National Iranian Oil Company
Graduations: BS in Mechanical Eng. & MS in Industrial Eng. Main experinces : Project Management and Project control 4 years as a project valuator in NIOC Corporate planning
9758
20978
36448
340 0 10302 13838 1360 2720 9758 544 544 0 544 544
1802 340 19720 27268 374 7752 19142 578 578 0 -1258
1258
170
AMAK Project
Problem:
Production Unit
Ahwaz1 Ahwaz2 147,560 Ahwaz3 Maroon3 Ab-Teymoor Kupal Mansuri 14,890 40,180 42,980 47,270 15.3 25.3 19.8 40.3 43.5
Total
292,880
241
AMAK Project
Problems:
AMAK Project
Solution :
Gathering, compressing, dehydrating & sweetening of the sour associated gases which are being flared in seven production units and transfer of the sweet gas to NGL plants (NGL700,800) and the acid gas to the petrochemical complex (RAZI).
AMAK Project
Environmental Aspects:
Stop flaring and wasting 241 MMSCFD of associated gases which contain 18,400 ppm of Hydrogen Sulfide Stop emission of 18,000 ton/day as polluting material Stop wasting of 640,000 m3 /hr of the atmospheric oxygen
AMAK Project
Opportunities :
Product Lean Gas Propane butane Naphta sulfur Unit MMSCFD b/d b/d b/d Ton/d Total 182 9450 6560 5280 180
AMAK Project
Opportunities :
Product
Yearly Product Value I.R.R P.B.P NPV @ 6%
Unit
MMUSD % month MMUSD
Amount
210 28 30 687.7
AMAK Project
Cost Estimate:
AMAK Project
AMAK Project
Kharg and Bahregansar Assoc. Gas Gathering & NGL Recovery Project
Kharg and Bahregansar Assoc. Gas Gathering & NGL Recovery Project Problems:
Offshore Flaring
Field
Bahregansar (Offshore) Soroosh Aboozar (Offshore) Nowrooz Foroozan Total
Associated Gas, Oil MMSCFD Production, bpd 60,000 40 100,000 200,000 90,000 100,000 550,000 13 56 38 150 297
Kharg and Bahregansar Assoc. Gas Gathering & NGL Recovery Project Problems:
Onshore Flaring
Prod. Unit
Oil Associated Production, Gas, MMSCFD bpd 100,000 265 (Included) 110,000 (Included) 249 (150) (120)* 244
Total
210,000
* After commissioning the NGL Plant sales gas will be delivered to injection plant
Kharg and Bahregansar Assoc. Gas Gathering & NGL Recovery Project Problems:
Norooz and
Bahregansar
Foroozan
1%
Aboozar
10%
Soroosh
0%
2%
Dorood 2
24%
63%
Kharg and Bahregansar Assoc. Gas Gathering & NGL Recovery Project Problems:
Aboozar 7%
Soroosh 3%
Kharg and Bahregansar Assoc. Gas Gathering & NGL Recovery Project Opportunities:
Product
Sales Gas Ethane Propane Butane Pentane Condensate Total , MMUSD/yr Unit MMSCFD ton/day ton/day ton/day b/day b/day Tot. 262 2250 2195.8 1251.8 2443 4811 Income MMUSD/Yr 66.941 54.093 324.594 185.504 26.750 61.640 719.343
Kharg and Bahregansar Assoc. Gas Gathering & NGL Recovery Project Solution :
Kharg Island
150 MMSCFD
20
Foroozan
150 MMSCFD 147 MMSCFD
26
Soroosh
13 MMSCFD
Bahreganser
40 MMSCFD
16
Aboozar(AB)
56 MMSCFD
8 14
Nowrooz
38 MMSCFD
12 AA
AC
Kharg and Bahregansar Assoc. Gas Gathering & NGL Recovery Project Solution :
Project elements:
1 - Offshore Gas Gathering 2 - Onshore Gas Gathering 3 - Feed Gas Compression 4 - Acid Gas Removal 5 - Acid Gas Injection 6 - Gas Dehydration 7 - NGL Plant 8 - Product Sweetening 9 - LPG Storage 10 - LPG Loading
Solution :
Sales Gas Ethane Propane Onshore Gas Compression (2 x 50%) Mercury Removal Acid Gas Removal Dehydration NGL Recovery Butane Storage and Loading Pentane Refrigeration (1 x 100%)
Disposal Well
Condensate
Compression (2 x 50%)
Mercury Removal
Dehydration
NGL Recovery
Kharg and Bahregansar Assoc. Gas Gathering & NGL Recovery Project Solution :
Kharg and Bahregansar Assoc. Gas Gathering & NGL Recovery Project
Cost Estimate: Onshore Facilities : 1200 MMUSD Offshore Gas Compression Platforms: 66.72 MMUSD Offshore Pipeline: 89.77 MMUSD
Kharg and Bahregansar Assoc. Gas Gathering & NGL Recovery Project Project Scheduling:
Kharg and Bahregansar Assoc. Gas Gathering & NGL Recovery Project Project environmental result:
N NE
30% 20% 10%
Calm 34.00%
SW S
11-16 m/s 7-10 m/s 4-6 m/s 1-3 m/s
SE
Scale 10%
4000
5000
NOx Emission
GAS, 16 (Existing) GAS, 10 (Existing) 21.5 MMSCFD OIL, 18 OIL, 16 75,000 bpd 100,000 bpd 87 MMSCFD
Nasr-PP
Sirri-E
Propane Butane Compression (1 x 100%) Acid Gas Removal Dehydration Mercury Removal NGL Recovery Pentane Condensate
Refrigeration (1 x 100%)
Cost Estimate:
Siri to Qeshm Pipe line Project: Siri to Kish Pipe line Project: Siri NGL Plant Project: Kish Compression Station Project
Project Scheduling:
Executed
Siri to Qeshm Pipe line Project : Executed Siri NGL Plant Project :
40 Month - Ongoing
Siri Assoc. Gas Gathering & NGL Recovery Project Project environmental result:
155 160 140 120 100 80 60 40 20 0 Befor After 4
NOx (gr/sec)