 REBOILER STEAMER SCRUBBER CONDENSER OFF GAS COOLER NITROGEN HEATER T2520 RECYCLE COOLER STEAM CONDENSATE VENT COOLER HEAT RECOVERY EXCHANGER ETHYLENE HEATER ETHYLENE COOLER C.W. PLATE EXCHANGER WASTER WATER COOLING TEAL FILTER DONOR FILTERS DONOR LOADING FILTER

2 1 2 2 2 1 1 1 1 1 1 1 1 1 1 3 2 2

3 1 1 1 1 2 2 2 1 1 1 1 1 2 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2 1 2 2 2 1 1 1 2 1 2 2 2 2 1 1 1 1

2 1 1 1 1 1 1 1 1 1 1 1 1 3 1 1 1 1

13 7 9 9 9 8 8 8 10 7 8 8 8 12 7 10 9 9

B B B B B B B B C B B B B B B C C C

CQ2 CQ3 CQ2 CQ2 CQ2 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ2 CQ3 CQ3 CQ3 CQ3

Attachment 1 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 6 of 18

CRITICALITY RATING ASSESSMENT

ITEM_NUMBER

DESCR

Personnel Safety

Stand-by Environmental Availability Impact

Design Maturity

Manufacturing Process Complexity 1 1 1 1 1 1 1 2 1 2 1 2 1 1 1 1 1 1

Engineering Interface Data 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

Importance, Cost, Size

Total Commodity QUALITY Score Complexity _CODE

F2130 F2131 F2140A/B F2150 F2151 F2160 F2161 F2230 F2240 F2310 F2311A/B F2340 F2341 F2501 F2660 F2701A/B F2710 F2721

GREASE FILTER OIL FILTER CATALYST MUD FILTERS METERING OIL FILTER PRESSURIZATION OIL FILTER ATMER AGENT FILTER LIQUID ADDITIVE LOADING FILTER HIGH PRESSURE FILTER T2240 FEED FILTER MEDIUM PRESSURE FILTER MEDIUM PRESSURE GUARD FILTERS LOW PRESSURE BAG FILTER LOW PRESSURE GUARD FILTER STEAM FILTER OIL FILTER HYDROGEN FILTERS ETHYLENE GUARD FILTER PROPYLENE GUARD FILTER

1 1 1 1 1 2 2 2 2 2 2 2 2 1 1 2 2 2

1 1 2 1 1 1 1 3 2 3 1 3 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 2 1 2 1 2 1 1 1 1 1 1

1 1 1 1 1 1 1 2 1 2 1 2 1 1 1 1 1 1

8 8 9 8 8 9 9 14 10 14 9 14 9 8 8 9 9 9

C C C C C C C B C B C B C C C C C C

CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ2 CQ3 CQ2 CQ3 CQ2 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3

Attachment 1 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 7 of 18

CRITICALITY RATING ASSESSMENT

ITEM_NUMBER

DESCR

Personnel Safety

Stand-by Environmental Availability Impact

Design Maturity

Manufacturing Process Complexity 1 1 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1

Engineering Interface Data 2 2 2 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2

Importance, Cost, Size

Total Commodity QUALITY Score Complexity _CODE

F2860 F3105 F4202A/B/C/D H4101 H4102 L2232 L2400 P2110A/B P2111 P2120A/B P2121 P2130 P2131 P2140A/B P2141 P2151A/B P2160A/B P2161

COOLING WATER FILTER WASHING WATER FILTER SEA WATER CIRCUL. FILTERS BACK FLOW PREVENTER CAUSTIC SODA STATIC MIXER R2230 SILENCER R2401 SILENCER TEAL METERING PUMPS FLUSHING OIL PUMP DONOR METERING PUMPS DONOR LOADING PUMP GREASE LOADING PUMP OIL LOADING PUMP D2140A/B JACKET PUMPS CYLINDER JACKET CIRCULATION PUMP PRESSURIZATION OIL PUMPS ATMER METERING PUMPS ATMER LOADING PUMP

1 1 1 2 2 1 1 3 1 2 2 1 1 1 1 1 2 2

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

8 8 9 9 9 7 7 10 8 9 9 8 8 8 8 8 9 9

C C C C C C C B C C C C C B C C C C

CQ3 CQ3 CQ3 CQ3 CQ3 CQ4 CQ4 CQ2 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3

Attachment 1 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 8 of 18

CRITICALITY RATING ASSESSMENT

ITEM_NUMBER

DESCR

Personnel Safety

Stand-by Environmental Availability Impact

Design Maturity

Manufacturing Process Complexity 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Engineering Interface Data 2 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

Importance, Cost, Size

Total Commodity QUALITY Score Complexity _CODE

P2200 P2210 P2211 P2240A/B P2241 P2350 P2351 P2401 P2430 P2501 P2520A/B P2551A/B P2610A/B P2611 P2630A/B P2660 P2661 P2840A/B

R2200 JACKET WATER CIRCULATION PUMP R2210 CIRCULATION PUMP R2210 JACKET WATER CIRCULATION PUMP R2230 RECYCLE BARRIER PUMPS LIQUID PURGE BOOSTER PUMP T2350 REFLUX PUMP OIL UNLOADING PUMP R2230 & R2401 START-UP HEATER PUMP T2430 BOTTOM PUMP STEAMER SCRUBBER REFLUX PUMP DRYER SCRUBBER REFLUX PUMPS NaBZ FEED PUMP CHILLED WATER PUMPS ETHYLENE GLYCOL LOADING PUMP STEAM CONDENSATE PUMPS OIL HEADER PUMP OIL LOADING PUMP MELTED ADDITIVE METERING PUMPS

