You are on page 1of 27

COMPANY PROPRIETARY INFORMATION

g GE POWER SYSTEMS

Gas Turbine Service Manual

MS6001FA GAS TURBINE MECHANICAL INSTALLATION & MAINTENANCE CLEARANCE FORMS (DN436)

Issued by: PGSE

Authorized by: Power Generation Services Engineering

Date Issued: April 30, 1996

COMPANY PROPRIETARY INFORMATION

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 2
April 30, 1996

NOTICE OF INTENT This document provides information concerning the major tasks and typical responsibilities associated with the installation of GE supplied equipment. It describes much of the overall scope of unit installation, but does not detail specific methods used to complete each activity. The primary purpose of this document is to provide an overview of the installation process for this unit type in typical configurations available at the time of publication. Subsequent design advances or changes in configuration may not be reflected in this guide. This document does not purport to cover all aspects of a particular installation. Unit-specific details are provided in the document and drawing packages supplied with each requisition per contract of sale. All sketches, descriptions, and dimensions are to be considered Typical of this type of unit. This document is the property of General Electric and is considered Company Proprietary Information.

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 3
April 30, 1996

Contents
Figure # 1 2 3 4 5 6 7 8 9 10 11 12 Form name Turbine to Load Gear Alignment Form Generator To Load Gear Alignment Form Starting Means/Generator Alignment Form Load Gear Foundation Locking Devise Form Generator Foundation (Collector End) Locking Device Form Generator Foundation (Load Gear End) Locking Device Form Turbine Aft Support Leg Drop Check Form Aft Turbine Gib Block Bolt Setting (as found) Form Aft Turbine Gib Block Bolt Setting (as left) Form Front Turbine Gib Block Bolt Setting (as found) Form Front Turbine Gib Block Bolt Setting (as left) Form Turbine (inlet end) Foundation Locking Device Form Page # 4 5 6 7 8 9 10 11 12 13 14 15

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 4
April 30, 1996

6FA TURBINE TO LOAD GEAR ALIGNMENT REPORT FORM

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 5
April 30, 1996

Figure 1

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 6
April 30, 1996

7A6 GENERATOR TO LOAD GEAR ALIGNMENT REPORT FORM

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 7
April 30, 1996

Figure 2

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 8
April 30, 1996

STARTING MEANS/GENERATOR ALIGNMENT REPORT FORM

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 9
April 30, 1996

Figure 3

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 10
April 30, 1996

LOAD GEAR FOUNDATION LOCK DEVISE READINGS REPORT FORM

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 11
April 30, 1996

Figure 4

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 12
April 30, 1996

7A6 GENERATOR FOUNDATION CENTERLINE DEVICE REPORT FORM

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 13
April 30, 1996

Figure 5

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 14
April 30, 1996

7A6 GENERATOR FOUNDATION CENTERLINE DEVICE REPORT FORM

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 15
April 30, 1996

Figure 6

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 16
April 30, 1996

AFT TURBINE SUPPORT LEG SHIM PACK READINGS REPORT FORM

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 17
April 30, 1996

Figure 7

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 18
April 30, 1996

AFT TURBINE GIB BLOCK BOLT SETTINGS (AS FOUND) REPORT FORM

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 19
April 30, 1996

Figure 8

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 20
April 30, 1996

AFT TURBINE GIB BLOCK BOLT SETTINGS (AS LEFT) REPORT FORM

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 21
April 30, 1996

Figure 9

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 22
April 30, 1996

TURBINE GIB BLOCK BOLT SETTINGS (AS FOUND) REPORT FORM

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 23
April 30, 1996

Figure 10

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 24
April 30, 1996

TURBINE GIB BLOCK BOLT SETTINGS (AS LEFT) REPORT FORM

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 25
April 30, 1996

Figure 11

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 26
April 30, 1996

GAS TURBINE FOUNDATION LOCK DEVISE READINGS REPORT FORM

GE Power Generation Service Engineering

COMPANY PROPRIETARY INFORMATION

PGSE
Subject

Gas Turbine Service Manual

g
MS6001FA Gas Turbine Mechanical Installation & Maintenance Clearance Forms
No.

DN436
Page 27
April 30, 1996

Figure 12

GE Power Generation Service Engineering