1 2 1 2 2 1 2 1 1 2 2 1 1 1 1 1 1 1

3 3 3 1 2 2 1 1 2 2 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

10 15 10 9 10 9 9 8 9 10 9 8 8 8 8 8 8 8

C B C B B C C C C C C C C C C C C C

CQ3 CQ2 CQ3 CQ2 CQ2 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3

Attachment 1 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 9 of 18

CRITICALITY RATING ASSESSMENT

ITEM_NUMBER

DESCR

Personnel Safety

Stand-by Environmental Availability Impact

Design Maturity

Manufacturing Process Complexity 1 1 1 1 1 2 2 1 2 2 1 1

Engineering Interface Data 2 2 2 2 2 2 2 2 2 2 2 2

Importance, Cost, Size

Total Commodity QUALITY Score Complexity _CODE

P2860A/B P2861 P3101 P4101A/B/C P4102A/B/C P4105A/B P4106A/B P4151A/B P4202A/B/C P4203 P4301A/B/C P4901A/B

PEROXIDE METERING PUMPS PEROXIDE UNLOADING PUMP WASHING WATER PUMP PROCESS/ POTABLE WATER FEED PUMP DEMINERALIZED WATER FEED PUMP SULPHURIC ACID TRANSFER PUMPS SODA TRASFER PUMPS SAFETY SHOWER WATER CIRCULATION PUMPS SEA WATER CIRCULATION PUMPS SEA WATER INTAKE BASIN EMPTYING PUMP COOLING WATER CIRCULATING PUMPS WASTE WATER LIFTING PUMP

2 2 1 1 1 2 2 2 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 2 1 2 1

9 9 8 8 8 10 10 9 10 9 9 8

C C C C C C C B B C B C

CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ2 CQ2 CQ3 CQ2 CQ3

P4902A/B

WASTE WATER DELIVERY PUMP SANITARY WATER DELIVERY PUMPS SANITARY WATER LIFT PUMPS PROCESS WASTE WATER LIFT PUMPS INTERMITTENT SPENT SULFIDIC CAUSTIC LOADING PUMP

CQ3

P4903A/B P4904A/B P4905A/B P4910A/B

1 1 1 3

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 2

2 2 2 1

1 1 1 1

8 8 8 10

C C C C

CQ3 CQ3 CQ3 CQ3

Attachment 1 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 10 of 18

CRITICALITY RATING ASSESSMENT

ITEM_NUMBER

DESCR

Personnel Safety

Stand-by Environmental Availability Impact

Design Maturity

Manufacturing Process Complexity 1 1 1 1 2 2 1 1 1 1 1 2 1 1 1 1 1 2

Engineering Interface Data 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 2

Importance, Cost, Size

Total Commodity QUALITY Score Complexity _CODE

P4701 P4702 P4703A/B P4704A/B PK2101 PK2150 PK2240 PK2250 PK2320 PK2360 PK2401 PK2510 PK2551 PK2710 PK2720 PK2801 PK2804 PK2810

D4701 FEED BOOSTER PUMP ELECTRICAL FIRE WATER PUMP DIESEL FIRE PUMPS ELECTRICAL FIRE WATER JOCKEY PUMPS TEAL UNLOADING ARMS CATALYST METERING UNIT PACKAGE HYDROGEN RECYCLE COMPRESSOR PACKAGE R2230 RECIRCULATION COMPRESSOR PACKAGE HIGH PRESSURE PROPYLENE BOOSTER PACKAGE LOW PRESSURE PROPYLENE BOOSTER PACKAGE R2401 GAS CIRCULATION COMPRESSOR PACKAGE STEAMER OFF GAS COMPRESSOR PACKAGE UNIT NaBz BAGS UNLOADING UNIT ETHYLENE PURIFICATION WATER / ALCHOOLS AND CO2 REMOVAL PROPYLENE DRYING PACKAGE UNIT PP PNEUMATIC TRANSPORT TO INTERMEDIATE / METERING PP PELLETS PNEUMATIC TRANSPORT TO HOMOGENIZERS SUCTION SYSTEM PACKAGE

1 1 1 1 3 1 2 2 2 2 2 2 1 2 2 1 1 1

1 1 1 1 2 1 2 3 2 2 3 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 2 2 3 3 3 3 2 1 1 1 3 3 1

8 8 8 8 12 10 11 13 12 12 13 11 8 9 9 11 11 9

C A A A C C B B B B B B C B B B B C

CQ3 CQ2 CQ2 CQ2 CQ3 CQ3 CQ2 CQ2 CQ2 CQ2 CQ2 CQ2 CQ3 CQ2 CQ2 CQ2 CQ2 CQ3

Attachment 1 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 11 of 18

CRITICALITY RATING ASSESSMENT

ITEM_NUMBER

DESCR

Personnel Safety

Stand-by Environmental Availability Impact

Design Maturity

Manufacturing Process Complexity

Engineering Interface Data

Importance, Cost, Size

Total Commodity QUALITY Score Complexity _CODE

PK2811

BIG BAG HANDLING AND DISCHARGE STATION SYSTEM POLYMER / ADDITIVES METERING PACKAGE SYSTEM FIBC TALC UNLOADING PACKAGE UNIT OFF SIZE POLYMER RECOVERY PACKAGE EXTRUSION BUILDING VACUUM SYSTEM EXTRUSION AND PELLETIZING PACKAGE UNIT PNEUMATIC HAULAGE FOR PELLETS RECYCLE TO PELLETS TRANSPORT TO STORAGE SILO BLENDERS BLOWING SYSTEM BAGGING PACKAGE UNITS PALLETTIZER SHRINK-WRAPPING UNITS DEMINERALIZED WATER PACKAGE SODIUM HYPOCHLORITE DOSING PACKAGE SAFETY SHOWERS WATER REFRIGERATION PACKAGE SEAWATER ELECTROCHLORINATION

11

CQ3

PK2812

11

CQ2

PK2815 PK2830 PK2870 PK2890 PK3101-LINE-A PK3101-LINE-B PK3104 PK3301A/B PK3302A/B PK3303A/B PK4102 PK4103 PK4151 PK4201

1 1 1 1 1 1 1 1 1 1 1 2 3 1

1 1 1 3 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1

2 2 1 1 1 1 1 1 1 1 1 1 1 1

2 2 2 2 1 1 1 2 2 2 2 2 1 2

2 2 2 3 3 3 2 2 2 2 2 2 2 2

2 2 1 3 3 3 1 3 3 3 2 1 1 2

11 11 9 14 11 11 8 11 11 11 10 10 10 10

B B C A B B C C C C C C B B

CQ2 CQ2 CQ3 CQ1 CQ2 CQ2 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ2 CQ2

Attachment 1 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 12 of 18

CRITICALITY RATING ASSESSMENT

ITEM_NUMBER

DESCR

Personnel Safety

Stand-by Environmental Availability Impact

Design Maturity

Manufacturing Process Complexity 2 1 1 2 1 1 1 1 1 2 2 2 1 1 1 1 1 1

Engineering Interface Data 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

Importance, Cost, Size

Total Commodity QUALITY Score Complexity _CODE

PK4202A/B PK4301 PK4302 PK4901 PK4921 PK4923 PK4925 PK4926 PK4702 R2200 R2210 R2230 R2401 S2230 S2501 S2510 S2520 S2601

SEA WATER INTAKE FILTRATION PACKAGE CORROSION INHIBITOR DOSING PACKAGE ANTIFOULING DISPERSANT DOSING PACKAGE WASTE WATER DEOILING SYSTEM N.G. METERING STATION LIQUID PROPANE METERING STATION ETHYLENE GAS METERING STATION LIQUID PROPYLENE METERING STATION FIRE WATER PUMPING STATION PRECONTACTING POT PREPOLYMERIZATION REACTOR MULTIZONE CIRCULATING REACTOR GAS PHASE REACTOR RECIRCULATION CYCLONE STEAMER CYCLONE WATER / ORGANIC SEPARATOR DRYER CYCLONE FLARE GUARD CYCLONE

1 1 1 1 2 2 2 2 1 2 2 2 2 1 1 1 1 1

2 1 1 1 3 3 3 1 1 3 3 3 1 2 2 1 2 2

1 1 1 1 1 2 1 2 1 1 1 1 1 1 1 1 1 1

1 1 1 2 1 1 1 1 1 1 1 2 1 1 1 1 1 1

2 1 1 1 2 2 2 2 1 1 2 3 2 1 1 1 1 1

11 8 8 10 12 13 12 11 8 12 13 15 10 9 9 8 9 9

B C C C B B B B A B B A B B B C B B

CQ2 CQ3 CQ3 CQ3 CQ2 CQ2 CQ2 CQ2 CQ2 CQ2 CQ2 CQ1 CQ2 CQ2 CQ2 CQ3 CQ2 CQ2

Attachment 1 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 13 of 18

CRITICALITY RATING ASSESSMENT

ITEM_NUMBER

DESCR

Personnel Safety

Stand-by Environmental Availability Impact

Design Maturity

Manufacturing Process Complexity 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 1 2 2

Engineering Interface Data 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 1 1 1

Importance, Cost, Size

Total Commodity QUALITY Score Complexity _CODE

S4951 S4952 S4953 S4954 S4955 S4956 S4957 S4958 S4960 S4961 S4962 S4963 SF2818 T2240 T2241 T2350 T2430 T2501

DELUGE SYSTEMS SPRINKLER SYSTEMS FIRE HYDRANTS FIRE HOSE BOXES FIRE HOSE REELS FIRE MONITORS EMERGENCY SHOWER & EYE WASHERS FIRE EXTINGUISHERS SELF CONTAINED BREATHING APPARATUS ALUMINIZED FIRE SUIT AMBULANCE FIRE TRUCK POLYMER / ADDITIVES SCREW FEEDER BARRIER ETHYLENE STRIPPER BARRIER PRESTRIPPER RECYCLE PROPYLENE SCRUBBER ETHYLENE STRIPPER STEAMER SCRUBBER

3 3 2 2 2 2 2 2 3 3 3 3 1 2 2 2 2 2

1 1 1 1 1 1 1 1 1 1 1 1 3 2 2 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1

9 9 8 8 8 8 8 8 9 9 9 9 12 11 11 8 9 9

C C E E E E E E C C C C B B B B B B

CQ3 CQ3 CQ4 CQ4 CQ4 CQ4 CQ4 CQ4 CQ3 CQ3 CQ3 CQ3 CQ2 CQ2 CQ2 CQ3 CQ2 CQ2

Attachment 1 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 14 of 18

CRITICALITY RATING ASSESSMENT

ITEM_NUMBER

DESCR

Personnel Safety

Stand-by Environmental Availability Impact

Design Maturity

Manufacturing Process Complexity 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 2

Engineering Interface Data 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 2 1 2

Importance, Cost, Size

Total Commodity QUALITY Score Complexity _CODE

T2520 T2711A T2711B T2723 W3301A/B Z2110 Z2120A/B Z2130 Z2131 Z2141 Z2142 Z2143 Z2144 Z2145 Z2160 Z2201A/B Z2202A/B Z2203A/B

DRYER SCRUBBER ETHYLENE PURIFICATION TOWER O2 REMOVAL ETHYLENE PURIFICATION TOWER O2 REMOVAL COS REMOVAL TOWER WEIGHTING BRIDGES SAFETY SEAL POT D2120A/B NITROGEN SPARGERS D2130 NITROGEN SPARGER D2131 NITROGEN SPARGER CATALYST DRUM SCALE CATALYST DRUM VIBRATOR CATALYST DRUM N2 INJECTOR CATALYST DRUM TILTER CATALYST DRUM HOIST D2160 NITROGEN SPARGER CATALYST IN LINE MIXERS OIL FLUSHING T-BRANCH LINES FROM Z2201A/B TO R2210

2 2 2 2 1 3 1 1 1 1 1 1 1 1 1 2 2 2

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 2

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

9 8 8 8 7 9 7 7 7 7 7 8 7 7 7 11 8 11

B B B B D C D D D D D D D D D B B B

CQ2 CQ3 CQ3 CQ3 CQ4 CQ3 CQ4 CQ4 CQ4 CQ4 CQ4 CQ4 CQ4 CQ4 CQ4 CQ2 CQ3 CQ2

Attachment 1 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 15 of 18

CRITICALITY RATING ASSESSMENT

ITEM_NUMBER

DESCR

Personnel Safety

Stand-by Environmental Availability Impact

Design Maturity

Manufacturing Process Complexity 2 1 2 2 2 2 2 1 2 1 1 1 1 1 1 1 1 1

Engineering Interface Data 1 2 2 2 2 2 2 2 2 2 1 1 2 2 1 1 2 1

Importance, Cost, Size

Total Commodity QUALITY Score Complexity _CODE

Z2204 Z2205 Z2210 Z2211 Z2230A/B Z2231A-H Z2233A/B/C Z2310 Z2401A/B Z2431 Z2511 Z2512 Z2550 Z2551 Z2650 Z2660 Z2810 Z2818

TEAL / DONOR COOLER FLUSHING OIL LIMITER LINE FROM R2210 TO R2230 P2210 SEAL FLUSH SYSTEM PRESSURIZATION PISTON GAS SAMPLE COLLECTING POINTS DOWNCOMER FLUSHING INJECTOR PROBES DOWNCOMER GAS SAMPLERS F2310 SAMPLING POT SAMPLE FILTERS P2431 SEAL OIL POT D2511 NITROGEN SPARGER D2512 NITROGEN SPARGER HOIST FOR A2501 NaBZ BIG BAGS HOIST D2650 NITROGEN SPARGER D2660 NITROGEN SPARGER LIFT EXTRUSION BUILDING FIBC HANDLING FORK LIFT

3 1 2 1 1 2 2 2 1 1 1 1 1 1 1 1 1 1

2 2 1 2 1 3 3 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 2 1 2 2 2 1 2 1 1 1 1 1 1 1 1 1

1 1 1 1 1 3 3 1 1 1 1 1 1 1 1 1 2 1

11 9 11 10 10 15 15 9 10 8 7 7 8 8 7 7 9 7

B C B B B A A B B C D D D D D D C D

CQ2 CQ3 CQ2 CQ2 CQ2 CQ1 CQ1 CQ2 CQ2 CQ3 CQ4 CQ4 CQ4 CQ4 CQ4 CQ4 CQ3 CQ4

Attachment 1 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 16 of 18

CRITICALITY RATING ASSESSMENT

ITEM_NUMBER

DESCR

Personnel Safety

Stand-by Environmental Availability Impact

Design Maturity

Manufacturing Process Complexity 1 1 1 1 1 1 1 1

Engineering Interface Data 1 2 2 2 2 1 1 1

Importance, Cost, Size

Total Commodity QUALITY Score Complexity _CODE

Z2819 Z2890 Z2891A/B/C Z2892 Z2893 Z3310A/B Z3311A/B/C Z3312A/B

FIBC HANDLING HAND JACK EXTRUDER SCREW MAINTENANCE HOIST EXTRUDER PARTS MAINTENANCE HOIST EXTRUDER MAIN MOTOR MAINTENANCE HOIST EXTRUDER SECONDARY MOTOR MAINTENANCE HOIST FORK LIFTS TELESCOPIC BULK LOADING DEVICES TRUCK WEIGHTING BRIDGE

1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1

7 8 8 8 8 7 7 7

D D D D D D D D

CQ4 CQ4 CQ4 CQ4 CQ4 CQ4 CQ4 CQ4

Attachment 1 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 17 of 18

CRITICALITY RATING ASSESSMENT

ITEM_NUMBER

DESCR

Personnel Safety

Stand-by Environmental Availability Impact

Design Maturity

Manufacturing Process Complexity 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 2

Engineering Interface Data 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2

Importance, Cost, Size

Total Commodity QUALITY Score Complexity _CODE

TRANSFORMER SWITCHGEAR

1 1 1 1 3 1 1 3 1 1 1 1 1 1 2 2

1 1 1 2 3 1 2 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2 2 1 2 1 1 1 1 1 1 1 1 1 1 1 1

1 1 2 2 2 1 2 1 3 1 2 2 2 2 2 2

8 8 8 10 12 7 10 9 9 7 8 8 8 8 10 11

B B E B B E B A E E E E E E E E

CQ3 CQ3 CQ4 CQ2 CQ2 CQ4 CQ2 CQ2 CQ4 CQ4 CQ4 CQ4 CQ4 CQ4 CQ4 CQ4

ELECTRICAL BULK

Electrical cables
STD Control Valves

Safety and Relief Valves Field Istruments Analyzers Fire Protection System
INSTRUMENT BULK Instrument cables
Instrument Bulk materials (Primary and secondary)

PIPING

VALVES

SPECIAL SUPPORTSpring SPECIAL SUPPORTBellow PIPING BULK CIVIL BULK HVAC


Gaskets, bolts, etc.

steel structure Building air conditioning

Attachment 1 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 18 of 18

CRITICALITY RATING ASSESSMENT

Reactor Section
Manufacturing Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

ITEM NO. ## B 1101

DESCRIPTION CHARGE HEATER

Personnel Safety

Stand-by Availability

Environmental Impact

Design Maturity

Process Complexity

3
B 1102 NO. 1 INTERHEATER

3 3 3 3 1 1 2

2 2 2 1 1 1 1

1 1 1 2 1 1 1

2 2 2 2 1 1 1

3 3 3 3 2 1 2

3 3 3 3 1 1 1

17 17 17 16 9 9 10

A A A A B C B

CQ1 CQ1 CQ1 CQ1 CQ2 CQ3 CQ2

3
B 1103 / 1104 NO.2 INTERHEATER / NO.3 INTERHEATER

3 2 2

1101

REACTOR EFFLUENT COMPRESSOR

1102 A/B

HYDROGEN COMPRESSOR

1101

SULFUR INJECTION DRUM

3
D 1102 STEAM DISENGAGING DRUM

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 1 of 32

CRITICALITY RATING ASSESSMENT

Reactor Section
Manufacturing Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

ITEM NO. D 1105

DESCRIPTION WATER BREAK TANK

Personnel Safety

Stand-by Availability

Environmental Impact

Design Maturity

Process Complexity

1
D 1106 REACTOR EFFLUENT COMPRESSOR SUCTION DRUM CHLORIDE TREATER

1 2 1 1 1 1 1

1 1 1 1 1 1 1

1 1 1 2 1 1 1

1 1 1 2 1 1 1

1 2 1 2 1 2 1

1 1 1 2 1 1 1

7 10 8 12 8 8 8

D C B B B C C

CQ4 CQ3 CQ3 CQ2 CQ3 CQ3 CQ3

2 2

1107

1108 A/B

REACTOR EFFLUENT DRIERS

2 2 1 2

1109

REGENERANT KNOCKOUT DRUM

1111

REACTOR EFFLUENT COMPRESSOR CONDENSATE DRUM CONTINUOUS BLOW DOWN DRUM

1114

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 2 of 32

CRITICALITY RATING ASSESSMENT

Reactor Section
Manufacturing Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

ITEM NO. D 1115

DESCRIPTION NATURAL GAS FOR PILOTS K.O DRUM

Personnel Safety

Stand-by Availability

Environmental Impact

Design Maturity

Process Complexity

2 2

2 2 1 2

1 1 2 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

9 9 9 9

C C C C

CQ3 CQ3 CQ3 CQ3

1116

H2 K.O DRUM

1205

SPENT CAUSTIC DEGASSING DRUM

2 2

DS

1101

DESUPERHEATER

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 3 of 32

CRITICALITY RATING ASSESSMENT

Reactor Section
Manufacturing Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

ITEM NO. E 1101 A/B

DESCRIPTION HOT COMBINED FEED EXCHANGERS

Personnel Safety

Stand-by Availability

Environmental Impact

Design Maturity

Process Complexity

1 1 1 1 2

2 2 2 2 2 2

1 1 1 1 1 1

3 1 1 1 1 1

3 1 1 1 1 1

2 1 1 1 1 1

3 2 2 2 2 2

15 9 9 9 10 9

A B B B B B

CQ1 CQ2 CQ2 CQ2 CQ2 CQ2

1102 A/B

REACTOR EFFLUENT COOLERS

1103

REACTOR EFFLUENT COMPRESSOR INTERSTAGE COOLER REACTOR EFFLUENT COMPRESSOR DISCHARGE COOLER REGENERANT HEATER

1104

1106

1107

REGENERANT COOLER

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 4 of 32

CRITICALITY RATING ASSESSMENT

Reactor Section
Manufacturing Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

ITEM NO. E 1108

DESCRIPTION FIRST STAGE HYDROGEN COMPRESSOR CHILLER

Personnel Safety

Stand-by Availability

Environmental Impact

Design Maturity

Process Complexity

1 1 2 1 1 1 1

2 2 2 2 2 2 2

1 1 1 1 1 1 1

1 1 2 1 1 1 1

1 1 2 1 1 1 1

1 1 2 1 1 1 1

2 2 2 1 1 1 1

9 9 13 8 8 8 8

B B B B B B B

CQ2 CQ2 CQ2 CQ3 CQ3 CQ3 CQ3

1109

SECOND STAGE HYDROGEN COMPRESSOR CHILLER REACTOR EFFLUENT COMPRESSOR STEAM CONDENSER HYDROGEN PRODUCT COOLER

1110

1111

1112

DEPROPANIZER NET OVERHEAD COOLER

1113

INTERCONDENSER FOR E1110

1114

AFTERCONDENSER FOR E1110

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 5 of 32

CRITICALITY RATING ASSESSMENT

Reactor Section
Manufacturing Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

ITEM NO. F 1101 A/B

DESCRIPTION FEED FILTERS

Personnel Safety

Stand-by Availability

Environmental Impact

Design Maturity

Process Complexity

1
F 1102 A/B REACTOR EFFLUENT FILTERS

1 1 1 1 1 1 2

1 1 1 1 1 1 1

2 2 2 2 2 2 2

1 1 1 1 1 1 1

1 1 1 1 1 1 1

1 1 1 1 1 1 1

8 8 9 8 8 8 9

B B C C C C C

CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3

1 2 1 1 1 1

1103 A/B/C SULFUR INJECTION PUMP SUCTION FILTER

1104 A/B

FUEL GAS FILTER FOR BOILERS

1105 A/B

NATURAL GAS FILTER FOR PILOTS

1106 A/B

FUEL GAS FILTER FOR PDH HEATER

1160

PSA PRODUCT FILTER

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 6 of 32

CRITICALITY RATING ASSESSMENT

Reactor Section
Manufacturing Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

ITEM NO. J 1101

DESCRIPTION EJECTOR

Personnel Safety

Stand-by Availability

Environmental Impact

Design Maturity

Process Complexity

1
L 1102 SILENCER

1 1 1 1 1 1

1 2 1 1 1 1

1 1 1 1 1 1

1 1 1 1 1 1

1 1 2 2 2 1

1 1 1 1 1 1

7 8 8 8 8 7

C D C C C D

CQ4 CQ4 CQ3 CQ3 CQ3 CQ4

1
J 1103 A/B 1ST STAGE EJECTOR FOR E1110

1 1 1

1104 A/B

2ND STAGE EJECTOR FOR E1110

1105

EVACUATION EJECTOR

1101

NEUTRALIZATION TANK MIXER (TK-1101)

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 7 of 32

CRITICALITY RATING ASSESSMENT

Reactor Section
Manufacturing Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

ITEM NO. P

DESCRIPTION

Personnel Safety

Stand-by Availability

Environmental Impact

Design Maturity

Process Complexity

1101 A/B/C SULFUR INJECTION PUMPS

2
P 1102 A/B WATER CIRCULATION PUMPS

1 1 1 2 1 1 2

1 1 1 1 1 1 1

1 1 1 1 1 1 1

1 1 1 1 1 1 1

2 2 2 2 2 2 2

1 2 1 1 1 1 1

9 9 8 10 8 9 10

C B C C C C C

CQ3 CQ2 CQ3 CQ3 CQ3 CQ3 CQ3

1 1 2 1 2 2

1105 A/B

WATER INJECTION AND MAKE-UP PUMP

1106

REGENERANT PUMP

DELETED
P 1108 A/B WASH WATER CIRCULATION PUMPS

1109 A/B

CAUSTIC CIRCULATION PUMPS

1110

SPENT CAUSTIC TRANSFER PUMP

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 8 of 32

CRITICALITY RATING ASSESSMENT

Reactor Section
Manufacturing Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

ITEM NO. P 1111 A/B

DESCRIPTION REACTOR EFFLUENT COMPRESSOR CONDENSATE PUMPS NEUTRALIZATION CIRCULATION PUMP

Personnel Safety

Stand-by Availability

Environmental Impact

Design Maturity

Process Complexity

1 2 2 1 2

1 1 1 2 2 2 2 2

1 1 1 1 1 1 1 1

1 1 1 1 2 1 1 1

1 1 1 1 2 2 1 1

2 2 2 2 2 2 2 2

1 1 1 1 3 2 1 1

8 9 9 9 14 12 9 9

B B B C B B C B

CQ3 CQ3 CQ3 CQ3 CQ2 CQ2 CQ3 CQ2

1112

1113

NEUTRALIZATION FILLING PUMP

1114 A/B

EXHAUST STEAM CONDENSATE TRANSFER PUMP SEPARATION SYSTEM

PK

1140

PK

1160

HYDROGEN PURIFICATION SYSTEM

2 1 1

PK
54

1165

OIL MIST LUBRICATION SYSTEM

PK

1170

FUEL GAS PREPARATION SYSTEM

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 9 of 32

CRITICALITY RATING ASSESSMENT

Reactor Section
Manufacturing Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

ITEM NO. PK 1175

DESCRIPTION LUBE OIL MIST ELIMINATOR

Personnel Safety

Stand-by Availability

Environmental Impact

Design Maturity

Process Complexity

1
R 1101 REACTOR NO.1

1 2 2 2 2 1 2 1 1

1 1 1 1 1 1 1 1 1

1 2 2 2 2 1 2 2 2

1 3 3 3 3 1 2 2 2

2 3 3 3 3 1 2 2 2

1 2 2 2 2 1 2 1 1

8 15 15 15 15 7 13 11 11

C A A A A D B C C

CQ3 CQ1 CQ1 CQ1 CQ1 CQ4 CQ2 CQ3 CQ3


Page 10 of 32

2
R 1102 REACTOR NO.2

2
R 1103 REACTOR NO.3

2
R 1104 REACTOR NO.4

2
S 1101 STEAM SEPARATOR

1
ST 1101 REC STEAM TURBINE

2
ST 1102 STEAM TURBINE FOR P-1102B

2 2

ST

1111

STEAM TURBINE FOR P-1111B

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

CRITICALITY RATING ASSESSMENT

Reactor Section
Manufacturing Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

ITEM NO. T 1101

DESCRIPTION REGENERANT GAS SCRUBBER

Personnel Safety

Stand-by Availability

Environmental Impact

Design Maturity

Process Complexity

2 1 2

2 1 1 1

1 1 2 1

1 1 1 1

2 1 1 1

2 1 1 1

1 1 1 1

11 7 9 7

B D B D

CQ2 CQ4 CQ2 CQ4

TH

1101

NEUTRALIZATION TANK HEATER

TK

1101

NEUTRALIZATION TANK

1101

OVERHEAD CRANE FOR REACTOR EFFLUENT COMPRESSOR

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 11 of 32

CRITICALITY RATING ASSESSMENT

Fractionation Section ITEM NO. C 1201 DESCRIPTION HEAT PUMP COMPRESSOR


Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

2
D 1201 A/B FEED GUARD BEDS

16

CQ1

1
D 1202 A/B FEED DRIERS

CQ3

1
D 1203 FEED DRIER REGENERANT COALESCER

CQ3

CQ3

1204

DEPROPANIZER RECEIVER

1
D 1207 DEETHANIZER RECTIFIER RECEIVER

CQ3

1
D 1208 HEAT PUMP COMPRESSOR SUCTION DRUM

CQ3

CQ3

1209

SPENT REGENERANT TREATER

1
D 1210 HEAT PUMP COMPRESSOR CONDENSATE DRUM

CQ3

CQ3
Page 12 of 32

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

CRITICALITY RATING ASSESSMENT

Fractionation Section ITEM NO. D 1211 DESCRIPTION EXHAUST STEAM CONDENSATE DRUM
Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

1
E 1203 FEED DRIER REGENERANT COOLER

CQ4

1
E 1204 A/B DEPROPANIZER REBOILER

CQ3

2
E 1205 DEPROPANIZER CONDENSER

10

CQ2

1
E 1206 STRIPPING HYDROGEN HEATER

CQ2

2
E 1207 SHP FEED HEATER

CQ3

2
E 1208 A/B DEETHANIZER STRIPPER REBOILER

CQ3

2
E 1209 DEETHANIZER STRIPPER CONDENSER

CQ2

1
E 1210 DEETHANIZER RECTIFIER CONDENSER

CQ3

1
Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

CQ3
Page 13 of 32

CRITICALITY RATING ASSESSMENT

Fractionation Section ITEM NO. E DESCRIPTION


Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

1211 A/B PROPYLENE-PROPANE SPLITTER REBOILER/CONDENSER

CQ3

1212

PROPYLENE TRIM CONDENSER

1
E 1214 DEPROPANIZER FEED PREHEATER

CQ2

1
E 1215 WATER CHILLER

CQ3

1
E 1216 HEAT PUMP COMPRESSOR STEAM CONDENSER

CQ2

CQ2

1217

DEPROPANIZER FEED STEAM PREHEATER

2
E 1218 INTER CONDENSER FOR E-1216

CQ2

2
E 1219 AFTER CONDENSER FOR E-1216

CQ3

2
H 1201 SHP MIXING NOZZLE

CQ3

1
Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

CQ4
Page 14 of 32

CRITICALITY RATING ASSESSMENT

Fractionation Section ITEM NO. H 1202 DESCRIPTION SHP MIXER


Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

1
J 1201 A/B 1ST STAGE EJECTOR FOR E-1216

CQ4

1
J 1202 A/B 2ND STAGE EJECTOR FOR E-1216

CQ3

1
J 1203 EVACUATION EJECTOR FOR E-1216

CQ3

1
N 1201 FEED DRIER REGENERANT SUPERHEATER

CQ3

10

CQ3

1202 A/B DEPROPANIZER OVERHEAD PUMPS

CQ3

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 15 of 32

CRITICALITY RATING ASSESSMENT

Fractionation Section ITEM NO. P P DESCRIPTION


Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

1203 A/B DEPROPANIZER BOTTOMS STRIPPER PUMP 1204 A/B DEETHANIZER STRIPPER REFLUX PUMPS

1 1

1 1

1 1

1 1

2 1

2 2

1 2

9 9

C C

CQ3 CQ3

1205 A/B DEETHANIZER RECTIFIER REFLUX PUMPS

CQ3

1206 A/B PROPANE RECYCLE PUMPS

1
P 1207 A/B PROPYLENE-PROPANE SPLITTER OVERHEAD PUMPS

CQ3

1 1 1

1 1 1

1 1 1

1 1 1

1 2 1

2 2 2

2 2 2

9 10 9

C C C

CQ3 CQ3 CQ3

P P

1208 A/B DIOLEFIN RECYCLE PUMP 1210 A/B HEAT PUMP COMPRESSOR CONDENSATE PUMPS

1211

FEED DRIER REGENERANT PUMP

1
P 1212 A/B EXHAUST STEAM CONDENSATE TRANSFER PUMP

CQ3

CQ3

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 16 of 32

CRITICALITY RATING ASSESSMENT

Fractionation Section ITEM NO. PK 1250 DESCRIPTION REFRIGERATION EQUIPMENT


Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

1
PK 1260 FEED DRIER REGENERANT DRIER PACKAGE

12

CQ2

11

CQ2

1201

SHP REACTOR

1
ST 1201 HPC STEAM TURBINE

12

CQ2

2
ST 1210 STEAM TURBINE FOR P-1210B

13

CQ2

2
T 1201 DEPROPANIZER

11

CQ3

2
T 1202 DEPROPANIZER BOTTOMS STRIPPER

12

CQ2

2
T 1203 DEETHANIZER STRIPPER

11

CQ2

12

CQ2

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 17 of 32

CRITICALITY RATING ASSESSMENT

Fractionation Section ITEM NO. T 1204 DESCRIPTION DEETHANIZER RECTIFIER


Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

2
T 1205 PROPYLENE-PROPANE SPLITTER

12

CQ2

2
X 1201 OVERHEAD CRANE FOR HEAT PUMP COMPRESSOR

13

CQ2

CQ4

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 18 of 32

CRITICALITY RATING ASSESSMENT

CCR Regeneration Section ITEM NO. C 1301 DESCRIPTION REGENERATION BLOWER


Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

2
C 1302 REGENERATION COOLER BLOWER

13

CQ2

1
C 1303 LIFT GAS BLOWER

11

CQ2

1
C 1304 FINES REMOVAL BLOWER

CQ3

1
D 1301 DISENGAGING HOPPER

CQ3

1
D 1302 REGENERATION TOWER

10

CQ3

1
D 1303 CATALYST ADDITION FUNNEL

13

CQ1

1
D 1304 CATALYST ADDITION LOCK HOPPER

CQ4

CQ4

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 19 of 32

CRITICALITY RATING ASSESSMENT

CCR Regeneration Section ITEM NO. D 1305 DESCRIPTION FLOW CONTROL HOPPER
Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

1
D 1306 SURGE HOPPER

10

CQ4

1
D 1307 LOCK HOPPER NO. 2

CQ3

1
D 1308 LIFT ENGAGER NO. 5

CQ3

1
D 1309 VENT DRUM NO. 1

CQ3

1
D 1310 VENT DRUM NO. 2

CQ4

1
D 1312 CAUSTIC BREAK TANK

CQ4

2
E 1301 LIFT GAS BLOWER SPILLBACK COOLER

CQ4

1
E 1303 REGENERATION COOLER

CQ3

1
Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

CQ3
Page 20 of 32

CRITICALITY RATING ASSESSMENT

CCR Regeneration Section ITEM NO. F 1301 DESCRIPTION IN-LINE AIR FILTER
Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

1
F 1303 10 WT% CAUSTIC FILTER

CQ3

2
J 1301 CHLORINE EDUCTOR

CQ3

3
N 1301 REGENERATION HEATER

11

CQ3

1
N 1302 AIR HEATER

10

CQ3

1
P 1302 A/B CAUSTIC INJECTION PUMPS

10

CQ3

2
PK 1301 AIR DRYER

10

CQ3

1
PK 1302 DUST COLLECTOR

10

CQ3

1
PK 1350 CCR VENT GAS TREATING SYSTEM

10

CQ3

2
Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

10

CQ3
Page 21 of 32

CRITICALITY RATING ASSESSMENT

CCR Reactor Area ITEM NO. D 1401 DESCRIPTION CATALYST COLLECTOR NO. 1 LIFT ENGAGER NO. 1
Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

1 1

2 2 2 2 2 2 2 2

1 1 1 1 1 1 1 1

2 2 2 2 2 2 2 2

1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1

9 9 9 9 9 9 9 9

C C C C C C C C

CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3

1402

1403

CATALYST COLLECTOR NO. 2 LIFT ENGAGER NO. 2

1 1

1404

1405

CATALYST COLLECTOR NO. 3 LIFT ENGAGER NO. 3

1 1

1406

1407

CATALYST COLLECTOR NO. 4 LOCK HOPPER NO. 1

1 1

1408

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 22 of 32

CRITICALITY RATING ASSESSMENT

CCR Reactor Area ITEM NO. D 1409 DESCRIPTION LIFT ENGAGER NO 4


Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

1
D 1410 VENT DRUM NO. 3

2 1 1

1 1 1

2 1 1

1 1 1

1 1 1

1 1 1

9 7 7

C C C

CQ3 CQ4 CQ4

1
D 1411 VENT DRUM NO. 4

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 23 of 32

CRITICALITY RATING ASSESSMENT

CCR Reactor Area ITEM NO. E 1401 DESCRIPTION PURGE GAS HEATER
Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

2
E 1402 CCR GAS HEATER

1 1 1 1 1 1 2

1 1 1 1 1 1 3

1 1 2 2 2 2 1

1 1 1 1 1 1 1

1 1 2 2 2 2 1

1 1 2 2 2 2 1

8 8 10 10 10 10 12

C C C C C C C

CQ4 CQ3 CQ3 CQ3 CQ3 CQ3 CQ3

2
N 1401 REDUCTION GAS HEATER

1 1 1 1 3

1402

REACTOR NO. 2 SURGE POT HEATER

1403

REACTOR NO. 3 SURGE POT HEATER

1404

REACTOR NO. 4 SURGE POT HEATER

PK

1401

CHLORINATION SYSTEM

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 24 of 32

CRITICALITY RATING ASSESSMENT

ISBL Others ITEM NO. D 1601 DESCRIPTION DRY FLARE K.O DRUM
Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

1
D 1602 METHANOL EXPANSION DRUM

CQ2

2
E 1601 DRY RELIEF SUPERHEATER

10

CQ3

2
E 1602 METHANOL VAPORIZER

CQ2

2
E 1603 DRY FLARE K.O DRUM VAPORIZER

CQ2

2
P 1601 A/B 10 WT% CAUSTIC PUMPS

CQ2

2
TK 1601 10 WT% CAUSTIC STORAGE TANK

CQ3

CQ2

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 25 of 32

CRITICALITY RATING ASSESSMENT

Steam Generation ITEM NO. B DESCRIPTION


Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

1710 A/B/C HP STEAM BOILER

2
D 1701 BOILER FEED WATER DRUM DEAERATOR

14

CQ2

2
D 1702 HP CONDENSATE FLASH DRUM

12

CQ2

2
D 1703 BOILER CONTINUOUS BLOW DOWN DRUM

CQ3

2
D 1704 INTERMITTENT BLOW DOWN DRUM

CQ3

2
DS 1701 HS / MS DESUPERHEATER

CQ3

2
DS 1702 MS / LS DESUPERHEATER FOR PDH PLANT

10

CQ3

10

CQ3

DS 1703

MS / LS DESUPERHEATER FOR PP PLANT

10

CQ3

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 26 of 32

CRITICALITY RATING ASSESSMENT

Steam Generation ITEM NO. DS 1704 DESCRIPTION DESUPERHEATER FOR ST-1701A/B


Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

2
E 1701 DEAERATOR VENT CONDENSER

10

CQ3

2
E 1702 CONDENSATE TANK VENT CONDENSER

CQ3

2
E 1703 BLOW DOWN COOLER

CQ2

2
E 1705 CONDENSATE COOLER FOR PDH PLANT

CQ2

1
E 1706 CONDENSATE COOLER FOR PP PLANT

CQ3

1
E 1708 CONTAMINATED CONDENSATE COOLER

CQ3

1
L 1701 HP STEAM SILENCER

CQ3

1
L 1702 MP STEAM SILENCER

CQ4

1
Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

CQ4
Page 27 of 32

CRITICALITY RATING ASSESSMENT

Steam Generation ITEM NO. P DESCRIPTION


Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

1701 A/B/CBOILER FEED WATER PUMPS

1
P 1702 A/B CONDENSATE PUMPS

CQ2

1
PK PK 1720 1730 CONDENSATE TREATMENT UNIT HYDRAZINE INJECTION PACKAGE

1 1 1

1 1 2

1 2 1

1 1 1

2 1 1

2 1 1

9 8 9

C C D

CQ3 CQ3 CQ4

1 2

PK

1740

PHOSPHATE INJECTION PACKAGE

2
PK 1750 AMINE INJECTION PACKAGE

CQ4

2
ST 1701 A/B STEAM TURBINE FOR P-1701A/B

CQ4

2
TK 1701 LP CONDENSATE BUFFER TANK

11

CQ3

CQ3

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 28 of 32

CRITICALITY RATING ASSESSMENT

Waste Water ITEM NO. P DESCRIPTION


Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

1801 A/B RAIN WATER PIT PUMPS

1
P 1802 A/B NEUTRALIZED WATER PUMPS

CQ3

1
P 1803 A/B PROCESS WASTE WATER PUMPS

CQ3

1
Z 1801 RAIN WATER PIT

CQ3

1802

NEUTRALIZATION PIT

1803

PROCESS WASTE WATER PIT

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 29 of 32

CRITICALITY RATING ASSESSMENT

Storage Tank & Flare ITEM NO. B 5001 DESCRIPTION FLARE STACK
Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

1
D 5001 WET FLARE KNOCK OUT DRUM

13

CQ3

1
E 4501 PROPANE FEED COOLER

CQ2

1
P 4501 A/B PROPANE FEED PUMPS

CQ3

1
P 4801 A/B/CPROPYLENE TRANSFER PUMPS

10

CQ2

1
P 4802 A/B OFF SPEC PROPYLENE TRANSFER PUMPS

10

CQ2

1 1 1

1 1 2

1 1 1

1 1 1

2 1 2

2 2 2

2 1 1

10 8 10

C C B

CQ3 CQ3 CQ2

P P

5001 A/B WET RELIEF LIQUID PUMPS 5002 OGDEN PUMP

5003 A/B RAIN WATER PIT PUMPS FOR TANK AREA

CQ3

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 30 of 32

CRITICALITY RATING ASSESSMENT

Storage Tank & Flare ITEM NO. ST 5001 DESCRIPTION STEAM TURBINE FOR P-5001B
Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

2
TK 4501 PROPANE FEED BUFFER TANK

11

CQ3

2
TK 4801 PROPYLENE STORAGE TANK

11

CQ2

15

CQ2

TK

4802

OFF SPEC PROPYLENE STORAGE TANK

11

CQ2

5001

RAIN WATER PIT FOR TANK

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 31 of 32

CRITICALITY RATING ASSESSMENT

Electrical & Bulk Materials ITEM NO. Electrical DESCRIPTION TRANSFORMER SWITCHGEAR Electrical Cable Instrument STD Control Valve Safety Relief Valve Field Instruments Analyzers Fire Protection System Instrument Cables Instrument Bulk Materials(Primary & Secondary) Valves Spring Belllows Gasket, Bolts etc Steel Structure HVAC Building Air Conditioning
Personnel Safety Stand-by Availability Environmental Impact Design Maturity Manufacturing Process Complexity Engineering Interface Data Importance, Cost, Size Total Score Commodity Complexity QUALITY _CODE

Piping

1 1 1 1 3 1 1 3 1 1 1 1 1 1 2 2

1 1 1 2 3 1 2 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2 2 1 2 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 2

1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2

1 1 2 2 2 1 2 1 3 1 2 2 2 2 2 2

8 8 8 10 12 7 10 9 9 7 8 8 8 8 10 11

B B E B B E B A E E E E E E E E

CQ3 CQ3 CQ4 CQ2 CQ2 CQ4 CQ2 CQ2 CQ4 CQ4 CQ4 CQ4 CQ4 CQ4 CQ4 CQ4

Attachment 2 to 3408-YZ-PC-0006 Is. 03 Project Material Criticality Assessment Plan

Page 32 of 32

You might also like